This Request for Proposals (RFP 27-CD01) is issued by the City of Milton, Georgia's Community Development Department, seeking qualified firms to provide building plan review and inspection services for residential and commercial construction permits within city limits. The primary services include building plan review, inspections and compliance documentation, staffing and coordination, and optional supplemental services such as Building Official coverage, Owner's Representative services, and City Facility Technical Support. Proposals must be submitted electronically via the City's BidNet procurement portal by 2:00 PM EST on November 17, 2026, with a question deadline of November 2, 2026, by 5:00 PM EST. The City will announce proposal receipt at approximately 2:30 PM on the proposal due date. The contract will be awarded on a proposed date of December 21, 2026, and services will be provided as needed for up to five years based on performance and mutual agreement, authorized through written task orders establishing scope, schedule, and not-to-exceed amounts. The Consultant must meet specified turnaround times including eight business days for initial residential and commercial plan reviews, five business days for resubmittal reviews, and next business day inspections.

Pricing will be based on hourly rates for residential building plan review, commercial building plan review, residential building inspection services, and commercial building inspection services, with rates remaining fixed through December 31, 2027, and any subsequent annual increases to be identified in the cost proposal. Hourly rates must include overhead, equipment, and transportation for inspection personnel, with separate pricing required for optional supplemental services. The evaluation criteria allocate 40 points to team qualifications, 40 points to related experience and work plan, and 20 points to pricing. All proposals will be evaluated on technical merit before cost evaluation, and the City reserves the right to request best and final offers, conduct discussions and negotiations, and require oral presentations. Consultant must obtain all required insurance including Commercial General Liability of at least $1,000,000 combined single limit, Professional Liability of $1,000,000, and Workers' Compensation as required by Georgia law. The Consultant must also comply with E-Verify requirements pursuant to O.C.G.A. 13-10-91 and provide proof of Workers' Compensation coverage within ten working days of the Request for Documents Notice.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS

(THIS IS NOT AN ORDER)

RFP Number:

27-CD01

RFP Title:

Building Division Support Services

Due Date and Time: November 17, 2026, by 2:00 pm EST

*Link for virtual announcement of proposals received in response to this RFP will be posted as a “Communication” under this solicitation listing on the City’s procurement portal, BidNet Direct

Number of Pages: 47

ISSUING DEPARTMENT INFORMATION

Issue Date: October 22, 2026 City of Milton Community Development Department 2006 Heritage Walk Milton, GA 30004

Phone: 678-242-2500

Website: www.miltonga.gov

INSTRUCTIONS TO OFFERORS

Electronic Submittal: **Proposals must be submitted electronically via Milton’s BidNet procurement portal/platform at www.miltonga.gov/finance/bids-rfps

If you have not registered as a vendor via BidNet we encourage you to register. There is no cost to join, and you will be notified of any potential bid opportunities with the City of Milton as well as other agencies who are part of the Georgia Purchasing Group.

Mark Envelope/Package:

RFP Number: 27-CD01 Name of Company or Firm Special Instructions:

Deadline for Written Questions

November 2, 2026, by 5:00 PM EST

Submit questions online via the BidNet Direct procurement portal at www.miltonga.gov/finance/bids-rfps

IMPORTANT: SEE STANDARD TERMS AND CONDITIONS

OFFERORS MUST COMPLETE THE FOLLOWING

Offeror Name/Address: Authorized Offeror Signatory:

(Please print name and sign in ink)

Offeror Phone Number: Offeror FAX Number:

Offeror Federal I.D. Number: Offeror E-mail Address:

OFFERORS MUST RETURN THIS COVER SHEET WITH RFP RESPONSE

http://www.miltonga.gov/ http://www.miltonga.gov/finance/bids-rfps

2 | RFP 27-CD01

TABLE OF CONTENTS

Offeror’s RFP Checklist

Disclosure Form

Proposal Letter

Contractor Affidavit and Agreement (E-Verify)

Schedule of Events

Section 1: Project Overview and Instructions

Section 2: RFP Standard Information

Section 3: Scope of Services

Section 4: Offeror Qualifications

Section 5: Cost Proposal

Section 6: Evaluation Criteria

Section 7: Standard Contract Information

Sample Standard Contract

3 | RFP 27-CD01

OFFEROR’S RFP CHECKLIST

The 10 Most Critical Things to Keep in Mind When Responding to an RFP for the City of Milton

1. Read the entire document. Note critical items such as: mandatory requirements; supplies/services required; submittal dates; number of copies required for submittal; funding amount and source; contract requirements (i.e., contract performance security, insurance requirements, performance and/or reporting requirements, etc.).

2. Note the procurement officer's name, address, phone numbers and e-mail address. This is the only person you are allowed to communicate with regarding the RFP and is an excellent source of information for any questions you may have.

3. Attend the pre-qualifications conference if one is offered. These conferences provide an opportunity to ask clarifying questions, obtain a better understanding of the project, or to notify the City of any ambiguities, inconsistencies, or errors in the RFP.

4. Take advantage of the “question and answer” period. Submit your questions to the procurement officer by the due date listed in the Schedule of Events and view the answers given in the formal “addenda” issued for the RFP. All addenda issued for an RFP are posted on the City’s website at http://www.miltonga.gov/finance/bids-rfps will include all questions asked and answered concerning the

RFP.

5. Follow the format required in the RFP when preparing your response. Provide point-by-point responses to all sections in a clear and concise manner.

6. Provide complete answers/descriptions. Read and answer all questions and requirements. Don’t assume the City or evaluation committee will know what your company capabilities are or what items/services you can provide, even if you have previously contracted with the City. The submittals are evaluated based solely on the information and materials provided in your response.

7. Use the forms provided, i.e., cover page, sample budget form, certification forms, etc.

8. Check the website for RFP addenda. Before submitting your response, check the City’s website at http://www.miltonga.gov/finance/bids-rfps to see whether any addenda were issued for the RFP. If so, you must submit a signed cover sheet for each addendum issued along with your RFP response.

9. Review and read the RFP document again to make sure that you have addressed all requirements. Your original response and the requested copies must be identical and be complete. The copies are provided to the evaluation committee members and will be used to score your response.

10. Submit your response on time. Note all the dates and times listed in the Schedule of Events and within the document and be sure to submit all required items on time. Late submittal responses are never accepted.

This checklist is provided for assistance only and should not be submitted with Offeror’s response.

http://www.miltonga.gov/finance/bids-rfps%20to

4 | RFP 27-CD01

CITY OF MILTON DISCLOSURE FORM

MUST BE RETURNED WITH PROPOSAL

This form is for disclosure of campaign contributions and family member relations with City of Milton officials/employees.

Please complete this form and return it as part of your RFP package when it is submitted.

Name of Offeror

Name and the official position of the Milton Official to whom the campaign contribution was made (Please use a separate form for each official to whom a contribution has been made in the past two (2) years.)

List the dollar amount/value and description of each campaign contribution made over the past two (2) years by the Applicant/Opponent to the named Milton Official.

Amount/Value Description

Please list any family member that is currently (or has been employed within the last 12 months) by the City of Milton and your relation:

5 | RFP 27-CD01

RFP# 27-CD01

PROPOSAL LETTER

We propose to furnish and deliver all the deliverables and services named in the Request for Proposals (27-CD01), Building Division Support Services.

It is understood and agreed that we have read the City’s specifications shown or referenced in the RFP and that this proposal is made in accordance with the provisions of such specifications.

By our written signature on this proposal, we guarantee and certify that all items included meet or exceed any and all such City specifications. We further agree, if awarded a contract, to deliver goods and services which meet or exceed the specifications. The City reserves the right to reject any or all proposals, waive technicalities, and informalities, and to make an award in the best interest of the City.

PROPOSAL SIGNATURE AND CERTIFICATION

I understand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of the proposal and certify that I am authorized to sign for my company. I further certify that the provisions of the Official Code of Georgia Annotated, Sections 45-10-20 et. seq. have not been violated and will not be violated in any respect.

Authorized Signature Date

Print/Type Name

Print/Type Company Name Here

6 | RFP 27-CD01

CONTRACTOR AFFIDAVIT AND AGREEMENT

STATE OF GEORGIA

CITY OF MILTON

By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm, or corporation which is engaged in the physical performance of services on behalf of the City of Milton has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91.

Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b).

Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

E-Verify Number

Date of Authorization

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on , , 20 in (city), (state).

Name of Contractor Signature of Authorized Officer or Agent

Building Division Support Services Name of Project

City of Milton, Georgia Name of Public Employer

Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME ON

THIS THE DAY OF ,20 .

NOTARY PUBLIC

[NOTARY SEAL]

My Commission Expires:

7 | RFP 27-CD01

SCHEDULE OF EVENTS

Task Date

Issue RFP October 22, 2026

Site Visit (recommended, but not mandatory) n/a

Deadline for Questions November 2, 2026, by 5:00 p.m. EST

Answers Posted by the City (Addendum)

On or about, November 4, 2026

Proposals Due By 2:00 p.m. EST on November 17, 2026

Award Contract December 21, 2026 (proposed)

NOTE: PLEASE CHECK THE CITY WEBSITE (http://www.miltonga.gov/finance/bids-rfps ) FOR ADDENDA AND SCHEDULE UPDATES.

8 | RFP 27-CD01

SECTION 1: PROJECT OVERVIEW AND INSTRUCTIONS

1.0 BACKGROUND AND STATEMENT OF INTENT

The City of Milton is seeking proposals from qualified firms to provide building plan review and inspection services for residential and commercial construction permits within the city limits. The selected Consultant will work closely with the Community Development Department’s Building Division.

1.1 SINGLE POINT OF CONTACT

From the date this Request for Proposals (RFP) is issued until a Contractor is selected, Offerors are not allowed to communicate with any City staff or elected officials regarding this procurement except at the direction of Honor Motes, Procurement Manager. Any unauthorized contact may disqualify the Offeror from further consideration. Contact information for the single point of contact is:

Procurement Office: Honor Motes, Procurement Manager Address: 2006 Heritage Walk, Milton, GA 30004 Telephone Number: 678-242-2507 E-mail Address: honor.motes@miltonga.gov

1.2 REQUIRED REVIEW

A. Review RFP.

Offerors should carefully review the instructions; mandatory requirements, specifications, standard terms and conditions, and standard contract set out in this RFP and promptly notify the procurement office identified above via e-mail of any ambiguity, inconsistency, unduly restrictive specifications, or error which they discover upon examination of this RFP.

B. Form of Questions.

Offerors with questions or requiring clarification or interpretation of any section within this RFP must submit their questions via the solicitation link on BidNet Direct, the procurement portal on the City’s website, on or before 5:00 PM (EST) on November 2, 2026. Each question must provide clear reference to the section, page, and item in question. Questions received after the deadline may not be considered.

C. City’s Answers.

The City will provide an official written answer to all questions on or about November 4, 2026. The City's response will be by formal written addendum. Any other form of interpretation, correction, or change to this RFP will not be binding upon the City. Any formal written addendum will be posted alongside the posting of the RFP at http://www.miltonga.gov/finance/bids-rfps .Offerors must sign and return any addendum with their RFP response.

D. Standard Contract.

By submitting a response to this RFP, Offeror agrees to acceptance of the City’s standard contract. Much of the language included in the standard contract reflects requirements of State law. Requests for exceptions to the standard contract terms, or any added provisions must be submitted to the procurement office referenced above by the date for receipt of written/e-mailed questions or with the Offeror’s RFP response and must be accompanied by an explanation of why the exception mailto:honor.motes@miltonga.gov http://www.miltonga.gov/finance/bids-rfps

9 | RFP 27-CD01

is being taken and what specific effect it will have on the Offeror’s ability to respond to the RFP or perform the contract. The City reserves the right to address non-material, minor, insubstantial requests for exceptions with the highest scoring Offeror during contract negotiation. Any material, substantive, important exceptions requested and granted to the standard terms and conditions and standard contract language will be addressed in any formal written addendum issued for this RFP and will apply to all Professionals submitting a response to this RFP.

E. Mandatory Requirements.

To be eligible for consideration, an Offeror must meet the intent of all mandatory requirements. The City will determine whether an Offeror’s RFP response complies with the intent of the requirements. RFP responses that do not meet the full intent of all requirements listed in this RFP may be subject to point reductions during the evaluation process or may be deemed non- responsive.

1.3 NON-DISCRIMINATION

All qualified applicants will receive consideration without regard to age, handicap, religion, creed or belief, political affiliation, race, color, sex, or national origin.

1.4 SUBMITTING PROPOSALS

Proposals shall be submitted in two (2) separate files, one containing the technical proposal and the other containing the cost proposal. The City will score all technical proposals before evaluating the costs.

Offerors must organize their proposal into sections that follow the following format.

A. Submittal Requirements.

Proposals shall include the following:

1. City of Milton request for proposal cover page (information entered and signed: first page of this document)

2. City of Milton Disclosure form (signed)

3. City of Milton Proposal letter (information entered)

4. Contractor Affidavit and Agreement (eVerify)

5. Technical Proposal:

a. No more than ten (10) pages

1. Cover page(s), table of contents, tabs, resumes of team members, and required forms do not count toward the page limit

b. Print-friendly, preferred font size 11-point

Each Technical Proposal Shall Contain (more information on each of these is below):

a. Project Team and Qualifications

b. Experience and References

c. Work Plan

10 | RFP 27-CD01

6. Applicable Addenda Acknowledgement Forms (if necessary)

7. Team member resumes may be included in an Appendix that will not count toward the page limit

Project Team and Qualifications:

• Provide the firm’s name, year established, brief profile, and proposed subconsultants.

• Identify the project manager, key personnel, and backup staff. Include an organizational chart, resumes, and relevant ICC certifications.

• Describe staffing capacity and availability for on-site services.

Experience and References:

• Describe relevant municipal plan review and inspection experience, including electronic permitting and digital plan review.

• Provide three (3) references for similar contracts performed within the last five

(5) years. Include the agency, contact name, phone number, email address, service dates, services provided, and proposed team members involved.

Work Plan

• Describe procedures for plan review, inspections, quality control, tracking, and reporting.

• Explain how the firm will meet the turnaround and documentation requirements in the Scope of Services.

• Describe the approach to communicating with applicants, resolving disagreements, working under City direction, and responding to feedback.

• Explain how safety concerns and unresolved issues will be communicated to City staff.

• Describe availability for on-site staffing, meetings, and emergency or after-hours response, as needed.

• In the Technical Proposal, list any optional supplemental services offered.

Further details and explanations for each optional supplemental service must be included in the Cost Proposal, not the Technical Proposal. For each service offered, include the following in the separate Cost Proposal:

• Service description and pricing.

• Staffing capacity and availability.

• References for similar services.

• Proposed work approach.

Offerors must organize their proposal into sections that follow the format of Section 1.4 and Section 5.0.

11 | RFP 27-CD01

B. Failure to Comply with Instructions.

Offerors failing to comply with these instructions may be subject to point deductions. The City may also choose to not evaluate, may deem non-responsive, and/or may disqualify from further consideration any qualifications that do not follow this RFP format, are difficult to understand, are difficult to read, or are missing any requested information.

C. Electronic Submittal Required and Deadline for Receipt of Proposals.

Proposals must be submitted electronically via Milton’s BidNet procurement portal/platform at www.miltonga.gov/finance/bids-rfps by 2:00 PM on November 17, 2026. Proposals will be opened at approximately 2:30 p.m. and names of Firms will be announced. *Link for virtual announcement of proposals received in response to this RFP will be posted as a “Communication” under this solicitation listing on the City’s procurement portal, BidNet Direct.

D. Late Proposals.

Regardless of cause, late proposals will not be accepted and will automatically be disqualified from further consideration. It shall be the Offeror’s sole risk to assure proposals are submitted via the BidNet Direct procurement portal by the designated time. Late proposals will not be accepted.

1.5 OFFEROR'S CERTIFICATION

By submitting a response to this RFP, Offeror agrees to an understanding of and compliance with the specifications and requirements described in this RFP.

1.6 COST OF PREPARING PROPOSALS

A. City Not Responsible for Preparation Costs.

The costs for developing and delivering responses to this RFP and any subsequent presentations of the proposal as requested by the City are entirely the responsibility of the Offeror. The City is not liable for any expense incurred by the Offeror in the preparation and presentation of their proposals.

B. All Timely Submitted Materials Become City Property.

All materials submitted in response to this RFP become the property of the City of Milton and are to be appended to any formal documentation, which would further define or expand any contractual relationship between the City and Offeror resulting from this RFP process.

SECTION 2: RFP STANDARD INFORMATION

2.0 AUTHORITY

This RFP is issued under the authority of the City of Milton. The RFP process is a procurement option allowing the award to be based on stated evaluation criteria. The RFP states the relative importance of all evaluation criteria. No other evaluation criteria, other than as outlined in the RFP, will be used.

12 | RFP 27-CD01

2.1 OFFEROR COMPETITION

The City encourages free and open competition among Offerors. Whenever possible, the City will design specifications, proposal requests, and conditions to accomplish this objective, consistent with the necessity to satisfy the City’s need to procure technically sound, cost-effective services and supplies.

2.2 RECEIPT OF PROPOSALS AND PUBLIC INSPECTION

A. Public Information.

All information received in response to this RFP, including copyrighted material, is deemed public information and will be made available for public viewing and copying after the time for receipt of qualifications has passed, and the award has been made, with the following four exceptions: (1) bona fide trade secrets meeting confidentiality requirements that have been properly marked, separated, and documented; (2) matters involving individual safety as determined by the City of Milton; (3) any company financial information requested by the City of Milton to determine vendor responsibility, unless prior written consent has been given by the Offeror; and (4) other constitutional protections.

B. Procurement Officer Review of Proposals.

Upon opening the submittals received in response to this RFP, the procurement office will review the proposals and separate out any information that meets the referenced exceptions in Section 2.2(A) above, providing the following conditions have been met:

1. Confidential information is clearly marked and separated from the rest of the submittal.

2. An affidavit from an Offeror’s legal counsel attesting to and explaining the validity of the trade secret claim is attached to each submittal containing trade secrets. Please contact Honor Motes, Procurement Manager, for additional information.

Information separated out under this process will be available for review only by the procurement office, the evaluation committee members, and limited other designees. Offerors must be prepared to pay all legal costs and fees associated with defending a claim for confidentiality in the event of a “right to know” (open records) request from another party.

2.3 CLASSIFICATION AND EVALUATION OF PROPOSALS

A. Initial Classification of Proposals as Responsive or Nonresponsive.

Proposals may be found nonresponsive at any time during the evaluation process or contract negotiation, if any of the required information is not provided; the submitted price is found to be excessive or inadequate as measured by criteria stated in the RFP; or the qualification is not within the specifications described and required in the RFP. If a qualification is found to be nonresponsive, it will not be considered further.

B. Determination of Responsibility.

The procurement office will determine if an Offeror has met the standards of responsibility. Such a determination may be made at any time during the

13 | RFP 27-CD01

evaluation process and through contract negotiation if information surfaces that would result in a determination of nonresponsive.

C. Evaluation of Proposals.

The evaluation committee will evaluate the remaining proposals and recommend whether to award the contract to the highest scoring Offeror or, if necessary, to seek discussion/negotiation to determine the highest scoring

Offeror. All responsive proposals will be evaluated based on stated evaluation criteria. In scoring against stated criteria, the City may consider such factors as accepted industry standards and a comparative evaluation of all other qualified RFP responses. These scores will be used to determine the most advantageous offering to the City.

D. Completeness of Proposals.

Selection and award will be based on the Offeror’s proposals and other items outlined in this RFP. Submitted responses may not include references to information located elsewhere, such as Internet websites or libraries, unless specifically requested. Information or materials presented by Offerors outside the formal response or subsequent discussion/negotiation, if requested, will not be considered, will have no bearing on any award, and may result in the Offeror being disqualified from further consideration.

E. Opportunity for Discussion/Negotiation and/or Oral Presentation/Product Demonstration.

After receipt of all proposals and prior to the determination of the award, the City may initiate discussions with one or more Offerors should clarification or negotiation be necessary. Offerors may also be required to make an oral presentation and/or product demonstration to clarify their RFP response or to further define their offer. In either case, Offerors should be prepared to send qualified personnel to Milton, Georgia to discuss technical and contractual aspects of the submittal. Oral presentations and product demonstrations, if requested, shall be at the Offeror’s expense.

F. Best and Final Offer The “Best and Final Offer” is an option available to the City under the RFP process which permits the City to request a “best and final offer” from one or more offerors if additional information is required to make a final decision.

Offerors may be contacted asking that they submit their “best and final offer,” which must include any and all discussed and/or negotiated changes. The City reserves the right to request a “best and final offer” for this RFP, if any, based on price/cost alone.

G. Evaluation Committee Recommendation for Contract Award.

The evaluation committee will provide a written recommendation for contract award.

H. Request for Documents Notice.

Upon concurrence with the evaluation committee’s recommendation for contract award, the procurement officer may issue a “Request for Documents Notice” to the highest scoring Offeror to obtain the required insurance documents, contract performance security, and any other necessary documents. Receipt of the “Request for Documents Notice” does not constitute

14 | RFP 27-CD01

a contract and no work may begin until a contract signed by all parties is in place.

I. Contract Negotiation.

The procurement officer and/or city department representatives may begin contract negotiation with the responsive and responsible Offeror whose submittal achieves the highest score and is, therefore, the most advantageous to the City. If contract negotiation is unsuccessful or the highest scoring Offeror fails to provide necessary documents or information in a timely manner, or fails to negotiate in good faith, the City may terminate negotiations and begin negotiations with the next highest scoring Offeror.

J. Contract Award.

Contract award, if any, will be made to the highest scoring Offeror who provides all required documents and successfully completes contract negotiation.

2.4 RIGHTS RESERVED

While the City has every intention to award a contract as a result of this RFP, issuance of the RFP in no way constitutes a commitment by the City of Milton to award and execute a contract. Upon a determination such actions would be in its best interest, the City, in its sole discretion, reserves the right to:

1. Modify, cancel, or terminate this RFP,

2. Reject any or all proposals received in response to this RFP,

3. Select an Offeror without holding interviews,

4. Waive any undesirable, inconsequential, or inconsistent provisions of this

RFP which would not have significant impact on any submittal,

5. To request further documentation or information, and to discuss an RFP submittal for any purpose to answer questions or to provide clarification,

6. Award a portion of this RFP or not award any portion of this RFP if it is in the best interest of the City not to proceed with contract execution;

or

7. If awarded, terminate any contract in accordance with the terms and conditions of the contract if the City determines adequate funds are not available.

15 | RFP 27-CD01

SECTION 3: SCOPE OF SERVICES

3.0 GENERAL

The City of Milton seeks a qualified firm to provide building plan review and inspection services to supplement the Community Development Department. Assignments may include residential, commercial, institutional, mixed-use, multifamily, and municipal projects involving new construction, additions, alterations, repairs, and changes of occupancy.

The Consultant shall provide qualified personnel to evaluate compliance with applicable adopted construction codes, local amendments, approved plans, and City requirements.

Services shall emphasize public safety, consistent code application, timely responses, clear documentation, and professional customer service.

Plan review and inspections are the primary services requested. The City may also authorize supplemental services described below under Optional Supplemental Services.

3.1 SPECIFIC SCOPE OF SERVICES

1. Building Plan Review

• Review construction plans and supporting documents for applicable building, structural, mechanical, electrical, plumbing, energy, and accessibility requirements.

• Provide clear, consolidated comments identifying required corrections and applicable code references.

• Review resubmittals, deferred submittals, and revisions to approved plans.

• Coordinate with City staff, other reviewing agencies, and applicants to resolve comments and document recommendations for approval.

2. Building Inspections and Compliance

• Perform building and trade inspections, re-inspections, and final inspections for compliance with approved plans, applicable codes, and permit conditions.

• Document inspection results, required corrections, applicable code references, and photographs as appropriate.

• Promptly report unsafe conditions, unauthorized occupancy, and unpermitted work to designated City staff. Immediately report apparent imminent threats to life or safety.

• Assist with evaluations of unsafe or damaged buildings, enforcement documentation, and follow-up inspections.

• Provide records and recommendations supporting temporary or final occupancy determinations.

• Provide technical testimony related to assigned work when requested.

3. Staffing, Coordination, and Service Standards

• Assign a primary project manager and qualified personnel with sufficient backup staffing to maintain service continuity.

• Provide notice to the City before replacing key personnel. For unexpected absences, promptly notify the City and provide qualified replacement personnel, subject to City approval.

• Provide on-site staffing at City offices when requested and identify availability for regular, temporary, and emergency coverage.

• Coordinate with City staff, applicants, contractors, and design professionals; attend project meetings as requested.

16 | RFP 27-CD01

• Provide quality control and follow City scheduling, safety, communication, and recordkeeping procedures.

The Consultant shall meet the following turnaround times unless otherwise approved by the City:

• Initial residential plan reviews: eight (8) business days.

• Initial commercial plan reviews: eight (8) business days.

• Resubmittal reviews: five (5) business days.

• Inspections: next business day for requests received before an agreed scheduling cutoff.

Review periods begin upon receipt of a complete submittal. Proposers shall identify exceptions and notify the City promptly of anticipated delays. Alternate schedules require City approval.

Inspection results shall be provided to the City on the day of inspection in a format approved by the City. Plan review activity and related records shall be updated daily in the City’s designated system or tracking format.

The Consultant shall provide transportation, phones, field equipment, protective equipment, and maintenance of professional credentials. City-provided workspace and applicable system access will be established for each assignment.

4. Optional Supplemental Services Offerors shall identify their qualifications and separate pricing for any of the following services they offer:

• Building Official Coverage: Code interpretations, occupancy determinations, enforcement coordination, oversight, and assistance with code updates, amendments, adoption materials, and related guidance.

• Owner’s Representative Services: Observation and oversight of City building construction, renovation, and repair projects, including progress, quality, schedules, costs, payment applications, changes, issue resolution, closeout, and warranty follow-up.

• City Facility Technical Support: Facility condition assessments, maintenance planning, repair priorities, technical scopes, preliminary cost estimates, and monitoring of corrective work.

Supplemental services require a City-authorized task order before work begins. Firms are not required to offer all supplemental services to be considered for the primary scope.

Potential conflicts between owner’s representative services and regulatory responsibilities shall be identified and addressed before assignment.

5. Deliverables

• Plan review comments, markups, and recommendations.

• Inspection reports, correction requirements, and follow-up records.

• Itemized invoices and accompanying monthly activity reports identifying projects or permits, services performed, personnel, hours or units, rates, turnaround times, and outstanding items.

17 | RFP 27-CD01

Coordination and Oversight The Consultant will report to the Building Official or other City-designated representative.

City staff will direct assignments, priorities, schedules, and deliverables and establish the Consultant’s approval and enforcement authority.

Schedule and Duration Services will be provided as needed for up to five (5) years, based on performance and mutual agreement. The City will authorize services through written task orders establishing the scope, schedule, and not-to-exceed amount.

The Consultant shall not begin work without an authorized task order or exceed its not-to-exceed amount without prior written City approval.

SECTION 4: OFFEROR PROPOSALS

4.0 CITY’S RIGHT TO INVESTIGATE

The City may make such investigations as deemed necessary to determine the ability of the Offeror to provide the supplies and/or perform the services specified.

4.1 OFFEROR INFORMATIONAL REQUIREMENTS

Firms interested in providing the services described in this RFP should be able to demonstrate experience in the areas described in Section 3.

18 | RFP 27-CD01

SECTION 5: COST PROPOSAL ~ Consultants must complete the hourly rates listed in this section and also include their own Rate Sheet for all other rates and expenses with this section. Include additional explanation, details, and rates for other Optional Supplemental Services here, not in the Technical Proposal.

MUST BE RETURNED WITH PROPOSAL ~ IN A SEPARATE FILE

RFP 27-CD01: Cost Proposal

The Offeror’s cost proposal shall be signed by an authorized agent of the company. All pages of the Cost Proposal must be returned with the proposal. There is no maximum page limit to Section 5.

The undersigned Offeror, having familiarized themselves with the work required by the RFP, the bid documents, the site where the work is to be performed, all laws, regulations, and other factors affecting performance of the work, and having satisfied itself/himself/herself of the expense and difficulties attending performance of the work; Hereby proposes and agrees, if this bid for the above named project is accepted to enter into a contract to perform all work necessary to the successful completion of the contract; and to supply all required submittals as indicated or specified in the RFP and the bid documents to be performed or furnished by bidder for the total contract price below:

Hourly rate for residential building plan review __________________________ Hourly rate for commercial building plan review __________________________ Hourly rate for residential building inspection services __________________________ Hourly rate for commercial building inspection services __________________________ Total hourly rates combined from above __________________________ Total hourly rate (in words) ____________________________________________________

Calendar year (starting 1/1/2028) escalation rate __________________________

Print/Type Company Name and Address:

Authorized Signature ___________________________________ Date____________________

Print/Type Name and Title ________________________________________________________

19 | RFP 27-CD01

SECTION 6: EVALUATION CRITERIA

6.0 EVALUATION CRITERIA

The evaluation committee will review and evaluate the proposals according to the following criteria:

• A selection team for the City will initially evaluate and score all submittals received.

• Proposals not meeting the minimum requirements and those who are non-responsive will not be considered.

• Cost Proposals will be reviewed after the technical review process.

• Firms are not required to offer all optional supplemental services to be considered for the primary scope.

Proposal Evaluation Criteria:

Qualifications of the Team 40 pts.

• Qualifications and experience of the Project Manager

• Relevant ICC certifications and qualifications of assigned plan reviewers and inspectors.

• Firm capacity, stability, and ability to provide qualified backup personnel.

• Availability for on-site staffing, meetings, and emergency or after-hours response.

• Experience with electronic permitting systems and digital plan review.

Related Experience, References, and Work Plan 40 pts.

• Experience providing comparable municipal building plan review and inspection services.

• Quality, accuracy, and consistency of previous services, supported by references.

• Proposed approach to plan review, inspections, quality control, documentation, and reporting.

• Ability to meet required turnaround times and maintain service continuity.

• Approach to customer service, resolving disagreements, coordinating with City staff, and promptly addressing safety concerns.

Price 20 pts.

• Provide hourly rates for proposed personnel

• Provide separate pricing and description for optional supplemental services with hourly rates for staff members that could provide those services

• Cost scoring will use the combined hourly rates for residential building plan review, commercial building plan review, residential building inspection services, and commercial building inspection services. Pricing for Supplemental Services will not be considered in the Cost scoring.

• Hourly rates shall include overhead, equipment, and transportation for inspection personnel. On a separate rate sheet, identify all minimum charges, travel costs for other personnel, emergency or after-hours charges, expedited-service fees, testimony fees, and other applicable costs.

• Rates shall remain fixed through December 31, 2027. Any proposed annual rate increases thereafter must be identified in the cost proposal.

Total – 100 points

20 | RFP 27-CD01

SECTION 7: STANDARD CONTRACT INFORMATION

7.0 STANDARD CONTRACT

The City’s standard contract is attached to this document as Appendix A. Offeror should notify the City of any terms within the standard contract that preclude them from responding to the RFP. This notification must be made by the deadline for receipt of written/e-mailed questions or with the Offeror’s RFP response. Any requests for material, substantive, important exceptions to the standard contract will be addressed in any formal written addendum issued by the procurement officer in charge of the solicitation. The City reserves the right to address any non-material, minor, insubstantial exceptions to the standard contract with the highest scoring Offeror at the time of contract negotiation.

7.1 ADDITIONAL CONTRACT PROVISIONS AND TERMS

This RFP and any addenda, the Offeror’s RFP response, including any amendments, a best and final offer, any clarification question responses, and any negotiations shall be included in any resulting contract. The City’s standard contract, attached as Appendix A, contains the contract terms and conditions which will form the basis of any contract negotiated between the City and the highest scoring Offeror. The contract language contained in Appendix A does not define the total extent of the contract language that may be negotiated. In the event of a dispute as to the duties and responsibilities of the parties under this contract, the contract, along with any attachments prepared by the City, will govern in the same order of precedence as listed in the contract.

7.2 SUBCONTRACTOR

The highest scoring Offeror will be the prime contractor if a contract is awarded and shall be responsible, in total, for all work of any subcontractors. All subcontractors, if any, must be listed in the proposals. The City reserves the right to approve all sub-contractors. The Contractor shall be responsible to the City for the acts and omissions of all sub-contractor or agents and of persons directly or indirectly employed by such sub-contractor, and for the acts and omissions of persons employed directly by the Contractor. Further, nothing contained within this document, or any contract documents created as a result of any contract awards derived from this RFP shall create any contractual relationships between any subcontractor and the City.

7.3 GENERAL INSURANCE REQUIREMENTS

See sample contract.

7.4 COMPLIANCE WITH WORKERS’ COMPENSATION ACT

The Contractor is required to supply the City of Milton with proof of compliance with the Workers’ Compensation Act while performing work for the City. Neither the Contractor nor its employees are employees of the City. The proof of insurance/exemption must be received by the City of Milton within ten (10) working days of the Request for Documents Notice and must be kept current for the entire term of the contract.

CONTRACTS WILL NOT BE ISSUED TO OFFERORS WHO FAIL TO PROVIDE THE

REQUIRED DOCUMENTATION WITHIN THE ALLOTTED TIME FRAME.

21 | RFP 27-CD01

7.5 COMPLIANCE WITH LAWS

The Contractor must, in performance of work under this contract, fully comply with all applicable federal, state, or local laws, rules and regulations, including the Civil Rights Act of 1964, the Age Discrimination Act of 1975, the Americans with Disabilities Act of 1990, and Section 504 of the Rehabilitation Act of 1973. Any subletting or subcontracting by the Contractor subjects subcontractors to the same provision.

The Contractor agrees that the hiring of persons to perform the contract will be made based on merit and qualifications and there will be no discrimination based upon race, color, religion, creed, political ideas, sex, age, marital status, physical or mental disability, or national origin by the persons performing the contract.

7.6 CONTRACT TERMINATION

See sample contract.

22 | RFP 27-CD01

SAMPLE CONTRACT ONLY ~ DO NOT RETURN WITH PROPOSAL

PROFESSIONAL SERVICES AGREEMENT

THIS AGREEMENT is made and entered into this day of , 20 (the “Effective Date”), by and between the CITY OF MILTON, GEORGIA, a municipal corporation of the State of Georgia, acting by and through its governing authority, the Mayor and City Council (hereinafter referred to as the “City”), and , a , (herein after referred to as the "Consultant"), collectively referred to herein as the "Parties."

WITNESSETH:

WHEREAS, City desires to retain Consultant to provide certain services in the completion of a Project (defined below); and

WHEREAS, City finds that specialized knowledge, skills, and training are necessary to perform the Work (defined below) contemplated under this Agreement; and

WHEREAS, Consultant has represented that it is qualified by training and experience to perform the Work; and

WHEREAS, Consultant desires to perform the Work as set forth in this Agreement under the terms and conditions provided in this Agreement; and

WHEREAS, the public interest will be served by this Agreement; and

WHEREAS, Consultant has familiarized itself with the nature and extent of the Agreement, the Project, and the Work, and with all local conditions and federal, state, and local laws, ordinances, rules, and regulations that may in any manner affect cost, progress, or performance of Work.

NOW, THEREFORE, for and in consideration of the mutual promises, the public purposes, and the acknowledgements and agreements contained herein, and other good and adequate consideration, the sufficiency of which is hereby acknowledged, the Parties do mutually agree as follows:

23 | RFP 27-CD01

I. SCOPE OF SERVICES AND TERMINATION DATE

A. Agreement. The Agreement shall consist of this Professional Services

Agreement and each of the Exhibits hereto, which are incorporated herein by reference, including:

Exhibit “A” – City Solicitation Documents Exhibit “B” – Consultant Response/Proposal Exhibit “C” – Scope of Work Exhibit “D” – Contractor Affidavit Exhibit “E” – Subcontractor Affidavit Exhibit “F” – Key Personnel

B. Project Description. The “Project” at issue in this Agreement is generally described as:

C. The Work. The Work to be completed under this Agreement (the “Work”) includes, but shall not be limited to, the work described in the Scope of Work provided in Exhibit “C”, attached hereto, and incorporated herein by reference. Unless otherwise stated in Exhibit “C”, the Work includes all material, labor, insurance, tools, equipment, machinery, water, heat, utilities, transportation, facilities, services, and any other miscellaneous items and work necessary to complete the Work. Some details necessary for proper execution and completion of the Work may not be specifically described in the Scope of Work, but they are a requirement of the Work if they are a usual and customary component of the contemplated services or are otherwise necessary for proper completion of the Work.

D. Schedule, Completion Date, and Term of Agreement. Consultant understands that time is of the essence of this Agreement and warrants and represents that it will perform the Work in a prompt and timely manner, which shall not impose delays on the progress of the Work. The term of this Agreement (“Term”) shall commence as of the Effective Date, and the Work shall be completed, and the Agreement shall terminate, on or before (provided that certain obligations will survive termination/expiration of this Agreement). If the Term of this Agreement is longer than one year, the Parties agree that this Agreement, as required by O.C.G.A. § 36-60-13, shall terminate absolutely and without further obligation on the part of City on December 31 each calendar year of the Term, and further, that this Agreement shall automatically renew on January 1 of each subsequent calendar year absent City’s provision of written notice of non-renewal to Consultant at least five (5) days prior to the end of the then current calendar year. Title to any supplies, materials, equipment, or other personal property shall remain in Consultant until fully paid for by City.

II. WORK CHANGES

A. Change Order Defined. A “Change Order” means a written modification

24 | RFP 27-CD01

of the Agreement, signed by representatives of City and Consultant with appropriate authorization.

B. Right to Order Changes. City reserves the right to order changes in the Work to be performed under this Agreement by altering, adding to, or deducting from the Work. All such changes shall be incorporated in written Change Orders and executed by Consultant and City. Such Change Orders shall specify the changes ordered and any necessary adjustment of compensation and completion time. If the Parties cannot reach an agreement on the terms for performing the changed work within a reasonable time to avoid delay or other unfavorable impacts as determined by City in its sole discretion, City shall have the right to determine reasonable terms, and Consultant shall proceed with the changed work.

B. Change Order Requirement. Any work added to the scope of this

Agreement by a Change Order shall be executed under all the applicable conditions of this Agreement. No claim for additional compensation or extension of time shall be recognized, unless contained in a written Change Order duly executed on behalf of City and Consultant.

C. Authority to Execute Change Order. The City Manager has authority to execute, without further action of the Mayor or City Council, any number of Change Orders so long as their total effect does not materially alter the terms of this Agreement or materially increase the Maximum Contract Price, as set forth in Section III(B) below.

Any such Change Orders materially altering the terms of this Agreement, or any Change Order affecting the price where the Maximum Contract Price (as amended) is in excess of $50,000, must be approved by resolution of the Mayor and City Council. Amendments shall not result in a variance in price exceeding ten percent of the original contract amount.

III. COMPENSATION AND METHOD OF PAYMENT

A. Payment Terms. City agrees to pay Consultant for the Work performed and costs incurred by Consultant upon certification by City that the Work was performed, and costs actually incurred in accordance with the Agreement. Compensation for Work performed and, if applicable, reimbursement for costs incurred shall be paid to Consultant upon City’s receipt and approval of invoices, setting forth in detail the services performed and costs incurred, along with all supporting documents requested by City to process the invoice. Invoices shall be submitted monthly, and such invoices shall reflect costs incurred versus costs budgeted. Any material deviations in tests or inspections performed, or times or locations required to complete such tests or inspections, and like deviations from the Work described in this Agreement shall be clearly communicated to City before charges are incurred and shall be handled through Change Orders as described in Section II above. City shall pay Consultant within thirty (30) days after approval of the invoice by City staff.

B. Maximum Contract Price. The total amount paid under this Agreement as

25 | RFP 27-CD01

compensation for Work performed and reimbursement for costs incurred shall not, in any case, exceed $ (the “Maximum Contract Price”), except as outlined in Section II(C) above, and Consultant represents that this amount is sufficient to perform all of the Work set forth in and contemplated by this Agreement. The compensation for Work performed shall be based upon .

C. Reimbursement of Costs. The Maximum Contract Price set forth in Section III(B) above includes all costs, direct and indirect, needed to perform the Work and complete the Project, and reimbursement for costs incurred shall be limited as follows:

□ There shall be no reimbursement for costs.

□ Long distance telephone and telecommunications, facsimile transmission, normal postage and express mail, and photocopying charges and time shall be billed at cost. Supplies and outside services, transportation, lodging, meals, and authorized subcontracts shall be billed at cost plus no more than a 10% administrative burden. Automobile mileage shall be no more than the current deductible rate set by the Internal Revenue Service. In no event shall the total reimbursement for costs incurred during a particular month exceed percent of the total amount due for Work for that month.

IV. COVENANTS OF CONSULTANT

A. Expertise of Consultant; Licenses, Certification and Permits. Consultant accepts the relationship of trust and confidence established between it and City, recognizing that City’s intention and purpose in entering into this Agreement is to engage an entity with the requisite capacity, experience, and professional skill and judgment to provide the Work in pursuit of the timely and competent completion of the Work undertaken by Consultant under this Agreement.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .