This is a Request for Proposals (RFP) for a highway construction task order under the Idaho, Montana, and Surrounding Areas Multiple Award Task Order Contract (MATOC). The project, ID FLAP ADA 2019(1), is titled "Western Heritage Byway - Swan Falls Road" and is located approximately 5 miles south of Kuna, Idaho in Ada County. The solicitation is issued by the U.S. Department of Transportation Federal Highway Administration (FHWA) Western Federal Lands Division in Vancouver, Washington, with solicitation number 69056726R000010. Proposals are due by 1400 hours local time on October 20, 2026, and will be publicly opened at that time. This RFP is exclusively for six pre-selected MATOC contractors: ASCORP Inc. DBA Debco Construction, Granite Construction, Hamilton Construction, M.A. Deatley Construction Inc., MJ Hughes Construction Inc., and Thompson Contracting Inc. Award will be made based on price evaluation.

The project consists of four separate bid schedules (A, B, C, and D) representing different segments of the Western Heritage Byway improvements, with lengths ranging from 3.25 to 8.50 miles. Work includes clearing and grubbing, roadway excavation, asphalt concrete pavement placement, pavement milling, culvert installation, erosion control, temporary traffic control, pavement markings, and roadway fixtures such as cattle guards and picnic tables. The estimated total project price range is $5,000,000 to $10,000,000. The contractor must commence work within 10 calendar days of receiving the notice to proceed and complete all work by October 27, 2027. A bid bond equal to a percentage of the bid amount is required, along with performance and payment bonds. Large businesses (average gross annual receipts of $45 million or more over the past three years) must submit an acceptable subcontracting plan prior to award. Bidders must acknowledge all amendments, complete the SF 1442 form, provide certifications and representations in SAM.gov, and submit printed proposals only to the FHWA Vancouver office. Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24) apply, along with special contract requirements and general wage determinations.

View the file

Other files

File Type Posted
QA_09-28-2026.pdf PDF
Physical Data.zip ZIP file
ida-ada2019-1_plans_signed.pdf PDF
Brand Name Justification_ID FLAP ADA 2019(1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDAHO, MONTANA, AND SURROUNDING AREAS MATOC

TASK ORDER REQUEST FOR PROPOSALS

Solicitation No. 69056726R000010

Project Number: ID FLAP ADA 2019(1) Project Name: Western Heritage Byway – Swan Falls Road

Solicitation, Offer & Award, Bid Schedule, Contract Clauses, Minimum Wage Schedule, Special Contract Requirements, and Plans

This solicitation cites

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24

This project uses U.S. Customary units of measure

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

610 EAST FIFTH STREET

VANCOUVER, WA 98661-3801

Phone (360) 619-7520

EMAIL: WFL.CONTRACTS@DOT.GOV

QUICK INDEX

Page Item --- Special Notice

--- Offer Submittal Checklist --- Authority to Sign --- Bid Bond --- Table of Contents A-1 Notice to Offerors A-3 SF1442, Solicitation, Offer and Award A-6a Subcontracting Plan A-7 B-1 C-1 D-1 E-1

H-1 I-1

Bid Schedule Solicitation Provisions Contract Clauses General Wage Decision Special Contract Requirements Permits Fire Protection & Suppression

Proposal Due Date:

See Page A-3, Block 13A

PROPOSAL REMINDERS

Electronic proposals will not be accepted.

Submit printed copy of proposal to the address listed on the enclosed SF 1442.

Before submitting your proposal, please review the following:

• Have you rechecked your figures?

• Have you completed the bid schedule?

• Have you completed and signed the SF 1442, Solicitation, Offer & Award?

• Have you acknowledged all amendments?

• Have you completed the Representations &

Certifications (Page B-1)?

• Is your bid guarantee enclosed in proper form and amount (see FAR Clause 52.228-1), including Power of Attorney affidavit?

• Does the lower left corner of the proposal envelope state “Proposal Enclosed”?

• Does the lower left corner include the Solicitation

Number and project name and number?

A-1 Notice to Offerors mailto:wfl.contracts@dot.gov

PROJECT No ID FLAP ADA 2019(1)

Project Name Western Heritage Byway – Swan Falls Road

Schedule A Schedule B BEGINNING AT See plans See plans

Schedule C Schedule D See plans See Plans

Schedule A Schedule B ENDING AT See plans See plans

Schedule C Schedule D See plans See Plans

Schedule A Schedule B LENGTH 3.25 miles 3.82 miles

Schedule C Schedule D

4.95 miles 8.50 miles

COUNTY Ada

STATE Idaho

FIXED COMPLETION DATE See SF1442, Block 11, page A-5

SPECIAL NOTICE

Project No. ID FLAP ADA 2019(1) Project Name: Western Heritage Byway – Swan Falls Road

Solicitation No.: 69056726R000010

THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELY FOR THE

FOLLOWING CONTRACTS AND CONTRACTORS:

Contract Number Contractor Name Phone

69056725D000002 ASCORP INC,

DBA DEBCO CONSTRUCTION

217 College Ave. STE 5 Orofino, ID 83544

208-476-3617

69056725D000003 GRANITE CONSTRUCTION

585 W Beach St.

Watsonville, CA 95076

360-606-1335

69056725D000004 HAMILTON CONSTRUCTION

2213 South F Street Springfield, OR 97477

541-746-2426

69056725D000005 M.A. DEATLEY CONSTRUCTION, INC.

829 Evans Road Clarkston, WA 99403

509-751-1580

69056725D000006 MJ HUGHES CONSTRUCTION, INC.

11510 NE 87TH AVE

Vancouver, WA 98662

360-314-2024

69056725D000007 THOMPSON CONTRACTING, INC

502 Gruber Rd.

Libby, MT 59923

406-293-5392

THIS PROJECT IS BEING ADVERTISED ON SAM.GOV TO ANNOUNCE THE

UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS BY PUBLICIZING

OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM THE ABOVE

PRIME CONTRACTORS.

This information is also available on our website:

Idaho, Montana and Surrounding Areas MATOC1:

https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc

1 A Multiple Award Task Order Contract (MATOC) is a group of contracts awarded to several contractors for upcoming work in a certain geographical area (in this case, work in Idaho, Montana, and Surrounding Areas). The contracts allow the contractor to compete for upcoming highway/bridge construction projects.

https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc https://highways.dot.gov/federal-lands/business/construction-contracting/idaho-montana-and-surrounding-areas-idiq-matoc

Offer Submittal Checklist

Project: ID FLAP ADA 2019(1), Western Heritage Byway – Swan Falls Road

Before submitting your offer, please review the following:

Done?

Is this in the envelope?

Bid Envelope

Did I correctly address the envelope? (See page A-3, blocks 7 & 8)

Does the lower left corner of the envelope include the Solicitation Number and the project name/number?

Pages A-3 & A-4 (SF 1442, Solicitation Offer & Award)

Did I include our firm name and address in block 14?

Did I include our firm’s phone number in block 15?

Did I include our firm’s remittance address in block 16?

(Use when different than block 14)

Did I include my unique entity identifier and my Cage Code?

Did I include the number & date of all amendments in block 19?

Did the appropriate official sign/date in block 20A, 20B & 20C?

Bid Schedule (see page A-7)

Did I insert “Unit Bid Price” and “Amount Bid” for each bid item?

Did the appropriate official initial corrections?

When applicable, did I include the totals for each schedule in the summary page?

(See last page of bid schedules.)

Bid Bond (Standard Form 24)

Bids received without a valid bid bond will be rejected.

Did I complete my bid bond correctly?

Did I include the original?

Did I attach the Power of Attorney to the bid bond?

Authority to Sign

Did I include a completed form for each person signing the SF1442 and Bid Bond?

Representations & Certifications & FAR Clause

Did I include the completed B-pages (beginning on B-1)?

Did I include the completed clause 1252.228-74 Notification of Payment Bond Protection (See page C-116)?

System for Award Management (SAM) SAM.gov

Do we have up-to-date data in SAM?

Veteran Reporting (FAR Clause 52.222-37) If applicable, did I ensure our firm has completed this annual report?

NOTE: The Contractor is fully responsible to verify that all data is correct each time a offer package is submitted. Failure to properly input and/or update your data may cause the offer to be rejected.

https://sam.gov/content/home

Driving Directions to our Vancouver Washington Office:

Directions to WFLHD https://www.google.com/maps/place/610+E+5th+St,+Vancouver,+WA+98661/data=!4m2!3m1!1s0x5495a8ae3f2d7083:0x5b7adcfa96ade37a?hl=en

INSTRUCTIONS: When the offeror/principal is a corporation, include this certification with your offer/bid.

Corporate Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the corporation named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this corporation;

that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.

_____________________________________ (signature) Affix Corporate Seal

_____________________________________ (title)

INSTRUCTIONS: When the offeror/principal is a limited liability company, include this certification with your offer/bid.

Limited Liability Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the limited liability company named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this company;

that the offer was duly signed for and on behalf of said company by authority and scope of its governing body, and within the scope of its powers.

_____________________________________ (signature) Affix Company Seal (as applicable) ___________________________________ (title)

Bid Bond (See Instructions on Page 3)

Date Bond Executed (Must Not Be Later Than Bid Opening Date)

OMB Control Number: 9000-0001 Expiration Date: 1/31/2027

Principal (Legal Name And Business Address) Type Of Organization ("X" One)

State Of Incorporation

Surety(ies) (Name And Business Address)

Percent Of Bid Price

Penal Sum Of Bond Amount Not To Exceed Million(s) Thousand(s) Hundred(s) Cents

Bid Identification Bid Date Invitation Number

Authorized For Local Reproduction Previous Edition Is Not Usable

STANDARD FORM 24 (REV. 10/2023)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

Obligation:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

Conditions:

The Principal has submitted the bid identified above.

Therefore:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the Principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government. Notice to the Surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

Other (Specify) Individual Partnership Joint Venture Corporation

69056726R000010 For (Construction, Supplies Or Services) Construction: ID FLAP ADA 2019(1), Western Heritage Byway – Swan Falls Road

2.

(Seal)2.(Seal)

1.

1.

1.

1. 3.2.

Name(s) (Typed)

Signature(s)

Individual Surety(ies)

Name(s) And Title(s) (Typed)

Corporate Seal

(Seal)

3.

(Seal)

2.

(Seal) Signature(s)

Principal

2.

State Of Incorporation Liability Limit ($)

2.

2.

1.Name(s) And Title(s) (Typed)

Signature(s) 1. 2. Corporate Seal

Corporate Seal

Su re ty C

Name And Address

Signature(s) Name(s) And Title(s) (Typed)

1.

1.

2.

2.

State Of Incorporation Liability Limit ($)

Corporate Seal

Name(s) And Title(s) (Typed)

Su re ty D

Signature(s)

Name And Address

1.

1.

2.

2.

State Of Incorporation Liability Limit ($)

Corporate Seal

Liability Limit ($)State Of Incorporation

1.

1.

Su re ty A

Name And Address

Su re ty B

Name(s) And Title(s) (Typed)

Signature(s)

Name And Address

Corporate Surety(ies)

Witness:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

STANDARD FORM 24 (REV. 10/2023) PAGE 2

STANDARD FORM 24 (REV. 10/2023) PAGE 3

Corporate Seal

Su re ty F

Name And Address

Signature(s) Name(s) And Title(s) (Typed)

1.

1.

State Of Incorporation

2.

2.

Liability Limit ($)

Corporate Seal

Name(s) And Title(s) (Typed)

Su re ty G

Signature(s)

Name And Address

1.

1.

2.

2.

State Of Incorporation Liability Limit ($)

Corporate Seal

State Of Incorporation Liability Limit ($)

2.

2.

1.

1.

Name And Address

Signature(s) Name(s) And Title(s) (Typed)

Su re ty E

Instructions

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the Liability

Limit block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "Corporate Surety(ies)." In the space designated

"Surety(ies)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New

Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and

"offeror."

STANDARD FORM 24 (REV. 10/2023) PAGE 4

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC §

3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0001. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General

Services Administration, Regulatory Secretariat Division (MVCB), 1800 F Street, NW, Washington, DC

20405.

Table of Contents

Project: ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road

TABLE OF CONTENTS

01 APR 2024–FP24

DESCRIPTION PAGE

Notice to Offerors ....................................................................................................................... A-1

Solicitation, Offer, and Award (SF 1442) ................................................................................... A-3

Bid Schedule ............................................................................................................................... A-7

Solicitation Provisions ................................................................................................................ B-1

Contract Clauses ......................................................................................................................... C-1

General Wage Decision .............................................................................................................. D-1

SCRs Table of Contents

SPECIAL CONTRACT REQUIREMENTS (SCR)

The following Special Contract Requirements amend and supplement the Standard

Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24, U.S. Department of Transportation, Federal Highway Administration.

Division 100 ..................................................................................................................... E-1

Division 150 ................................................................................................................... E-23

Division 200 ..................................................................................................................... F-1

Division 300 ..................................................................................................................... F-2

Division 400 ..................................................................................................................... F-4

Division 500 ..................................................................................................................... F-6

Division 600 ..................................................................................................................... F-7

Division 700 .................................................................................................................... G-1

Permits ........................................................................................................................................ H-1

Fire Protection and Suppression Plan ........................................................................................... I-1

Table of Contents

(This page intentionally left blank)

A-1

Notice to Offerors

Project: ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road

NOTICE TO OFFERORS

05 JAN 2026–FP24

THIS PROJECT IS BEING SOLICITED AND AWARDED UNDER FP-24.

The FP-24 is FLH’s Standard Specifications for Construction of Roads and Bridges on Federal

Highway Projects. To view the FP-24 electronically go to:

https://highways.dot.gov/federal-lands/specs.

PLEASE NOTE:

This solicitation and the resulting contract incorporate the latest updates from the Revolutionary

Federal Acquisition Regulation (FAR) Overhaul (RFO). Any standard FAR references within this document correspond directly to the associated text in the RFO. All provisions and clauses reflect the most recent RFO requirements and approved deviations. Offerors can review the complete RFO text at Revolutionary FAR Overhaul.

I. Project Location

General Location. The project work is located 5 miles South of Kuna, Idaho in Ada County.

Approximate Global Positioning System (GPS) coordinates for the beginning of the project are

43.276025, -116.393555.

Project Limits. Signs have not been erected to identify the project limits. No Government personnel will be available for show-me tours.

II. Pre-proposal Information.

GENERAL AND TECHNICAL QUESTIONS REGARDING PROPOSED WORK FOR

THIS PROJECT WILL BE ACCEPTED UNTIL CLOSE-OF-BUSINESS FIVE [5] DAYS

PRIOR TO PROPOSAL DUE DATE.

Refer to page A-5 for information on how to submit questions related to General Information and

Technical Information. Answers to General and Technical Questions will be posted at https://sam.gov/workspace/contract/opp/3e889445824e465da96410afd7409a1b/view.

Every attempt to respond to questions will be made. However, response to questions received after the above posted date is not guaranteed.

MATOC. This solicitation is solicited under the Idaho, Montana, and surrounding areas Multiple

Award Task Order Contract (MATOC). Selection of the successful offer is based on price.

https://highways.dot.gov/federal-lands/specs https://www.acquisition.gov/sites/default/files/page_file_uploads/RFO.pdf https://sam.gov/workspace/contract/opp/3e889445824e465da96410afd7409a1b/view

A-2

Project: ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road

Disclosure of Price Tabulations. After award, price tabulations (bid tabs) will be made publicly available and posted to sam.gov; unless the offeror submits an acceptable pricing confidentiality justification on or before the Task Order proposal due date. See Subsection 102.05.

Multiple Schedules. Offers for the construction of this project are being invited under four bid schedules, designated A, B, C, and D. Schedule A, Schedule B, Schedule C, and Schedule D are not alternate bids. Complete all schedules according to Subsection 102.02 of the special contract requirements. Award of the task order will be made according to Subsection 102.05A.

Electronic Plan Sheets. This solicitation includes electronic plan sheets available at https://sam.gov/workspace/contract/opp/3e889445824e465da96410afd7409a1b/view.

Viewing the Project. This project was pre-advertised in the Notice to Prospective Offerors posted to https://sam.gov/workspace/contract/opp/759e09535c784c0f9dc56ef47c106591/view on June 4, 2026. The project may be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Offerors were encouraged to view the project during fall as conditions permitted. No Federal Highway Administration personnel will be available for show me tours.

Physical Data. Physical data applicable to this project is listed in Subsection 102.02A Physical

Data.

Representations & Certifications. Submit or update Representations and Certifications online at https://sam.gov/ before bid submittal.

Requests for Information. Requests for technical information (Plan and Division 100 – 700

Specification questions only) about this project will only be accepted in writing (see Block 9 on page A-5).

SF 1442, Solicitation, Offer, and Award. Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, 20B, and 20C are completed correctly. Block 20B must be signed according to the instructions in Subsection 102.02.

You must submit a completed “Authority to Sign” document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B-1.

Issuance of this solicitation does not guarantee that an award will be made. Any resulting awards are subject to the availability of funding and the discretion of the awarding entity, including cancellation or amendment based on a determination of change in agency needs.

PLEASE NOTE: FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work has been removed due to the FAR Overhaul. See the SF-1442 and Block 11 for contract requirements related to the fixed completion date.

Facsimile and email offers, modifications, and withdrawals. Facsimile and email offers are not authorized for this solicitation. Offers may be modified or withdrawn by email, if such notice is received by the time specified for receipt of offers. The Government will not be responsible for any failure attributable to the transmission or receipt of email data. See FAR Provision 52.215-1, https://sam.gov/workspace/contract/opp/3e889445824e465da96410afd7409a1b/view https://sam.gov/workspace/contract/opp/759e09535c784c0f9dc56ef47c106591/view https://sam.gov/ https://www.acquisition.gov/far-overhaul

A-2a

Project: ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road

Instructions to Offerors – Competitive Acquisition. EMAIL WFL.Contracts@dot.gov. To confirm receipt, call 360.619.7520.

Surety Bond Guarantee Program. Small businesses that need surety bonds can qualify for U.S.

Small Business Administration (SBA) backed surety bonds. SBA assistance in locating a participating surety company or agent, and completing application forms is available online. For more information on the U.S. SBA’s Surety Bond Guarantee program, go online to https://www.sba.gov/funding-programs/surety-bonds.

Fraud Alert. Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters request that the Contractors resubmit their banking information to DOT. If you receive such a letter, please DO NOT complete the requested worksheet that is attached to the letters and DO

NOT release any information. To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party. You can access SAM at https://www.sam.gov/SAM/ .

III. Post Award Information.

Insurance. Insurance requirements are described in Subsection 107.05.

Contractor Performance Evaluations. This office posts performance evaluations in the

Contractor Performance Assessment Reporting System (CPARS); for additional information, see https://cpars.gov/cparsweb/home. Upon receiving an email notice of evaluation availability, you will have 14-60 days to review the evaluation online and submit comments. If you are unable to access the system, call 360.619.7520 for assistance or for a copy of the evaluation.

IV. Specifications and Permits.

Specifications. This solicitation and subsequent contract are governed by the Federal Acquisition

Regulation (FAR), agency supplemental regulations, and the Standard Specifications for

Construction of Roads and Bridges on Federal Highway Projects, FP-24. An electronic version may be found at https://highways.dot.gov/federal-lands/specs.

Masterworks. This project requires the Contractor to use the Government’s web-based system

Masterworks to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors

Daily Reports) and measurement notes (pay notes). Attend a training session on the use of

Masterworks. The virtual training sessions will be either a video presentation or live training as determined by the CO. Train additional staff. See Subsection 104.04.

Audio, Video, and AI Note-Taker Restrictions. To promote partnership, trust, and transparent communication, audio/video recording and AI notetaking are not allowed to be utilized during meetings between the Government representatives and contractor staff during this construction project. See subsection 103.01.

Material Sources. Material sources have not been identified for this project. Secure all permits and clearances for Contractor-located sites and sources. See Subsection 105.02(c).

mailto:WFL.Contracts@dot.gov https://www.sba.gov/funding-programs/surety-bonds https://www.sam.gov/SAM/ https://cpars.gov/cparsweb/home https://highways.dot.gov/federal-lands/specs

A-2b

Project: ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road

Progress Schedules. This project includes new specifications for Prosecution and Progress and for Schedules for Construction Contracts. Carefully review Special Contract Requirements

Section 108 - Prosecution and Progress, and Section 155 – Schedules for Construction

Contracts.(This page intentionally left blank)

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

690567

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E Fifth Street Vancouver WA 98661

a. NAME

ACQUISITIONS

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

360-619-7520

See Block 10 x 09/17/2026

69056726R000010

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

THIS TASK ORDER REQUEST FOR PROPOSAL IS BEING SOLICITATED TO THE IDAHO, MONTANA, &

SURROUNDING AREAS MATIOC IDIQ HOLDERS. ONLY CONTRACTORS AWARDED AN IDIQ

CONTRACT WILL BE CONSIDERED.

This solicitation is designated ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road

IN STRICT ACCORDANCE WITH:

Federal Acquisition Regulations (FAR) and Transportation Acquisition Regulations

(TAR)

General Wage Decision

Special Contract Requirements

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 calendar days and complete it within ________________ ________________ calendar days after receiving

*Page A-5

________________________ 10/20/2026

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 8/2014)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

A-3

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

690567

31a. NAME OF CONTRACTING OFFICER (Type or print)

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 8/2014) BACK

A-4

Unique Entity Identifier(SAM.gov):

Cage Code:

See bid schedule.

All items on bid schedule.

See page A-6

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

A-5

Continuation SF 1442

Project: ID FLAP ADA 2019(1), Western Heritage Byway – Swan Falls Road

Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to

4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov.

FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing.

Submit questions via e-mail at wfl.plans-spec@dot.gov.

QUESTIONS/ANSWERS POSTED ONLINE. You can view questions and answers on the Contract Opportunities Website SAM.gov.

• Insert the solicitation number in search box.

• Scroll to the project.

• Make sure you are on the most recent view and look in the right section of the page for the most recent Q&A document.

FOR DAVIS-BACON WAGE RATE INFORMATION go to the U.S. Department of

Labor, Branch of Construction Wage Determinations Website:

https://www.dol.gov/agencies/whd/government-contracts/construction.

FOR PHYSICAL DATA, See Subsection 102.02A in the Special Contract

Requirements for listing of available data. Physical Data will be posted with the solicitation on the SAM.gov website.

Block 11 COMPLETION DATE: The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 10/27/2027 for Schedule A, Schedule B, Schedule C, and Schedule D, subject to such extensions as may be authorized. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 01/15/2027. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

Work shall be completed on or before the date specified above, subject to such extensions as may be authorized by the terms of the contract and the specifications made a part thereof.

Block 12A PERFORMANCE & PAYMENT BONDS: See FAR Clause, 52.228-15, Performance and Payment Bonds - Construction (clauses begin on page C-1) and Subsection 102.06 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway

Projects, FP-24, U.S. Customary Units.

Block 13B BID BOND AMOUNT: See FAR Clause 52.228-1, Bid Guarantee (clauses begin on page C-1).

mailto:wfl.contracts@dot.gov mailto:wfl.plans-spec@dot.gov https://sam.gov/content/home https://www.dol.gov/agencies/whd/government-contracts/construction https://sam.gov/content/home

A-6

Continuation SF 1442

ADDITIONAL INFORMATION: See Subsections 102.03 and 102.04 of Standard

Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-

24, U.S. Customary Units.

Block 24 SUBMITTING INVOICES: See Subsection 109.08 of the Standard Specifications for

Construction of Roads and Bridges on Federal Highway Projects FP-24, U.S. Customary

Units.

ESTIMATED PRICE RANGE. The price range of the project work is between $5,000,000 and

$10,000,000.

SUBCONTRACTING PLAN. This Request for Proposals requires an offeror who is a LARGE business to submit an acceptable subcontracting plan prior to contract award. A large business is one whose average gross annual receipts over the past 3 years equal $45 million or more. For your information the subcontracting plan form is included beginning on page A-6a. This requirement does not apply to SMALL businesses

A-6a

APM 025E – Revised 2/4/2025. WFLHD Updated 08/19/2026.

ATTACHMENT 2 – FHWA SUBCONTRACTING PLAN TEMPLATE

Any standard FAR references within this document correspond directly to the associated text in the Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Revolutionary FAR Overhaul.

1. INSTRUCTIONS:

• Where subcontracting opportunities will not exist for the solicitation, the bidder/offeror shall submit a response outlining the rationale for making this determination with its proposal/bid. The statement shall be signed by an official authorized to make decisions on behalf of the firm.

• The following information shall be provided in the bidder/offeror subcontracting plan submission and shall be expressed in terms of goal percentages of the total planned subcontracting dollars.

• Text lines may be added to this template as needed.

Note to the CS/CO: Per APM 025, where a subcontracting plan is required, the complete solicitation shall be sent to the Small Business Specialist (SBS) for review/approval along with Attachment 3, Combined

Subcontracting Plan Routing Sheet. Prior to award, completed Subcontracting Plan(s) shall be sent to the SBS for review/approval along with the previously signed routing sheet.

*insert and complete additional tables if the contract includes option year(s).

1 Percentage = (subcontracted amount in the category/total planned subcontracted amount) 2 Planned subcontracts to “other than small business” concerns + subcontracts to Small Business concerns = 100% 3 SDVOSB is a subcategory of VOSB. Any dollar amount applied to SDVOSB also applies to VOSB.

4 In this document, the term WOSB includes Economically Disadvantaged WOSB (EDWOSB) concerns.

SUBCONTRACTING GOALS – BASE YEAR

Total prime contract amount – Base Year: $ [insert amount]

Total planned subcontracted amount (regardless of firm/entity size status) – Base Year:

$ [insert amount]

Total planned subcontracts to “other than small business” concerns (i.e., large, non-profit, university, etc.)

$[insert amount] [insert #]%1

Total planned subcontracts to Small Business concerns: $[insert amount] [insert #]%2

• Total planned subcontracts to Veteran Owned Small Business concerns (VOSB)3:

$[insert amount] [insert #]% o Total planned subcontracts to Service-Disabled Veteran Owned Small Business (SDVOSB) concerns:

$[insert amount] [insert #]%

• Total planned subcontracts to Historically Underutilized Business Zones (HUBZones): $[insert amount] [insert #]%

• Total planned subcontracts to Small Disadvantaged Business (SDB) concerns (includes 8(a), Alaska Native Corporations (ANC), and Indian Tribes):

$[insert amount] [insert #]%

• Total planned subcontract awards to Women-Owned Small Business concerns (WOSB)4 concerns:

$[insert amount] [insert #]%

A-6b

1.1 Rationale if establishing a goal lower than 5% for VOSB:

1.2 Rationale if establishing a goal lower than 5% for SDVOSB:

1.3 Rationale if establishing a goal lower than 3% for HUBZone:

1.4 Rationale if establishing a goal lower than 5% for SDB:

1.5 Rationale if establishing a goal lower than 5% for WOSB:

1.6 Rationale if establishing a goal lower than the current DOT subcontracting goal:

2. The following principal types of supplies and/or services are planned to be subcontracted under this contract. [Add additional rows if more space is needed.]

5 List all applicable size standards for each proposed subcontractor.

Type of

Supply/Service to be Subcontracted

Company/Firm

Name

Subcontracted

Amount

Subcontractor Size

Standard (Other Than

SB, SB, VOSB, SDVOSB,

HUBZone, SDB, WOSB)5 https://www.sba.gov/document/support-agency-contracting-goals

A-6c

3. The following methods were used to develop the subcontract percentage goals:

4. The following methods were used to identify potential subcontract sources for solicitation purposes. (i.e. source lists used and organizations contacted to identify potential SB concerns, such as the System for Award Management (www.SAM.gov), SBA Small Business Search (https://search.certifications.sba.gov/), trade associations, industry conferences/fairs, etc.)

5. [Select appropriate option.] Indirect costs [were/were not] included in establishing the subcontracting goals specified in the table above.

6. If indirect costs were included, the following method was used to determine the proportionate share of indirect costs to be incurred with SB, VOSB, SDVOSB, HUBZone, SDB and WOSB subcontractors:

7. The following individual will administer the subcontracting program:

Name:

Title:

Address:

Telephone:

E-mail:

This individual's specific duties, as they relate to the subcontracting program, are as follows:

8. The following efforts will be taken to ensure that SB, SDB, VOSB, SDVOSB, HUBZone, and

WOSB subcontractors will have an equitable opportunity to compete for subcontracts:

http://www.sam.gov/ https://search.certifications.sba.gov/

A-6d

[initial] It is agreed that FAR Clause 52.219-8, Utilization of Small Business Concerns, will be included in all subcontracts, which offer further subcontracting opportunities. It is further agreed that all subcontractors (except small business concerns) at all tiers below the prime contractor who receive subcontracts in excess of $900,000 ($2M for construction of any public facility with further subcontracting possibilities) will be required to adopt and comply with a subcontracting plan in accordance with FAR Clause 52.219-9.

9. The following types of records will be maintained concerning procedures that have been adopted to comply with the requirements and goals in the plan (i.e., establishment of source lists, guides and other data that identify SB, VOSB, SDVOSB, HUBZone, SDB and WOSB concerns; a description of the offeror’s efforts to locate SB, VOSB, SDVOSB, HUBZone, SDB and WOSB concerns and to award subcontracts to them, etc.) and shall be maintained through completion of the contract:

10. In accordance with FAR Subpart 19.206-2 and FAR Clause 52.219-9(d)(10),(12),(13),(14),(15),the

Contractor further agrees to:

[Initial each line]

Cooperate in any studies or surveys as may be required;

Submit periodic reports as may be required so that the Government can determine the extent of compliance by the Contractor with the subcontracting plan;

Include subcontracting data for each order when reporting subcontracting achievements for indefinite-delivery, indefinite-quantity contracts intended for use by multiple agencies;

Submit the Individual Subcontract Report (ISR) and the Summary Subcontract Report (SSR) in accordance with 52.219-9(l) using the Subcontracting Plan Reporting (SPR) site (https://sam.gov/).

Ensure that its subcontractors with subcontracting plans agree to submit the ISR and/or the SSR using SPR;

Provide its prime contract number, its unique entity identifier, and the e-mail address of the Offeror’s official responsible for acknowledging receipt of or rejecting the ISRs, to all first-tier subcontractors with subcontracting plans so they can enter this information into the SPR when submitting their ISRs;

https://sam.gov/

A-6e

Require that each subcontractor with a subcontracting plan provide the prime contract number, its own unique entity identifier, and the e-mail address of the subcontractor’s official responsible for acknowledging receipt of or rejecting the ISRs, to its subcontractors with subcontracting plans;

Make a good faith effort to acquire articles, equipment, supplies, services, or materials, or obtain the performance of construction work from the small business concerns that it used in preparing the bid or proposal, in the same or greater scope, amount, and quality used in preparing and submitting the bid or proposal;

Provide the Contracting Officer with a written explanation if the Contractor fails to acquire articles, equipment, supplies, services, or materials or obtain the performance of construction work as described in paragraph 52.219(d)(12). This written explanation will be submitted to the contracting officer within 30 days of contract completion;

Will not prohibit a subcontractor from discussing with the contracting officer any material matter pertaining to payment to or utilization of a subcontractor; and

Pay its small business subcontractors on time and in accordance with the terms and conditions of the underlying subcontract, and notify the Contracting Officer when the prime contractor makes either a reduced or an untimely payment to a small business subcontractor (see 52.242-5).

Submitted by:

POC Name:

Title:

Email Address:

Company Name:

UEI:

Mailing Address:

Signature

A-6f

This page intentionally left blank.

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.

BID SCHEDULE

A-7Bid Schedule

BID SCHEDULE

Project No : ID FLAP ADA 2019(1) Schedule : A

Project Name : Western Heritage Byway - Swan Falls Road

Schedule Type : Base

Contract Quantity Pay Items

No Contract Quantity Pay Items

AMD# Line Item Number

Pay Item Number

Description Supplemental Description

Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION ALL LPSM

A0040 15201-0000

CONSTRUCTION

SURVEY AND

STAKING

ALL LPSM

A0060 15301-0000 CONTRACTOR

QUALITY CONTROL ALL LPSM

A0080 15401-0000 CONTRACTOR

TESTING ALL LPSM

A0100 15501-0000 CONSTRUCTION

SCHEDULE ALL LPSM

A0120 15705-1400

SOIL EROSION

CONTROL, FIBER

ROLL

10,500.000 LNFT

A0140 15802-0000 WATERING FOR DUST

CONTROL ALL LPSM

A0160 20101-0000 CLEARING AND

GRUBBING 9.000 ACRE

A0180 20301-0600 REMOVAL OF CATTLE

GUARD 1.000 EACH

A0200 20301-1100 REMOVAL OF GATE 1.000 EACH

A0220 20301-2100 REMOVAL OF

RESTROOM FACILITY 2.000 EACH

A0240 20301-2400 REMOVAL OF SIGN 4.000 EACH

A0260 20301-3300 REMOVAL OF VAULT (CONCRETE TANK) 4.000 EACH

A0280 20302-0700 REMOVAL OF FENCE 55.000 LNFT

A0300 20315-0000 SAWCUTTING

PAVEMENT 33,880.000 LNFT

A0320 20401-0000 ROADWAY

EXCAVATION 13,000.000 CUYD

A0340 20421-0000 ROCK EXCAVATION 420.000 CUYD

A0360 20425-1000 DITCH, EXCAVATION (REGRADING) 90.000 LNFT

A0380 20471-0000 REMOVE AND RESET

BOULDER 35.000 EACH

A0400 25101-0200 PLACED RIPRAP,

CLASS 2 5.000 CUYD

A0420 30202-2000

ROADWAY

AGGREGATE,

METHOD 2

17,000.000 TON

A0440 30202-2100

ROADWAY

AGGREGATE,

METHOD 2, SURFACE

COURSE

(6-INCH DEPTH)

650.000 TON

A0460 40301-0000 ASPHALT CONCRETE

PAVEMENT 3,600.000 TON

A0480 41201-0000 TACK COAT 1.500 TON

A0500 41301-1000

ASPHALT PAVEMENT

MILLING, 4-INCH

DEPTH

1,200.000 SQYD

A-8Bid Schedule

A0520 41402-2000 CRACKS, CLEANING

AND SEALING

(AND FILLING) 3.200 MILE

A0540 50101-2600

MINOR CONCRETE

PAVEMENT, PLAIN, 6-

INCH DEPTH

70.000 SQYD

A0560 60201-0600 18-INCH PIPE

CULVERT 210.000 LNFT

A0580 60201-0800 24-INCH PIPE

CULVERT 270.000 LNFT

A0600 60210-0800 END SECTION FOR 24-

INCH PIPE CULVERT 3.000 EACH

A0620 60704-0000 CLEANING CULVERT

IN PLACE 2.000 EACH

A0640 60915-1000 WHEELSTOP,

CONCRETE 2.000 EACH

A0660 61001-0100 SIDEWALK,

CONCRETE

(6-INCH DEPTH) 240.000 SQYD

A0680 61401-0000 FLOWABLE BACKFILL 13.000 CUYD

A0700 61903-1100 CATTLE GUARD, 32

FEET 1.000 EACH

A0720 61921-1000 REMOVE AND RESET

FENCE 30.000 LNFT

A0740 62201-0300

DUMP TRUCK, 12

CUBIC YARD MINIMUM

CAPACITY

40.000 HOUR

A0760 62201-0550

BACKHOE LOADER, 6

CUBIC FOOT MINIMUM

RATED CAPACITY

BUCKET, 24-INCH

WIDTH

40.000 HOUR

A0780 62301-0000 GENERAL LABOR 40.000 HOUR

A0800 62302-1020

SPECIAL LABOR,

HIRED TECHNICAL

SERVICES,

ARCHEOLOGICAL

SERVICES

350.000 HOUR

A0820 62402-0300

PROVIDING AND

PLACING TOPSOIL, 4-

INCH DEPTH

7.000 ACRE

A0840 62501-0000 TURF

ESTABLISHMENT 7.500 ACRE

A0860 63302-0000 SIGN SYSTEM 235.000 SQFT

A0880 63308-3000 OBJECT MARKER,

TYPE 3 4.000 EACH

A0900 63313-0000 RUMBLE STRIP 32,950.000 LNFT

A0920 63401-0300

PAVEMENT

MARKINGS, TYPE B,

SOLID

(WHITE)

69,000.000 LNFT

A0940 63401-0300

PAVEMENT

MARKINGS, TYPE B,

SOLID

(YELLOW)

51,210.000 LNFT

A0960 63401-0400

PAVEMENT

MARKINGS, TYPE B,

BROKEN

(YELLOW)

15,700.000 LNFT

A0980 63405-0850

PAVEMENT

MARKINGS, TYPE B,

ACCESSIBILITY

SYMBOL

4.000 EACH

A1000 63502-0400

TEMPORARY TRAFFIC

CONTROL,

BARRICADE TYPE 1

5.000 EACH

A1020 63502-0600

TEMPORARY TRAFFIC

CONTROL,

BARRICADE TYPE 3

2.000 EACH

A1040 63502-1300 TEMPORARY TRAFFIC

CONTROL, DRUM 230.000 EACH

A-9Bid Schedule

A1060 63502-2000

TEMPORARY TRAFFIC

CONTROL, PORTABLE

CHANGEABLE

MESSAGE SIGN

2.000 EACH

A1080 63503-0700

TEMPORARY TRAFFIC

CONTROL, PAVEMENT

MARKINGS

430.000 LNFT

A1100 63504-1000

TEMPORARY TRAFFIC

CONTROL,

CONSTRUCTION SIGN

150.000 SQFT

A1120 63506-0500 TEMPORARY TRAFFIC

CONTROL, FLAGGER 3,000.000 HOUR

A1140 63506-0600 TEMPORARY TRAFFIC

CONTROL, PILOT CAR 600.000 HOUR

A1160 63507-0700

TEMPORARY TRAFFIC

CONTROL, TRAFFIC

CONTROL

SUPERVISOR

105.000 DAY

A1180 64603-0700 FIXTURE, PICNIC

TABLE 2.000 EACH

A1200 64603-1000 FIXTURE, VAULT

TOILET 1.000 EACH

A1220 64603-1500 FIXTURE, SHELTER (SHADE STRUCTURE) 1.000 EACH

A1240 64620-0600 REMOVE AND RESET

TRASH RECEPTACLE

(ASSEMBLY) 1.000 EACH

Submitted By: Schedule Total:

A-10Bid Schedule

Project No : ID FLAP ADA 2019(1) Schedule : B

Project Name : Western Heritage Byway - Swan Falls Road

Schedule Type : Base

Contract Quantity Pay Items

No Contract Quantity Pay Items

AMD# Line Item Number

Pay Item Number

Description Supplemental Description

Quantity Unit Unit Price Amount

B0020 15101-0000 MOBILIZATION ALL LPSM

B0040 15201-0000

CONSTRUCTION

SURVEY AND

STAKING

ALL LPSM

B0060 15301-0000 CONTRACTOR

QUALITY CONTROL ALL LPSM

B0080 15401-0000 CONTRACTOR

TESTING ALL LPSM

B0100 15501-0000 CONSTRUCTION

SCHEDULE ALL LPSM

B0120 15705-1400

SOIL EROSION

CONTROL, FIBER

RO…