This is a Request for Proposal (RFP) from SLAC National Accelerator Laboratory for the procurement of two S-Band Thermionic RF Guns for the SPEAR Linac. The base requirement is for one fully assembled RF gun, with an optional second unit to be potentially purchased later. The RF guns must meet stringent technical specifications, including a resonant frequency of 2856 MHz, operation at 3-7 MW power, beam/charge stability within 1%, and an unloaded quality factor greater than 12,000.

Proposals are due by July 11, 2025, at 4:00 PM Pacific Time and must remain valid for 90 days. The earliest delivery date is requested for August 1, 2026, or sooner. Vendors must be registered in the System for Award Management (SAM), provide a Dun and Bradstreet report, and submit various required forms including a Buy American Act Certification. The procurement will be evaluated on technical compliance, past performance, schedule management, pricing, and financial standing, with technical factors being more important than price. The contract is funded by the U.S. Department of Energy and will be awarded by Stanford University, which operates SLAC National Accelerator Laboratory.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SLAC NATIONAL ACCELERATOR LABORATORY • 2575 SAND HILL ROAD • MENLO PARK • CALIFORNIA • 94025 • USA Operated by Stanford University for the U.S. Department of Energy

SUPPLY CHAIN MANAGEMENT

Astrid Torres Subcontract Administrator

SLAC MS 01

astridt@slac.stanford.edu

June 23, 2025

TO ALL OFFERORS:

Subject: SLAC Request for Proposal (RFP)_356511(AT) Description: Base Requirement: S-Band Thermionic RF Gun Procurement Qty 1

Option 1: S-Band Thermionic RF Gun Procurement Qty 1

Dear Prospective Offerors:

You are invited to submit a firm-fixed price proposal in accordance with Line Items in Section B of this RFP and the proposal preparation requirements and other applicable documents.

Your proposal must be received no later than July 11, 2025 4:00 PM Pacific and be valid for 90 days after submission. The Offeror shall make a clear statement in its proposal cover letter utilizing the following language, “The undersigned agrees that this offer is valid for ninety (90) days and shall furnish any or all items upon which prices are offered, at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.”

Proposals shall be signed by an authorized representative of the offeror and addressed to the Subcontract Administrator. Submit proposals via e-mail to astridt@slac.stanford.edu.

Offeror’s submission of signed proposal without exceptions, is confirmation that the Offeror agrees to all Terms and Conditions in is RFP. Payment Terms are Net 30 if not indicated otherwise.

Marking of Proprietary/Confidential Information. Offerors shall properly mark and identify with a restrictive legend or information markings on pages of the proposal that contain Proprietary/confidential information.

For Offeror to be eligible for a subcontract award with the University, Offeror shall be registered with the System for Award Management (SAM), the Official U.S. Government system that consolidated the capabilities of CCR/FedReg, ORCA, and EPLS. There is NO fee to register for this site. Entities may register at no cost directly at the SAM website:

https://sam.gov/content/home?api_key=ROEXk2SBBROUbVQ4L38wSJsGEvZ3oWtLxva9h0zV

The following documents must be completed and returned with your proposal:

1. Dun and Bradstreet report.

mailto:astridt@slac.stanford.edu https://sam.gov/content/home?api_key=ROEXk2SBBROUbVQ4L38wSJsGEvZ3oWtLxva9h0zV

2. Section A – Subcontract Award Form

3. Section B – Supplies & Services

4. Section K – Representation and Certification Supplement (Domestic and/or International)

5. Section K – Buy American Act Certification

6. Section L – Technical Checklist

7. Section L – Business Checklist

The Procurement shall be performed in accordance with the requirements documents set forth below:

1. Section C – Specification

2. Section D – Shipping

3. Section E – Inspections Acceptance

4. Section F – Deliveries Performance

5. Section G – Terms and Conditions

6. Section H – Special Terms and Conditions

7. Section J – List of attachments

8. Section L – Instructions to Offerors

9. Section M – Evaluation Factors

The following document shall be submitted for any questions by the Offerors.

1. Section L – Offeror’s Request for Clarifications

a. Questions / clarifications must be submitted no later than July 1, 2025.

Technical, contractual, and administrative questions should be directed to the Subcontract Administrator, in writing, at astridt@slac.stanford.edu. The Subcontract Administrator is the SOLE point of contact. Any communication to any other SLAC employee or contractor regarding this solicitation may be grounds for disqualification.

Your participation in Stanford University's (SLAC) procurement process is appreciated.

Sincerely, Astrid Torres Subcontract Administrator

SECTION A (REV.07/08/22) SLAC-SCM-GEN-028 PAGE 1 OF 1

SUPPLY CHAIN MANAGEMENT

SUBCONTRACT

Section A – Subcontract Form

1. Subcontract Number: TBD 3. Type of Subcontract: Firm Fixed Price 2a. Solicitation Number:

RFP_356511(AT) 2b. Offers Due By (Date): July 11, 2025 2c. Offers Due By (Time): 4 pm PST 4a. Subcontract Administrator:

Astrid Torres 4b. Email Address:

astridt@slac.stanford.edu 4c. Telephone:

408-655-6240

5. Issued By:

The Board of Trustees of the Leland Stanford, Jr.

University as Manager Operator of SLAC National Accelerator Laboratory (SLAC) 2575 Sand Hill Road Menlo Park, CA 94025

6. Submit Invoices To:

SLAC National Accelerator Laboratory Accounts Payable 2575 Sand Hill Road Menlo Park, CA 94025 or preferably ap@slac.stanford.edu

7. Name and Address of Seller:

TO All OFFERORS

8. Project Site:

SLAC National Accelerator Laboratory 2575 Sand Hill Road Menlo Park, CA 94025

9. TABLE OF CONTENTS

(X) Sec Description (X) Sec Description

A Subcontract Award Form H Special Terms and Conditions B Supplies or Services and Prices/Costs I Specific Subcontract Clauses C Specifications/Statement of Work J List of Attachments D Delivery, Shipping, Packing K Representations and Certifications E Inspections and Acceptance L Instructions to Offerors F Deliveries or Performance M Evaluation Factors for Award G General Terms and Conditions

10. Brief description of supplies or services being acquired:

S-Band Thermionic RF Gun Procurement

11. Total Amount of Subcontract:

See Section B for Total Amount of Subcontract

12. Negotiated Agreement. The subcontractor agrees to furnish and deliver the items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this subcontract. The rights and obligations of the parties to this subcontract shall be governed by (a) this subcontract award, (b) the solicitation, and (c) the clauses, terms and conditions, representations, certifications, and specifications incorporated by reference in or attached to this contract.

13. Award. The Board of Trustees of the Leland Stanford, Jr. University, SLAC National Accelerator Laboratory, accepts your offer dated on this solicitation identified in item 2 above as reflected in this subcontract, which is subject to and governed by (a) this subcontract award, (b) the solicitation, and (c) the clauses, terms and conditions, representations, certifications, and specifications incorporated by reference in or attached to this contract.

Seller is required to sign and return a copy of this document (Check if applicable)

The Board of Trustees of the Leland Stanford, Jr.

University as Manager Operator of SLAC National Accelerator Laboratory (SLAC)

12b. Signature of person authorized to sign for seller: 13b. Signature of person authorized to sign:

12c. Name of Signer: 13c. Name of Signer:

12d. Title of Signer: 13d. Title of Signer:

12e. Date: 13e. Date:

SECTION B (SUPPLIES OR SERVICES AND PRICES/COST) (REV. 04/01.2024) PAGE 1 OF 1

SUPPLY CHAIN MANAGEMENT

Section B – Supplies or Services and Prices/Costs

All line items to be provided, in accordance with Section C – Statement of Work

ITEM

NO.

SUPPLIES/SERVICES QTY UOM UOM

PRICE

TOTAL PRICE

Base Requirement: S-Band Thermionic RF Gun Procurement 1 ea $ $

Option 1 - S-Band Thermionic RF Gun Procurement

NOT EXERCISED.

To be placed no earlier than 6 months after successful commissioning and operation of the first gun. 1 ea $ $

Total Subcontract Value ($USD)

Total Subcontract Funded Amount ($USD)

SLAC will normally evaluate offers for award purposes by adding the total price for options to the total price for the basic requirement. Evaluation of options will not obligate the SLAC to exercise the option(s).

Unique Entity ID:

DUNS Number:

Payment Terms will be Net 30 Unless Otherwise Stated:

Discounts (if applicable) [Educational, University, Quantity, etc] Harmonized Tariff Code (if applicable)

SECTION C (REV. 6/01/12) SLAC-SCM-GEN-030 PAGE 1 OF 1

SUPPLY CHAIN MANAGEMENT

Section C – Statement of Work

The following documents and all referenced applicable documents therein apply to this scope of work.

• SPEAR Linac Thermionic RF Gun Statement of Work (SOW) dated June 20, 2025

• SPEAR Linac Thermionic RF Gun Technical Requirements dated June 13, 2025

SECTION C

SPEAR Linac Thermionic RF Gun Procurement Statement of Work (SOW) Date: 6/20/2025

Scope

This Statement of Work (SOW) defines the scope and expectations for the procurement of two S-band thermionic RF electron guns for use in the SPEAR Linac at SLAC. These guns will replace existing systems and must comply with defined mechanical, electrical, and performance requirements.

1. Technical Requirements

The electron gun(s) shall meet all technical and performance specifications outlined in the separate document titled: “SPEAR Linac Thermionic RF Gun Technical Requirements,” dated Jun 13, 2025.

This includes, but is not limited to:

RF and beam performance Mechanical compatibility with existing system Vacuum and thermal requirements Electrical specifications and field profiles High-power and beam test requirements

2. Procurement Strategy and Deliverables

This procurement includes a base deliverable and an optional deliverable, structured as follows:

Base Deliverable (Firm Commitment)

Fabrication, testing, and delivery of one (1) fully assembled S-band thermionic RF gun.

Complete design documentation package, including:

o Detailed design specifications.

o Mechanical and assembly drawings.

o RF model.

o Simulation results (e.g., E-field profile, beam dynamics, thermal analysis) and source files.

o Manufacturer’s part number for gun cathode assembly.

o Test reports verifying electrical, mechanical, and high-power performance.

Support for installation and commissioning at SLAC.

Optional Deliverable (Contingent Second Gun)

The second unit shall be functionally identical to the first, unless specific design changes are mutually agreed upon.

3. Testing and Acceptance

Factory Acceptance Test (FAT): The vendor shall conduct FAT to verify compliance with specifications. SLAC may witness the test in person or remotely.

Site Acceptance Test (SAT): Conducted at SLAC following installation, verifying functionality and operational readiness. Due to the SLAC operational schedule, this testing can only occur once per year, during the startup of the system.

4. Schedule and Reporting

Vendor to provide detailed manufacturing and delivery schedule within four (4) weeks of contract award.

Monthly progress reports are required throughout the fabrication and testing period.

Final documentation to be delivered within one (1) week after completion of each unit.

5. General Conditions

All components must be new and conform to SLAC and U.S. DOE safety and quality standards.

SLAC will handle on-site installation; vendor shall support remotely or in person as needed.

SPEAR Linac Thermionic RF Gun Technical Requirements

6/13/2025

A. General Performance Requirements

1. The gun shall be resonant at 2856 MHz and operate reliably at RF powers ranging from 3 MW to

7 MW.

2. 10 Hz with minimal downtime.

3. Ensure stability in cathode emission, RF breakdown, vacuum conditions, RF frequency, field profile, and high-power RF source.

4. Output beam parameters must meet current SPEAR operational requirements.

5. Mechanical interface must be identical to the existing system.

6. Capable of delivering up to an average 400 mA beam current during a nominal 2 us (FWHW) RF pulse (800 nC), demonstrated through beam test.

7. It is preferable that SLAC provides the cathode cartridge.

8. Vendors with a proven track record of success on similar projects are strongly preferred.

B. General Design and Features

1. The gun shall consist of three cells, two axial cells that accelerate the electrons and one side-coupled cell to couple the fields between the axial cells.

2. One of the axial cells will be a full cell and the other will be a shortened cathode cell.

3. The full cell length corresponds to /2, where = 10.504 cm is the free space wavelength of

= 2856 MHz. The cathode cell length is nominally half that of the full cell, corresponding to 4.

4. RF power fed into the full cell, with power transfer to the cathode cell via a side-coupled cavity.

The gun will be operated in the /2 mode.

5. Modes separation >= 40 MHz

6. Thermionic cathode diameter: 6 mm.

7. On-axis E-field profile with a peak E-field ratio of 3:1 between full cell and half-cell. The field profile should be identical to the original design as shown in Figure 1.

8. Both simulation and beam performance results of the purchased gun shall be close to those of the current gun

Figure 1: Desired on-

C. Electrical Specifications

1. The operating temperature, currently approximately 27 , will be specified by SLAC to minimize disruption to the existing system.

2. Unloaded quality factor: 12000.

3. Nominal peak on- in the full cell.

4. RF coupling: = 2 ± 0.2 5.

6. Field probes: Two probes (one for cathode cell, one for full cell) – each terminated by a female

SMA connector. The coupled RF power from these probes should closely match that of the current system; SLAC will provide the reference values.

7. The nominal cathode cell backplane shall be identical to the original design. However, SLAC is open to considering potential improvements to its existing design.

8. Removable cathode holder for commercially available 6 mm diameter cathode.

9. RF system compatibility: Utilize existing RF system (up to 7 MW peak power), with nominal operating power of approximately 3 MW.

D. Mechanical Requirements

The following mechanical requirements are based on preliminary data and are provided as initial guidance. Due to the absence of finalized detailed measurements, the vendor is expected to accommodate reasonable adjustments to these requirements as more precise information becomes available throughout the project. Close collaboration with the customer during the final design phase will be essential to ensure the system meets all performance and integration requirements.

1. Vacuum better than 5×10-9 Torr after up to 200 C bakeout (heater cold, no RF power applied)

2. Sufficient pumping to achieve vacuum quality called out in item 1, above.

o One pump out port per cell.

o Or other equivalent mutually agreed-upon options

3. Flanges:

o flanges.

o o

4. Cooling capacity: sufficient to maintain gun in resonance with o -axis field in the full cell o 10 Hz macropulse repetition rate and o 0.4 A beam current

5. Cell spacing:

o - 0.1mm.

o Cathode plane to full cell center: 52. 1mm.

o Cell alignment concentricity: 0.02

6. Port arrangement: Waveguide port faces up, ion pump ports face down.

E. High Power Test Requirements

1. gradient and 10Hz repetition rate.

2. Beam test:

o Pulsed current: maximum pulsed current 400 o Charge stability: Within 1%

F. Deliverables

1. Fully assembled RF gun meeting all specified requirements.

2. Full set of design documentation, including:

o Detailed design specifications.

o Mechanical and assembly drawings.

o RF model.

o Simulation results (e.g., E-field profile, beam dynamics, thermal analysis) and source files.

o Manufacturer’s part number for gun cathode assembly.

o Test reports verifying electrical, mechanical, and high-power performance.

3. Spare parts (if specified in contract scope).

SECTION D (REV. 6/01/12) SLAC-SCM-GEN-032 PAGE 1 OF 1

Section D – Delivery, Shipping, Packing

1. Delivery, Shipping, Packing in accordance with the Section C Statement of Work

Shipping Terms: Domestic entities: FOB Destination Pre-paid and Add

Foreign entities: CIP SLAC Menlo Park, and Duty Unpaid

FOR INTERNATIONAL VENDORS or SHIPPING OUTSIDE OF THE USA:

VENDOR IS INSTRUCTED TO COORDINATE SHIPMENT WITH SLAC CUSTOMS AGENT:

"TO BE CLEARED THROUGH CUSTOMS IN SAN FRANCISCO BY Green Worldwide Shipping (USA), INC. (PHONE) 650-918-6776 (MOBILE) 650-690-6408, Email: slacimports@greenworldwide.com

(INBOUND CONTACT).

For additional import or export information use: slacexports@greenworldwide.com mailto:slac-exportsgreenworldwide.com http://www.greenworldwide.com and https://www.greenworldwide.com/contact-green

Please mark the "BSO" box (Broker Select Option) in the form.

Address to:

Green Worldwide Shipping, LLC 433 Airport Blvd., Suite 310 Burlingame, CA 94010 USA Main: +1 650 348 2211 Email: slac-imports@greenworldwide.com www.greenworldwide.com

2. Marking for Shipment

Exterior of shipping containers shall be adequately and properly marked for identification. All containers shall include the following minimum exterior marking:

a. Addressee:

SLAC National Accelerator Laboratory Attn: TBD 2575 Sand Hill Road Menlo Park, CA 94025

b. Shipper

c. The SLAC subcontract or purchase order number mailto:slacimports@greenworldwide.com mailto:slacexports@greenworldwide.com mailto:slac-exportsgreenworldwide.com http://www.greenworldwide.com/ https://www.greenworldwide.com/contact-green mailto:slac-imports@greenworldwide.com http://www.greenworldwide.com/

SECTION E (REV. 06/04/12) SLAC-SCM-GEN-031 PAGE 1 OF 1

Section E – Inspections and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Item

NO.

SUPPLIES / SERVICES

INSPECT AT

INSPECT BY ACCEPT AT ACCEPT BY

Base Requirement: S-Band Thermionic RF Gun Procurement

Vendor Vendor Vendor/SLAC SLAC

Option 1 - S-Band Thermionic RF Gun Procurement

Vendor Vendor Vendor/SLAC SLAC

SECTION F (REV. 06/04/12) SLAC-SCM-GEN-032 PAGE 1 OF 1

Section F – Deliveries or Performance

DELIVERY INFORMATION

Item No.

DELIVERY DATE QUANTITY SHIP TO ADDRESS

Base Requirement: S-Band Thermionic RF Gun Procurement

Delivery Date: Aug 1, 2026 or sooner

1 SLAC

Option 1 - S-Band Thermionic RF Gun

NOT EXERCISED.

To be placed no earlier than 6 months after successful commissioning and operation of the first gun.

11 months ARO

1 SLAC

SECTION G (REV. 06/04/12) SLAC-SCM-GEN-033 PAGE 1 OF 1

SUPPLY CHAIN MANAGEMENT

Section G – General Terms and Conditions

The following SLAC General Terms and Conditions for Fixed Price Commercial Supplies and Services, dated August 2023 are attached hereto and incorporated by reference.

GENERAL TERMS AND CONDITIONS FOR FIXED PRICE COMMERCIAL SUPPLIES AND SERVICES

August 2023

GENERAL TERMS AND CONDITIONS

For Fixed Price Commercial Supplies and Services

INDEX

1. DEFINITIONS

2. SCOPE; ENTIRE AGREEMENT AND ORDER OF

PRECEDENCE

3. SELLER ACCEPTANCE OF SUBCONTRACT

4. SERVICES

5. KEY PERSONNEL

6. TITLE AND RESPONSIBILITY

7. INSTRUCTIONS FOR PACKAGING

8. APPROVAL OF TECHNICAL DATA

9. TRAVEL

10. INVOICES AND PAYMENTS

11. EXTRAS

12. TAX AND BUYER EXEMPTION

13. INSPECTION AND ACCEPTANCE OF

COMMERCIAL PRODUCTS OR COMMERCIAL

SERVICES

14. QUALITY OF ITEMS AND COUNTERFEIT PARTS ... 4

15. WARRANTY

16. LIMITATION OF LIABILITY

17. INDEMNITY

18. CONFIDENTIALITY

19. MATERIAL BREACH

20. ASSIGNMENT

21. INDEPENDENT CONTRACTOR

22. PERMITS, LICENSES, AND APPLICABLE LAWS

23. DISPUTES AND GOVERNING LAW

24. EXPORT CONTROL

25. CONTRACTS FOR MATERIALS, SUPPLIES,

ARTICLES, AND EQUIPMENT

26. TIME IS OF THE ESSENCE

27. EXCUSABLE DELAYS

28. PUBLICITY

29. CLAUSES INCORPORATED BY REFERENCE

1. DEFINITIONS

As used in the Subcontract, the term:

a. “Buyer” means the Board of Trustees of the Leland Stanford Jr. University (“University”), or any duly authorized representative thereof, acting through SLAC National Accelerator Laboratory (“SLAC”), under its Management and Operating Contract with the United States Department of Energy (“DOE”).

b. “Commercial product” or “commercial service” has the meanings set forth in FAR 2.101, as updated from time to time.

c. “Government” means the government of the United States of America.

d. “Micro-Purchase Threshold” shall mean the threshold defined in FAR 2.101, as updated from time to time.

e. “Procurement Specialist” means Buyer’s designated contracting officer with the authority to bind Buyer. Unless otherwise provided in writing herein, no other Buyer personnel or agents possess such authority. Procurement Specialist may also be referred to as “Subcontract Administrator” in the Subcontract.

f. “Seller” means the firm (individual person and/or entity) supplying the materials, supplies or services under the Subcontract. Seller may also be referred to as supplier, Subcontractor or vendor.

g. “Seller Representative” means Seller’s primary point of contact for Buyer, designated by Seller as responsible for leading and organizing the services to be provided herein.

h. “Simplified Acquisition Threshold” shall mean the threshold defined in FAR 2.101, as updated from time to time.

i. “Technical Representative(s) or Service Manager(s),” if one or more is designated in this Subcontract, shall mean Buyer’s agent(s) for all technical inquiries and oversight. The Technical Representative or Service Manager has the authority to provide clarifying instruction or grant approvals in the manner defined in the Subcontract, but not to modify or amend any term of this Subcontract, nor to commit Buyer funds.

2. SCOPE; ENTIRE AGREEMENT AND ORDER OF PRECEDENCE

a. The scope of the Subcontract shall be limited to the acquisition of commercial products or services, on a fixed-price basis.

b. The Subcontract may consist of any or all of the following documents: (1) signed Subcontract or Purchase Order, including any special

August 2023 terms and conditions attached thereto; (2) these terms and conditions and any on-site supplemental terms and conditions (for services provided at Buyer’s site); (3) Statement of Work,; (4) any other Buyer referenced and incorporated clauses, provisions, and documents;

(5) Buyer-furnished Government Property; and (6) Seller’s written and accepted proposal. These documents comprise the entire agreement between the parties and supersede all prior proposals, representations, negotiations, or agreements, whether written or oral.

c. Any conflicts and/or inconsistencies in the documents identified above comprising this Subcontract shall be resolved by giving precedence in the order they are listed above, with the first numbered item(s) having the highest precedence, and each following item(s) having successively lower precedence.

d. Except as otherwise provided in this Subcontract, the term “Sub-Subcontract” includes lower-tier subcontracts and purchase orders under this Subcontract, and the terms “subcontractor” or “sub-subcontractor” shall mean Seller’s subcontractor.

3. SELLER ACCEPTANCE OF SUBCONTRACT

a. Seller’s acknowledgement, commencement of performance, or acceptance of payment, whichever occurs first, shall constitute Seller’s unqualified acceptance of the Subcontract.

b. Seller, by accepting the Subcontract, does hereby agree that (i) this Subcontract sets forth the entire agreement between the Buyer and the Seller and supersedes any prior offers, negotiations, and agreements concerning the subject matter of this Subcontract, and (ii) no form, document, or additional or differing terms supplied by the Seller shall constitute a part of the Subcontract or have any effect, regardless of where they are included, unless specifically and expressly accepted in writing by the Procurement Specialist.

4. SERVICES

a. The Seller shall be responsible for the professional quality, technical accuracy and the coordination of all data, reports, documentation, and other services furnished by the Seller under this Subcontract, as applicable. The Seller shall, without additional compensation, correct or revise any errors or deficiencies in its data, reports, documentation, and services.

b. The Seller shall manage its own services, consult regularly with the Buyer, communicate with members of the project team, and regularly report progress to the Buyer. In addition, as may be necessary, the Seller shall coordinate with Buyer’s Technical Representative or Service Manager, research and develop applicable design or other technical criteria and documentation and attend project meetings. The Seller will make available the services of certain of its employees, as contractually required, for the purpose of personally rendering expert advice and assistance to the Buyer in connection with the performance of services under this Subcontract.

c. The extent and character of the services to be provided by Seller shall be subject to the general oversight, supervision, direction, control, and approval of Buyer. Neither the Buyer’s reviews, approval or acceptance of, nor payment for, the services under this Subcontract shall be construed to operate as a waiver of any rights under this Subcontract, or of any cause of action arising out of the performance of this Subcontract, and the Seller shall be and remain liable to the Buyer, in accordance with applicable law, for all damages to the Buyer caused by the Seller’s negligence or misconduct.

5. KEY PERSONNEL

a. Seller Representative shall: (A) devote a reasonable amount of time to the services to be provided herein; (B) be closely involved and continuously responsible for the conduct of the services; (C) not be replaced unless pre-approved in writing by Buyer; and (D) promptly advise Buyer if she/he will devote substantially less effort to the services hereunder than anticipated or otherwise set forth in the Subcontract.

b. Any of Seller’s key technical personnel identified in the Subcontract and assigned to perform the services hereunder shall not be assigned to other work that will interfere with the services they are to provide under this Subcontract, without prior, written approval from Buyer, except in circumstances beyond the reasonable control of Seller. If such circumstances arise, Seller shall inform the Procurement Specialist of such reassignments within five (5) business days of the occurrence of such circumstance(s). A replacement individual shall be assigned by the Seller, subject to prior approval by the Procurement Specialist, within ten (10) business days. If an acceptable individual is not identified, Buyer may terminate this Subcontract immediately.

6. TITLE AND RESPONSIBILITY

a. Title to the material and supplies purchased hereunder shall pass to the Government at the point of delivery to the Buyer; and, if purchased F.O.B. Shipping Point, delivery to the carrier by the Seller shall be deemed delivery to the Buyer. No insurance charges will be allowed unless specifically authorized in the Subcontract.

b. Except as otherwise provided in the Subcontract (i) the Seller shall be responsible for the supplies covered by the Subcontract until they are delivered at the designated delivery point, regardless of the point of inspection; (ii) the Seller shall bear all risks as to rejected supplies after notice of rejection, except that the Buyer shall be responsible for the loss, or destruction of, or damage to, the supplies, if loss, destruction or damage results from the gross negligence of officers, agents, or employees of the Buyer acting within the scope of their employment.

c. The actual total transportation charges paid to the carrier(s) by the consignor or consignee shall be reimbursed by the Seller.

August 2023

7. INSTRUCTIONS FOR PACKAGING

Packing and packaging shall be adequate to prevent damage when shipped by common carrier or another method utilized. Seller shall be solely responsible for any damage resulting from improper packaging, containerizing, or lack thereof. The Seller shall indicate the Subcontract and/or Purchase Order number on each container or package. An itemized packing list shall be affixed to the outermost cover of each container or package. The use of environmentally sustainable packaging materials is required.

8. APPROVAL OF TECHNICAL DATA

a. If this Subcontract requires the Seller to furnish any drawings, specifications, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance or test data, or other technical data for approval by the Buyer prior to Seller performance, the approval of the data by the Buyer shall not relieve the Seller from responsibility for any errors or omissions in such data or from responsibility for complying with the requirements of this Subcontract, except as specified below. Any work done prior to such approval shall be at the Seller’s risk.

b. If the data includes any variations from the Subcontract requirements, the Seller shall describe such variations in writing at the time of submission of the data. If the Buyer approves any such variation(s), a change order to the Subcontract shall be issued by the Buyer and, if appropriate, a bilateral modification to the Subcontract shall be negotiated.

9. TRAVEL

Only when travel is included as part of the performance under the Subcontract and is set forth as a specific cost/price element in the Subcontract, the following requirements shall apply:

a. Expenses incurred for travel, lodging, meals, and incidental expenses shall be reimbursed only to the extent that they comply with Buyer’s travel reimbursement guidelines. The Seller shall submit with its invoice itemized receipts showing proof of payment for expenses in excess of $75. If travel is not reimbursed on a cost-basis, then the requirements of this paragraph do not apply.

b. To the extent any foreign travel (outside the U.S.) is required under this Subcontract, it shall be conducted pursuant to the requirements contained in DOE Order 551.1, “Official Foreign Travel” or any subsequent version of the Order in effect at the time of award. All foreign travel requests must be entered into the DOE Foreign Travel Management System (FTMS) within 60 calendar days before the proposed departure date. Travelers must contact the Procurement Specialist for the necessary foreign travel forms and processes well in advance of the FTMS deadline. All foreign travel request forms are to be submitted to the Travel Office for entry into FTMS.

c. No such foreign travel shall be taken until a DOE FTMS Foreign Travel Approval Number has been obtained from the SLAC Travel Office and transmitted to the Seller. Reimbursement for foreign travel incurred without a FTMS Approval Number will not be allowed.

More information can be found at the SLAC Travel Office’s website, at https://travel.slac.stanford.edu/.

10. INVOICES AND PAYMENTS

a. Except as otherwise provided in the Subcontract, no later than 30 days upon Buyer’s acceptance and receipt of invoices satisfactory to Buyer, whichever occurs later, the Seller shall be paid the amounts agreed, less deductions and discounts if any. Payments shall be made by check or automated clearing house (ACH) as agreed.

b. Unless otherwise specified, partial payments will not be made. This, however, does not preclude payments for partial shipments of completed deliverables (as distinguished from components).

c. At minimum, all invoices shall contain the information required by Buyer, available at https://suppliers.slac.stanford.edu/doing-business-slac/invoicing-and-reimbursement, incorporated herein by reference. All invoices shall reference applicable Purchase Orders by Buyer Purchase Order number, and the applicable line item numbers or other item number specified on the Purchase Order or Subcontract.

d. For Sellers providing services in California and if Seller is not a California resident or entity, or does not have an office in California, the invoice must specify the number of hours and amount being invoiced for services performed in California.

e. All invoices shall be submitted to ap@slac.stanford.edu or to the following address:

SLAC National Accelerator Laboratory c/o Accounts Payable, MS 09 OR c/o Accounts Payable DISCOUNT DESK, MS 09 (for invoices with discount terms) 2575 Sand Hill Road Menlo Park, California 94025

11. EXTRAS

Except as otherwise provided in the Subcontract no payment for extras shall be made unless such extras and the price therefore have been authorized in writing by the Procurement Specialist.

12. TAX AND BUYER EXEMPTION

a. Except as may be otherwise provided in the Subcontract, the selling price includes all applicable federal taxes in effect on the date of this https://travel.slac.stanford.edu/ https://suppliers.slac.stanford.edu/doing-business-slac/invoicing-and-reimbursement https://suppliers.slac.stanford.edu/doing-business-slac/invoicing-and-reimbursement mailto:ap@slac.stanford.edu

August 2023

Subcontract but does not include any state or local sales, use, or other tax directly applicable to the completed supplies or services covered by the Subcontract nor any other tax, duties, tariffs, and similar fees from which the Seller or this transaction is exempt. Upon request of the Seller, the Buyer shall furnish, unless no legal basis exists therefore, a tax exemption certificate or similar evidence of exemption with respect to any such tax not included in the Seller’s price pursuant to this Article.

b. For Sellers providing services, the Buyer will automatically withhold from any invoice paid appropriate taxes, if required by the U.S.

Internal Revenue Service and the California Franchise Tax Board.

c. The Seller agrees to notify Buyer of any government tax, fee, or charge levied or purported to be levied on or collected from the Subcontractor in connection with this Subcontract which Seller has reason to believe may be inapplicable or invalid, and which would be reimbursable or the Buyer has claimed an exemption hereunder. The Subcontractor also agrees to refrain from paying any such tax, fee, or charge, unless otherwise authorized by the Buyer, and to take such steps as may be required by the Buyer to cause such tax, fee, or charge to be paid under protest and, if so directed by the Buyer, to cause to be assigned to the Buyer or its designee any and all rights to the abatement or refund of any such tax, fee, or charge, and to permit the Buyer or its designee to join with the Seller in any proceedings for the recovery thereof or to sue for recovery in the Seller’s name.

13. INSPECTION AND ACCEPTANCE OF COMMERCIAL PRODUCTS OR COMMERCIAL SERVICES

a. All supplies (which term throughout this article includes without limitation raw material, components, intermediate assemblies, and end products) shall be subject to inspection, test and expediting by the Buyer and/or the Government to the extent practicable at all times and places including the period of manufacture, and in any event prior to acceptance.

b. In case any supplies or lots of supplies are defective in material or workmanship or are otherwise not in conformity with the requirements of this Subcontract, the Buyer shall have the right either to reject them (with or without instruction as to their disposition) or to require their correction. Supplies or lots of supplies which have been rejected or required to be corrected shall be removed, or, if permitted or required by the Buyer, corrected in place, by and at the expense of the Seller promptly after notice, and shall not thereafter be tendered for acceptance unless the former rejection or requirement of correction is disclosed. If the Seller fails to promptly remove such supplies or lots of supplies which are required to be removed, or to promptly replace or correct such supplies or lots of supplies, the Buyer either (i) may by order or otherwise replace or correct such supplies and charge to the Seller the cost occasioned the Buyer thereby, or (ii) may terminate this order for default in accordance with the applicable FAR clause(s). Unless the Seller corrects or replaces such supplies within the delivery schedule, the Buyer may require the delivery of such supplies at a reduction in price which is equitable under the circumstances.

c. If any inspection or test is made by the Buyer and/or the Government on the premises of the Seller or a subcontractor, the Seller without additional charge shall provide all reasonable facilities and assistance for the safety and convenience of the Buyer and Government inspectors in the performance of their duties. If Buyer and/or Government inspection or test is made at a point other than the premises of the Seller or a subcontractor, it shall be at the expense of the Buyer except as otherwise provided in this order; Provided that, in case of rejection the Buyer shall not be liable for any reduction in value of samples used in connection with such inspection or test. All inspections and tests by the Buyer and/or Government shall be performed in such a manner as not to unduly delay the work. The Buyer reserves the right to charge to the Seller any additional cost of Buyer and/or Government inspection and test when supplies are not ready at the time such inspection and test are requested by the Seller or when re-inspection or re-test is necessitated by prior rejection.

d. Notice of rejection shall be provided within forty-five (45) days of the receipt of the items or completion of services. If no such notice of rejection is provided within the aforementioned time, or if the Procurement Specialist formally accepts the item or services in writing, such item or services shall be deemed accepted, provided, however, this period may be extended to thirty (30) days after the date of discovery of a material defect (if such date is later) if (1) the Buyer could not have reasonably discovered such a material defect from a reasonable inspection; or (2) the defect is of the type specified in the Article, “Quality of Items and Counterfeit Parts,” below.

e. The Seller shall provide and maintain an inspection system acceptable to the Government covering the supplies hereunder. Records of all inspection work by the Seller shall be kept complete and available to the Government during the performance of this order and for such longer period as may be specified elsewhere in this order.

14. QUALITY OF ITEMS AND COUNTERFEIT PARTS

All item(s), including any materials and supplies furnished by the Seller in performance of any services, shall as a minimum: (1) be new and genuine, or reconditioned and so identified and warranted as new, genuine and not of such age or so deteriorated as to impair their usefulness or safety; and (2) not contain any counterfeit or suspect materials, parts, or components. The furnishing of reconditioned items must be specified and mutually agreed in the Subcontract or pre-approved in writing by the Buyer’s Procurement Specialist. Types of materials, parts, and components known to have been counterfeit or suspect include, but are not limited to: electrical components, piping, fittings, flanges, and fasteners. Any acceptance of items or materials delivered to Buyer not meeting these minimum requirements shall be deemed null and void, and at minimum, Buyer shall be entitled to replacement at no cost or refund at any time after such defects are reasonably discovered.

15. WARRANTY

Seller at a minimum warrants that all services, supplies and materials delivered hereunder shall be free from all defects in materials, workmanship and Seller’s design and engineering documentation, and shall comply with all the requirements of the Subcontract. The Seller further warrants that the data and documentation provided by Seller or its suppliers shall be complete and accurate, and may be relied upon by Buyer. The warranty shall begin upon acceptance and extend for a period of the manufacturer (as applicable) or Seller’s standard warranty period or one year, whichever is longer. If any nonconformity appears within that time, Buyer, in addition to any other rights and remedies

August 2023 provided by law, or under other provisions of this Subcontract, may require Seller to repair or replace the goods and/or re-perform the services at no increase in price, or to reduce the Subcontract price to reflect the reduced value of the Sellers’ performance. When supplies are returned, the Seller shall bear the risk of loss and transportation cost. If Seller fails to replace or repair the goods or re-perform the services within 10 days of Buyer’s written notice to do so, Buyer shall have the right by contract or otherwise to replace or repair the goods or re-perform the services, and charge the Seller the cost occasioned thereby.

16. LIMITATION OF LIABILITY

Except as otherwise provided herein, neither Party shall be liable for consequential damages resulting from this Subcontract.

17. INDEMNITY

The Seller shall indemnify, defend, and hold harmless the Board of Trustees of the Leland Stanford Junior University, the Government of the United States, and their respective trustees, contractors, officers, agents, and employees from and against all claims of noncompliance with or violation of applicable laws or regulations, any and all loss, property damage, expense, personal injury, death, or other liability arising out of or related to the performance of the work hereunder by Seller or Seller’s agents, provided that such loss is not caused by the gross negligence or willful misconduct of the Buyer. The Seller shall also pay any cost and/or attorneys’ fees that may be incurred by any of the above-name indemnities in enforcing this indemnity.

18. CONFIDENTIALITY

a. Except to the extent required by governing law or necessary to report fraud, waste, or abuse to the Government, Seller, its employees, contractors, and agents shall not reproduce or disclose any information, knowledge, or data of the Buyer that the Seller receives or has access to in connection with this Subcontract when such information, knowledge, or data is marked confidential, proprietary, trade secret, official use only, or is otherwise so expressly designated by the Buyer, the Government, or third-party contractors.

b. The Seller shall have appropriate agreements or policies with its employees, agents, and lower-tier subcontractors to ensure compliance with this clause.

19. MATERIAL BREACH

In the event that Seller breaches any of its material obligations under this Subcontract, Buyer may provide written notice to Seller specifying the nature of the default, requiring it to cure such breach, and stating its intention to terminate this Agreement if such breach is not cured within thirty (30) days. If such breach is not cured within thirty (30) days after the receipt of such notice and such breach remains uncured, Buyer, in its sole discretion, shall be entitled to terminate the Subcontract, or portions thereof, for cause immediately by written notice to Seller. If Buyer terminates the Subcontract in accordance with the foregoing, Seller shall be responsible for all costs and expenses that Buyer incurs to cure the applicable breach(es) and to complete or replace any unfinished services or deliverables, irrespective of whether Buyer conducts such work itself or through another third party. Nothing in this provision is intended to prevent Buyer from seeking immediate equitable or injunctive relief, or to avail itself of any of the other remedies available to it under this Subcontract or at law.

20. ASSIGNMENT

Neither the Subcontract nor any interest therein nor claim thereunder shall be assigned or transferred by the Seller except as expressly authorized in writing by the Procurement Specialist, provided that the Seller or its assignee’s rights to be paid amounts due as a result of performance of the Subcontract may be assigned to a bank, trust company or other financing institution, including any federal lending institution. Payments to an assignee shall be subject to setoff or recoupment for any present or future claims of Buyer against Seller.

21. INDEPENDENT CONTRACTOR

Seller is an independent contractor in all its operations and activities hereunder. The employees used by Seller to perform work under the Subcontract shall be Seller’s employees exclusively, without any relation whatsoever to Buyer or its affiliates.

22. PERMITS, LICENSES, AND APPLICABLE LAWS

In performance of the Subcontract, Seller shall, at its own expense, comply with all applicable local, state, and federal laws, orders, rules, regulations, and ordinances. Seller must, at its own expense, have and maintain the license(s) and/or certification(s) appropriate to its trade, issued by the relevant trade association, or regulatory or administrative agency.

23. DISPUTES AND GOVERNING LAW

a. The parties shall attempt to resolve any dispute, controversy, or claim arising out of or related to this Subcontract in good faith, by direct, informal negotiations. Pending resolution of the dispute, claim, or controversy, the Seller shall proceed diligently with the performance of this Subcontract, in accordance with its terms and conditions.

b. All disputes under this Subcontract that are not disposed of by mutual agreement may be decided by recourse to an action at law or in

August 2023 equity.

c. The parties submit all their disputes arising out of or in connection with this Subcontract to the exclusive jurisdiction of the state or federal courts located in the Northern District of California.

d. Any substantive issue of law shall be determined in accordance with the body of applicable federal law. If there is no applicable federal law, the law of the State of California shall apply.

e. Seller shall have appropriate agreements or policies with its employees, agents, and next-tier subcontractors to ensure compliance with this clause.

24. EXPORT CONTROL

a. Seller agrees that it shall not provide, deliver, or display any information, materials, or products subject to United States export controls, including those subject to the Export Administration Regulations (“EAR”) administered by the Commerce Department or the International Traffic in Arms Regulation (“ITAR”) administered by the State Department unless it provides written notice of the same at least 20 calendar days prior to the delivery or display to the Procurement Specialist.

b. If any information, materials, or products delivered are subject to such controls, Seller shall provide applicable export control classification numbers or other information requested by the Buyer to comply with applicable export laws and regulations.

25. CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT

If this Subcontract is for the manufacture or furnishing of materials, supplies, articles, or equipment in an amount which exceeds or may exceed $15,000.00 and is otherwise subject to the Walsh-Healy Public Contracts Act, as amended (41 U.S. Code 35-45), there are hereby incorporated by reference all representations and stipulations required by said Act and regulations issued thereunder by the Secretary of Labor, such representations and stipulations being subject to all applicable rulings and interpretations of the Secretary of Labor which are now or may hereafter be in effect.

26. TIME IS OF THE ESSENCE

The Seller shall undertake the services hereunder diligently with such forces as the Seller determines are necessary to complete the work of this Subcontract within the times specified in the Subcontract.

27. EXCUSABLE DELAYS

The Seller shall be liable for delays, unless such delays are caused by an occurrence beyond the reasonable control of the Seller and without its fault or negligence, such as acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, flood, pandemics, epidemics, quarantine, restrictions, strikes, unusually severe weather, and delays of common carriers. The Seller shall notify the Buyer in writing as soon as reasonably possible after commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give the Buyer written notice of the cessation of such occurrence.

28. PUBLICITY

Seller shall not release any advertising copy or other publicly available information mentioning Buyer or quoting the opinion of any of Buyer’s employees. Seller shall not state or imply in advertising or other copy that Buyer, the Government, or their employees endorse in any way Seller’s products or services. The Seller and its employees, agents, or contracts shall not use or exploit "Stanford University," "SLAC," or any other trademark or logo owned by the Buyer or the Government, unless necessary to perform the Subcontract and if prior, written approval of Buyer of such use is received by Seller.

29. CLAUSES INCORPORATED BY REFERENCE

The Federal Acquisition Regulation (“FAR”) and Department of Energy Acquisition Regulation (“DEAR”) clauses listed below, which are located in Chapters 1 and 9, respectively, of Title 48 of the Code of Federal Regulations, are incorporated by this reference as a part of the Subcontract as prescribed below or as prescribed by the clauses’ prescriptives. If a condition listed next to the listed clause is inapplicable, then the clause is not incorporated by reference. As used in the clauses, the term “contract” shall mean the Subcontract; the term “Contractor” shall mean the entity (“Subcontractor” or “Seller”) who entered into the Subcontract with the Buyer; the term “subcontractor” shall mean the Subcontractor/Seller’s subcontractor; and the terms “Government” and “Contracting Officer” shall mean the Buyer, except in FAR clauses 52.227-1, 52.227-3, 52.227-14, and 52.227-19, 52.204-10 in which clauses “Government” shall mean the Government and “Contracting Officer” shall mean the DOE Contracting Officer for Prime Contract DE-AC02-76SF00515 with the Buyer. The Seller shall include the listed clauses in its subcontracts at any tier, to the extent applicable.

THE FOLLOWING CLAUSES APPLY TO ALL SUBCONTRACTS:

FAR 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR

STATEMENTS (JAN 2017)

FAR 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021) if contractor

August 2023 may have Federal contract information residing in or transiting through its information system

FAR 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR

PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (NOV 2021)

FAR 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS- COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)

FAR 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015) if the Subcontract includes the Equal Opportunity clause

FAR 52.222-26 EQUAL OPPORTUNITY (SEP 2016), unless the Subcontract is entirely exempt from the requirements of Executive Order 11246

FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)

FAR 52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 ) if FAR 52.222-6 or FAR 52.222-41 applies and is to be performed in whole or in part in the United States

FAR 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .