RFP Addendum 1 - 26414.docx

DOCX document 188 KB Posted

Attached to
511/26414. CAK; Fort Custer CST - Armory Renovation
Solicitation number
RFP 171 260000002417 2
Issued by
Michigan

About this file

This is an RFP Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration Design and Construction Division, in coordination with the Department of Military and Veterans Affairs (DMVA) for the Fort Custer CST Armory Improvements project (File Number 511/26414.CAK). The addendum, issued July 31, 2026, clarifies and modifies the original RFP requirements for Professional Services Contractor (PSC) selection. The proposal due date is August 6, 2026. Key scope modifications include that DMVA will provide a hazardous materials survey report for the existing CST Building to the selected PSC, and the PSC must include survey and soil borings as specified in Section F of the Design Guide using an existing site survey document that DMVA will provide in Civil 3D format. The PSC shall submit separate fees for Phase 300, 400, 500, 600, and 700 services for two alternates: complete design of a new motor vehicle storage building (MVSB) and parking lot relocation for the new MVSB, MIL, and POV. An optional pre-proposal site visit is scheduled for Monday, August 3, 2026, at 10:00 a.m., with interested parties required to contact Scott Domanski at domanskis@michigan.com prior to attendance. Sign sheets for on-site and remote attendance at the Pre-Proposal Meeting are provided.

Since the project is 100% Federally funded and located on Federal property, plans and specifications are not required to be submitted to the Michigan Department of Licensing and Regulatory Affairs (LARA) for plan review. The PSC shall coordinate with the DMVA Capital Facilities Management Office (CFMO) for storm water design. Construction documents must include Federal Davis-Bacon wage determinations for when the project is bid. The design scope includes all new finishes for the restroom renovation, and updated proposed site plan and floor plan documents have been provided with this addendum.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 2/22)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL

ADDENDUM NO. 1

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals. Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.

TO:
ALL PROPOSERS
DATE ISSUED

July 31, 2026

PROJECT NAME

Fort Custer CST Armory Improvements

FILE NUMBER

511/26414.CAK

PROJECT DIRECTOR

Chris Kulhanek

PROPOSAL DUE DATE:

August 6, 2026

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

1. DMVA will arrange for a hazardous materials survey and report to be completed for the existing CST Building. The report will be shared with the selected Professional Services Contractor (PSC).

2. The PSC shall include survey and soil borings as indicated in Section F of the Design Guide. Please see the attached PDF of the existing site survey. DMVA has this document in Civil 3D as a dwg extension and will share this file with the selected PSC.

3. The PSC should provide fees separate from the base scope of work for Phase 300, 400, 500, 600 and 700 services for the alternates noted in the Design Guide:

A. Complete design of new motor vehicle storage building (MVSB). Alternate B. Parking lot relocation for new MVSB, MIL and POV. Alternate Please see the attached sample Phase Summary Format table for reference.

4. Please see the attached sign sheets for on site and remote attendance at the Pre-Proposal Meeting.

5. The PSC should work with DMVA CFMO office for storm water design. The project is on Federal property and is not subject to local jurisdictions.

6. Because this project is 100% Federally funded and on Federal property plans and specifications are not required to be submitted to LARA for plan review.

7. The construction documents should include Federal Davis-Bacon wage determinations when the project is bid.

8. Please see the attached updated proposed site plan and floor plan.

9. The design scope shall include all new finishes for the restroom renovation.

10. An optional site visit will be held on Monday, August 3 at 10:00. PSC and/or consultants wishing to attend should contact Scott Domanksi domanskis@michigan.com prior to the meeting.

attachments

APPROVED BY:

Chris Kulhanek

PROJECT DIRECTOR DATE 7-31-2026