RFP for Canada Creek Bridge .pdf
PDF 320 KB Posted
- Attached to
- Canada Creek Bridge Replacement
- Solicitation number
- PE-74400-NONST-2025-000000009
- Issued by
- Ware County, Georgia
About this file
This Request for Proposal is issued by the Union County Commissioner in Blairsville, Georgia for the replacement of the Canada Creek Bridge located in Suches, Georgia (Project# UC-2025-03). The RFP solicits proposals from Georgia state-licensed contractors to provide all materials and services necessary for the bridge replacement project. Proposals must be received by December 10, 2025 at 2:00 PM local time at the Union County Commissioner's Office, 65 Courthouse Street, Suite 1, Blairsville, Georgia 30512. No pre-proposal meeting is scheduled. Contractors may submit written questions by November 25, 2025 at 12:00 noon, with answers posted to the county website by December 2, 2025 at 5:00 PM. The contract shall become effective upon signing and remain in force until project completion. Proposals may not be withdrawn for ninety days after the closing date except as allowed by Georgia law. The RFP was released on November 12, 2025, and legal notices will run on November 12, 19, and 26, and December 3, 2025.
Proposers must submit a five percent bid bond with their proposal, and the awarded contractor must provide performance and payment bonds equal to 100 percent of the total contract price. Pricing proposals must address all elements of the scope of work, including materials, supervision, labor, transportation, delivery, and allowances for unforeseen conditions. Union County reserves the right to reject any or all proposals, waive irregularities, and cancel the RFP at any time without liability for costs incurred by contractors. Qualifications will be scored on a 100-point scale based on company background and local participation (10 points), financials (10 points), personnel qualifications (20 points), relevant work performed for public entities within the last five years (25 points), and pricing proposal (35 points). The County reserves the right to conduct oral presentations and to negotiate modifications with the apparent winner prior to final award. All contract documents, including drawings, specifications, and the geotechnical report, are available on the Union County website.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
Issuing Agency Union County Commissioner
65 Courthouse Street, Suite 1
Blairsville, Georgia 30512
Phone: 706-439-6000
Fax: 706-436-6004
Issue Date November 12, 2025
Proposal Closing Date Wednesday, December 10, 2025
Proposal Closing Time 2:00 P.M.
Commodity Canada Creek Bridge Replacement
Project# UC-2025-03
REQUEST FOR PROPOSAL
The Union County Commissioner is requesting proposals from Georgia state licensed contractors to replace the Canada Creek Bridge in Union County located in Suches, Georgia. Contractor must have current contractor’s license. The Contractor shall provide all materials and services necessary in the performance of this RFP.
Proposals will be received by the Union County Commissioner, 65 Courthouse Street, Suite
1, Blairsville, Georgia 30512 until 2:00 PM local time on Wednesday, December 10, 2025.
Late proposals will not be considered nor returned. Proposals will be formally accepted and acknowledged at the Union County Commissioner’s Office by staff personnel.
The Proposal documents and specifications are available for inspection on the Union
County website https://www.unioncountyga.gov/Bids.aspx and at the Union County
Commissioner’s Office, 65 Courthouse Street, Suite 1, Blairsville, Georgia 30512; phone
706-439-6000 or fax 706-439-6004.
Proposals may not be withdrawn for ninety (90) days after the time and date set for closing, except as allowed by O.C.G.A. Union County reserves the right to reject any and all proposals and to waive any technicalities.
RFP DOCUMENTS ARE AVAILABLE AT THE UNION COUNTY, GEORGIA
WEBSITE:
https://www.unioncountyga.gov/Bids.aspx
Legal ad to run 11/12/2025, 11/19/2025, 11/26/2025, and 12/3/2025.
Also to be advertised on the county website and the Georgia Procurement Registry.
1.0 INTRODUCTION
1.1 Purpose of Procurement
The Union County Commissioner is requesting proposals from Georgia State licensed contractors to replace the Canada Creek Bridge in Union County located in Suches, Georgia.
1.2 Proposal Certification
Pursuant to the provisions of the Official Code of Georgia Annotated 50-5-67(a), Union County certifies that the use of competitive sealed bidding will not be practical or advantageous to the
County in completing the acquisition described in this document.
The Owner shall have the right to waive any informality, irregularity, or insufficiency in the proposal procedure and in any proposal or proposals received and to accept the proposal which, in the Owner’s sole judgment, is in the Owner’s own best interests. The Owner shall have the right to accept any proposal.
1.3 Schedule of Events
This Request for Proposals shall be governed by the following schedule:
DATE ACTIVITY
November 12, 2025
Release of RFP
November 25, 2025
12:00 noon
Deadline for written questions to be submitted to
Kevin Hamby (kevin@hambymanagement.com)
December 2, 2025
5:00 p.m.
Answers to written questions posted to website:
https://www.unioncountyga.gov/Bids.aspx
December 10, 2025
2:00 p.m.
Proposals Due
1.4 Restrictions on Communications
From the issue date of this RFP until a contractor is selected and the award is announced, Contractors are not allowed to communicate for any reason with any County staff or elected officials except: 1) through the Project Manager or County Staff named herein, 2) at the Pre-
Proposal Meeting or 3) as provided by existing work agreement(s). The County reserves the right to reject the submittal of any bidder violating this provision.
1.5 Pre-Proposal Meeting
Omit.
mailto:kevin@hambymanagement.com
1.6 Questions & Addenda
All questions concerning this RFP must be submitted in writing (email is preferred but fax and mail may be used) to the Union County Commissioner’s Office no later than 12:00 pm on
November 25, 2025, local time.
The Inquiries must be directed to:
Kevin Hamby, Project Manager
Union County Commissioner
65 Courthouse Street, Box 1
Blairsville, GA 30512 kevin@hambymanagement.com
Phone (706) 215-1364
No response to inquiries other than written will be binding upon the County. Union County reserves the right to issue written addenda to any inquiries that alter the scope of the Request for
Proposals. Addenda shall be posted to the county website, https://www.unioncountyga.gov/Bids.aspx no later than December 2, 2025, at 5:00 PM. A signed copy of any addenda shall accompany submitted qualifications proposals. Proposers are advised to check the website for addenda before submitting their Proposals.
1.7 Definition of Terms
County – Office of the Union County Commissioner
OCGA - Official Code of Georgia Annotated (State Statute)
Proposer - Respondent to this Request for Proposals
Contractor - The successful respondent to this Request for Proposals, after being placed under contract with the County.
RFP - Request for Proposals
Contract Documents – The Contract Documents are defined as all Drawings, Specifications, Bulletins, Agreement Forms and Addenda issued through the completion of the project including, but not limited to:
1. Appendix A Proposal Certification
2. Appendix B e-Verify / Save Affidavit (for contractor, sub-contract, and sub-sub contractor)
3. Appendix C UCC Contract
4. Appendix D UCC Design Drawings
5. Appendix E Geotechnical Report
6. Appendix F Pricing Form
1.8 Contract Term
The contract between the County and the Contractor shall become effective upon signing and shall remain in force until completion of the project, or until notice of termination in writing is given by the other party as provided herein. Union County reserves the right to terminate contract at any time if successful bidder fails to meet requirements stated in this proposal.
The contract shall terminate absolutely and without further obligation at such time as appropriated and otherwise unobligated funds are not longer available to satisfy the obligations of the County under this contract.
1.9 Bonds
Bid Bonds 5% of total bid amount
Performance Bonds 100% of total contract price (required of awarded vendor only)
Payment Bonds 100% of total contract price (required of awarded vendor only)
Information regarding bonds to be furnished (if required) is stated in the 6.0 Terms and
Conditions section of this bid document, 6.26 “Bid Bonds, Performance Bonds & Payment
Bonds”.
1.10 Exception to RFP
Each proposal shall be deemed to agree to comply with all terms, conditions, specifications, and requirements of this RFP. An “exception” is defined as the Proposer’s inability or unwillingness to meet a term, condition, specification, or requirement in the manner specified in the RFP. All exceptions taken must be identified and explained in writing in your proposal and must specifically reference the relevant section(s) of this RFP. If the proposer provides an alternate solution when taking an exception to the requirement, the benefits of this alternative solution and impact, if any, on any part of the remainder of the proposer’s solution, must be explained in detail.
The County welcomes innovative suggestions and recommendations from Contractors that will ensure a 100% successful service approach.
2.0 SCOPE OF WORK
The term "Work" means the construction and services required by the Contract Documents, and includes all other labor, materials, equipment and services provided by the Contractor to fulfill the Contractor's obligations to replace the Canada Creek Bridge in Union County located in Suches, Georgia.
3.0 MANDATORY REQUIREMENTS
This section identifies all mandatory requirements which must be present in the proposal before further consideration will be given.
3.1 Proposal Requirements
a. A transmittal letter that states the Proposal is submitted in response to RFP “Canada
Creek Bridge Replacement – Project# UC-2025-03”. Letter must be signed by a person authorized to enter into a contractual agreement on behalf of the submitting firm. Name, title, email address and phone number shall be included for a contact person.
b. Completed Pricing Proposal that addresses all elements of the Scope of Work referenced in Section 2 of this RFP.
c. Qualifications Information requested in Section 4 of this RFP.
d. Evidence of Insurance.
e. Bidder’s Certification (Appendix A)
f. E-Verify / SAVE Affidavit (Appendix B)
g. Signed Addendum (if any)
h. Current contractor’s license
3.2 Pricing Proposal
The pricing proposal is to provide Union County with how your company charges for the materials and services needed. Pricing should include normal fees associated with the performance of the service specified, including materials, supervision, labor, transportation, delivery, and related costs including allowances for any unforeseen conditions. Refer to Appendix F.
The Pricing Proposal must be signed by an authorized individual/officer of the firm along with company name and address and printed name of authorized individual/officer.
The Pricing Proposal must be submitted as a separate, sealed package.
4.0 QUALIFICATIONS INFORMATION
Qualifications information together shall not exceed 20 pages. Provide the following qualifications information:
a. Business location and officers of the firm (company background)
b. Provide financial information that would allow proposal evaluators to ascertain the financial stability of the Proposer.
i. If a public company, include a recap of the most recent audited financial report.
ii. If a private company, provide a recap of the most recent internal financial statement; and a letter, on the financial institution’s letterhead, stating financial stability.
c. Resumes of key personnel proposed to participate in the project including education background and employment history.
d. A complete list of all relevant work performed for public entities within the last five (5) years, including contact names and telephone numbers.
e. Copies of manufacturer installer certificates (if applicable to RFP). Contractors must be certified resellers of the products they provide and install.
f. Logistics Plan. Proposers shall submit a brief description of proposed site management logistics including the following items:
i. Contractor's on site staffing, number of personnel and their primary duties.
ii. Space requirements for on-site materials storage.
iii. List of proposed subcontractors.
g. As the above items are to be considered in selection of the Contractor, submission of this information shall be binding on the Contractor and shall not be changed without agreement in writing from the Owner.
5.0 PROPOSAL SUBMISSION AND EVALUATION
5.1 Process for Submitting Proposals
5.1.1 Preparation of Proposal
Each proposal should be prepared simply and economically, avoiding the use of elaborate promotional materials beyond those sufficient to provide a complete presentation. If supplemental materials are a necessary part of the technical proposal, the Contractor should reference these materials in the technical proposal, identifying the document(s) and citing the appropriate section and page(s) to be reviewed.
5.1.2 Packaging of Proposal
Mark the outside of the shipping package as follows:
RFP –Canada Creek Bridge Replacement -
Project# UC-2025-03
Failure to properly label the OUTSIDE of the shipping container may result in disqualification.
Inside the shipping container, the proposal in response to this RFP must be divided into two separate and appropriately labeled and sealed packages - a
Qualifications Proposal and a Pricing Proposal. The inner packages shall be labeled with the submitting firm’s name.
1. The contents of the sealed, inner package labeled “Qualifications Proposal” will include an original and five (5) copies of each of the following:
• Transmittal letter referenced under Section 3.1 of this RFP
• Bidder’s Certification (Appendix A)
• E-Verify / SAVE Affidavit (Appendix B)
• All qualifications information referenced under Section 4 of this RFP
• Proof of Insurance
• Signed Addendum (if any)
• Copy of current business license
2. The contents of the sealed, inner package labeled “Pricing Proposal” will
Include an original and five (5) copies of each of the following:
• Completed Pricing Proposal
Do not include price information of any kind in the Qualifications Proposal
5.1.3 Submission of Proposals
Proposals will be received by Union County until 2:00 PM on December 10, 2025.
The original and five (5) copies must be mailed, hand-delivered, or express mailed to:
Pam Hawkins
Union County Commissioner’s Office
65 Courthouse Street, Suite 1
Blairsville, GA 30512
Any submission received after the due date and time will not be evaluated.
NOTE: Many express mail services do not guarantee overnight delivery times to
Union County. Any proposal received after 2:00 PM on December 10, 2025 will not be opened.
5.2 Evaluation Process
The evaluation of proposals received on or before the due date and time will be conducted as follows:
5.2.1 Administrative Review
The proposals will be reviewed by the County for the following administrative requirements:
1. Submitted by deadline
2. Separately sealed Qualifications Proposal and Financial Proposal
3. All required documents have been submitted
4. Qualifications Proposal does not include any financial information
5. All documents requiring an original signature have been signed and are included
5.2.2 Mandatory Requirements Review
Proposals which pass the administrative review will be reviewed to ensure all Mandatory Requirements identified in Section 3.0 are addressed satisfactorily.
5.2.3 Qualifications Proposal Evaluation
Proposals which pass the Mandatory Requirements Review will then be evaluated based on the qualification factors. Qualifications information will be scored as follows and may receive a maximum of one hundred (100) points.
Company Background /
Local Participation 10
Financials 10
Personnel Qualifications 20
Relevant Work 25
Pricing Proposal 35
Total Points 100
5.2.4 Financial Proposal Evaluation
The pricing proposal from bidders not eliminated during the qualification proposal evaluation will then be reviewed to determine which proposal results are most beneficial to the County.
5.2.5 Oral Presentations
The County reserves the right to invite Proposers to present their qualifications.
5.2.6 Selection of Proposal
Upon completion of the evaluation process, the Commissioner will select the proposal that is in the best interest of Union County.
5.3 Rejection of Proposals/Cancellation of RFP
Union County reserves the right to reject any or all submissions, to waive any irregularity or informality in a submission, and to accept or reject any item or combination of items, when to do so would be to the advantage of the County. It is also within the right of the County to reject submissions that do not contain all elements and information requested in this document. The
County reserves the right to cancel this RFP at any time. The County will not be liable for any cost/losses incurred by the Contractors throughout this process.
6.0 TERMS AND CONDITIONS
6.1 RFP Amendments
The County reserves the right to amend this RFP prior to the proposal due date. All addenda and additional information will be posted to the County website at https://www.unioncountyga.gov/Bids.aspx prior to 5:00 PM on December 2, 2025. It is the
Proposer’s responsibility to check the website for addenda before submitting a Proposal. All signed addenda shall be included in the Qualifications Proposal.
6.2 Agreement and Project Forms
The Agreement form shall be the Owner’s agreement form. The Owner’s payment, waiver of lien and change order form(s) shall be used.
6.3 Proposal Withdrawal
A submitted proposal may be withdrawn prior to the due date by a signed written request to the
Purchasing Director.
6.4 Cost for Preparing Proposals
The cost for developing the proposal is the sole responsibility of the Proposer. The County will not provide reimbursement for such costs.
6.5 Conflict of Interest
If a Proposer has any existing client relationship that involves Union County, the Proposer must disclose each relationship.
6.6 Contractor Selection
Union County reserves the exclusive right to determine which Proposer should be awarded the
Contract. The County also reserves the right to reject any or all bids at its discretion with or without cause.
6.7 Negotiations with Apparent Winner
Prior to award, the apparent winning Proposer will be required to enter into discussions with the
County to resolve any contractual differences. These discussions are to be finalized within one (1) week of notification unless extending the time period is advantageous to the County. Failure to resolve differences will lead to rejection of the Contractor's proposal.
The County reserves the right to negotiate modifications and costs with the successful Proposer provided that no such modifications affect the evaluation criteria set forth herein.
The Contractor shall commence work only after the transmittal of a fully executed contract and
Notice to Proceed from the County.
6.8 Taxes
Union County is exempt from taxes; however the Contractor shall pay all taxes required of him by law. Union County cannot exempt others from tax.
6.9 Compliance with Laws
The Contractor will comply with all State and Federal laws, rules, and regulations.
6.10 Cancellation for Cause
If either party shall refuse, fail, or be unable to perform or observe any of the terms or conditions of the contract for any reason, then the party claiming such failure shall give the other party a written notice of such breach. If, within thirty (30) days from such notice, the failure has not been corrected, the injured party may cancel the contract effective thirty (30) days after notice of cancellation.
Union County reserves the right to terminate the contract immediately in the event that the
Contractor discontinues or abandons operations; is adjudged bankrupt, or is reorganized under any bankruptcy law; or fails to keep in force any required insurance policies or bonds.
Failure of the successful contractor to comply with any section or part of the contract will be considered grounds for immediate termination of the contract by the County without penalty to
Union County. Union County shall pay for services rendered up to the point of termination.
Notwithstanding anything to the contrary contained in the contract between the County and the successful contractor, the County may, without prejudice to any other rights it may have, terminate the contract for convenience and without cause, by giving thirty (30) days written notice to the successful contractor.
If the termination clause is used by the County, the successful contractor will be paid by the
County for all scheduled work completed satisfactorily by the successful contractor up to the termination date set forth in the written termination notice.
6.11 Condition of Materials
It is understood and agreed that materials delivered shall be new, of latest design, and in first quality condition.
6.12 Rejection of Submissions/Cancellation of Request for Proposals
Union County reserves the right to reject any or all proposals, to waive any irregularity or informality in a proposal, and to accept or reject any item or combination of items, when to do so would be to the advantage of Union County. It is also within the rights of Union County to reject proposals that do not contain all elements and information requested in this document. Union
County reserves the right to cancel this Request for Proposals at any time. Union County will not be liable for any cost/losses incurred by the Contractors throughout this process.
6.13 Non-discrimination
Union County does not discriminate on the basis of race, religion, color, sex, national origin, age, or disability.
6.14 Payment
Payment terms and invoicing requirements shall be as defined by the Agreement form. See Section
6.2 of this RFP for more information on the Agreement form.
6.15 Insurance
The Contractor shall be responsible for his work and every part thereof, and for all materials, tools, equipment, appliances, and properties of any and all description used in connection with this project.
The Contractor assumes all risks of direct and indirect damage or injury to the property of persons used or employed on or in connection with the work contracted for, and of all damage or injury to any person or property wherever located, resulting from any action, omission, commission or operation under the Contract, or in connection in any way whatsoever with the contracted work.
The Contractor shall, during the continuance of all work under the Contract, provide the coverage as listed in Appendix C - UCC Contract.
6.16 Project Coordination
The Contractor shall employ and assign only qualified and competent personnel to perform any service or task involved in this project. The Contractor shall designate one such person as a Project
Manager, and the Project manager shall be deemed to be the Contractor’s authorized representative, who shall be authorized to receive and accept any and all communications from the County. The
County shall name a Project Manager who shall be authorized to generate, receive and accept communication as an authorized representative of the County.
The Contractor hereby agrees to replace any personnel or sub-contractor, at no cost or penalty to the County, if the County reasonably determines that the performance of any sub-contractor or personnel is unsatisfactory.
6.17 Accuracy of Work
The Contractor shall be responsible for the accuracy of the work performed and shall promptly correct its errors and omissions without additional compensation. Acceptance of the work by the
County will not relieve the Contractor of the responsibility for subsequent correction of errors, the clarification of any ambiguities, or the costs associated with any additional work caused by negligent acts, errors, or omissions by the Contractor or latent defects in the products sold by the
Contractor.
At any time during the execution of this project or during any phase of work performed by others based on data secured by the Contractor under this Agreement, the Contractor shall confer with the County for the purpose of interpreting the information supplied by the Contractor and to correct any errors or omissions. The above consultations, clarifications, and/or corrections shall be made without added compensation to the Contractor. The Contractor shall give immediate attention to these changes so there will be minimum delay to others. The Contractor shall be responsible for errors and omissions and save harmless the County and its agents as provided in this Agreement.
6.18 Ownership
Reports, plans, data, statistics, specifications, and other supporting records compiled or prepared in the performance of the Services required by this Contract, shall be the absolute property of the
County and shall not be used by the Contractor for purposes unrelated to this Contract without the prior written approval of the County. Such original documents shall be turned over to the County upon completion of the contract except that Contractor shall have the right to retain copies of the same.
6.19 News Releases by Contractor
As a matter of policy, the County does not endorse the products or services of a Contractor. News releases concerning any resultant contract from this solicitation shall not be made by a Contractor without the prior written approval of the County. All proposed news releases shall be routed to
Union County for review and approval.
6.20 Severability/Cancellation
It is understood and agreed by the parties hereto that if any part, term, or provision of this Contract is held illegal or in conflict with any law of the State where made or having jurisdiction over any of the parties hereto, the validity of the remaining portions or provisions shall not be affected, and the rights and obligations of the parties shall be construed and enforced as if the Contract did not contain the particular part, term, or provisions held to be invalid.
The County and the Contractor agree to resolve through negotiation or mediation prior to filing any cause of action. The venue for any litigation arising from this contract shall be Union County, Georgia.
The County reserves the right to cancel the contract and discontinue the services with a thirty (30) day written notice as a result of the failure of the Contractor to provide acceptable work and services as delineated in the response to this document or if determined that services can be better provided by in-house or other sources.
6.21 Drug Free Workplace
By submission of a Proposal, the Contractor certifies that the provisions of Code Sections 5024-
1 through 50-24-6 of the Official Code of Georgia Annotated, relating to the "Drug-free
Workplace Act", have been complied with in full. The Contractor further certifies that:
1. A drug-free workplace will be provided for the Contractor's employees during performance of the contract; and
2. Each Contractor who hires a sub Contractor to work in a drug-free work place shall secure from that sub Contractor the following written certification:
3. As part of the subcontracting agreement with (Contractor's name), (Sub Contractor's name) certifies to the Contractor that a drug-free workplace will be provided for the sub Contractor's employees during the performance of this Contract pursuant to
Paragraph (7) of Sub-section (b) of Code Section 50-24-3".
4. The Contractor further certifies that he will not engage in the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana during the performance of the Contract.
6.22 Assignment of Contractual Rights
It is agreed that the Contractor will not assign, transfer, convey, or otherwise dispose of a contract that may result from this bid or his right, title, or interest in or to the same, or any part thereof, without written consent of the County.
6.23 Indemnity
To the fullest extent permitted by law, the Contractor will indemnify, defend, and hold Union
County harmless from and against any and all claims, damages, losses, and expenses, including, but not limited to, fees and charges of attorneys and court and arbitration costs, arising out of or resulting from the negligent acts, negligent omissions, willful misconduct, or reckless misconduct of the Contractor or anyone for whom the Contractor is responsible.
6.24 Appropriation of Funds
The initial contract and any continuation contract(s) shall terminate immediately and absolutely at any such time as there are no appropriated and otherwise unencumbered funds available to satisfy the County’s obligations under said contract(s).
6.25 Documents Deemed Part of Contract
All Contract Documents issued by the Owner and executed by both parties through the completion of the project shall be deemed part of the contract. No documentation or information provided by the proposer or contractor, as part of this proposal or otherwise, shall be deemed part of the contract unless and until incorporated into the contract documents issued by the Owner.
6.26 Bid Bonds, Performance Bonds & Payment Bonds (if required)
A five percent (5%) Bid Bond, a one hundred percent (100%) Performance Bond, and a one hundred percent (100%) Payment Bond shall be furnished to Union County if stated as required in Paragraph 1.9 in the “Introduction” section of this document. Failure to submit appropriate bonding will result in automatic rejection of proposal. Bonding company must be authorized to do business in Georgia by the Georgia Insurance Commission, listed in the Department of
Treasury’s publication of companies holding certificates of authority as acceptable surety on
Federal bonds and as acceptable reinsuring companies, and have an A.M. Best rating.
File details come from the government source that posted it. Updated .