RFP 8939 09172026.pdf
PDF 9 MB Posted
- Solicitation number
- 8939
- Issued by
- New Haven County, Connecticut
About this file
Summary of RFP 8939 - Prefabricated Modular Housing Construction
This Request for Proposal (RFP) is issued by the City of Waterbury on behalf of the Waterbury Land Bank Authority (WLB) to solicit qualified general contractors for the construction of two prefabricated modular duplex housing units located at 234 and 238 Orange Street in Waterbury, Connecticut. The project encompasses new construction of two independent but contiguous residential duplexes within the W.O.W. (Walnut Orange Walsh) Neighborhood Revitalization Project. Each duplex unit will measure approximately 900-950 square feet with a 24-foot width, feature three bedrooms on the first floor and at least two bedrooms on the second floor, include public utilities (gas and electric), HVAC units with air conditioning, and a crawl space foundation. Site work will include driveways and three on-site parking spaces per parcel along with accessory landscaping. A mandatory information session and site visit is scheduled for October 1, 2026 at 12:00 PM at 234 Orange Street. All questions and clarification requests must be submitted by 2:00 PM on October 6, 2026, with addenda responses published by 2:00 PM on October 13, 2026. Proposals must be received by 11:30 AM on October 23, 2026. The contract period will commence upon delivery of a written Notice to Proceed following execution by both parties. Proposers must submit one original and five paper copies along with a PDF version on a CD or flash drive.
Proposals must include a separate sealed cost proposal submitted in Attachment J format and will be evaluated based on qualifications, experience, ability to meet timelines, financial capacity, past performance, and competitiveness of pricing. Qualified contractors must demonstrate experience with prefabricated modular housing development, site work in urban areas, and knowledge of HUD Grant Guidelines. A proposal security of 10 percent of the total price proposal is required for proposals exceeding $50,000. The project is funded through U.S. Department of Housing and Urban Development (HUD) Community Project Funding (CPF) and is subject to HUD Davis-Bacon prevailing wage requirements for all on-site work, Section 3 employment requirements, Build America Buy America Act (BABAA) domestic preference requirements, and Executive Order compliance provisions. Permit fees are waived by the City. No state prevailing wage requirements apply. Contractors must maintain insurance with minimum coverages including $1,000,000 general liability, $2,000,000 aggregate, and $1,000,000 auto liability. The WLB will work with selected contractors to qualify local subcontractors for Section 3 requirements. A Phase 1 environmental assessment and HUD environmental study have been completed with no contaminants observed.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (#8939)
BY THE CITY OF WATERBURY
ON BEHALF OF THE WATERBURY LAND BANK AUTHORITY
FOR THE CONSTRUCTION OF TWO PREFABRICATED MODULAR HOUSING DUPLEXES
Land Bank Authority is seeking Proposals from qualified general contractors to carry out the new construction of two (2) prefabricated modular (duplex) housing units on two independent but contiguous parcels located at 234 and 238 Orange Street, Waterbury, Connecticut. Said Project is more specifically described in Attachment G.
The property information including a proposed site sketch with building envelope is identified in Attachment E. This RFP process shall be conducted consistent with the provisions of the City of Waterbury Code of Ordinances, Chapters 38-39, also known as
The RFP process shall be administered by the City of Waterbury Purchasing Department.
A. Background and Intent
The purpose of this RFP is to secure a qualified general contractor with either: experience in prefabricated modular housing development and experience in site work in Waterbury or similar urban areas; or experience as a general contractor with the ability to procure and acquire modular home units from a reputable modular home manufacturer, and has extensive experience in site work in Waterbury or similar urban areas. The general contractor should have experience or knowledge of HUD Grant Guidelines.
The general contractor will be required to be familiar with federal requirements, as published see section 5 of the below grant guide, pages 16
27) CPF Grant Guide - July 2026 Version 1.0. (Pages 16 to 27 of this guide as noted, are included within this RFP for reference as Attachment L.)
Since the project will include a prefabricated modular home development whereby the units are manufactured within the manufacturers warehouse, HUD Davis Bacon and Section 3 requirements do not apply to the units per se. These requirements are required, however, for any work done on the site.
The WLB will work with the general contractor to qualify local contractors as it pertains to the Section 3 requirements.
The HUD Section 3 Documentation (includes 13 pages) included as Attachment K.
eived funding from the U.S.
Department of Housing and Urban Development (HUD) via the CT State Congressionally es/ of prefabricated modular construction (housing units) on two independent but contiguous parcels located at 234 and 238 Orange Street which is within the W.O.W. (Walnut Orange Walsh) Neighborhood within the City of Waterbury. Each parcel will be improved with one modular duplex unit along with necessary site work to accommodate a driveway and three
(3) on-site parking spaces, and accessory landscaping. (Please see Attachment G.)
This RFP is seeking qualified and professional general contractors who have an established track record. An established contractual relationship with a prefabricated modular housing manufacturer is a plus but not required.
The WLB owns the parcels which are subject of this RFP with each parcel being suitable for housing development. Each parcel will be independently developed with a two-story duplex.
The proposed width of each modular unit is 24 LF which is in accordance to City Planning and Zoning requirements. The proposed SF area of each unit will be 900 to 950 SF. The desired number of bedrooms per unit is three on the first floor and at least two on the second floor. We would anticipate each duplex to have a crawl space (basement not required.) Each unit shall also have public utilities (gas and electric) and HVAC units with air conditioning.
The contractor will work with the WLB on this project, and in accomplishing this goal. The WLB anticipates that the selected contractor would provide a fee proposal for the work described and outlined in Attachment J. The WLB will assist the general contractor as a liaison with the City. It has been determined that all permit fees by the City will be waived, therefore, permit fees are not included in the cost proposal.
Project Information in Attachment G, includes a project summary, concept plan with building envelope sketch, a sample floor plan(s), and a proposed timeline. It is assumed that the foundation will include an appropriate crawl space to accommodate site infrastructure /hook ups, or other mechanicals. No basement is required.
Property Information in Attachment E, includes a location map, tax map for each parcel, assessor property card, and a survey of the property. The contractor may come to the WLB office to review the survey if needed. Additionally, the WLB has completed a Phase 1 environmental area assessment of the site; and a HUD environmental study. No contaminants were observed during these studies.
It is the intent of the WLB for the Successful Proposer to furnish all labor, services, materials, tools, equipment, transportation and incidentals necessary to execute and properly finish the Project, as detailed and described herein.
Funding for this Pr Initiative - Community Project Funding (HUD-CPF). will be provided to the general contractor at the time of the mandatory site visit. Contractor is required to conform to and comply with all applicable requirements set forth therein. This compliance requirement includes applicable Federal statutes, issued by the Department of Housing and Urban Development (HUD.) This Contract is subject to 2 C.F.R. Part 180 0MB Guidelines to Agencies on Government Debarment and Suspension and the U.S.
Treasury's implementing regulations set forth at 31 C.F.R. Part 19, Government Debarment and Suspension.
B. Qualifications
Eligible General Contractors/Proposers will be those individuals, businesses, and institutions that have the following qualifications:
1. Experience and expertise in regard to providing the Work, Services and/or Items to be procured as detailed and described in the RFP.
2. Ability to undertake and complete the Scope of Services.
3. Proven track record in providing the type of Work, Services and/or Items required by the RFP.
4. Proven track record of meeting project budgets (if provided) and contract timelines.
5. Adequate staff/employees to complete the Scope of Services in a timely manner.
6. Knowledge of, and compliant with, all applicable Federal, State, and City of
Waterbury laws and regulations governing the services to be provided under this
RFP.
7. At the time of contract award, has or will have sufficient capacity, facilities, equipment, labor, financial capability, and experience to provide all services required hereunder throughout the Agreement Period, plus any extensions thereof, and to conduct all such services in a regulatory-compliant and reliable manner.
8. Proposers shall be registered with the State of Connecticut Secretary of State to do business in the State of Connecticut.
9. Proposers shall have knowledge and/or experience in prefabricated modular home construction, have experience in performing housing construction site work in urban areas.
C. Scope of Services
1. Scope of Work Summary. The scope of work for this Project includes:
contracting with and purchasing modular units from the prefabricated housing manufacturer; ordering the housing units in unison with working on the design details with the WLB; securing any/all approvals/permits etc. with the City of Waterbury; preparing site work for development; delivering housing units to the site and assembling said units; completing final construction details for occupancy;
working through and obtaining Certificate of Occupancy; working with the Waterbury Land Bank Authority on pre-sales of units.
2. (Attachment E), for the development of two duplex, prefabricated, modular housing units, and to the Project Information regarding the housing units (Attachment G) which describe and illustrate the work and services associated with this RFP.
D. Agreement Period
1. Any award of work equal to or greater than $50,000.00 shall require a formal Contract. If a Contract is awarded as a result of this RFP, the Successful Proposer agrees and covenants that the Contract Time shall commence upon delivery of the Waterbury Land Bank written Notice to Proceed, which shall occur after contract execution by both parties.
E. Insurance
The Successful Proposer (also referred to herein as shall provide insurance as set forth in Attachment D provided by insurers, satisfactory to the City and authorized to do business in the State of Connecticut, with a minimum - Rating and at least a Class V3 or better financial category as shown in the most current A.M. Best Company ratings.
F. General Information
1. The WLB is an Equal Opportunity and Affirmative Action employer and does not discriminate in hiring, employment, or business practices. Small, minority and women business enterprises are encouraged to submit a Proposal in response to this RFP. The WLB is committed to complying with the Americans with Disabilities Act of 1990 (ADA) and does not discriminate on the basis of disability, in admission to, access to, or operation of its programs, services, or activities. WLB is compliant with Title VI of the Civil Rights Act of 1964.
2. RFP Documents
In order to view, download and receive all RFP related documents and notifications issued by the City, potential Proposers must register online at the City o f p rocuremen t w e bs i te
(https://waterburyct.procureware.com/register).
Please note that completion of the registration process requires entry of a valid email address and selection of at least one category classification.
3. Information Session
There will be a Mandatory Information Session and Site Visit with respect to this RFP on Thursday, October 1, 2026 at time 12:00 PM, at the site location 234 Orange Street, Waterbury, CT
4. All questions, requests for clarification and communications about this RFP and submission requirements must be submitted through the City of Waterbury ProcureWare website and must be received by 2:00 PM on October 6, 2026. Prospective Proposers must limit their contact regarding this RFP to the Purchasing Director or such other person otherwise designated by the Purchasing Director.
Addenda responding to questions submitted by the above date or identified at any Information Session to be held in regard to this RFP, along with any changes or amendments to this RFP, will be available via the City of Waterbury ProcureWare website by 2:00 PM on October 13, 2026. It shall be the responsibility of the Proposer to download this information. If you have any procedural questions in this regard, please contact the Purchasing Director or such other person otherwise designated by the Purchasing Director.
G. Management
Any contract resulting from this RFP will be between the Waterbury Land Bank Authority and the Proposer and shall be managed exclusively by the Waterbury Land Bank Authority Executive Director.
H. Conditions
The submission of a Proposal will be considered conclusive evidence that the Proposer is willing to adhere to, and is in agreement with, the following conditions, as well as all other terms, conditions and requirements of the RFP:
1. All proposals in response to this RFP are to be the sole property of the WLB. Proposers are encouraged not to include in their proposals any information which is proprietary. All materials associated with this procurement process are subject to the terms of state laws defining freedom of information and privacy and all rules, regulations and interpretations resulting from those laws.
2. Any product, whether acceptable or unacceptable, developed under a contract or purchase order awarded as a result of the RFP is to be the sole property of the WLB.
3. The timing and sequence of events resulting from this RFP will ultimately be determined by the Waterbury Land Bank Authority.
4. The Proposer agrees that the proposal will remain valid for a period of at least One Hundred Twenty (120) consecutive calendar days after the closing date for the proposal submission and may be extended beyond that time by mutual agreement.
5. The WLB may amend the terms or cancel this RFP any time prior to the execution of a contract or purchase order for these services if the WLB deems it to be necessary, appropriate or otherwise in the best interests of the WLB. Failure to acknowledge receipt of addendums may result in a proposal not being considered. or of Purchasing, the WLB may provide all Proposers with a limited opportunity to remedy any technical deficiencies identified by the WLB in their initial review of proposals.
6. The Proposer must certify that the personnel identified in its response to this RFP will be the persons actually assigned to the project. Any additions, deletions or changes in personnel from the Proposal during the course of the agreement period must be approved by the WLB, with the exception of personnel who have terminated employment. Replacements for personnel who have terminated employment are subject to approval by the WLB. At its discretion, the WLB may require the removal and replacement of any of the Proposer's personnel who do not perform adequately, regardless of whether they were previously approved by the WLB.
7. All subcontractors hired by the Proposer awarded a contract as a result of this RFP must have prior approval of the WLB prior to and during the Agreement Period.
8. Any costs and expenses incurred by Proposers in preparing or submitting Proposals are the sole responsibility of the Proposer.
9. A Proposer must be prepared to present evidence of experience, ability, financial standing, and any other information deemed necessary by the WLB to satisfactorily meet the requirements set forth or implied in the Proposal.
10. No additions or changes to the original Proposal will be allowed after submittal, except as may be allowed by the WLB, at its option, in accordance with Section H.5. of this RFP. While changes are not permitted, clarification of Proposals may be required by the WLB at the sole cost and expense. The final price and scope of services of any contract resulting from this RFP may be negotiated with responsible Proposers.
11. The Proposer may be required to give presentations to the extent necessary to satisfy the requirements or needs. In some cases, Proposers may have to give presentations or further explanation to the RFP selection committee established by the WLB.
12. The Proposer represents and warrants that the Proposal is not made in connection with any other Proposer and is in all respects fair and without collusion or fraud. The Proposer further represents and warrants that it did not participate in any part of the RFP development process, had no knowledge of the specific contents of the RFP prior to its issuance, and that no agent, representative or employee of the WLB participated directly in the preparation.
13. The Proposer represents and warrants that it has (a) examined the RFP thoroughly, (b) familiarized itself with all Federal, State and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of the Work; and (c) studied and carefully correlated the
Documents.
14. All responses to the RFP must conform to instruction. Failure to include any required signatures, provide the required number of copies, to meet deadlines, answer all questions, follow the requested format, or failure to comply with any other requirements of this RFP may be considered appropriate cause for rejection of the response.
15. If a Contract is awarded as a result of this RFP, the Successful Proposer must Attachment B). Further, submission of a Proposal will constitute an incontrovertible representation by the Proposer that Proposer accepts the terms contained in Attachment B.
16. Execution of Contract and Conditions. Time is of the essence, and subsequent to a Notice of Award, if any, to the Successful Proposer, multiple unsigned copies of a Contract and all other applicable contract documents (if a Contract is awarded as a result of this RFP) will be made available to the Successful Proposer for execution. Within ten (10) consecutive calendar days, thereafter, Successful Proposer shall fully complete, execute and return all copies of the contract and all other applicable contract documents, including without limitation, acceptable certificates of insurance, a Corporate/LLC Resolution, and all required bonds to the WLB. Thereafter, upon all required reviews, approvals, and the WLB signature, the WLB will deliver one fully executed copy of the contract to Successful Proposer.
17. Should the Successful Proposer fail to timely execute and deliver the Contract, evidence of insurance, or fail to timely fulfill any other such preconditions, the WLB may, at its option and discretion, rescind the Notice of Award and thereafter negotiate with the next ranked Proposer, or may reject all Proposals.
18. Any contract or purchase order resulting from this RFP process will represent the entire agreement between the Proposer and the WLB and will supersede all prior negotiations, representations or agreements, alleged or made, between the parties.
19. The WLB shall assume no liability for payment of services under the terms of the contract until the successful Proposer is notified that the contract has been accepted and approved by the WLB. Any contract resulting from this RFP may be amended only by means of a written instrument signed by the Proposer and signed by the Executive Director of the WLB.
I. Proposal Requirements & Required Format
1. One original (clearly identified as such) and five paper copies of the Proposal, as well as a copy of the original Proposal in pdf format on a CD or flash drive, must be received at the following address no later than 11:30 AM on October 23, 2026.
Proposals received after that time shall not be considered.
Mr. Kevin McCaffery Director of Purchasing
City of Waterbury 235 Grand Street
Room 103 Waterbury, CT 06702
a. Proposals shall be submitted as directed herein. At the discretion, failure to do so may result in disqualification.
b. Proposals must set forth accurate and complete information in connection with each of the items/documents listed below, and all forms shall be fully completed and properly executed, and completed in ink or typed written, with all requested contact information (name, address, etc.) provided. All required signatures and notarizations shall also be provided.
c. Proposals must be single sided, bound or stapled and Proposers shall make the requisite copies of all forms, etc., as required.
d. Proposer is solely responsible for ensuring its Proposal is received by the Director of Purchasing, at the location indicated, on or before the above-stated time and date. The City will in no way be responsible for any delays in delivery, regardless of cause.
2. Proposals must include the following items (summarized below) as part of their Proposal submission:
Contract Compliance Documents (Attachment A) Non-Collusion Affidavit and Addenda Acknowledgment (Attachment C) Price Proposal (ATTACHMENT J)
a. Contract Compliance Documents (Attachment A)
i. Proposer shall fully complete and include as part of its Proposal submission the following Contract Compliance Documents (Attachment A):
Certification Regarding Debarment
Annual Statement of Financial Interests
Disclosure & Certification Affidavit Regarding Outstanding Obligations
ii. If a Contract is awarded as a result of this RFP, the Successful Proposer shall complete and sign a Corporate/LLC Resolution, as applicable, (see Attachment A) and date it the same day the Successful Proposer signs the Contract.
b. Non-Collusion Affidavit and Addenda Acknowledgment (Attachment C)
i. Proposer shall fully complete and include as part of its Proposal submission Attachment C addressed to Mr. Kevin McCaffery, which, in part, includes a statement by the Proposer accepting all terms and conditions and requirements contained in the RFP, as well as affirmative statement certifying that the Proposer has not colluded with any other Proposer.
ii. Proposer shall be responsible for determining that it has received all Addenda issued and shall acknowledge receipt of all Addenda as required per Attachment C.
c. Sample Proposal Security (Attachment F)
i. Any Proposal with a Total Price Proposal of over Fifty Thousand Dollars ($50,000.00) shall be accompanied by a Proposal Security (a Certified Check or Bid Bond) in the amount of ten (10) percent of the Total Price Proposal.
ii. attention is directed to Attachment F for an example of Proposal Security acceptable to the City.
d. Proposer Qualification Statement (Attachment H)
Proposer shall fully complete and include as part of its Proposal submission the Contractor Qualification Statement (Attachment H).
e. CHRO/State Set-Aside Requirements - THIS REQUIREMENT DOES
NOT APPLY TO THIS RFP
i. The contractor who is selected to perform this municipal public works project, funded in whole or part by the State, must comply with CONN. GEN.
STAT. §§ 4a-60, 4a-60a, 4a-60g, and 46a-68b through 46a-68f, inclusive, as amended by Public Act 23-204 and Public Act 25-168. An Affirmative Action Plan must be filed with and approved by the Commission on Human Rights and Opportunities prior to the commencement of construction.
ii. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services under the provisions of CONN. GEN. STAT. § 4a-60g, as amended.
(25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The contractor must demonstrate good faith effort to meet the 25% set-aside goals.
iii. For municipal public works contracts, the contractor must file a written or electronic non-discrimination certification with the Commission on Human Rights and Opportunities. Forms can be found at http://www.ct.gov/opm/cwp/view.asp?a=2982&q=390928&opmNav_GID=1 806.
f. Section 3, Housing and Urban Development Act
i. Section 3 of the Housing and Urban Development Act typically applies to all contractors or subcontractors that receive contracts with Two Hundred Thousand Dollars ($200,000.00) or more of HUD funding .
attention is directed to HUD Section 3 Documentation included in this RFP (Attachment K agreement language (see Attachment B) for additional information regarding the requirements and application of Section 3 of the Housing and Urban Development Act.
ii. HUD Section 3 requirements apply ONLY TO THE SITE WORK FOR THIS
PROJECT.
iii. Proposer, therefore, shall complete and submit as part of its Proposal submission the following (see Attachment K):
A completed Assurance Compliance Form (i.e., a completed Exhibit 4 of HUD Section 3 Documentation), and, An Economic Opportunity Plan in accordance with Exhibit 5 of HUD Section 3 Documentation).
g. CT-DAS Contractor Prequalification Requirements - THIS
REQUIREMENT DOES NOT APPLY TO THIS RFP
If applicable, Proposers shall submit with their Proposals their DAS Contractor Prequalification Certificate along with a current Updated Bid/Proposal Statement. In addition, any named Subcontractor whose subcontract value is equal to or greater than $500,000 shall hold a current DAS Contractor Prequalification Certificate in the closest applicable Classification of the work that the Subcontractor will complete in the contract. The proposer must submit with their proposal, all applicable Subcontractor DAS Prequalification certificates. Any Proposal submitted without a copy of the DAS Prequalification Certificate and an Updated Bid/Proposal Statement for the proposal and DAS Prequalification Certificates for Subcontractors whose subcontract value is equal to or greater than $500,000 shall be invalid.
The Successful Proposer and each of its Subcontractors having subcontracts in value equal to or greater than $500,000 shall maintain and keep current their respective DAS Contractor Prequalification Certificates at all times during the term of the Contract and any warranty period set forth in the Contract Documents.
3. Exceptions and Alternatives, Expected City Services
Proposals may, at discretion, contain the following:
1. Exceptions and Alternatives. Proposers wishing to take any exceptions or provide alternatives to certain provisions and/or requirements of the RFP shall state and explain such exceptions/alternatives; however, no exceptions or alternatives to agreement language (see Attachment B), will be considered.
a. The WLB may accept Proposals which take exception to any requirements in this RFP, or which offer any alternative to a requirement herein as well as consider such exceptions and alternatives in evaluating Proposals. Any exception or alternative must be clearly delineated referencing the specific provision(s) and/or items at issue (plus, include pricing information, where appropriate) and cannot impermissibly affect the substance of this RFP. Further, the volume of exceptions/alternatives
b. The WLB, in its sole discretion, may accept some or all of the proposed exceptions, alternatives or additions or reject same. Any exception, alternative or addition that has not been accepted by the WLB in writing is deemed rejected.
2. Anticipated services to be provided by the WLB. Identify the nature and scope of the services that would be generally required in undertaking this project.
3. The taking of any exception or proposing of any alternative or addition, as well as the identification of any anticipated services by the City/WLB, is not binding on the WLB, legally or otherwise, and in no way gives rise to any contractual relationship or rights, express or implied, between the WLB and the Proposer.
4. Cost Schedule. Proposals shall include a fee schedule according to the Attachment J Cost Proposal for work to be performed in accordance with this RFP, inclusive of all personnel and non-personnel expenses, as per Attachment J. Any i tems considered essent ia l to the deve l opment o f th is pro jec t but a re not inc luded in the cos t schedule a t tachment J may be wr i t ten in and separa te ly i temized and c lear ly noted that the addi t iona l cos t would be an opt ion i f the WLB agreed to the inclus ion of th is i t em. (For example :
a i r condi t i oning. ) This price should encompass the entire Scope of Services in this RFP. The City reserves the right to negotiate costs, scope of services, and key personnel based on provider proposals. In order for the City to evaluate the proposed cost, proposers must include for each element in the Work Plan outlined in Section I.3.b. above, the staff, hours, hourly rates and the total cost. Include details generally associated with non-personnel costs as an additional cost section.
Since WLB may statement of work, and other aspects of the RFP prior to the Cost Proposal, the
Note: WLB is exempt from the payment of excise, transportation and sales taxes imposed by the Federal Government and/or the State. Such taxes must not be included in prices.
J. Evaluation of Proposals; Selection Process
1. Evaluation Criteria
The following criteria are expected to be among those utilized in the selection process. They are presented as a guide for the Proposer in understanding the WLB requirements and expectations for this project and are not necessarily all inclusive or presented in order of importance.
a. Quality, completeness and responsiveness of Proposal;
b. Qualifications, experience, expertise and capabilities of the Proposer;
c. The extent to which the goods or services meet the needs;
d. Ability to provide Services as required;
e. Ability to comply with the required timeline for delivery of services or goods;
f. Adequate financial resources for performance, including bonding capacity;
g. references/satisfactory record of past performance, and
h. Competitiveness of Price Proposal.
2. Selection Process
a. The WLB will have the Proposals evaluated by a Selection Committee as part of the selection process. If deemed necessary, the WLB reserves the right to arrange for interviews/oral presentations as part of the selection process.
b. The Successful Proposer shall, if requested by the WLB, provide the WLB with an updated/revised Price Proposal, scope of services and schedule of performance.
K. Rights Reserved
1. The WLB reserves the right to award in part, to reject any and all Proposals in whole or in part for misrepresentation or if the Proposer is in default of any prior WLB contract, or if the Proposal impermissibly limits or modifies any of the terms and conditions and/or specifications of the RFP. The City/WLB also reserves the right to waive technical defects, irregularities and omissions if, in its judgment, the best interest of the WLB will be served.
2. Nothing in this RFP shall require that the WLB accept the lowest Price Proposal. Instead, the WLB reserves the right to base its decision solely, in its own judgment, on what it determines to be in the best interest of the WLB.
3. The WLB reserves the right, in its sole discretion, to reject any Proposal, in whole or in part, based upon prior history with the WLB or with any other party that demonstrates, without limitation, failure to perform or unsatisfactory performance in accordance with the terms of one or more contracts or purchase orders or significant failure(s) to meet contractual obligations or if the Proposal is nonresponsive or contains pricing that is abnormally low or high or if it appears unrealistic in terms of technical commitment, shows a lack of technical competence, or indicates a failure to comprehend the risk and complexity of a potential contract or the underlying project.
L. Federal, State and Local Employment Requirements
1. The Successful Proposer must meet all local, State, and Federal affirmative action and equal employment opportunity practices and requirements.
2. This agreement is for services related to a project that is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure
-58. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States, as further outlined by the Office of Management and Memorandum M-22-11, Initial Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure, April 18, 2022.
Contractor certifies that it is familiar with all laws and regulations that may affect costs, progress, and performance of the work, including BABAA requirements.
a) Instructions to Contractors
Any request for substitute or shall include a Certification of compliance with Build America, Buy America Act (BABAA) requirements mandated by Title IX of the Infrastructure Investment and Jobs Act Pub.
L. 177-58.
b) General or Supplemental Conditions
Definitions Section:
Build America, Buy America Act (BABAA) Requirements instituted by the Bipartisan Infrastructure Law of 2021 mandating domestic preference that all iron and steel, manufactured products, and construction materials are produced in the United States.
Construction Materials Those articles, materials, or supply other than an item of primarily iron or steel; a manufactured product; cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives that are or consist primarily of: non-ferrous metals, plastic and polymer-based products, glass, lumber or drywall.
Manufactured Product Items assembled out of components, or otherwise made or processed from raw materials into finished products. Manufactured products must be manufactured (assembled) in the United States, and the cost of components that were mined, produced, or manufactured in the United States must be greater than 55 percent of the total cost of all components of the project.
Documentation provided by a Manufacturer, certifying that the items provided by Manufacturer meet the domestic preference requirements of BABAA.
N. Prevailing Wages
State Prevailing Wages - NOT APPLICABLE
Davis-Bacon (Federal) Prevailing Wages - Required for work done on-site.
Proposers are advised that Davis-Bacon prevailing wage rates apply to this Project (on-site work). The minimum rates to be paid labor of the various classifications shall be in accordance with the prevailing rate of wages established by the U.S.
Department of Labor. Bidder’s attention is directed to the attached wage rate schedules and documentation. Proposer’s attention is directed to Attachment M – Wage Rate Documentation.
O. Additional Federal Policy Requirements
1. The proposer shall not use grant funds to promote "gender ideology", as defined in Executive Order (E.O.) 14168, Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government;
Index of Attachments:
Attachment A- Contract Compliance Docs
Attachment B- Sample Contract
Attachment C- Non-Collusion Affidavit and Addenda Acknowledgment
Attachment D- Insurance Requirements
Attachment E- Property Information
Attachment F- Sample Proposal Security
Attachment G- Project Information and Drawings
Attachment H- Proposer Qualification Statement
Attachment I- Sample Payment Application forms
Attachment J- Price Proposal
Attachment K- HUD Section 3 Documentation
Attachment L- HUD's Grant Guide Federal Requirements; pages 16-27
Attachment M- Davis-Bacon Federal Prevailing Wages reduced by the cost savings resulting from the products eliminated by the change request
30.2.2. Owner's Acceptance of Change Request. If the Owner accepts the Contractor's proposal, the Owner shall issue a change order referencing the Contractor's proposal and all parties shall sign the change order. The Contractor shall not implement any change request until the Owner has issued a valid, properly executed, change order.
30.3.3 Owner's Rejection of Change Request. If the Owner does not accept the Contractor's proposal, the Owner may within two weeks of such non-acceptance: (i) with.draw the change request; or, (ii) modify the change request, in which case the procedures set forth above shall apply to the Contractor's response to the modified change request
30.3. Owner Discretion. The Owner may, in Owner's sole discretion, approve the proposed Change Order and shall forward same for additional signatures under the following conditions: (i) if it conforms to provisions of applicable laws; (ii) if it is consistent with this Contract; (iii) if the time of perlormance of this Contract will not be unreasonably delayed; and (iv) if the Change Order requires an increase in the price of the Contract, the Owner has sufficient funds therefore either from the loan or personal funds.
30.4. Change Orders Governed by the Provisions of this Contract. All work performed under a Change Order is governed by the provisions of this Contract h
31. Conflicts or Disputes. Tis Contract represents the concurrence between the Owner and the Contractor and governs all disputes between and/or among them. In the instance of a conflict or dispute over issues not specifically referenced within the Contract, the following documents shall be used as historical documents, without regard to the order of precedence, to resolve such conflicts or disputes, as follows: (i) the RFP Number 8939 and (ii) the Contractor's bid response to RFP Number 8939 dated ( }, 20l ) . Said historical documents are attached hereto as part of ATTACHMENT "A".
31.1. Procedure. This procedure supersedes all statements to the contrary occurring either in proposals or other prior agreements, oral or written, and all other communications among the parties relating to this subject.
31.2. PrC3umption. Tbis ConLral:t or any section thereof shall not be construed against any party due to the fact that the Contract or any section thereof was drafted by such party.
32. Disputes; Legal Proceedings; Waiver of Trial by Jury and Continued Performance. The Contractor agrees that its waives a trial by jury as to any and all claims, causes of action or disputes arising out of this Contract or services to be provided pursuant to this Contract.
Notwithstanding any such claim, dispute or legal action, the Contractor shall continue to perform services under this Contract in a timely manner, unless otheIWise directed by the Owner.
REQUEST FOR PROPOSAL (#8632)
BY THE CITY OF WATERBURY
ON BEHALF OF THE WATERBURY LAND BANK AUTHORITY FOR THE GENERAL CONTRACTOR
SELECTION
Attachment D
Insurance Reau;rements
ContractorNendor shall agree to maintain in force at all times during the contract the following minimum coverages and shall name the City of Waterbury and the Waterbury Land Bank Authority as Additional Insured on a primary and non-contributory basis to all policies, except Workers Compensation. All policies should also include a Waiver of Subrogation. Insurance shall be written with Carriers approved in the State of Connecticut and with a minimum AM Best's rating of "A"VIII.
If any policy is written on a "Claims Made" basis, the policy must be continually renewed for a minimum of two (2) years from the completion date of this contract. If the policy is replaced and/or the retroactive date is changed, then the expiring policy must be endorsed to extend the reporting period for claims for the policy in effect during the contract for two (2) years from the completion date.
Original, completed Certificates of Insurance must be presented to the City of Waterbury and the Waterbury Land Bank Authority prior to contract issuance. ContractorNendor agrees to provide replacement/renewal certificates at least 30 days prior to the expiration date of the policies. Should any of the above described policies be cancelled, limits reduced or coverage altered, 30 days written notice must be given to the City of Waterbury and the Waterbury Land Bank Authority.
General Ljabmty:
Auto uabmty·
Workers compensation:
Excess/Umbrella uabmty:
$1,000,000 each Occurrence $2,000,000 General Aggregate
$2,000,000 Products/ Completed Operations Aggregate
$1,000,000 Combined Single Limit each Accident
Any Auto, All Owned and Hired Autos
WC Statutory Limits
Employer Liability (EL)
$1,000,000 EL each Accident
$1,000,000 EL Disease each Employee
$1,000,000 EL Disease Policy Limits
$1,000,000 each Occurrence
$1,000,000 Aggregate
Byjlder's Rjsk(lnstaHatjon floater Insurance: $1,000,000 each Occurrence OR Limits equaling the Value of the Project
Employee Dishonesty/Crjme: $1,000,000 per Loss
Wordjna for Addjtjonal Insured Endorsement and wa;yer of Subrogat;on:
The City Waterbury and Waterbury Land Bank Authority is listed as an Additional Insured on a primary and non-contributory basis on all policies except Workers Compensation. All policies shall include a Waiver of Subrogation.
Polution Liability $1,000,000
REQUEST FOR PROPOSAL (#8939)
BY THE CITY OF WATERBURY ON BEHALF OF
THE WATERBURY LAND BANK AUTHORITY
FOR THE W.O. W. NEIGHBORHOOD REVITALIZATION PROJECT
ATTACHMENTJ-COSTPROPOSAL
(Must be submitted as part of RFP # 8939 response in a separate sealed envelope. marked "Confidential: Price .")
Date:
Kevin Mccaffery Director of Purchasing City of Waterbury 235 Grand Street, Room 103 Waterbury, CT 06702
Sir:
Pursuant to and in compliance with your RFP, the Undersigned, (Print or Type Company/Corporate Name)
(Print or Type Business Address) having carefully examined all the RFP Documents, together with all Addenda, as acknowledged on Attachment C, and having informed itself fully in regard to all conditions and related requirements pertaining to the performance of services required under this RFP; and that with this representation, the undersigned makes this Proposal, as follows:
Attachment M
Davis-Bacon Federal Prevailing Wages
"General Decision Number: CT20260023 05/18/2026
State: Connec�cut
Construc�on Types: Building
Coun�es: Connec�cut Coun�es of
New Haven
Modifica�on Number Publica�on Date
1 01/23/2026
2 05/18/2026
ASBE0033-002 06/01/2025
Rates Fringes
HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND
MECHANICAL SYSTEMS).................................$ 48.81 33.65
BRCT0001-001 01/05/2026
BRICKLAYER..........................................$ 45.56 36.94
BRCT0001-005 01/05/2026
CEMENT MASON/CONCRETE FINISHER......................$ 45.56 36.94
CARP0326-023 05/05/2025
CARPENTER (INCLUDES ACOUSTICAL CEILING
INSTALLATION, DRYWALL HANGING, FORM WORK, METAL
STUD INSTALLATION, SOFT FLOOR LAYER - VINYL AND
RESILIENT)..........................................$ 42.03 29.19
CARP0326-024 05/05/2025
FLOOR LAYER: CARPET ONLY............................$ 42.03 29.19
CARP0326-025 05/05/2025
FLOOR LAYER: HARDWOOD FLOORS ONLY...................$ 42.03 29.19
CARP0326-026 05/05/2025
METAL BUILDING ERECTOR (METAL SIDING / WALL PANELS).$ 42.03 29.19
CARP0326-027 05/05/2025
CARPENTER (SCAFFOLD BUILDER)........................$ 42.03 29.19
CARP0326-036 05/05/2025
SOFT FLOOR LAYER....................................$ 42.03 29.19
CARP1121-006 01/05/2026
MILLWRIGHT..........................................$ 45.14 30.24
ELEC0090-012 06/01/2024
ELECTRICIAN.........................................$ 46.48 38.05
ELEC0090-013 06/01/2025
ELECTRICIAN (ALARM INSTALLATION ONLY)...............$ 46.48 38.05
ELEC0090-014 06/01/2025
ELECTRICIAN: COMMUNICATION TECHNICIAN...............$ 46.48 38.05
ELEC0090-015 06/01/2025
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)...............$ 46.48 38.05
ELEC0488-003 06/01/2025
ELECTRICIAN (HVAC/TEMPERATURE CONTROLS
INSTALLATION).......................................$ 47.40 36.74
ELEV0091-002 01/01/2025
ELEVATOR MECHANIC FOOTNOTE: A.VACATION:
6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR
ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR
HOURLY RATE FOR ALL HOURS WORKED. B. PAID
HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY;
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING
DAY; AND CHRISTMAS DAY..............................$ 66.72 38.44
ENGI0478-004 04/06/2025
POWER EQUIPMENT OPERATOR:
BACKHOE/EXCAVATOR/TRACKHOE PAID HOLIDAYS: NEW
YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK
IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF
SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING
DAY AFTER THE HOLIDAY...............................$ 51.92 29.80
ENGI0478-005 04/06/2025
POWER EQUIPMENT OPERATOR, BULLDOZER: ROUGH GRADE
DOZER PAID HOLIDAYS: NEW YEAR'S DAY, GOOD
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 50.22 29.80
POWER EQUIPMENT OPERATOR, BULLDOZER: FINEGRADE
(SLOPES, SHAPING, LASER OR GPS, ETC.) PAID
HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3
DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF
SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE
AND THE WORKING DAY AFTER THE HOLIDAY...............$ 51.92 29.80
ENGI0478-012 04/06/2025
POWER EQUIPMENT OPERATOR: CRANE UNDER 100 TON RATED
CAPACITY) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 56.79 29.80
ENGI0478-016 04/06/2025
POWER EQUIPMENT OPERATOR: LOADER - 7 CUBIC YARDS OR
OVER PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE
EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE
HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE
WORKING DAY BEFORE AND THE WORKING DAY AFTER THE
HOLIDAY.............................................$ 53.33 29.80
IRON0424-001 06/02/2025
IRONWORKER: REINFORCING, STRUCTURAL, ORNAMENTAL.....$ 45.25 43.62
LABO0455-001 04/06/2025
LABORER: MASON TENDER- CEMENT/CONCRETE..............$ 35.70 28.85
PAIN0011-014 06/01/2025
GLAZIER.............................................$ 43.13 26.75
PAIN0011-021 06/01/2025
PAINTER: BRUSH AND ROLLER...........................$ 39.57 26.75
PAIN0011-023 06/01/2025
DRYWALL FINISHER/TAPER..............................$ 40.32 26.75
PLUM0777-001 06/01/2025
PLUMBER.............................................$ 50.58 35.85
PLUM0777-008 06/01/2025
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION)........$ 50.58 35.85
ROOF0009-001 01/01/2026
ROOFER: SLATE AND TILE..............................$ 45.65 23.53
ROOFER: COMPOSITION.................................$ 45.15 23.53
SHEE0040-001 07/01/2025
SHEET METAL WORKER (INCLUDING HVAC UNIT
INSTALLATION).......................................$ 44.70 44.50
SHEE0040-002 07/01/2025
SHEET METAL WORKER (METAL FLASHING AND HVAC DUCT
INSTALLATION ONLY)..................................$ 44.70 44.50
SHEE0040-008 07/01/2025
SHEET METAL WORKER (METAL ROOFS INSTALLATION).......$ 44.70 44.50
SUCT2016-005 09/19/2018
LABORER: COMMON OR GENERAL.........................$ 27.85 18.04
TEAM0191-001 04/06/2025
TRUCK DRIVER: DUMP TRUCK............................$ 36.39 32.68
WELDERS - Receive rate prescribed for cra� performing opera�on to which welding is incidental.
Note: Execu�ve Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicita�on was issued) on or a�er January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permited to use paid sick leave for their own illness, injury or other health-related needs, including preven�ve care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preven�ve care; or for reasons resul�ng from, or to assist a family member (or person who is like family to the employee) who is a vic�m of, domes�c violence, sexual assault, or stalking. Addi�onal informa�on on contractor requirements and worker protec�ons under the EO is available at htps://www.dol.gov/agencies/whd/government-contracts.
Note: Execu�ve Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or a�er January 30, 2022. Execu�ve Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to
Execu�ve Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determina�on, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Execu�ve Order minimum wage rate will be adjusted annually.
Addi�onal informa�on on contractor requirements and worker protec�ons under Execu�ve Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifica�ons needed for work not included within the scope of the classifica�ons listed may be added a�er award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
The body of each wage determina�on lists the classifica�ons and wage rates that have been found to be prevailing for the type(s) of construc�on and geographic area covered by the wage determina�on. The classifica�ons are listed in alphabe�cal order under rate iden�fiers indica�ng whether the par�cular rate is a union rate (current union nego�ated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classifica�on rate.
Union Rate Iden�fiers
A four-leter iden�fier beginning with characters other than
SU , UAVG , SA , or SC denotes that a union rate was prevailing for that classifica�on in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an iden�fier of the union whose collec�vely bargained rate prevailed in the survey for this classifica�on, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determina�on. The date, 07/01/2024 in the example, is the effec�ve date of the most current nego�ated rate.
Union prevailing wage rates are updated to reflect all changes over �me that are reported to WHD in the rates in the collec�ve bargaining agreement (CBA) governing the classifica�on.
Union Average Rate Iden�fiers
The UAVG iden�fier indicates that no single rate prevailed for those classifica�ons, but that 100% of the data reported for the classifica�ons reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determina�on. The date, 01/01/2024 in the example, indicates the date the wage determina�on was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collec�ve bargaining agreements on which the rate is based.
Survey Rate Iden�fiers
The SU iden�fier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classifica�on in the survey or that the rate was derived by compu�ng a weighted average rate based on all the rates reported in the survey for that classifica�on. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classifica�on. FL indicates the State of Florida.
This is the start of the file's text. The full file is on GovTribe.