rfp-des-2026-10.pdf
PDF 555 KB Posted
- Attached to
- New Hampshire Clean Diesel Program
- Solicitation number
- RFP DES 2026-10
- Issued by
- New Hampshire
About this file
New Hampshire Clean Diesel Program - Request for Proposals Summary
This is a Request for Proposals issued by the New Hampshire Department of Environmental Services for the New Hampshire Clean Diesel Program, a grant initiative funded by approximately $1,000,000 in federal EPA Diesel Emissions Reduction Act Program funds. The program seeks proposals for diesel emission reduction projects including vehicle, engine, or equipment replacements; EPA-certified remanufacture systems; EPA-verified idle reduction technologies; EPA-verified aerodynamic technologies; and EPA-verified low rolling resistance tires. Eligible applicants include state, county, and local government agencies; municipalities; public schools and school districts; public colleges and universities; public transit agencies; and non-profit or private entities in good standing with the New Hampshire Secretary of State that can demonstrate substantial public and economic benefits to New Hampshire. Applications are accepted on a rolling monthly basis with submissions due on the 20th of each calendar month by midnight, with applicants notified of selection status within five business days. Project completion requires procurement and registration of replacement units, permanent scrappage and disabling of original units, installation of charging infrastructure if applicable, and submission of invoice and proof-of-payment documentation. The effective date of grant awards is contingent upon approval by the New Hampshire Governor and Executive Council, with project completion deadlines to be specified in individual grant agreements.
This is a partial reimbursement program requiring applicants to cover full project costs upfront before seeking reimbursement for eligible expenses, with all projects requiring non-federal matching funds. Grant funding percentages vary by project type, ranging from 25% to 45% maximum grant funding depending on the unit type and engine tier, with corresponding mandatory cost-share requirements ranging from 55% to 75%. There is no minimum or maximum award size specified per individual project. Replacement units may be powered by battery electric, grid electric, hydrogen fuel cell, compressed natural gas, propane, liquefied petroleum gas, hybrid diesel-electric, gasoline, or EPA/CARB-certified diesel engines, though existing diesel-powered units must meet specified engine tier requirements and minimum usage criteria. Any costs incurred prior to the effective date of the grant agreement are ineligible for reimbursement without prior written approval from NHDES. Proposal preparation costs are the sole responsibility of applicants. The program operates on a rolling basis and remains open until all available funding is obligated. Contact information for inquiries is provided through the NHDES Mobile Sources Grants Program at ms-grants@des.nh.gov or (603) 271-8330.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| rfp-des-2026-10.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New Hampshire Clean Diesel Program | Request for Proposals
Grant applications accepted on a rolling monthly basis
January 21, 2026
Table of Contents Section 1. Information and instructions
1.1 Basic information
1.2 Background
1.3 Available funding, restrictions and reimbursement
1.4 Designated contact email address
1.5 Program schedule
1.6 Project proposal application submittal
1.7 Project costs
1.8 Project award effective dates and completion dates
1.9 Definitions
1.10 Eligible applicants
1.11 Eligible projects and funding parameters
1.12 Ownership, usage and remaining life requirements
Section 2. General conditions
Section 3. Proposal evaluation and award
3.1 Formal evaluation and scoring
3.2 Preliminary assessment of non-profit and private entity applications
3.3 Priority New Hampshire Communities
Section 4. RFP terms and conditions
4.1 Proposal preparation cost
4.2 RFP addendum
4.3 Property of the state
4.4 Proposal confidentiality
4.5 Public disclosure
4.6 Electronic posting of RFP results and resulting grant agreement
4.7 Non-commitment
Section 1. Information and instructions
1.1 Basic information
Overview: New Hampshire Clean Diesel Program Request for Proposals (RFP)
Objective Providing partial reimbursement for projects that reduce diesel emissions in New Hampshire
Available funding Approximately $1,000,000
Eligible applicants a. State, county and local government agencies and departments.
b. Municipalities.
c. Public schools and school districts.
d. Public colleges and universities.
e. Public transit agencies.
f. Non-profit entities whose projects would provide substantial public and economic benefits to NH. See Section 1.10 for more details.
g. Private entities in Good Standing with the New Hampshire Secretary of State whose projects would provide substantial public and economic benefits to NH. See Section 1.10 for more details.
Eligible project types a. Vehicle, engine, or equipment (unit) replacements.
I. Existing units must be powered by diesel.
II. New units may be powered by electricity (including battery, grid, or hydrogen fuel cell electricity), propane or liquefied petroleum gas (LPG), compressed natural gas (CNG), hybrid-electric, gasoline, or diesel.
III. Engine tier, engine model year, and minimum usage requirements apply. See Section 1.12 for more details.
b. EPA-certified remanufacture systems.
c. EPA-verified idle reduction technologies.
d. EPA-verified aerodynamic technologies.
e. EPA-verified low rolling resistance tires.
Submission requirements and deadlines
NHDES intends for this funding opportunity to be available until all funding has been obligated. Applications will be accepted on a rolling monthly basis, with applications due on the 20th of each month at midnight. See Section 1.6 for full application instructions.
Agency contact information
Email: ms-grants@des.nh.gov Phone: (603) 271-8330 Website: New Hampshire Clean Diesel Program mailto:ms-grants@des.nh.gov tel:+16032718330 https://www.des.nh.gov/business-and-community/loans-and-grants/dera
1.2 Background
The United States Environmental Protection Agency (EPA) Diesel Emissions Reduction Act (DERA) Program, through state-run programs, funds projects that protect human health and improve air quality by reducing harmful emissions from diesel engines. Through the New Hampshire Clean Diesel (NHCD) Grant Program, the New Hampshire Department of Environmental Services (NHDES) seeks proposals for eligible diesel emission reduction projects utilizing New Hampshire’s (NH) remaining DERA funding.
Despite today’s cleaner vehicles and fuels, millions of 2009 and older diesel vehicles and engines in use across the United States continue to emit large amounts of nitrogen oxides (NOx), particulate matter (PM), and air toxics that contribute to serious public health problems including asthma, lung cancer, and various other cardiac and respiratory diseases that can cause lung damage and even premature death.
Replacing older diesel equipment will reduce emissions of these pollutants and greenhouse gas emissions, including carbon dioxide (CO2).
Although future funding is not guaranteed, NHDES has been awarded DERA funding from EPA on an annual basis and has made those funds available through a competitive grant program. Since 2015, NHDES has awarded approximately $3,300,000 for eligible projects. Completed projects will result in emissions reductions of approximately 273 tons of NOx, 10.2 tons of PM2.5, and nearly 10,000 tons of CO2 over the lifetime of the projects.
1.3 Available funding, restrictions and reimbursement
NHDES has approximately $1,000,000 available for diesel emissions reduction project awards. There is no minimum or maximum award size.
This round of funding is intended to complement the eligible project types under NHDES’ Volkswagen Environmental Mitigation Trust Granite State Clean Fleets (GSCF) grant program. Prospective applicants are encouraged to review the requests for proposals (RFPs) of both programs, as grant funding percentages and applicant and project eligibility may differ between the programs.
NHDES plans to administer this program on a rolling monthly basis until all the available funding has been obligated. NHDES plans to score complete and accurate project proposal applications received on or before midnight of the 20th of each calendar month and notify selected applicants electronically within five (5) business days (e.g., applicants applying on or before February 20 would be notified of selection status by February 27).
This program is a partial reimbursement program only. Applicants must cover the full cost of the proposed project prior to seeking partial reimbursement for eligible project costs. Participants must provide non-federal matching funds for all projects. All existing vehicles, engines or equipment replaced through this program must be scrapped and permanently disabled by drilling a three-inch hole in the engine block and cutting completely through the frame/frame-rails on each side, or by some other approved scrappage method.
No funds awarded under this program shall be used to fund the cost of emissions reductions that are mandated under federal law. This restriction applies when the mandate takes effect (the effective date) for any affected vehicles, engines or equipment.
https://www.des.nh.gov/business-and-community/loans-and-grants/volkswagen-mitigation-trust/granite-state-clean-fleets
This RFP, as well as the associated Appendix B: EPA’s DERA State Grants Program Guide, which can be found on the NHDES website’s New Hampshire Clean Diesel Grant Program webpage, details certain eligibility requirements. After ensuring your project meets the comprehensive project eligibility requirements, please submit your proposal to the designated contact email address below.
1.4 Designated contact email address
Any questions related to this RFP must be submitted by email, or phone if email is not an option, to either the Mobile Sources Grants inbox at ms-grants@des.nh.gov or (603) 271-8330. Common questions and responses can be found in the Frequently Asked Questions (FAQ) document on the New Hampshire Clean Diesel Program webpage.
1.5 Program schedule
The following schedule is subject to change at NHDES’ discretion. Such changes will be posted to the New Hampshire Clean Diesel Program webpage.
Event Date/Deadline
RFP opens January 21, 2026
Rolling monthly application due date Every 20th day of the month by midnight.
Anticipated date of notification of selection
Within five (5) business days of the 20th of the month in which a complete and accurate application was received (e.g., applicants who applied on or before February 20 would be notified by February 27).
Project award effective date The date that a grant agreement is approved by the New Hampshire Governor and Executive Council (G&C).
Required project completion date At the discretion of NHDES, to be specified in each grant agreement.
1.6 Project proposal application submittal
Project proposals must comply with the following parameters for submission:
a. Follow the format of and provide all information requested in the project proposal form (found on the New Hampshire Clean Diesel Program webpage) included in either:
i. Appendix A1 (for vehicle/engine/equipment projects) or
ii. Appendix A2 (for off-board idle reduction projects for marine vessels, locomotives or long-haul trucks).
b. Be signed (electronically or physically) and submitted electronically by email attachment to the designated contact email address in Section 1.4, using the following subject line in the email:
NHCD Rolling Grant Proposal: [Name of your organization].
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=P1017V7B.pdf https://www.des.nh.gov/business-and-community/loans-and-grants/dera mailto:ms-grants@des.nh.gov tel:+16032718330 https://www.des.nh.gov/sites/g/files/ehbemt341/files/documents/dera-faq.pdf https://www.des.nh.gov/business-and-community/loans-and-grants/dera https://www.des.nh.gov/business-and-community/loans-and-grants/dera https://www.des.nh.gov/business-and-community/loans-and-grants/dera https://www.des.nh.gov/business-and-community/loans-and-grants/dera https://onlineforms.nh.gov/nform/?FormTag=NHDES-A-03-023 https://onlineforms.nh.gov/nform/?FormTag=NHDES-A-03-029
c. Additional documents, as requested in the project proposal forms, may be attached in different file formats (e.g. Excel or image files). No changes or additions to a proposal will be accepted after submittal, unless approved in advance by NHDES. NHDES staff may contact applicants for clarification of submitted information if deemed necessary.
Applicants submitting multiple units for replacement must submit each as separate project proposal applications and each application will be scored separately. There is no limit to the number of applications an entity may submit.
If an applicant is unable to submit a proposal electronically, please contact the NHDES Mobile Sources Grants Program Coordinator via email at ms-grants@des.nh.gov or call (603) 271-8330 for instructions on alternate submittal options.
1.7 Project costs
For project cost eligibility, please refer to Section X. Part D: Vehicle and Equipment Costs of Appendix B:
EPA’s DERA State Grants Program Guide. Additional information can be found in Section C of the New Hampshire Clean Diesel Grant Program’s FAQs.
Please note: Costs incurred in preparation of proposals in response to the RFP are the sole responsibility of the applicant.
1.8 Project award effective dates and completion dates
NHDES will develop grant agreements with applicants whose projects have been scored and selected for funding. Any costs incurred prior to the effective date of the grant agreement are ineligible for partial reimbursement without the prior written approval of NHDES. The effective date of the grant agreement is contingent upon G&C approval. Project completion for replacement projects is achieved through the procurement and registration (if applicable) of the replacement unit, scrappage and disabling of the original unit, completing installation of charging infrastructure (if applicable), and submission of invoice and proof-of-payment documentation for reimbursement. Project completion for idle reduction projects consists of the installation and operation of the idle reduction technology, and the submission of invoice and proof-of-payment documentation for reimbursement.
Project completion dates will be set at the discretion of NHDES and will be specified in each grant agreement.
1.9 Definitions
Throughout this RFP, the following definitions apply to the corresponding terms:
a. Unit: Vehicles, engines, or equipment eligible through this program.
b. Existing unit: The diesel-powered unit in current use and in the applicant’s possession at the time of application that is to be scrapped and replaced.
c. Replacement unit: The unit proposed to replace the existing unit through this program or the existing unit after it has been repowered.
d. School Bus: A diesel-powered Type A, B, C, or D bus which meets the National Highway
Transportation Safety Administration’s definition of a school bus. This definition includes but is not limited to: 1) a bus that is used for purposes that includes carrying students to and from mailto:ms-grants@des.nh.gov tel:+16032718330 https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=P101BLGX.pdf https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=P101BLGX.pdf https://www.des.nh.gov/sites/g/files/ehbemt341/files/documents/dera-faq.pdf school or related events on a regular basis; 2) is identified with the words “School Bus;” and 3) is painted National School Bus Glossy Yellow.
e. Vehicle Class: A vehicle’s weight class as determined by its Gross Vehicle Weight Rating (GVWR).
To determine a vehicle’s class by its GVWR, check the GVWR (e.g., on the vehicle’s registration or VIN tag) and then use the following definitions:
Class 5: 16,001-19,500 lbs. GVWR.
Class 6: 19,501-26,000 lbs. GVWR.
Class 7: 26,001-33,000 lbs. GVWR.
Class 8: 33,001 lbs. GVWR and above.
1.10 Eligible applicants
Eligible applicants include the following entities:
a. State, county and local government agencies and departments.
b. Municipalities.
c. Public schools and school districts.
d. Public colleges and universities.
e. Public transit agencies.
f. Non-profit entities, or private entities in good standing with the New Hampshire Secretary of
State, whose projects would provide substantial public and economic benefits to NH, such as:
i. Job creation in NH.
ii. Providing publicly accessible transportation services.
iii. Supporting NH’s travel and tourism industry.
iv. Investment in NH communities.
v. Providing other measurable benefits such as rate decreases for services provided to local governments or public school districts.
Prior to formal scoring and evaluation as described in Section 3.1, applications from non-profit and private entities will be preliminarily assessed as described in Section 3.2, on the impact of the stated prospective public and economic benefits their proposed projects would provide to NH.
Previous participation or prior selection does not preclude future participation in the program. Please see Section B. Applicant eligibility of the New Hampshire Clean Diesel Program’s FAQs for more information.
1.11 Eligible projects and funding parameters
To be eligible, projects must reduce diesel emissions through:
a. Certified vehicle or equipment replacements.
b. Certified engine replacements.
c. Certified remanufacture systems.
d. Verified idle reduction technologies.
e. Verified aerodynamic technologies.
f. Verified low rolling resistance tires.
https://afdc.energy.gov/data/10380 https://www.des.nh.gov/sites/g/files/ehbemt341/files/documents/dera-faq.pdf
New vehicle, equipment, or engine replacements may be powered by any of the following fuels or technologies:
a. Zero tailpipe emission sources, such as:
i. Battery electric.
ii. Grid electric.
iii. Hydrogen fuel cell.
b. Compressed natural gas (CNG).
c. Propane or liquefied petroleum gas (LPG).
d. Hybrid diesel-electric.
e. Gasoline.
f. Diesel with an engine certified by EPA (or CARB, if applicable).
Certain restrictions are listed in Appendix B: EPA’s DERA State Grants Program Guide (particularly Section VIII pages 9-15 and Section X, pages 18-32). Applicants should review this guide to ensure their proposed project is eligible.
The grant funding and mandatory cost-share of approved projects are determined by the project type.
The tables below provide an overview of the maximum grant funding limits and minimum mandatory cost-share requirements for each eligible technology. Review Appendix B: EPA’s DERA State Grants Program Guide for further details, including links to EPA certification databases.
SEE NEXT PAGE FOR FUNDING AND ELIGIBILITY OVERVIEW TABLES.
https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=P1017V7B.pdf https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=P1017V7B.pdf https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=P1017V7B.pdf
Table 1. Non-road project funding and eligibility overview (for construction, cargo handling, marine, agriculture, mining and energy production sectors, including stationary generators)
Unit or Engine Type Engine Tier Restriction
Maximum Grant Funding
Minimum Mandatory Cost-Share
Non-road equipment replacement with EPA-certified diesel engine (e.g. diesel-powered graders, skid steer loaders, snow groomers, excavators, etc.)
Existing unit must be Tier 0-3; Replacement unit must be Tier 4 25% 75%
Non-road equipment replacement with CARB-certified low NOx engine* (certain LPG and CNG units; e.g. CNG-powered ice resurfacers)
Existing unit must be Tier 0-3 35% 65%
Non-road equipment replacement with zero-tailpipe emission power source, such as battery-electric (e.g. electricity-powered wheel loader)
Existing unit can be any Engine Tier 45% 55%
Marine engine replacement with EPA-certified diesel engine (<803 horsepower)
Existing unit must be Tier 0-2; Replacement unit must be Tier 3
40% 60%
Marine engine replacement with EPA-certified diesel engine (≥804 horsepower)
Existing unit must be Tier 0-2; Replacement unit must be Tier 3 or 4
40% 60%
Non-road engine replacement with EPA-certified diesel engine
Existing unit must be Tier 0-3. Replacement unit must be Tier 4
40% 60%
Non-road engine replacement with CARB-certified low NOx engine*
Existing unit must be Tier 0-3 50% 50%
Non-road engine replacement with zero-tailpipe emission power source, such as battery electric
Existing unit can be any Engine Tier 60% 40%
*Refer to EPA’s Low NOx fact sheet for help in identifying certified Low NOx Engines. Note that as of October 3, 2023, no diesel engines have been certified as meeting the CARB Optional Low NOx Standard.
https://nepis.epa.gov/Exe/ZyPDF.cgi/P10119PZ.PDF?Dockey=P10119PZ.pdf
Table 2. On-road project funding and eligibility overview (for class 5-8 trucks, transit and shuttle buses, and school buses of Types A, B, C, and D)
Unit Type Engine Model Year (EMY) Restriction
Maximum Grant Funding
Minimum Mandatory Cost-Share
Drayage truck replacement with EPA-certified diesel, alternative-fuel, or zero-tailpipe emission power source engine
New diesel unit:
existing unit must be EMY 2009 or older
New CARB-certified low NOx or zero-tailpipe emission unit: existing unit can be any EMY
50% 50%
On-road vehicle or equipment replacement with EPA-certified diesel engine
Existing unit must be EMY 2009 or older 25% 75%
On-road vehicle or equipment replacement with CARB-certified low NOx engine* (certain LPG and CNG units)
Existing unit can be any
EMY 35% 65%
On-road vehicle replacement with zero-tailpipe emission power source, such as battery-electric
Existing unit can be any
EMY 45% 55%
On-road engine replacement with CARB certified low NOx engine* (certain LPG and CNG units)
Existing unit can be any
EMY 50% 50%
On-road engine replacement with zero-tailpipe emission power source (such as battery electric)
Existing unit can be any
EMY 60% 40%
*Refer to EPA’s Low NOx fact sheet for help in identifying certified Low NOx Engines. Note that as of October 3, 2023, no diesel engines have been certified as meeting the CARB Optional Low NOx Standard.
https://nepis.epa.gov/Exe/ZyPDF.cgi/P10119PZ.PDF?Dockey=P10119PZ.pdf
Table 3. Other emissions reduction projects funding and eligibility overview
Idle Reduction or Aerodynamics Project Type Additional Requirements
Maximum Grant Funding
Minimum Mandatory Cost-Share
EPA-verified electrified parking space or truck stop idle reduction technologies, or shore power connection systems for marine vessels and locomotives*
Proposed technology and infrastructure must be Build America, Buy America (BABA) compliant
30% 70%
EPA-verified marine shore power connection systems*
Proposed technology and infrastructure must be BABA-compliant
25% 75%
EPA-certified remanufacture systems (for locomotives only)
None 100% 0%
EPA-verified locomotive idle reduction technologies*
None 40% 60%
EPA-verified highway idle reduction technologies without new exhaust after-treatment retrofit*
None 25% 75%
EPA-verified highway idle reduction technologies with new exhaust after-treatment retrofit*
None 100% 0%
EPA-verified aerodynamics and low rolling resistance tires when combined with new exhaust after-treatment retrofit
None 100% 0%
*Only EPA-verified idle reduction technologies are eligible. The types of idle reduction technologies proposed for funding under this category must exist on EPA’s list of SmartWay Technology for the vehicle/engine use specified in the application at the time of application submission.
1.12 Ownership, usage and remaining life requirements
The following eligibility criteria apply to all projects except for idle reduction projects. Each existing unit must:
a. Be equipped with a diesel-powered engine.
b. Operate the majority of the time in New Hampshire.
c. Be fully operational and in regular service.
d. Have a minimum of three years of anticipated operational life remaining. Applicants must include the anticipated date of retirement of the unit on the project proposal form included in Appendix A1 of this RFP.
e. Be owned and operated by the applicant for at least two years prior to the anticipated date of the unit’s replacement.
https://www.epa.gov/verified-diesel-tech/smartway-verified-list-idling-reduction-technologies-irts-trucks-and-school
f. Meet or exceed the corresponding usage requirement listed below. Note that for replacement projects, the usage of multiple units may be combined if they all are to be scrapped and replaced with a single unit.
i. Agricultural pumps: 250 hours per year during the two years prior to replacement.
ii. Locomotive and marine engines: 1,000 hours per year during the two years prior to replacement.
iii. All other non-road engines: 500 hours per year during the two years prior to replacement.
iv. All on-road/highway vehicles/engines: 7,000 miles per year during the two years prior to replacement.
Please note: NHDES will not seek waivers from EPA of unit ownership, remaining life and minimum usage requirements. Projects must meet all the eligibility requirements above to be considered for funding.
Section 2. General conditions If approved for funding, in addition to the scope of work detailed in the grant agreement, all recipients must confirm or perform the following:
1) Implementation requirements
a. For non-road unit replacement, the replacement unit’s engine horsepower must not exceed the existing unit’s engine horsepower by greater than 40%.
b. For on-road/highway unit replacement, the replacement unit must not be in a larger weight class (i.e., class 5-8) than the existing unit. Note: the replacement unit can be a smaller weight class than the existing unit.
c. The replacement unit(s)/technology must be used in normal service (for replacements, in functions similar to their corresponding existing units) for a period of no less than five years. In the event that recipients sell or surplus their replacement unit(s)/technology within five years of the effective date of the grant agreement, recipients may be required to reimburse the State of New Hampshire as specified in the grant agreement.
d. Electric vehicle supply equipment (EVSE) and electrified parking space technologies--including charging units, mounts, cables, and pedestals – funded through this Program are subject to Buy America Sourcing requirements under the Build America, Buy America (BABA) provisions of the Infrastructure Investment and Jobs Act (IIJA). Please consider these requirements when preparing project and budget information. For more information, please visit EPA’s Build America, Buy America website.
2) Information and communication requirements
a. Provide timely responses to NHDES to enable development and approval of a grant agreement in a timely manner.
b. Submit project status reports as described in the grant agreement. Project status reports shall contain, at a minimum, the procurement status of the replacement unit, the miles driven/hours of operation, fuel usage, idling hours, and service status/maintenance information for existing and replacement units for the reporting period, as applicable. Failure to report will be considered a violation of the terms of the grant agreement.
i. Quarterly status reports will be due on 1/15, 4/15, 7/15 and 10/15 of every year and for two (2) years after the acquisition of the replacement unit.
https://www.epa.gov/cwsrf/build-america-buy-america-baba https://www.epa.gov/cwsrf/build-america-buy-america-baba
ii. Subsequent to the quarterly reports, three (3) annual reports will be due on 1/15 of every year, beginning the January following the last quarterly report.
3) Service and scrappage requirements for unit replacement projects
a. Each existing unit must be taken out of service no later than 15 days from the date that the corresponding replacement unit is put into service.
b. Each existing unit must be scrapped and permanently disabled within 90 days from the date that the corresponding replacement unit is put into service. Engines being replaced must be permanently disabled by creating a minimum three-inch diameter hole in the engine block.
Units being replaced must also be scrapped by cutting the frame/frame rail(s) in half.
Representatives of NHDES must be allowed the opportunity to witness the destruction with a two-week (minimum) advance notice of the event.
i. The scrapped engine/chassis may be sold for scrap/salvage and funds put towards the mandatory match, so long as the value of the scrap/salvage is reported to NHDES.
Section 3. Proposal evaluation and award
3.1 Formal evaluation and scoring
Applications will be evaluated on the criteria in Table 5. Scoring criteria. If two or more proposals receive the same score, preference will be given to the proposal which NHDES staff determines to best align with EPA’s DERA funding priorities.
3.2 Preliminary assessment of non-profit and private entity
applications
Non-profit and private entity applications will be preliminarily assessed on the impact of the stated prospective public and economic benefits their proposed projects would provide to NH. In order for the application to proceed to formal evaluation and scoring described in Section 3.1, the application must receive a minimum Impact Score of four (4) as per the criteria in Table 4. Impact score.
Table 4. Impact score
Scoring Criteria Maximum Points
Public and Economic Benefits – Description is clear and complete. Benefits are substantial. Impact is verifiable or quantifiable. Benefits and impact are assured.
3.3 Priority New Hampshire Communities
NHDES seeks to prioritize projects benefiting rural or resource-strapped New Hampshire communities, termed “Priority New Hampshire Communities.” These communities may be economically challenged with fleet and technology procurement, and/or may be disproportionately affected by higher levels of diesel pollution or legacy environmental issues. To this end, NHDES has assembled a list of these Priority New Hampshire communities, ranked by the percentage of individuals below the poverty line using New Hampshire Employment Security’s NH Community Profiles data.
Projects benefiting these communities may receive up to five (5) or ten (10) bonus points, depending on the percentage of individuals below the poverty line ranking. The 50 communities with the highest individual poverty rates may receive up to ten (10) bonus points, contingent upon project impact;
communities ranked 51-100 on this list may receive up to five (5) bonus points, contingent upon project impact. Please see the full list of Priority New Hampshire communities and their respective bonus point eligibility on the New Hampshire Clean Diesel Program webpage for more information.
SEE NEXT PAGE FOR SCORING CRITERIA.
https://www.des.nh.gov/business-and-community/loans-and-grants/dera
Table 5. Scoring criteria
Scoring Criteria Maximum Points
Proposal Clarity, Project Readiness & Funding Viability – Application is complete and directly addresses all questions asked. All aspects of project proposal are thoroughly developed. Project seems feasible within budget and will be completed within a reasonable timeframe.
Cost Effectiveness of NOx Reductions – Calculated using tools provided by Environmental Protection Agency (EPA) or National Laboratory of the Rockies (NLR). 20 Cost Effectiveness of PM2.5 Reductions – Calculated using tools provided by EPA or NLR. 20 Cost Effectiveness of CO2 Reductions – Calculated using tools provided by EPA or NLR. 10 Percent Operation in NH -- Based on hours of operation or miles traveled within NH.
Additional Benefits – Project provides benefits in addition to air quality, such as water quality, noise reduction, scalability, plans to showcase the project and/or economic or workforce development. 10
Total 100
Bonus Criteria Potential
Points Alternative Fuel Bonus:
• 15 points for battery-electric, grid electric or hydrogen fuel cell electric.
• 10 points for propane, CNG or plug-in hybrid.
• 5 points for conventional hybrid.
New Hampshire Public Entity Bonus – includes the following New Hampshire entities:
a. State, county and local government agencies and departments.
b. Municipalities.
c. Public schools and school districts.
d. Public colleges and universities.
e. Public transit agencies.
Priority New Hampshire Communities Bonus – Project impacts an area identified as a Priority New Hampshire Community based on Individuals Below Poverty Line Percentage.
Rankings determined using New Hampshire Employment Security’s New Hampshire Community Profiles data.
• Up to 10 points if community is ranked 1-50 in highest percentage of individuals below poverty line, contingent upon project impact.
• Up to 5 points if community is ranked 51-100 in highest percentage of individuals below poverty line, contingent upon project impact.
Total 140
Section 4. RFP terms and conditions
4.1 Proposal preparation cost
By submitting a project proposal application (proposal), an applicant agrees that in no event shall the State be either responsible for or held liable for any costs incurred by an applicant in the preparation of or in connection with the proposal, or for work performed prior to the effective date of a resulting grant agreement.
4.2 RFP addendum
The State reserves the right to amend this RFP at its discretion, prior to the proposal submission deadline. In the event of an addendum to this RFP, the State, at its sole discretion, may extend the proposal submission deadline, as it deems appropriate.
4.3 Property of the state
All material received in response to this RFP shall become the property of the State and will not be returned to the applicant. Upon grant agreement award, the State reserves the right to use any information presented in any proposal.
4.4 Proposal confidentiality
Unless necessary for the approval of a grant agreement, the substance of a proposal must remain confidential until the effective date of any grant agreement resulting from this RFP. An applicant’s disclosure or distribution of proposals other than to the State may be grounds for disqualification.
4.5 Public disclosure
The information submitted in response to this RFP (including all materials submitted in connection with it, such as attachments, exhibits, addenda, and presentations), any resulting grant agreement, and information provided during the provided during development of a grant agreement may be subject to public disclosure under Right-to-Know law, including RSA 91-A.
Confidential, commercial or financial information may be exempt from public disclosure under RSA 91- A:5, IV. If an applicant believes any information submitted in response to this RFP should be kept confidential, the applicant must specifically identify that information where it appears in the submission in a manner that draws attention to the designation and must mark/stamp each page of the materials that the applicant claims must be exempt from disclosure as “CONFIDENTIAL.”
Applicants must also submit a letter to the program contact for this RFP, identifying the specific page number and section of the information you consider to be confidential, commercial or financial and providing your rationale for each designation. Marking or designating an entire proposal, attachment or section as confidential shall neither be accepted nor honored by the State. Applicants must also provide a separate copy of the full and complete document, fully redacting those portions and shall note on the applicable page or pages that the redacted portion or portions are “confidential.”
Submissions which do not conform to these instructions by failing to provide a redacted copy (if necessary), by failing to provide a letter specifying the rationale for each redaction, by failing to designate the redactions in the manner required by these instructions, or by including redactions which are contrary to these instructions or operative law may be rejected by the State as not conforming to the requirements of the proposal.
Pricing, which includes but is not limited to, the administrative costs and other performance guarantees in Proposals or any subsequently awarded grant agreement shall be subject to public disclosure regardless of whether it is marked as confidential.
Notwithstanding an applicant’s designations, the State is obligated under the Right-to-Know law to conduct an independent analysis of the confidentiality of the information submitted in a proposal. If a request is made to the State to view or receive copies of any portion of the proposal, the State shall first assess what information it is obligated to release. The State will then notify you that a request has been made, indicate what, if any, information the State has assessed is confidential and will not be released, and specify the planned release date of the remaining portions of the proposal.
To halt the release of information by the State, an applicant must initiate and provide to the State, prior to the date specified in the notice, a court action in the Superior Court of the State of New Hampshire, at its sole expense, seeking to enjoin the release of the requested information.
By submitting a proposal, applicants acknowledge and agree that:
• The State may disclose any and all portions of the proposal or related materials which are not marked as confidential and/or which have not been specifically explained in the letter to the program contact for this RFP;
• The State is not obligated to comply with an applicant’s designations regarding confidentiality and must conduct an independent analysis to assess the confidentiality of the information submitted in your proposal; and
• The State may, unless otherwise prohibited by court order, release the information on the date specified in the notice described above without any liability to an applicant.
4.6 Electronic posting of RFP results and resulting grant agreement Pursuant to RSA 91-A and RSA 9-F:1, the Secretary of State will post to the public any document submitted to G&C for approval, including grant agreements resulting from this RFP, and posts those documents on its website). By submitting a proposal, applicants acknowledge and agree that, in accordance with the above-mentioned statutes and policies, (and regardless of whether any specific request is made to view any document relating to this RFP), any grant agreement resulting from this RFP that is submitted to G&C for approval will be made accessible to the public online.
4.7 Non-commitment
Notwithstanding any other provision of this RFP, this RFP does not commit the State to award a grant agreement. The State reserves the right, at its sole discretion, to reject any and all proposals, or any portions thereof, at any time; to cancel this RFP; and to solicit new proposals under a new acquisition process.
https://sos.nh.gov/administration/miscellaneous/governor-executive-council/ https://sos.nh.gov/administration/miscellaneous/governor-executive-council/
| Section 1. Information and instructions |
| 1.1 Basic information |
| 1.2 Background |
| 1.3 Available funding, restrictions and reimbursement |
| 1.4 Designated contact email address |
| 1.5 Program schedule |
| 1.6 Project proposal application submittal |
| 1.7 Project costs |
| 1.8 Project award effective dates and completion dates |
| 1.9 Definitions |
| 1.10 Eligible applicants |
| 1.11 Eligible projects and funding parameters |
| 1.12 Ownership, usage and remaining life requirements |
| Section 2. General conditions |
| Section 3. Proposal evaluation and award |
| 3.1 Formal evaluation and scoring |
| 3.2 Preliminary assessment of non-profit and private entity applications |
| 3.3 Priority New Hampshire Communities |
| Section 4. RFP terms and conditions |
| 4.1 Proposal preparation cost |
| 4.2 RFP addendum |
| 4.3 Property of the state |
| 4.4 Proposal confidentiality |
| 4.5 Public disclosure |
| 4.6 Electronic posting of RFP results and resulting grant agreement |
| 4.7 Non-commitment |
File details come from the government source that posted it. Updated .