RFP W56HZV-20-R-L805 (Zone 3 Pierside) .pdf

PDF 834 KB Posted

Attached to
AWSM Zone 3 Solicitation - Amendment 0004 Federal contract opportunity
Solicitation number
W56HZV-20-R-L805
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

This is a request for proposal for an indefinite delivery/indefinite quantity contract to provide pier-side maintenance, repair, modification and modernization services for the U.S. Army vessel fleet. The Army Contracting Command - Detroit Arsenal will issue task orders over five years for work at locations specified in each order. Services will include repairs, installations, testing, certifications and towing. Responses are due by the date and time listed on the cover page. Evaluation will be based on criteria in each task order request, which may include technical approach, experience, past performance or cost. A small business subcontracting requirement and NAICS code may be included at the task order level.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W56HZV20RL805 12-Mar-2020

b. TELEPHONE NUMBER

586-282-3902

8. OFFER DUE DATE/LOCAL TIME

05:00 PM 13 Apr 2020

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W56HZV9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

CHRISTOPHER M. MURPHY

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL MI 48937-5000

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$41,500,000

NAICS:

488390

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF104

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W56HZV20RL805

Section A - Solicitation/Contract Form

SUPPLEMENTAL INFORMATION

A.1 Electronic Contracting

(a) All Army Contracting Command – Warren solicitations will be publicized on the System for Award Management website (https://www.beta.sam.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.

(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via beta.SAM.gov/.

(c) Requirements for the online beta.SAM bid submission:

(1) Vendors must log into beta.SAM.gov to be able to submit electronic responses for opportunities.

(2) Vendors must be registered in beta.SAM at www.beta.sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).

(3) Once logged into beta.SAM, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.

(4) beta.SAM will send an email to vendor’s registered email address confirming the electronic submission.

Note to offerors:

(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.

(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

(f) Solicitations may remain posted on beta.SAM after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.

(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Government’s intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website at http://www.aptacus.

org/ to locate a regional center.

A.2 ACKNOWLEDGEMENT OF AMENDMENTS

Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

Amendment Number: Date:

A.3 ARMY CONTRACTING COMMAND – WARREN (DTA) OMBUDSPERSON

Information regarding the Ombudsperson for this contract is located at the following website:

http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html

A.4 PROGRAM: ARMY WATERCRAFT SUSTAINMENT MAINTENACE (AWSM) EXECUTIVE SUMMARY

The information below describes the planned acquisition approach for the AWSM program. The solicitation, clauses, Performance Work Statement (PWS), and associated information is posted on Beta.SAM.gov website under solicitation W56HZV-20-R-L805. The Government will post all changes, amendments, and updates to the solicitation, as well as answers to questions generated by industry on this site up until the deadline for receipt of proposals.

AWSM PROGRAM OVERVIEW

The Army Watercraft Sustainment Maintenance (AWSM) program consists of three zones. Zone 1: CONUS Requirements, Zone 2: OCONUS Requirements, Zone 3: Global pier-side requirements. Each zone will be solicited separately.

The U.S. Army Contracting Command-Detroit Arsenal (ACC-DTA), issues this Request for Proposal (RFP) W56HZV-20-R-L805 for the Army Watercraft Sustainment Maintenance (AWSM) contract requirements in Zone 3:

Global pier-side requirements. The purpose of this service contracting effort will combine its pierside efforts for un-programmed maintenance, emergency repair, modification, and modernization efforts that do not require the use of a dry dock for U.S. Army vessels located anywhere in the world. The PD AWS modification, and modernization services will consist of all the materials and supplies for the application of Engineering Change Proposals (ECPs) and/or Modification Work Order (MWO) efforts.

Awards will only be made to offerors who are eligible for award as identified in M.1.2. For Zone 3, one criteria is a valid Master Vessel Agreement or Agreement for Boat Repair (ABR). For this requirement either an MVA or ABR are valid. The ABR is typically established for those contractors who can perform pier-side vessel repairs and overhauls as well as non-complex work on the US Army Vessel fleet. The Army Contracting Command – Detroit Arsenal (ACC-DTA) enters into Master Agreement for the Repair and Alteration of Vessels (hereinafter "MVA") with prospective contractors who desire ship repair work and who possess the organization and facilities to perform the work satisfactorily.

The MVA or ABR will be issued in accordance with Department of Defense Federal Acquisition Regulation Supplement (DFARS), Subpart 217.71, which defines the MVA as "... a written instrument of understanding, negotiated between a contracting activity and a contractor that - (A) contains contract clauses, terms, and conditions applying to future contracts for repairs, alterations, and/or additions to vessels; and (B) contemplates separate future contracts that will incorporate by reference or attachment the required and applicable clauses agreed upon in the master agreement."

The offeror shall provide a copy of their valid Master Vessel Agreement (MVA), Master Agreement for Repair and Alteration of Vessels (MARAV) or ABR package. Offerors without a valid MVA or ABR that possess the necessary qualifications to perform ship repair work may request to have their facilities and capabilities evaluated and certified in order to obtain an MVA. Instructions and requirements for submitting a request for an MVA certification can be found by visiting https://beta.sam.gov and searching for AWSM Zone 3. Packages shall be submitted 15 days prior to the closing date of the solicitation to allow for proper assessment of the offerors application and execution of the MVA.

A.5 Definitions: As used throughout this contract, the following words are defined:

A.5.1 Abrasive Blast to Near White Metal: Clean surfaces to SSPC-SP10, NACE No. 2, Swedish Sa 1 ½ standard, 95% free of mil scale, rust, paint, staining or discoloration of the material surface, remaining 5% of surface area may contain randomly dispersed paint and staining residue.

A.5.2 Abrasive Blast to White Metal: Clean surfaces to SSPC-SP5, NACE No. 1, Swedish Sa 3 standard, 100% free of mill scale, rust, paint, staining or any discoloration of material surface.

A.5.3 Appendage: A general term for any part projecting from the underwater portion of the hull such as shaft bossings, bar keel, bilge keel, propeller struts and skegs.

A.5.4. Definite Item: Known work that shall be diligently prosecuted upon issuance of delivery order.

A.5.5. Exchange: Replacement of an item with a like item.

A.5.6. Furnish: The Contractor shall provide what is needed at the Contractor's expense, as part of the work item price. All parts shall be new, unless the specification allows for a reconditioned item.

A.5.7. Hand Tool Clean: Clean surfaces to SSPC-SP2, Swedish St 2 standard, free of all loose paint, scale, rust and debris, utilizing hand tools.

A.5.8. Indefinite Item: Work to be accomplished only upon the written approval of the Contracting Officer.

Activation of an indefinite item does not entitle the Contractor to an extension of the performance period.

A.5.9. Marine Surveyor: The person who acts as the Contracting Officer's Representative (COR)

A.5.10. New Item: A new item is an item of work and/or material which is found during the period of performance and is required in order to deliver a seaworthy vessel.

A.5.11. Power Tool Clean: Clean surfaces to SSPC-SP3, Swedish St 3 standard, free of all loose paint, scale, rust and debris, utilizing power tools or to SSPC-SP11 to “near white” surfaces when indicated in the specification..

A.5.12. Qualified Manufacturer’s Repair Technician: A person who has received training and has a current certification by the manufacturer enabling the individual to properly inspect, troubleshoot, diagnose, adjust and perform repairs to that specific equipment/component.

A.5.13. Recondition: The elimination and/or correction of those defects and/or conditions that, determined by the item manufacturer's standards, would adversely affect a used item in its continued service, by work on that item, resulting in a serviceable finished item with all tolerances and dimensions remaining within the manufacturers allowable wear limits and/or variance for the intended service.

A.5.14. Reinstall: To place back in designed position, remount and reconnect.

A.5.15. Renew: Put in a new item, unit or part as required by technical specifications. The Contractor will be compensated at cost for the item, unit or part to be renewed.

A.5.16. Repair: To restore an item or system to a sound condition by the performance of work on that item or system.

A.5.17. Replace: To supply an equivalent new item for the item to be replaced, to furnish and install.

be defined as requiring total removal of all visible and accessible rust, including loose and hard scale, to bare metal.

Additionally, unless a method is specified, the Contractor shall determine and use any method of rust removal necessary to accomplish the task, and all bare metal surfaces exposed by the de-rusting process shall be properly and adequately primed.

A.5.18. SSPC: Steel Structures Painting Council standards.

A.5.19. Surface Cleanliness: SSPC standards for surface cleanliness is the condition of the substrate after cleaning has removed partial or total residues of chloride, soluble ferrous salts and sulfate contamination. The acceptable standard of cleanliness in this specification is SC-2.

A.5.20. Surface Profile: All abrasive blasted, water jet cleaned, power tool cleaned or hand tool cleaned surfaces shall have a measurable surface profile upon completion of cleaning. The actual measured profile readings shall be included in the Test and Inspection sheets for the surface areas cleaned and painted. The surface profile shall meet the SSPC standards for surface profile before application of primer paints.

A.5.21. Tug: Vessel powered, designed, built and equipped for towing.

A.5.22. Water Jetting: Using ultra high-pressure (UPH-WJ) to SSPC-SP12 standard to achieve a near white blast, standard WJ-2.

SECTION A NARRATIVE

Army Contracting Command- Detroit Arsenal (ACC-DTA) intends to award a new five-year Multiple Award (MA) Indefinite Delivery Indefinite Quantity (IDIQ) contract for the follow-on efforts for the Watercraft Inspection Branch and Army Watercraft Systems Product Directorate to combine its shipyard efforts to efficiently execute un-programmed maintenance, emergency repair, modernization and modification efforts for its existing fleet of vessels in Zone 3 (Pierside). These efforts will include Engineering Change Proposals (ECPs), Modification Work Orders (MWOs), and Modernized Integrated Bridge Systems (MIBS).

This effort will be broken up into three zones;

Zone 1: CONUS (including Hawaii and Alaska) Zone 2: OCONUS Zone 3: Pier-side

The offeror shall provide a copy of their valid Agreement for Boat Repair (ABR), Army Master Vessel Agreement (MVA) or Master Agreement and Alteration of Vessels (MARAV) package. Offerors without a valid ABR or MVA that possess the necessary qualifications to perform ship repair work may request to have their facilities and capabilities evaluation and certified in order to obtain an ABR or MVA. Instructions and requirements for submitting a request for a certification can be found by visiting https://beta.SAM.gov and searching for AWSM Zone 3. Packages shall be submitted 15 days prior to the closing date of the solicitation to allow for proper assessment of the offerors application and execution of the certification.

SECTION A CLAUSES

AS7526

A.__NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION (FPCON)

Contractor is hereby notified that there is a potential impact on contractor performance on during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.

Section B - Supplies or Services and Prices

SECTION B NARRATIVE

NOTICE—CLIN CONTRACT TYPE: Due to contract administration system requirements, the CLIN CONTRACT TYPE states “Firm‐Fixed Price” however, each individual task order placed against the AWSM Pierside Contract will establish its own CLIN structure and type specific to individual requirements.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot Pierside Watercraft Services

FFP

Duration of Ordering Period: The ordering period shall run from the date of award through 1,824 calendar days after contract award.

NOTE: IAW Section H.2 THE LABOR RATES PROPOSED FOR AN

INDIVIDUAL TASK ORDER SHALL NOT EXCEED THE CEILING RATES

ESTABLISHED IN ATTACHMENT 0003 - PRICING LABOR MATRIX FOR

THE CALENDAR YEAR IN WHICH THE SERVICE IS PERFORMED.

FOB: Destination

NET AMT

Section C - Descriptions and Specifications

SECTION C.

PIER SIDE MAINTENANCE, REPAIRS AND MODIFICATIONS TO THE US ARMY ACTIVE, ARMY

PRE-POSITION STOCK AND RESERVE VESSELS AT HOME STATION AND IN FORWARD

OPERATING AREAS

SECTION C:

C.1.0 General Information The purpose of this contract is for the contractor to provide pier side repairs on the Army Vessel Fleet, identified in Exhibit B, and deliver fully mission capable vessel(s). The contractor shall furnish all labor, materials, and equipment to accomplish the pier side requirements identified in the applicable task order(s); and provide vessel certifications to the US Army Active and Reserve Vessels.

C.1.0.1 The contractor, as an independent contractor and not as an agent to the Government, shall only perform work under this contract to the extent authorized by written task orders signed and provided by the Contracting Officer (CO). Work authorized by task orders shall in no case require or constitute personal services as defined in the Federal Acquisition Regulation (FAR 37.104).

C.1.0.2 Scope The contractor shall be able to perform maintenance, repairs, and modifications to the following systems, on any of the US Army’s vessel fleet, in attachment 0001.

(a) Mechanical Systems

(b) Electrical Systems

(c) Electronic Systems (Command, Control, Communications, Computer, Intelligence and Surveillance and Reconnaissance) (C4ISR)

(d) Air Conditioning Systems

(e) Hydraulic Systems

(f) Fuel Systems

(g) Piping Systems

C.1.0.3 Services specified in individual task orders may include effort either singly or in any combination as identified in the task order. Such services will fall into one or more of these categories:

(a)Troubleshooting of failed components and systems (b)Fabrication of parts in support of repair, installation, or modification

(c) Replace obsolete equipment/systems

(d) Add new capability to meet operational needs requirements

(e) Welding

(f) Painting/coatings

(g) Install machinery (h)Testing of equipment to verify functionality, verify adequacy of repairs, or support certifications (i)Support of Government and third party tests (j)Repair, modification, or installation of new or replacement parts and systems (k)Annual Certifications (l)Towing the vessel

C.1.0.3.1. Troubleshooting and evaluation. The contractor shall troubleshoot parts, components, or systems.

Contractor shall document all defects, including causes of failure, if determined during troubleshooting, found on all components of the equipment or system, including the hardware and software identified in the task order, to determine the best method of repair. The contractor shall submit the findings and recommended repairs IAW CDRL A008, repair assessment.

C.1.0.3.2. Fabrication, repair, modification, and installation. The contractor shall perform all repairs to a failed component, part, or system, or modify, fabricate, or install parts, systems, or equipment, in accordance with Government Technical Manuals, manufacturer’s manuals or technical information, applicable technical data package(s), or other appropriate documentation.

C.1.0.3.3. Testing of equipment to verify functionality, verify adequacy of repairs, or support certifications. The contractor shall perform testing, or support and witness tests performed by a third party. Testing may include operation of equipment to verify that repairs or modifications have been completed satisfactorily, load testing or other testing to support certification or recertification of vessel systems or equipment, or other test activities as defined by the task order that can be accomplished pier side. The specific test requirements will be in the task order.

C.1.0.3.4. Certification. Contractor may, by task order, be required to obtain certification or recertification of vessel systems or equipment.

C.1.0.3.5. Towing. Contractor may, by task order, be required to tow the vessel to its facility or to another facility suitable for pier side repairs, modifications, installations, or other work to be performed under this contract.

C.1.0.4 Recognized Holidays.

The contractor shall not schedule interfacing work (meetings, approvals, deliveries, etc.) with the Government on any of the recognized holidays in federal services, or any other day designated as a holiday by Federal Statue or by Executive Order except with prior approval from the Contracting Officer. If a holiday falls on a Saturday the official holiday will be celebrated the preceding Friday. If a holiday falls on a Sunday, the official holiday will be celebrated the following Monday.

New Year's Day Martin Luther King Jr.'s Birthday President's Day Memorial Day Independence Day Labor Day Columbus Day Veteran's Day Thanksgiving Day Christmas Day C.1.0.5 Place of Performance. The applicable task order will identify the required place of performance. Task orders may require work pier side at any Government or private facility where vessels are located or able to be moved.

C.1.0.6 Contractor Travel.

Contractor will be required to travel CONUS and OCONUS during the performance of this contract. The contractor may be required to travel to off-site locations in support of this PWS. Contractor will be authorized travel expenses consistent with the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires Government approval and authorization and notification to the COR prior to initiating travel.

C.1.0.7 Specialized Watercraft Information The contractor shall comply with all applicable regulations and standards including: Department of Defense (DoD) regulations, Army Regulations (AR) 56-9, Watercraft, Code of Federal Regulations (CFR) Title 46, Technical Bulletin (TB) 043-144, American Bureau of Shipping (ABS) Rules, and discharge standards.

C.1.1 Response Time:

C.1.1.1. Emergency work. Emergency repairs are defined as those that make a vessel non-mission capable, or operationally limited, and which require immediate repairs that can be accomplished pier side. Unless otherwise specified, the contractor shall provide a response to an emergency task order within three calendar days. Contractors choosing not to submit a task order proposal to an emergency task order shall provide a “no-bid” response with three calendar days.

C.1.1.2. Programmed, Un-programmed and Modification work. Includes any repair that limits vessel operation and work covered under this contract that are not emergency repairs as defined in C.1.1.1. Unless otherwise specified, the contractor shall provide a response to a task order within 14 calendar days.

C.1.2. Provisioning Performance Schedule.

C.1.2.1. The contractor shall prepare and submit a provisioning performance schedule (referred to as schedule) to the Contracting Officer for approval in accordance with CDRL A001 for each task order. The schedule shall show work listed by individual item, and showing the order in which the contractor proposes to perform the work, and the dates on which the contractor projects starting and completing the work (including acquiring the material). All updates shall identify the actual start date of each item, actual completion dates, and clearly identify the impact on all critical path items that impact completion of the project. If the contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of payments until the contractor submits the required schedule and the Government accepts the schedule.

C.1.2.2. The contractor shall keep the schedule current by making entries to include added or deleted items of work or changes in scheduled dates, and upon doing so shall deliver the updated schedule electronically to the Contracting Officer for approval during the performance of each task order. An updated schedule shall be provided to the COR and the Contracting Officer IAW CDRL A001. In the event of a significant change in schedule, a revised schedule shall be submitted to the Contracting Officer within two days.

C.1.2.3. In the event of schedule delays, the contractor shall immediately notify the Contracting Officer’s Representative (COR) and the Contracting Officer by e-mail. The contractor shall detail the reasons for the schedule delay, proposed corrective action(s), and submit a revised schedule to the COR and Contracting Officer.

The Government reserves the right to review and approve or disapprove any contractor proposed changes that affect the contract and task order schedules. Any request for PoP extension shall be requested in advance of the completion date established in the task order. Any revisions to the schedule shall show the original start and completion dates, in addition to the amended dates, for each item of the contract.

C.1.2.4. Extensions: All requests for an extension shall be submitted in writing to the Contracting Officer. The Contracting Officer is the only authority who can authorize an extension to the PoP. The request shall include what efforts were taken to prevent asking for an extension

C.1.2.5. Extensions for severe foul weather will be considered provided the production schedule clearly indicates that the severe foul weather as defined by the five-year norm for that month, or other circumstances impacted work along the critical path. The contractor shall submit the request to the Contracting Officer, in writing, and shall include weather data for the preceding five (5) years. The Contracting Officer will coordinate with the COR on site to determine the impact of the severe foul weather or other circumstances on the contractor's progress. The severe foul weather must occur within the performance period, or any extension, before it will be considered by the Contracting Officer.

C.1.2.6. Extensions for long lead time items shall be submitted in writing to the Contracting Officer within seven calendar days of task order award. Long lead time material is considered any material that has a lead time which exceeds the PoP of the task order. If requesting an extension for long lead time items, include evidence to indicate the date the items were ordered, as well as supporting documentation from the supplier(s) stating the cause and length of delay. In addition, provide quotes or other documentation (which can be in the form of a statement), that the long lead time items could not be obtained faster from another source or were not available from another source.

Failure to be diligent in obtaining items can be cause for denial of an extension. Internal contractor ordering documents such as purchase orders shall have the hull number and contract number annotated on each page.

C.1.3. Vessel Modifications. The contractor shall install, modify or upgrade vessel equipment or systems, in accordance with applicable Modification Work Orders (MWO), Technical Data Packages, Equipment Improvement Reports (EIR), Maintenance Digest Articles, and Technical Bulletins (TB).

C.1.4 Vessel Repair. The specified maintenance required to correct materiel damage or failure, as required to restore the basic and/or end item, assembly, or subassembly to the normal materiel condition.

C.1.5 Vessel maintenance. Cyclic, normal overhaul, and/or rebuild. Also includes the disassembly, testing, and inspecting of the operating components and the basic structure to determine and accomplish the necessary rework, replacement, and servicing required to obtain the desired performance and permit the return of a fully mission capable vessel in accordance with maintenance standards established for each item of equipment.

C.1.6. Request for Variance: The contractor shall not deviate from the requirements of any documentation describing the work to be performed, unless written permission is obtained from the Contracting Officer. If the work cannot be performed in the manner prescribed, due to existing vessel conditions, conflicting requirements, or other issues. Requests for Variance shall be submitted IAW CDRL A009.

C.1.7 Part Standardization: In order to have uniformity among US Army Vessel(s), installed equipment is sometimes shown as being manufactured by a particular manufacturer, with a set part number or National Stock

Number. This specific identification can be in the specifications, the drawings or the vessel technical manuals.

There shall not be any substitutions for those pieces of equipment unless the request for variance is submitted to the Contracting Officer and approval for the substitution is granted

C.1.8. Modification Completion Report: The contractor shall create a modification completion report for each vessel upgraded under the task order. The report shall include vessel number and a list of modifications. The modification completion report shall be submitted IAW CDRL A006.

C.2. The contractor shall conduct inspections IAW their Quality Control System/Plan to assure the service operations performed by them, or by a subcontractor, are accomplished economically and in accordance with the standards set forth in this contract.

C.2.1. Deviation from the task order defined Acceptable Quality Level (AQL), acceptable performance level, may result in price and payment contract deductions. All areas of contract performance will be measured by the Government.

C.2.2. Government Quality Assurance: The contractor shall self-certify that all contractually required work has been performed and meets or exceeds the minimum quality standards for the work.

C.2.2.1. The Government will audit the contractor’s performance to assure contract compliance. Additional audits shall be based on customer feedback or COR observations.

C.2.2.2. The Government reserves the right to inspect contractor performance with Government audit agencies such as Internal Review & Audit Compliance (IRAC); Inspector General (IG); Army Audit Agency (AAA); and the Government Accounting Office (GAO) at any time.

C.2.2.3 Deviation from the task order defined Acceptable Quality Level (AQL), acceptable performance level, may result in price and payment Contract deductions. All areas of contract performance will be measured by the Government.

C.3. WARRANTIES AND REPAIRS

C.3.1. Pass-through warranty. The contractor shall pass through all warranties on any purchased equipment installed or delivered under a task order. The contractor shall maintain documentation of all warranties.

C.3.1.1. The contractor shall maintain a warranty file on all equipment installed under each task order. The warranty file shall include all documentation of warranties on any equipment delivered or installed under the task order. The contractor shall maintain documentation of communications with vendors, manufacturers or other contractor’s pertinent to specific warranties and shall include all such documentation in the warranty file. The documentation shall be fully completed so that it can be used as a valid reference for the CO’s use, i.e. date and time; person initiating, person called; nature of the problem; and the contractor’s response and resolutions. The contractor shall deliver the warranty file upon completion of the task order in accordance with CDRL A006.

C.3.1.2. Workmanship warranty. The contractor shall warrant all work performed under each task orders for no less than 90 days from the end of the task order PoP. Any failure of repaired or modified equipment occurring due to workmanship of the contractor during the warranty period shall be repaired or replaced at the contractor’s expense.

Additionally, equipment improperly installed by the contractor that fails within a manufacturer’s warranty period due to poor workmanship or failure to follow manufacturer’s installation or operating instructions shall be repaired or replaced at the contractor’s expense. This determination shall be made by the CO. The contractor shall report any difficulty in exercising manufacturer’s warranty to the COR and CO.

C. 3.1.3 Additional warranties. Task orders may require additional warranties for specific work. Such warranty requirements will be detailed in the applicable task order. For example, a task order may require a longer warranty on rebuild of major equipment, such as an engine, than would typically be provided under C.3.1.2 above.

C.4. Meeting Attendance and Support, and Reporting Requirements C.4.1. Task Order Kickoff Meeting The contractor shall host a telecom kickoff meeting for each task order. The kickoff meeting shall include the contractor personnel assigned to the tasks prescribed by the task order, the COR, the Contract Specialist, and any additional personnel identified by the COR prior to the kickoff meeting. The purpose of the task order kickoff meeting is to ensure all parties are aware of the latest information regarding the vessel and material availability and any other important developments regarding the task order. Kickoff meetings may be held in conjunction with other regularly scheduled meetings if applicable.

C.4.2. Meeting Minutes

Following the Start of each task order kickoff meeting, the contractor shall provide meeting minutes within two calendar days in accordance with CDRL A003.

C.4.3. Integrated Product Team (IPT) Meetings The contractor shall participate in all planning/implementation meetings (consisting of IPT and working group meetings) during the performance of a task order. In general, the IPT meetings will take place every two weeks in accordance with CDRL A003.

C.4.4 Contractors Progress, Status and Management Reports. The contractor shall provide weekly written status reports that describe the technical progress and status of task orders, action items, and outstanding issues or problems. These status reports shall be completed in accordance with the CDRL A007.

C.4.5. Materials shall be ordered immediately upon vessel arrival, unless identified as long lead time materials, which shall be ordered upon contract award to alleviate long lead time material extension requests. Material identified as option items shall be ordered immediately upon option exercise. The contractor shall submit invoices verifying material purchase within five days after purchase.

C.4.6 Access to Data. The contractor shall provide access to records and data generated in the course of performing an individual task order.

C.5. Over and Above Requirements

C.5.1. During performance of this contract, it is expected that issues may be identified which need to be resolved in order to meet performance of the Army Watercraft Sustainment Maintenance requirements, that are in the general scope of the contract, but that were not specifically included in the original contract scope of work. When directed by the Government, and when funding is made available by the contract modification, the contractor shall provide these services on an expedited basis. All requirements authorized under this provision shall be provided by the contractor in accordance with DFARS 252.217-7028 and this scope of work. Pursuant to DFARS 252.217-7028, the Government may modify these procedures as appropriate.

C.5.1.1 When requested by the Government, or when a need is identified by the contractor, the contractor shall submit a CR, in contractor format, to the CO and the COR.

At a minimum, the request shall include the following:

a. A description of the work to be performed;

b. Identification of the proposed procedure;

c. Replacement parts required (excludes GFP for pricing purposes only);

d. Estimated labor hours and/or material costs; and

e. An engineering assessment certifying the vehicle or component will meet the applicable specification following the work to be performed.

The contractor shall also submit all supporting documentation along with the CR. Before work can begin, it must be authorized by the CO and availability of funds must be verified.

C.5.1.2 The CO will, in coordination with the COR:

a. Verify the necessity of the work;

b. Verify the conformance of the contractors proposed method of modification or repair and approved modification or repair procedures;

c. Verify whether the contractors proposed designation and identification of the work as Over & Above is valid;

d. Determine whether an item will be repaired or replaced.

Normally an item will be replaced if the repair price is equal to or exceeds 65 percent of the replacement price;

e. Shall consider procurement lead time versus repair time in all repair or replace determinations; and

f. Agree to the estimated hours and/or estimated material costs.

C.5.1.3 As applicable under paragraph C.5.1.1 above, the CO shall notify the contractor within three (3) working days regarding whether the CR is authorized. Once such notification is received, funds shall be requested and a Contract modification executed by the CO. If the contract modification is not executed within five working days after notification of work request authorization, the contractor has no obligation to perform the work until such time as a properly executed modification has been completed. Upon receipt of the modification, the contractor shall bill against the funded CLIN.

C.5.2 It is understood and agreed to by both parties that the Government is not under any contractual obligation for the duration of the contract to acquire any specific quantity or services covered by the clause and no liability shall be incurred by the contractor or the Government in the event that no acquisitions are made.

C.5.3 The contractor shall maintain records, available for Government review, of the funds committed, expended, and disbursed under the clause for each requisition.

C.6. Security Requirements C.6.1. The contractor shall be responsible for safeguarding all Government equipment, information and property provided for contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

C.6.2. Protection of Vessel(s): The contractor is responsible for the protection of the vessel(s) while under tow and in its yard. The contractor must at all times have the vessel(s) secured and protected from fire, vandalism and theft.

C.7. Safety C.7.1. The contractor shall, within five days of the base award, prepare and submit a Safety Plan to the Contracting Officer for approval in accordance with CDRL A005.

C.7.2. The contractor shall be responsible for the control, accountability and safety of all employees and subcontracted employees, on any project associated with this this contract.

C.7.3. The contractor shall comply with all Federal, State, Local, and Facility safety regulations in Continental United States (CONUS), or in accordance with National, Prefecture, Facility, and Local or other applicable safety regulations Outside the Continental United States (OCONUS). The contractor shall ensure that all personnel entering contractor’s work area(s) are wearing the appropriate protective equipment (PPE) for the area(s). The contractor shall provide appropriate PPE for all Government personnel entering the contractor’s work area(s).

C.7.4. The contractor shall dispose of all waste products in accordance with Federal, State, Local and Facility regulations in Continental United States (CONUS), or in accordance with National, Prefecture, Local or other applicable regulations Outside the Continental United States (OCONUS).

C.7.5. In the performance of any burning, heating or welding required to accomplish the repairs specified in the individual task order, it shall be the responsibility of the contractor to provide a "gas free" or "safe for hotwork" certificate to the COR, in accordance with CDRL A005, certifying that all tanks and other adjacent areas in the way of repairs and alterations are free of gas and other fire hazards.

C.8. Damages The contractor shall be responsible for all damages to the vessel(s), its equipment and machinery incurred while the vessel(s) is under the contractor’s care, due to the contractors, its employees or its subcontractors’ negligence or failure to act to protect the vessel(s).

C.9. Contractor Furnished Items and Services C.9.1. The contractor shall furnish all supplies, equipment, tools, facilities and services required to perform work under this agreement; except for those items specifically stated to be government furnished in individual task orders, or that made be made available by the government for completion of work.

C.9.2. The contractor shall remove all equipment from the site of work on a government facility no more than two days after vessel completion. Vessel completion is defined as the point at which the Contracting Officer agrees all work has been completed within the terms of the contract.

C.9.3. The contractor shall display a company name, contact name and phone number on every piece of contractor furnished equipment listed in the routine equipment maintenance program.

C.9.4. The contractor shall obey all local laws regarding proper disposal of debris. The contractor shall dump waste in a Government approved site and comply with local environmental laws.

C.10 Certifications: Labor classifications (including skill levels) used for contract tasks shall be consistent with those found in the current Service Contract Act Directory of Occupations issued by the U.S. Department of Labor.

Work found to have been performed by unqualified employees shall be performed at the contractor’s own expense (including material costs) or, at the CO discretion; the contract price shall be reduced by an equitable amount.

C.10.1. Welder Certification: Welders must be certified for the types of metal and position of welding being performed with a minimum of three years’ experience relating to repair of vessels. Submit certification on award of order.

C.10.2. Quality Assurance Inspectors: Quality Assurance Inspectors shall have industry or OEM approved accreditation for the type of work or inspection process, applicable to the work item.

C.10.3. Machinery and Electrical Repair: Machinery and Electrical Repair Technicians shall have proof of training and experience for the machinery being repaired in the applicable work items

C.10.4. Blasters and Painters: Blasters and painters shall have the appropriate general skills training from either Society for Protective Coatings (SSPC) or National Association of Corrosion Engineers (NACE) for the work item requirements.

C.10.5. Documentation of all Certifications Documentations of all certifications shall be maintained as part of the contractor’s approved Quality Assurance/Quality Control Program. Such documentation should be available upon request by the Government Representatives designated by the CO.

C.11 Contractor Manpower Reporting C.11.1 Contractor Manpower Reporting (CMR). The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via secure data collection site. The contractor is required to completely fill in all required data fields in the format using the following web address: https://cmra.army.mil.

The required information includes the following:

(1) Contracting Office, CO, Contracting Officer's Technical Representative;

(2) Contract number, including task and delivery order number;

(3) Beginning and ending dates covered by reporting period;

(4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;

(5) Direct labor hours (including sub-contractors);

(6) Direct labor dollars paid this reporting period (including sub-contractors);

(7) Total payments (including sub-contractors);

(8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each subcontractor if different);

(9) Data collection cost;

(10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);

(11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);

(12) Presence of deployment or contingency contract language; and

(13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country).

C.11.2 Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2016. Contractors may direct questions to the help desk at: https://cmra.army.mil.

C.12 ANTI-TERRORISM (AT) AWARENESS TRAINING REQUIREMENT FOR CONTRACTOR

PERSONNEL TRAVELING OVERSEAS

Contractor employees and associated subcontractor employees shall receive government-provided Anti-Terrorism (AT) awareness training specific to the area of responsibility (AOR) as directed by AR 525-13. Specific AOR training content is to be directed by the combatant commander, with the unit Anti-Terrorism Officer (ATO) being the local point of contact.

C.13 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

(a) The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 “Personal Identity Verification of Contractor Personnel”) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

(b) For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal Management.

(c) For contractors that do not require CAC, but require access to a DoD facility or installation.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .