RFB - JAMACHA FORCE MAIN AND GRAVITY MAIN SEWER IMPROVEMENTS – LA PRESA PHASE 1
Solicitation number
BPM013242
Issued by
California

About this file

This is a Plan Holders List for a Request for Bids (RFB) issued by the County of San Diego Department of Purchasing and Contracting for the Jamacha Force Main and Gravity Main Sewer Improvements - La Presa Phase 1 project (RFB 13242). The project, located in Spring Valley, involves replacing approximately 4,500 linear feet of the existing 12-inch sewer force main with dual 18-inch HDPE force mains along Jamacha Boulevard and replacing approximately 400 linear feet of gravity sewer pipe west of Grand Avenue and Sacramento Avenue. Additional work includes installation of new sewer maintenance holes, pump station yard piping, sewer plug valves, trenching, dewatering, sewage bypassing, and traffic control. The bid schedule contains 41 line items covering mobilization, traffic control, erosion control, pipe installation in various sizes, valves, concrete structures, fencing, and asbestos cement pipe removal. Sealed bids are due August 13, 2026 at 2:00 p.m. local time with virtual opening via Microsoft Teams. Prospective bidders must be prequalified by the County and hold a California Class A General Engineering Contractor's license.

The County's estimated project cost is $9,215,826.50. Bid security equal to at least 10 percent of the bid amount is required, and the successful bidder must furnish 100 percent Performance and Payment Bonds. Prime contractors must meet or exceed a 3% Small-Local Business Subcontractor Participation Requirement and submit a Small-Local Business Utilization Plan (PC611 form). At least 50 percent of the original contract price must be performed by the contractor's own organization. The project is subject to California prevailing wage requirements under Labor Code Section 1720 et seq., and contractors must register with the Department of Industrial Relations and comply with apprenticeship requirements. The contract is also subject to the Working Families Ordinance and California Air Resources Board In-Use Off-Road Diesel-Fueled Fleets regulations. Two plan holders have been identified as of July 9, 2026: Palm Engineering Construction Company, Inc. (general contractor) and Romero General Construction Corp (subcontractor).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COUNTY OF SAN DIEGO

DEPARTMENT OF PURCHASING AND CONTRACTING

PLANHOLDERS LIST FOR

BPM013242

RFB - JAMACHA FORCE MAIN AND GRAVITY MAIN SEWER IMPROVEMENTS – LA PRESA PHASE 1

DATE ADDED COMPANY/ CONTACT

PERSON/ EMAIL

GENERAL/ SUB ADDRESS

7/9/2026 Palm Engineering Construction

Company, Inc.

Estimating omar@palmengineeringco.com

General 7330 Opportunity Rd Suites A

San Diego, California 92111

UNITED STATES

7/9/2026 Romero General Construction

Corp David Donnelly ddonnelly@romerogc.com

Subcontractor 2150 Centre City Parkway

STE. 1

Escondido, California 92026

UNITED STATES

File details come from the government source that posted it. Updated .