This is a Request for Proposal (RFP) issued by the City of Duluth, Georgia for the Booster Pump Station Interior Demolition and Improvement Project located at 2407 Main Street, Duluth, GA 30096. The project involves the removal and proper disposal of pumping equipment, above-grade piping and conduits, installation of blind flanges on walls, filling of floor pipes and bulkhead with concrete flush to the floor, removal of existing transformers and installation of new transformers, removal of electrical switchgear, variable frequency drives (VFDs), control panels and associated conduit and wiring, removal of electrical equipment pads and conduits, and refinishing of damaged flooring. A mandatory pre-submittal meeting is scheduled for August 5, 2026 at 10:00 a.m. at the project site. Sealed proposals must be received by 11:00 a.m. on August 19, 2026, with formal opening and bid reading at 11:01 a.m. the same day at Duluth City Hall. The successful bidder shall commence work within ten calendar days of receiving a Notice to Proceed, with an anticipated start date of October 12, 2026, and must complete all work within a sixty-day time period. Questions regarding the project must be submitted in writing by August 7, 2026 at 5:00 p.m., with responses posted by August 10, 2026.
Pricing is based on unit prices for each line item as shown in the bid form, with all costs including materials, labor, tools, equipment, and miscellaneous items necessary for completion. A bid bond of not less than five percent of the base bid amount must accompany each proposal, and the successful bidder must provide performance and payment bonds of one hundred percent of the contract amount. Liquidated damages are assessed at five hundred dollars per calendar day for work not completed within the agreed-upon schedule. Contractors must maintain a permanent place of business, have operated under their current corporate name for at least two years, possess sufficient bonding capacity, and demonstrate no defaults or bankruptcies within the past ten years. At least one project management personnel with two years of experience on similar projects must be designated as the Project Superintendent and remain on-site during all construction activities. Evaluation of proposals will be based on bid cost (up to 70 points), written project approach and schedule (up to 15 points), and resumes and references (up to 15 points), with the highest-scoring proposal recommended to City Council for award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP PH2026_03 _ Pump House Demo _ AD.pdf | ||
| RFP PH2026_03 _ Pump House Demo _ PLANS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request For Proposal
RFP No. PH 2026-03
Booster Pump Station Building Interior Demolition and Improvement Project
2407 Main Street Duluth, GA 30096
City of Duluth
3167 Main Street
Duluth GA 30096
City of Duluth Booster Pump Station Interior Demolition and Improvement Plan
2 | P a g e
REQUEST FOR PROPOSAL
Sealed proposal packages will be received by the City of Duluth (Owner) until 11:00 a.m. legally prevailing time on August 19, 2026 for:
Booster Pump Station Interior Demolition and Improvement Project
Location: 2407 Main Street Duluth, GA 30096
Proposal packages will be formally opened and the total bid from the bid form will be read aloud at 11:01a.m. legally prevailing time on August 19, 2026, in the second-floor executive conference room of Duluth City Hall, located at 3167 Main Street, Duluth, GA 30096.
THIS WILL BE A PACKAGE OPENING AND BID READING ONLY. No determination as to the most qualified or highest-ranking proposal will be made until a thorough evaluation has been completed by the City of Duluth’s evaluation team, and the evaluation team’s recommendation is approved by City Council.
For purposes of this Request for Proposal (RFP), the terms “Proposer”, “Bidder”, and “Contractor” will be used interchangeably, and are intended to refer to the entity submitting the proposal package.
Contractor shall provide one (1) original, two (2) copies of the complete submittal package and one (1) thumb drive with the submittal information. All items must be submitted in a sealed package, addressed to City of Duluth (OWNER). Each sealed package containing the items must be plainly marked on the outside as follows:
TO: City of Duluth
3167 Main Street
Duluth, GA 30096
Attention: Teresa Lynn, City Clerk
RE: Booster Pump Station Interior Demolition
Submittal packages shall include the following completed items:
o Written Project Approach, including a schedule o Corporate Certificate o Surety Requirements Acknowledgement o Bid Bond o Oath of Bidder o Statement of Bidder Qualifications o Contractor E-Verify Affidavit o Resumes and References as described below o Acknowledgment of any Addenda o Bid Form (including schedule of items)
3 | P a g e
Failure to include any of the above items fully complete and executed may result in your package being declared as “non-responsive” and disqualify you from further consideration.
If submittal is forwarded by mail or delivery service, the sealed package containing the one (1) original, two (2) copies and thumb drive listed above must be enclosed in another internal package to the attention of OWNER at the address previously given. If, for example, your FedEx box is opened and the submittal is not in a sealed package within the FedEx box, it may be declared non-responsive and disqualified from consideration. Submittal packages must be sealed to maintain their integrity prior to the formal opening.
Submittal packages received without the aforementioned criteria enclosed may be returned to
Contractor. Submittal packages received after said time and date will be marked late and not opened. No extension of the proposal period will be made.
The Instructions to Proposers, Bid Information, Evaluation Criteria, Forms, Project Manual, Specifications, Drawings, Bid Bond, Performance and Payment Bond requirements and other
Documents related to the bidding and construction of the Work of this Project may be obtained via the following:
Project plans and specifications for the “Booster Pump Station Interior Demolition and Improvement Plan” will be available electronically at no charge via the City’s website and via the Georgia State Procurement Registry.
PACKAGES MUST BE SUBMITTED IN RESPONSE TO THE PROJECT IN ITS ENTIRETY. NO PARTIAL
SUBMITTALS WILL BE ACCEPTED.
The City of Duluth and the Georgia Procurement Registry are the only official sources for this invitation or any addenda that may be issued for same. The City of Duluth will not be held responsible for errors or omissions in submittal packages.
The written bid within the Contractor’s submittal package will include the furnishing of all labor, materials, equipment, and all items necessary pursuant to Drawings, Specifications and
Conditions, etc., for the Booster Pump Station Interior Demolition and Improvement Plan
(hereinafter referred to as the Project).
Proposed Project Location: Duluth Booster Pump Station
2407 Main Street
Duluth, Georgia 30096
Scope of Work: The City of Duluth purchased a decommissioned water booster pumping station building from Gwinnett County Water Resources in
March of this year. The city is seeking to hire a contractor to remove and properly dispose of the pumping equipment and above grade piping and conduits, install blind flanges on walls, fill floor pipes and bulkhead with concrete flush to the floor, remove existing transformers and set new transformer, remove electrical switchgear, VFDs, control panel and associated conduit and wiring, remove electrical equipment pads, conduits and refinish damaged floor.
4 | P a g e
Contractor Experience Requirements:
1. The Contractor maintains a permanent place of business.
2. The Contractor has operated under the current corporate name for at least the last two
(2) years.
3. The Contractor currently has sufficient bonding capacity to provide performance and payment bonds, both in the amount of 100 percent of the contract amount.
4. The Contractor has not defaulted on a project or failed to complete a project within the last ten years.
5. The Contractor has not filed for bankruptcy nor been judged bankrupt at any time over the last ten years.
6. The Contractor has a history of completing projects consistently on time and within the bid amount.
7. The Contractor does not have a history of being involved in litigation or filing claims against Owners, Construction Contract Administration Firms, or Design Firms.
8. The Contractor has available at least one project management personnel with at least two years experience on projects with the technical characteristics required of a project of similar scope. The project management personnel must be the Project Superintendent and must be on the jobsite at all times during construction. Documentation of this experience must be provided with the proposal package, including resumes of the project management personnel and a list of at least one (1) similar project completed by the contractor with project name, description, and reference contact information.
9. The onsite project management personnel shall be fluent in the English language.
10. The Contractor, nor any of its affiliated companies, is not currently involved in a dispute, formal claim, or litigation with the OWNER, or with any authority or organization with which the City of Duluth (OWNER) has a vested interest.
11. The Contractor has a written Quality Control/Quality Assurance Program.
12. The Contractor has a written Safety Program.
5 | P a g e
Project Schedule:
Contractor understands that time is of the essence for completion of the project and, because damages will be difficult to ascertain, the parties shall include a provision in the Contract agreeing that liquidated damages in the amount of five hundred dollars ($500.00) per calendar day shall be paid by Contractor for each day that Contractor is in default of completing the work within the agreed-upon time frame. Completion of the work includes successfully passing any required punch-list inspection by the designer and/or owner.
The successful bidder shall commence work with an adequate force and equipment on a date to be specified in a written order of the Owner (Anticipated Notice to Proceed – October 12, 2026) and shall complete the work within the sixty (60) day time period allotted. Payment will be made to the contractor each calendar month based on the estimated work complete and in place as prescribed by the standard specifications. Retainage as prescribed by the standard specifications will be withheld. Final payment of amount withheld will not be made until the work has been satisfactorily completed and accepted by Owner.
Mandatory Bid Information:
A mandatory pre-submittal meeting will be held at property located at 2407 Main Street on
August 5, 2026 at 10:00 a.m. This meeting is mandatory, A City representative will be present on site throughout the duration of the meeting. This will be the proposer’s only opportunity to visit the project site prior to submitting a proposal.
All addenda will be issued on the State procurement Registry and on the City’s website at www.duluthga.net
The City will assume no responsibility for representations or understandings concerning conditions made by its officers or employees unless included in this request for proposal.
A Bid Bond in the amount of not less than 5% of the total amount of the base bid must be submitted with each bid made payable to the City of Duluth. Failure to supply bond will force your bid to be declared non-responsive.
The successful proposer shall provide a 100% payment and a 100% performance bond at the signing of the contract. Failure to supply bonds will result in default of contract.
Failure to sign your bid in the proper space provided on Part II (Bid Form) may force your bid to be declared as “non-responsive” and it may not be considered for award.
No bid may be withdrawn for a period of ninety (90) days after time has been called on the date of opening.
Contract, if awarded, will be based on the bid prices for each line item as is in the best interest of the City of Duluth.
The City of Duluth reserves the right, with or without notice or cause, to accept any bid regardless of the amount thereof; to reject any bid, any number of bids or all bids; to negotiate with any bidder for a reduction or alteration in its bid; to waive or insist upon formal requirements; to reject all bids and to call for additional bids upon the same or different Invitation to Bid and/or
6 | P a g e
Plans and Specifications; to be sole judge, in its discretion, of all questions as to whether or not a bid complies with the Invitation to Bid, the Plans or the Specifications, and as to the qualifications of a bidder to perform the Contract.
Questions must be submitted in writing to Jason Brock from the City of Duluth via jbrock@duluthga.net. The deadline for questions shall be August 7, 2026 at 5:00 PM. No questions received after this deadline will be addressed. All questions will be answered via addendum posted on the City’s website on or before August 10, 2026. Note that no phone calls regarding this project will be accepted.
The successful bidder will be issued one (1) complete set of documents for construction execution.
Any additional sets required will be at the bidder’s expense. A demolition permit will be required for the work. The contractor will be responsible for coordinating all required inspections, close out items, etc. associated with the permits and or work.
Please Note: The City of Duluth strives to maintain a website that is both accessible to all visitors and compliant with the Web Content Accessibility Guidelines (WCAG 2.0). All Request for Proposal packages may be requested in WCAG 2.0 compatibility format by emailing pio@duluthga.net.
7 | P a g e
END OF SECTION
INSTRUCTIONS TO BIDDERS/PROPOSERS/CONTRACTORS
SECTION 1
1.1 QUALIFICATIONS
Firm must have a current Contractor’s Public Liability Insurance policy and must be insurable in the following amounts: Bodily injury, including death limits of $1,000,000 for each accident.
Property damage limits of $2,000,000 for each accident and $10,000,000 for the aggregate of operations. (The OWNER reserves the right to require additional limits and/or coverage for actual contract.)
1.2. ERRORS IN PROPOSAL PACAKGES
Contractors or their authorized representatives are expected to fully inform themselves as to the conditions, requirements, and specifications before submitting proposal packages. Failure to do so will be at the contractor’s own risk. In case of error in extension of prices in the bid, the contract price will govern.
1.3. CONTRACT INFORMATION
The contract will be based on unit prices for each line item as shown in the bid. The price bid for each item will include materials, labor, tools, equipment and all other miscellaneous and/or necessary items to complete each item. The bidder agrees that the cost of any work performed, materials furnished, services provided, or expenses incurred, which are not specifically delineated in the bid list or Contract Documents, but which are incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included in the prices bid for the various items scheduled.
1.4 STATEMENT OF AGREEMENT
With the submission of a proposal package, the Contractor agrees that he/she has carefully examined the Request for Proposal and the proposal documents, and the Contractor agrees that it is the Contractor’s responsibility to request clarification on any issues in any section of the
Request for Proposal with which the Contractor disagrees or needs clarified. The Contractor also understands that failure to mention these items in the proposal package will be interpreted to mean that the Contractor is in full agreement with the terms, conditions, specifications and requirements therein. With submission of a proposal package, the Contractor hereby certifies:
(a) that this proposal package is genuine and is not made in the interest or on behalf of any undisclosed person, firm, or corporation; (b) that Contractor has not directly or indirectly included or solicited any other Contractor to put in a false or insincere proposal package; (c) that Contractor has not solicited or induced any person, firm, or corporation to refrain from submitting a proposal package.
8 | P a g e
GENERAL CONDITIONS
SECTION 2
2.1 MULTIPLE PROPOSAL PACKAGES:
No contractor shall be allowed to submit more than one proposal package.
2.2 BID FOR ALL OR PART:
Contractors must submit a bid sheet for the Base Bid items and must name a price on each item.
Incomplete bid sheets will not be accepted and may cause the proposal package to be considered incomplete, disqualifying it from further consideration.
2.3 PRICES TO BE FIRM:
Contractor warrants that bid prices, terms and conditions quoted on his bid sheet will be firm for acceptance for a period of ninety (90) days from proposal package opening date.
2.4 COMPLETENESS:
All information required by the Request for Proposals (RFP) must be completed and submitted to constitute a proper bid proposal.
2.5 QUALITY:
All materials, or supplies used for the construction necessary to comply with this RFP shall be of the best quality and of the highest standard of workmanship. Workmanship employed in any construction, repair, or installation required by this RFP shall be of the highest quality and meet recognized standards within the respective trades, crafts, and of the skills employed.
2.6 GUARANTEE:
Unless otherwise specified by the City, the Contractor shall unconditionally guarantee the materials and workmanship on all material and/or services. If, within the guarantee period any defects occur which are due to faulty material and/or services, the contractor at his expense, shall repair or adjust the condition, or replace the material and/or services to the complete satisfaction of the City. These repairs, replacement or adjustments shall be made only at such time as will be designated by the City as being least detrimental to the operation of the City business.
2.7 LIABILITY PROVISIONS:
Where contractors are required to enter or go onto City property to take measurements or gather other information in order to prepare the bid form as requested by the City, the contractor shall be liable for any injury, damage or loss occasioned by negligence of the contractor, his agent, or any person the contractor has designated to prepare the bid form and shall indemnify and hold
9 | P a g e harmless the City from any liability arising therefrom. The contract documents specify the liability provisions required of the successful contractor in order to be awarded a contract with the City.
2.8 CANCELLATION OF CONTRACT:
The contract may be cancelled or suspended by the City in whole or in part by written notice of default to the contractor upon non-performance or violation of contract terms.
2.9 PATENT INDEMNITY:
Except as otherwise provided, the successful contractor agrees to indemnify the City and its officers, agents and employees against liability, including costs and expenses for infringement upon any letters patent of the United States arising out of the performance of this contract or out of the use of disposal for the account of the City of supplies furnished or construction work performed hereunder.
2.10 CERTIFICATION OF INDEPENDENT PRICE DETERMINATION:
By submission of this proposal package, the contractor certifies, and in the case of a joint bid each party thereto certifies, as to its own organization, that in connection with this procurement:
(1) The prices on this bid form have been arrived at independently, without consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or with any competitor.
(2) Unless otherwise required by law, the prices which have been quoted on this bid form have not been knowingly disclosed by the contractor prior to opening, directly or indirectly to any other contractor or to any competitor; and
(3) No attempt has been made or will be made by the contractor to induce any other person or firm to submit or not to submit a proposal package for the purpose or restricting competition.
2.11 SIGNED BID CONSIDERED OFFER:
The signed bid shall be considered an offer on the part of the contractor, which offer shall be deemed accepted upon approval by the City, Purchasing Agent or his designee. In case of default on the part of the contractor after such acceptance, the City may take action as it deems appropriate, including legal action for damages for lack of required performance.
2.12 NOTICE TO PROCEED:
The successful contractor or proposer shall not commence work under this Request for Proposal until a written contract is awarded and a Notice to Proceed is issued by the City or their designee.
If the successful bidder does commence any work or deliver items prior to receiving official notification, he does so at his own risk.
2.13 TERMS OF CONTRACT: (check where applicable)
_________A. Annual Contract
_________B. One-time Purchase
10 | P a g e
____X____C. Other One Time Contract
2.14 RESPONSIBILITY FOR CLAIMS AND RELIABILITY:
The Contractor shall agree to hold harmless, indemnify and defend the City and its agents. The
Contractor will require any and all Subcontractors to conform to the provisions of this clause prior to commencing any work and agrees to ensure that this clause is in conformity with the insurance provisions of the contract.
2.15 BASIS OF CONTRACT AWARD:
If the contract is awarded, it will be awarded to the contractor whose proposal package was ranked highest by the evaluation team and approved by the City Council. Evaluation criteria are listed in section 3.2 of this Request for Proposal.
The City reserves the right to reject any or all proposal packages and to waive any technicalities.
Contracts will be administered by the City Representative. Invoices will be submitted to the City
Representative as directed.
2.16 SUBLETTING, ASSIGNMENT OR TRANSFER
The City considers the work of the CONTRACTOR personal. The CONTRACTOR agrees not to assign, sublet, or transfer any or all of its interest in this agreement without prior written approval of the City.
The City reserves the right to review all subcontracts prepared in connection with the agreement, and the CONTRACTOR agrees that it shall submit to the City any proposed subcontract documents together with the subcontractor cost estimates for review and written concurrence of the City in advance of their execution. All subcontracts of $10,000 or more shall include the provisions set forth in this agreement.
2.17 PRE-CONSTRUCTION CONFERENCE:
The contractor shall attend a pre-construction conference prior to commencing any work.
11 | P a g e
PROPOSAL EVALUATION
SECTION 3
Proposal packages will be evaluated in two phases.
3.1 COMPLETENESS VERIFICATION
Contractor shall include all items in his/her package as required by this request for proposal:
o Bid Form o Written Project Approach o Anticipated schedule for project, including major milestone dates o Corporate Certificate o Surety Requirements Acknowledgement o Bid Bond o Oath of Bidder o Statement of Bidder Qualifications o Contractor E-Verify Affidavit o Resumes and References o Acknowledgment of any Addenda
Phase one of the evaluations will include verification that all items from the above list are included in the proposal package. If anything from the above list is missing from the proposal package, the packages may be deemed non-responsive, and disqualified from further consideration.
Complete packages will move forward into the scoring phase.
3.2 RANKING/SCORING
Once each package has been reviewed for completeness, the evaluation team will score each complete package based on the following criteria. Packages will be ranked in order of score, with the highest scoring proposal package being recommended to Council for contract award.
o Bid (Total Cost) – up to 70 points o Written Project Approach & Schedule – up to 15 points o Resumes and References – up to 15 points
12 | P a g e
WRITTEN PROJECT APPROACH
Contractor shall include a written approach (max 1 pages) indicating the following to the evaluation team:
1. How does your team plan to mobilize and conduct demolition activities?
2. How will you anticipate phasing demolition and construction?
3. What assistance will you require from the City to complete the project?
4. What is your anticipated schedule?
13 | P a g e
CORPORATE CERTIFICATE
I,___________________________________, certify that I am the Secretary of the Corporation named as Contractor in the foregoing Bid; that, ______________________________ who signed said Bid in behalf of the Contractor, was then (Title) ________________________ of said
Corporation; that said Bid was duly signed for and in behalf of said Corporation by authority of its Board of Directors, and is within the scope of its corporate powers, that said Corporations organized under the laws of the State of Georgia.
This ______day of __________, 2026.
______________________________ (SEAL)
Signature
14 | P a g e
SURETY REQUIREMENTS ACKNOWLEDGEMENT
A Bid Bond for five percent (5%) of the amount of the base bid is required to be submitted with each bid.
A Performance Bond and Payment Bond for one hundred percent (100%) of the base bid plus any requested add-alternates will be required of the successful bidder.
The Bidder certifies that he/she has examined all documents contained in this bid package, and is familiar with all aspects of the bid proposal and understands fully all that is required of the successful bidder. The Bidder further certifies that his/her bid shall not be withdrawn for ninety
(90) days from the date on which the bid is publicly opened and read.
The Contractor agrees, if awarded this bid, he/she will:
• Furnish, upon receipt of an authorized City of Duluth Contract Agreement, all items indicated thereon as specified in this request for proposal for the bid amount, or;
• Enter a contract with the City to do and/or furnish everything necessary to provide the service and/or accomplish the work as stated and/or specified in this request for proposal for the bid amount, and;
• Furnish a performance bond and payment bond with amounts based upon any add-alternates selected if required by the City, and;
• Forfeit the amount of the Bid Bond as liquidated damages if he/she fails to enter a contract with the City as stated above, within fifteen (15) days of the date on which he/she is awarded the contract.
COMPANY DATE
SIGNATURE TITLE
15 | P a g e
BID BOND
KNOW ALL MEN BY THESE PRESENTS, THAT WE ______________________ (hereinafter called the Principal) and ________________________ (hereinafter called the Surety), a Corporation chartered and existing under the laws of the State of ___________________ with its principal offices in the City of ________________________and authorized to do business in the State of
Georgia, are held and firmly bound unto the City of DULUTH in the full and just sum of
___________________________________Dollars ($ . ) good and lawful money of the United States of America, to be paid upon demand of the City of Duluth, to which payment well and truly to be made, we bind ourselves, our heirs, executors, administrators, and assigns jointly and severally and firmly by these presents.
WHEREAS, the Principal is about to submit, or has submitted, to the City of Duluth, a bid for furnishing materials, labor and equipment for:
Booster Pump Station Interior Demolition and Improvement Project
WHEREAS, the Principal desires to file this Bond in accordance with law in lieu of a certified
Bidder's check otherwise required to accompany this Proposal.
NOW, THEREFORE, the conditions of this obligation are such that if the bid be accepted, the
Principal shall within ten (10) days after receipt of notification of the acceptance, execute a
Contract in accordance with the bid and upon the terms, conditions, and prices set forth in the form and manner required by the City of DULUTH, and execute a sufficient and satisfactory
Performance Bond in the amount of 100% of the total contract price and Payment Bond in the amount of 100% of the total contract price payable to the City of DULUTH, in form and with security satisfactory to said City of DULUTH , and otherwise, to be and remain in full force and virtue in law; and the Surety shall, upon failure of the Principal to comply with any or all of the foregoing requirements within the time specified above, immediately pay to the City of DULUTH, Georgia, upon demand, the amount hereof in good and lawful money of the United States of
America, not as a penalty, but as liquidated damages.
IN TESTIMONY THEREOF, the Principal and Surety have caused these presents to be duly signed and sealed this ________________ day of _______________, 2024.
SURETY PRINCIPAL
BY:_______________________________ BY:_______________________________
(SEAL) (SEAL)
16 | P a g e
OATH OF BIDDER
Personally appeared before the undersigned officer duly authorized by law to administer oaths and ________________________________who, after being first duly sworn, depose and say that they are all the officers, agents, persons, or employees who have acted for or represented
____________________________________________ (Company Name) in bidding or procuring a Contract with the City of Duluth on the following projects:
Booster Pump Station Interior Demolition and Improvement Project and that said _______________________________ has not by (himself, themselves) or through any persons, officers, agents, or employees prevented or attempted to prevent by any means whatsoever competition in such bidding; or by any means whatsoever prevented or endeavored to prevent anyone from making a bid therefore, or induces or attempted to induce another to withdraw a bid for said work.
BY: _______________________________
Signature of Bidder
Name – Printed
Title
Sworn to and subscribed before me this _______day of ____________, 2026.
Notary Public (SEAL)
17 | P a g e
STATEMENT OF BIDDER’S QUALIFICATIONS
(To be subscribed and sworn to before a notary public)
Firm Name:__________________________________________________________________
LEGAL NAME OF BUSINESS (As registered with Secretary of State)
Address: __________________________________________________________________
LEGAL BUSINESS ADDRESS (P.O. BOX IS INSUFFICIENT)
CITY STATE ZIP
MAILING ADDRESS IF DIFFERENT FROM ABOVE
Telephone Number: ______________________ Facsimile Number: _______________________
Contact Person Name and Email Address: ___________________________________________
Georgia Resident: YES_____ NO_____
When Organized: ______________________ Where Incorporated: _______________________
Federal I.D. No.: ______________________ or Social Security No.: ______________________
Number of years engaged in the contracting business under the present firm name:
General Contractor’s License Number: _____________________________________________
Credit Available for This Contract: _________________________________________________
Contracts Now in Hand, Gross Amount: _____________________________________________
Plan of Organization: Proprietorship Corporation Partnership LLC
The bidder has refused to sign a contract at the original bid. YES or NO (Please circle one)
The bidder has been declared in default on a contract. YES or NO (Please circle one)
The bidder has been involved in litigation or filing claims against Owners, Construction Contract
Administration Firms, or Design Firms in the last 3 years. YES or NO (Please circle one)
If answer is Yes to any statement above, please explain:
The bidder has written corporate safety and quality assurance/quality control processes in place, and the City may examine these documents if requested. YES or NO (Please circle one)
18 | P a g e
(STATEMENT OF BIDDER’S QUALIFICATIONS - CONTINUED)
I certify that the above information is complete, true, and correct.
Sworn to and subscribed before me this _______day of ____________, 2026.
Notary Public (SEAL)
19 | P a g e
CONTRACTOR E-VERIFY AFFIDAVIT
By executing this affidavit, the undersigned contractor verifies its compliance with The Illegal Reform
Enhancements for 2013, stating affirmatively that the individual, firm, or corporation which is contracting with the City of Duluth has registered with and is participating in a federal work authorization program* [any of the electronic verification of work authorization programs operated by the United States Department of Homeland Security or any equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act, in accordance with the applicability provisions and deadlines established therein].
The undersigned further agrees that, should it employ or contract with any subcontractor(s) in connection with the physical performance of services or the performance of labor pursuant to this contract with the City of Duluth, contractor will secure from such subcontractor(s) similar verification of compliance with the Illegal Immigration Reform and Enforcement Act on the Subcontractor Affidavit provided in Rule 300-10-01-.08 or a substantially similar form. Contractor further agrees to maintain records of such compliance and provide a copy of each such verification to the City of Duluth at the time the subcontractor(s) is retained to perform such service.
E-Verify * User Identification Number Date Registered
Legal Company Name
Street Address
City/State/Zip Code
BY: Authorized Officer or Agent Date
(Contractor Signature)
Title of Authorized Officer or Agent of Contractor
Printed Name of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME ON THIS THE
_______ DAY OF ______________________, 2026
_________________________________________ My Commission Expires:________________
Notary Public
* As of the effective date of O.C.G.A. § 13-10-91, the applicable federal work authorization program is “E-Verify” operated by the U.S. Citizenship and Immigration Services Bureau of the U.S.
Department of Homeland Security, in conjunction with the Social Security Administration (SSA).
20 | P a g e
RESUMES AND REFERENCES
Contractor shall include at least one project management personnel with at least two years experience on projects with the technical characteristics required of a project of similar scope.
The project management personnel must be the Project Superintendent and must be on the jobsite at all times during construction. Documentation of this experience must be provided in this section, including resumes of the project management personnel and a list of at least one similar project completed by the contractor with project name, description, and reference contact information.
21 | P a g e
ACKNOWLEDGEMENT OF ADDENDA
Contractor shall acknowledge all addenda by date each was posted as follows. It is the bidder/contractor’s responsibility to check the City’s website or the Georgia Procurement Registry for such updates, and to ensure he/she reviews and understands their content. Failure to do so may disqualify contractor’s proposal package from further consideration.
ADDENDUM 1 DATED __________________
ADDENDUM 2 (if applicable) DATED __________________
ADDENDUM 3 (if applicable) DATED __________________
Other Addenda, as needed, please list.
I certify that the above information is complete, true, and correct.
22 | P a g e
BID FORM
In compliance with your Request for Proposal, the undersigned, hereinafter termed the Bidder, proposes to enter into a Contract with the City of Duluth to provide the necessary machinery, tools, apparatus, and other means of construction, and all materials and labor specified in the
Contract, necessary to complete the work in the manner therein specified within the time specified, as therein set forth, for:
Booster Pump Station Interior Demolition and Improvement Project
The Bidder has carefully examined and fully understands the Contract and other Contractual
Documents hereto attached and has made a personal examination of the proposed Work and has satisfied himself as to the actual conditions and requirements of the Work, and hereby proposes and agrees that if his Bid is accepted, he will contract with the City of Duluth in full conformance with the Contract Documents. It is the intent of this Bid to include all items of construction and all Work indicated on the Drawings and called for in the Specifications.
In accordance with the foregoing, the undersigned proposes to furnish and construct the items listed in the below Schedule of Items for the following bid amounts:
Cost Summary
Total cost for complete project as shown in project documents.
Phase Total Cost Remove pumping equipment and above grade piping and conduits
Install blind flanges on wall pipes
Fill Bulkhead and floor pipes with concrete flush with floor
Coordinate with Georgia Power to remove existing transformers and set new transformer
Remove electrical switchgear, VFDs, control panel, and associated conduit and wiring
Remove electrical equipment housekeeping pads and conduit stub ups. Refinish damaged floor.
Furnish and install new 400A breaker for new service entrance, and connect to existing MCC.
Bonds & Insurance
Total Project Cost (Base Bid) $
23 | P a g e
The bidder agrees that the cost of any work performed, materials furnished, services provided, or expenses incurred, which are not specifically delineated in the Contract Documents, but which are incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included in the prices bid for the various items scheduled.
The bidder further proposes and agrees hereby to promptly commence the Work with adequate force and equipment within ten (10) calendar days from receipt of Notice to Proceed, and to complete the Work within the agreed upon schedule. The City of Duluth will charge the contractor five hundred dollars ($500.00) per calendar day as liquidated damages for every day beyond this deadline that work is not fully complete.
The undersigned represents that the unit prices listed above are complete as specified, acknowledges that the estimated quantities are not guaranteed, and agrees that payment will be for actual in-place quantities installed per the plans.
Prices must be entered for all blanks in the schedule.
Providing items in excess of the amount shown on the plans will not be paid unless requested by and approved by the City in advance.