rfb_13242_info_only_cctv_report.pdf

PDF 123 KB Posted

Attached to
RFB - JAMACHA FORCE MAIN AND GRAVITY MAIN SEWER IMPROVEMENTS – LA PRESA PHASE 1
Solicitation number
BPM013242
Issued by
California

About this file

This is a CCTV (Closed-Circuit Television) inspection report documenting pipe conditions for the City of Spring Valley, California, in support of the Jamacha Force Main and Gravity Main Sewer Improvements – La Presa Phase 1 project. The inspection was conducted on September 17, 2019, at 1:54 AM on the mainline segment SV5388 located at 9330 Jamacha Boulevard in Spring Valley. The pipe inspected was a 15-inch diameter gravity main line running in the 1D direction. The inspection was performed by CUES, Inc., a pipe inspection service provider located in Orlando, Florida. This report provides photographic documentation of the pipe run conditions as part of the information-only submittal for the referenced request for bids.

The CCTV inspection report serves as supporting documentation for the bidding process, enabling contractors to assess existing pipe conditions and structural integrity along the project corridor. The report contains pipe run imagery with measurements and directional data necessary for scope development and cost estimation related to the sewer main improvements project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Weather:

Street:

Start date/time:

9/17/2019 1:54 AM

C

Main Inspections Pipe Run with Images

Width:Shape:

9330 JAMACHA BLVD

Direction:

1D

Project name:

YR 2019 Remaining SV Large Diameter Lines

Location code:

Material:

XXX

Mainline ID:

SV5388

City:

SPRING VALLEY

Height:

15 in.

CUES, Inc.

3600 Rio Vista Avenue Orlando, FL 32805 Phone: 407-849-0190 Fax: 407-425-1569

Page 1 of 2Main Inspections Pipe Run with Images

Project name:

SV5388

Mainline ID: Start date/time:

D

Direction:

Weather:

9/17/2019 1:54 AMYR 2019 Remaining SV Large Diameter Lines

Page 2 of 2Main Inspections Pipe Run with Images

File details come from the government source that posted it. Updated .