RFP #1052 - Addendum #1.pdf
PDF 2 MB Posted
- Solicitation number
- RFP #1052
- Issued by
- Berrien County, Blissfield Village, Michigan
About this file
Addendum No. 1 for RFP #1052 is issued by Bloomfield Hills Schools for asbestos abatement services at four elementary schools: Conant, Eastover, Way, and Lone Pine. The addendum specifically focuses on correcting and updating the project scope for Eastover Elementary School, providing a detailed project summary for asbestos floor tile removal under cabinets. The project is scheduled to commence on Monday, June 16, 2025, and will be completed by the end of the workday on Wednesday, June 18, 2025, with a total of three workdays allocated for the abatement activities.
The abatement scope involves removing asbestos flooring materials from various rooms throughout the Eastover Elementary School building, with specific square footage identified for each room. The contractor will be required to establish multiple regulated areas and follow strict Class II removal procedures, including setting up comprehensive safety barriers, using air filtration devices, and implementing a three-stage decontamination chamber. The project requires adherence to AHERA and OSHA asbestos standard regulations, with final clearance contingent upon Phase Contrast Microscopy (PCM) air sample analysis below 0.01 fibers per cubic centimeter.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
TO
ASBESTOS ABATEMENT
SPECIFICATIONS
RFP #1052
Asbestos Abatement at Conant, Eastover, Way, and Lone Pine Elementary Schools
Owner:
Bloomfield Hills Schools
281 Enterprise Ct, Suite 300 Bloomfield Hills, Michigan 48303
Building(s):
Conant Elementary School 4100 West Quarton Road
Bloomfield Hills, Michigan 48302
Way Elementary School 765 West Long Lake Road
Bloomfield Hills, Michigan 48302
Eastover Elementary School 2800 Kensington Road
Bloomfield Hills, Michigan 48304
Lone Pine Elementary School 2601 Lone Pine Road
West Bloomfield, Michigan 48323
AEG Project #: AE240922 Issue Date: Wednesday, January 15, 2025 Bids Due: 11:00 A.M., Monday, January 20, 2025
RFP #1052 – Asbestos Abatement at Conant, Eastover, Way, and Lone Pine Elementary Schools Page 1
The following changes have been made to the asbestos abatement specification for asbestos abatement activities at Eastover Elementary School and should be incorporated into the Scope-of-Work.
1. RFP #1052 – Asbestos Abatement at Conant, Eastover, Way, and Lone Pine Elementary Schools
Eastover Elementary School, Project Group EES1 (Pages 14-19) Due to significant changes in the summary of locations table, this entire project has been corrected to include correct quantities of materials to be abated. A copy of the corrected project scope of work and requirements for “Eastover Elementary School – Project Group EES1 – Eastover Elementary School”” is located in Attachment #1. Please refer to the corrected “Eastover Elementary School – Project Group EES1
– Eastover Elementary School”” included in this addendum only. Do not refer to the “Eastover Elementary School – Project Group EES1 – Eastover Elementary School”” issued in the specification documents.
RFP #1052 – Asbestos Abatement at Conant, Eastover, Way, and Lone Pine Elementary Schools Page 2
Project Group EES1 - “Eastover Elementary School”
Project Summary:
The second project for abatement is at Eastover Elementary School includes the removal and disposal of asbestos flooring materials, including asbestos floor tile under cabinet from throughout the building. The project will include, but is not limited to, the entire interior of the building. These projects at Eastover Elementary School will involve multiple regulated areas to remove the asbestos materials using Class II removal procedures. The project will begin on Monday, June 16, 2025, and will be complete with all abatement activities, including tear down activities, by the end of the workday on Wednesday, June 18, 2025. The project schedule allows for a total of three (3) workdays (Monday-Wednesday) to complete the project.
Abatement Activities:
1. Remove and dispose of all asbestos flooring materials under cabinets from the identified areas at Eastover
Elementary School
Summary of Locations:
Room / Location Materials -> FT
Room 200 10 sf
Room 202 10 sf
Room 204 10 sf
Room 205 10 sf
Room 208 5 sf
Room 210 5 sf
Room 212 5 sf
Room 300 5 sf
Room 202 5 sf
Room 301 5 sf
Room 302 5 sf
Room 303 5 sf
Room 304 5 sf
Room 305 5 sf
Room 306A 5 sf
Room 306B 5 sf
Room 400 20 sf
Room 402 20 sf
Room 403 5 sf
Room 404 5 sf
Room 405 5 sf
Room 406 ---
Room 407 ---
Room 409 5 sf
Room 410 5 sf
RFP #1052 – Asbestos Abatement at Conant, Eastover, Way, and Lone Pine Elementary Schools Page 3
Room / Location Materials -> FT
Room 500 5 sf
Staff Room (Teacher’s Lounge) 5 sf
Key for Table FT Asbestos Floor Tile Under Cabinet
The scope of abatement for Project Group EES1 includes all asbestos floor tile under cabinets from throughout the identified areas of the building.
Abatement Requirements:
The Contractor will be allowed to construct multiple negative pressure enclosures for the complete removal of all of the materials detailed in the “Abatement Activities” for Project Group EES1.
1. The Contractor is responsible for all of the materials listed in the “Abatement Activities” located inside of the project areas. The project areas include all portions of the functional spaces listed in the “Summary of Locations” table. When present in, connected to or adjacent to the room, materials located in bathrooms, closets, storage rooms, and below fixtures (such as radiators, cabinets and bookcases), behind furniture and inside sink cabinets, flooring materials are included when exposed by pre-abatement demolition activities. Additional descriptions for certain areas are listed below:
• Material Below Cabinets/Casework: The Contractor will be responsible for all asbestos materials found below cabinets/casework in the spaces identified. The Contractor will not be responsible for the demolition of cabinets/casework.
2. The regulated areas will be emptied of furniture, furnishings and moveable objects prior to the start of the project. This activity will be completed by the Owner.
3. All regulated enclosures established for the removal of asbestos flooring materials only will be set up in accordance with the following minimum guidelines prior to the start of any abatement activities:
• Asbestos banner tape and asbestos warning signs will be set up extending to a minimum of 8’ in all directions from the asbestos floor tiles.
• Critical barriers, constructed of a minimum of one (1) layer of six-mil polyethylene sheeting, will be placed over all ceiling return vents, bookcases, lockers and all items which cannot be decontaminated in each of the regulated areas.
• A minimum of one (1) layer of six-mil polyethylene sheeting will be placed over all wall surfaces, counters and other non-floor surfaces inside the regulated areas.
• A minimum of one (1) layer of six-mil polyethylene sheeting will be placed over all non-asbestos flooring inside of the project areas THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY DAMAGE
TO ADJACENT FLOORING MATERIALS.
• For project areas where the amount of materials removed is greater than 10 square feet or 25 linear feet, a minimum of one (1) air filtration devices (AFDs) will be required in each functional space in excess of 400 square feet. This minimum number of machines is desired to create a minimum negative pressure of 0.02 inches of water equivalent, sufficient air changes and appropriate air flow through the enclosure. The Contractor will be responsible for properly securing the exhaust tubes in any exterior windows and/or doors used for exhaust locations.
RFP #1052 – Asbestos Abatement at Conant, Eastover, Way, and Lone Pine Elementary Schools Page 4
• For project areas where the amount of materials removed is greater than 10 square feet or 25 linear feet, a three-stage decontamination chamber will be required. The decontamination chamber will be connected at a location convenient to building access and waste out activities and will be coordinated on-site. A black polyethylene barrier will be placed in front of the decontamination chamber to provide an additional visual barrier to the work area.
• In addition to the minimum requirements listed above, all work will be conducted in accordance with all requirements of AHERA and all applicable provisions of the OSHA Asbestos Standard (1926.1101(g) - “Methods of Compliance”.
4. All asbestos floor tile abatement activities will be completed in accordance with the listed “Class II Non-
Friable Floor Tile Abatement Procedures” (“General Procedures for Asbestos Abatement, Item 11.2”) and with all applicable provisions of the OSHA Asbestos Standard (1926.1101(g) - “Methods of Compliance”).
5. All asbestos-containing materials must be removed using wet methods and then bagged and sealed immediately. Bags will be randomly checked as they are transported from the enclosure and double bagged.
All bags determined to not be adequately wet will be sent back into the enclosure. No bags may remain open inside the enclosure. The Contractor will be permitted to leave sealed bags inside the enclosure overnight. All bags must be removed from the enclosure prior to the start of the visual inspection.
7. All surfaces inside the enclosure will be fully washed with a combination of wire brushing, rinsing, wet-wiping and HEPA vacuuming during the final cleaning portion of the project. During final cleaning activities, the ceiling will be rinsed and then encapsulated during the lock down portion of the project.
8. At the conclusion of the final cleaning activities in the enclosure, a visual inspection will be completed in accordance with the listed “Visual Inspection Procedures” (Item #5, “General Requirements and Information”).
Final Clearance Sample Requirements:
PCM Clearance Air Samples Each of the regulated areas established for the removal of the materials described in Project Group EES1 will be cleared using Phase Contrast Microscopy (PCM). Pursuant to the requirements of AHERA, up to five (5) PCM samples will be collected from each regulated area. All samples collected must be analyzed below 0.01 fibers per cubic centimeter allow for tear down of the enclosure. All PCM air samples will be collected in accordance with the AHERA regulation and all EPA recommended guidelines.
Project Schedule:
The Contractor will start the project on Monday, June 16, 2025, and will be complete with all abatement activities, including tear down activities, by the end of the work shift on Monday, June 23, 2025. The building will be available each workday from 7:00 a.m. - 5:30 p.m. The Contractor will be allowed seven (7) workdays (Monday-Saturday, Monday) to complete the project. Additional project dates include:
# Location Start Ready for Pas End # Days
EES1 Eastover Elementary School Monday, 6-16-25 Wednesday, 6-18- 25 @ 2:30 p.m.
Wednesday, 6-18- 25 @ 5:30 p.m.
3 w/td
Schedule Restrictions - Set-up:
The Contractor will not be allowed to mobilize to the project site until 7:00 a.m. on Monday, June 16, 2025.
RFP #1052 – Asbestos Abatement at Conant, Eastover, Way, and Lone Pine Elementary Schools Page 5
Project Diagrams:
There are three (3) project diagrams provided for Project Group EES1
RFP #1052 – Asbestos Abatement at Conant, Eastover, Way, and Lone Pine Elementary Schools Page 9
END OF ADDENDUM