This document is an architectural plan for the pump house demolition project for the City of Duluth, Georgia, which acquired a decommissioned water booster pumping station building from Gwinnett County Water Resources. The project scope includes the removal and proper disposal of pumping equipment, above-grade piping, and conduits; installation of blind flanges on exposed pipes at typical locations; filling and bulkheading of floor pipes with concrete flush to the existing floor; removal of existing electrical transformers and installation of new transformer equipment; and removal of electrical switchgear, VFDs, control panels, and associated conduit and wiring. The plans specify coordination requirements with Georgia Power for transformer deenergization, removal of service entrance cables, and new transformer location installation. The project also requires removal of the main switchboard, pump starters, pump motors, all associated cables and conduits, and electrical equipment pads, with refinishing of the damaged floor.
The plans detail specific electrical work including the removal of MCC feeder cables from the existing 400-ampere feeder circuit breaker in the main switchboard, with installation of a new 400-ampere circuit breaker in a NEMA-3R enclosure rated as service entrance equipment. The existing main control center is to remain in service. The demolition plan identifies multiple work areas marked on 27 sheets (labeled 01 through I-4) covering various sections including architectural, structural, mechanical, and electrical components. Coordination with the power company is mandatory for deenergizing transformers, removing existing service entrance cables, and establishing the new transformer location. The plans indicate typical removal work at five distinct locations within the facility involving piping of varying sizes, including 30-inch, 18-inch, 48-inch, and 14-inch diameter installations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP PH2026_03 _ Pump House Demo _ AD.pdf | ||
| RFP PH2026_03 _ Pump House Demo _ RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
jfleck Architect Tank has previously been removed
Close valve, remove valve box and bury
PolyLine jfleck PolyLine jfleck PolyLine jfleck PolyLine jfleck PolyLine jfleck Architect Remove existing pumps, bases, pipe supports, and above grade piping and valves. (Typ. 5 places) jfleck Architect Install blind flange on end of exposed 30" DIP (Typ. 5 places) jfleck PolyLine jfleck Architect Cut pipe flush with floor, bulkhead 48" pipe and fill 24" pipe with concrete fill to flush with existing floor. (Typ. 5 places) jfleck Architect Remove existing pumps, bases, pipe supports, and above grade piping and valves. (Typ. 5 places) jfleck Rectangle jfleck Rectangle jfleck Architect Remove existing pumps, bases, pipe supports, and above grade piping and valves. (Typ. 5 places) jfleck Architect Remove existing pipe supports and above grade piping and valves.
jfleck Architect Cut pipe flush with floor, bulkhead pipe and fill 14" pipe with concrete fill to flush with existing floor.
jfleck
Install blind flange on end of exposed 18" DIP
COORDINATE REMOVAL WITH GEORGIA POWER AND INSTALLATION OF NEW TRANSFORMER
Polygon jfleck Rectangle jfleck Architect
NOTES:
1. COORDINATE WITH POWER COMPANY TO DEENERGIZE THEIR TRANSFORMERS AND REMOVE THE SERVICE ENTRANCE CABLES.
2. REMOVE THE MCC FEEDER CABLES FROM THE 400A FEEDER CIRCUIT BREAKER IN THE MSB.
3. EXISTING MCC TO REMAIN.
4. PROVIDE A NEW 400A CIRCUIT BREAKER IN NEMA-3R ENCLOSURE. THE CIRCUIT BREAKER SHALL BE U.L. LISTED AS SERVICE ENTRANCE RATED.
5. COORDINATE WITH POWER COMPANY FOR THE NEW TRANSFORMER LOCATION.
6. THE EXISTING MAIN SWITCHBOARD, PUMP STARTERS, PUMP MOTORS, AND ALL ASSOCIATED CABLES/CONDUITS SHALL BE REMOVED.
jfleck Arc jfleck Ellipse jfleck Ellipse jfleck Arc jfleck Arc jfleck Arc jfleck Arc jfleck Arc jfleck Arc jfleck Arc jfleck Arc jfleck Line jfleck PolyLine jfleck Ellipse jfleck Architect
TWO SETS OF 2 1/2"C 4#4/0, #2G
jfleck Architect 400A jfleck Rectangle jfleck Architect
TWO SETS OF 2 1/2"C 4#4/0, 1#2G
jfleck Ellipse jfleck Ellipse jfleck PolyLine jfleck PolyLine jfleck PolyLine jfleck Line jfleck Line jfleck Line jfleck PolyLine jfleck Line jfleck Line jfleck Ellipse jfleck Architect
NOTE 2
jfleck Ellipse jfleck Ellipse jfleck Architect #2G jfleck Architect N jfleck Architect G jfleck Architect
NOTE 4
jfleck Architect
NOTE 5
jfleck Ellipse jfleck Architect
NOTE 1
jfleck Ellipse jfleck Architect
NOTE 1
jfleck Architect
NOTE 6
jfleck Architect
NOTE 6
jfleck
NOTE 3
Rectangle jfleck Rectangle jfleck Rectangle jfleck Rectangle jfleck Architect Remove VFDs and Switchgear jfleck Architect Remove Main Control Panel jfleck Architect Remove SCADA Panel jfleck Architect Existing MCC to remain in service jfleck
Remove housekeeping pads for all removed electrical equipment, cut conduit off and refinish floor
| 01 - Cover |
| 02 - C-2 |
| 03 - C-2 |
| 04 - C-3 |
| 05 - C-4 |
| 06 - A-2 |
| 07 - A-2 |
| 08 - A-3 |
| 09 - AD-1 |
| 10 - S-1 |
| 11 - S-2 |
| 12 - S-3 |
| 13 - S-4 |
| 14 - S-5 |
| 15 - M-1 |
| 16 - M-2 |
| 17 - H-1 |
| 18 - H-2 |
| 19 - E-1 |
| 20 - E-2 |
| 21 - E-3 |
| 22 - E-4 |
| 23 - E-5 |
| 24 - E-6 |
| 25 - I-1 |
| 26 - I-2 |
| 27 - I-3 |
| 28 - I-4 |
File details come from the government source that posted it. Updated .