Revised TE 1-Service Schedule and Building List.xls
XLS spreadsheet 60 KB Posted
- Attached to
- Custodial Service for Camp Casey
- Solicitation number
- W91QVN20R0083-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN20R0083-0001.docx | DOCX document | |
| W91QVN20R0083 Conform Document.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCH
| WORK SCHEDULE FOR CUSTODIAL SERVICE CONTRACT IN CAMP CASEY ENCLAVE | ||||||
| Task | SCH I | SCH II | SCH III | SCH IV | SCH V (Camp Kwangsari) | SCH VI |
| Basic Service | 2 days per Week | Standard Service for Fitness Center | 5 days per Week (Community Bldgs) | Latrine: 3 Times per Week, Other area: 2 Times per Week | 7 days per Week |
(Carey Fitness Center)
| Clean Kitchens & Breakrooms | N/A | A/R | A/R | D | A/R | D |
| Remove trash in Kitchens & Breakrooms | 2W | 2W | D | D | 2W | D |
| Clean/Supply Restrooms | 2W | 2W | D | D | 3W | D |
| Disinfect Toilets/Urinals | 2W | 2W | D | D | 3W | D |
| Remove trash in Restrooms | 2W | 2W | D | D | 3W | D |
| Clean Drinking fountains | 1W | 2W | D | D | 2W | D |
| Remove Trash | 1W | 2W | 2W | D | 2W | D |
| Remove Recycle | 1W | 1W | 1W | 1W | 1W | 1W |
| Vacuum Cleaning | 1W | 2W | 1W | D | 2W | D |
| Carpet Cleaning | 1Y | 1Y | 1Y | 1Y | 1Y | 1Y |
| Spot Clean | A/R | A/R | A/R | A/R | A/R | 1W |
| Sweep Floors | 1W | 2W | D | D | 2W | D |
| Wet Mop | 1W | 2W | D | D | 2W | D |
| Wax Floor | 2Y | 2Y | 4Y | 4Y | 2Y | 4Y |
| Stripping/Finishing Tile | 1Y | 1Y | 2Y | 2Y | 1Y | 4Y |
| Regular Dusting | 2Y | 2Y | 2Y | 4Y | 2Y | D |
| High Dusting | 1Y | 1Y | 1Y | 2Y | 1Y | 1M |
| Clean Furniture | 1Y | 1Y | 2Y | 4Y | 1Y | D |
| Clean interior glass | A/R | A/R | A/R | 4Y | A/R | D |
| D: Daily | 1W: Once a Week | 2W: Twice a Week | 3W: 3 Times a Week | 1M: Once a Month | ||
| 1Y: Once a Year | 2Y: Twice a Year | 4Y: 4 Times a Year | A/R: As Required/Requested |
Bldg List
| BUILDING LIST FOR CUSTODIAL SERVICE CONTRACT FOR CAMP CASEY ENCLAVE | |||
| As of 22 Jun 20 | |||
| Schedule I (50 BLDGS: 332,964SF) : Administrative & Community Offices | |||
| Cp Casey | Bldg No. | Utilization | Sq Ft |
| T-1 | CG's Office | 4,561 | |
| T-43 | Judge Advocate Office | 4,314 | |
| S-50 | Memorial Chapel | 4,845 | |
| S-62 | Court Room | 6,562 | |
| S-504 | Tel Exchange | 2,360 | |
| S-599 | Utility Office | 4,771 | |
| S-600 | Bldg/Ground Office | 1,118 | |
| T-606 | Supply Office | 2,915 | |
| S-617 | P&I Office/Conference room | 4,402 | |
| S-620 | BO&I Office | 5,892 | |
| T-647 | Motor Pool Office | 1,248 | |
| S-712 | Garrison HQ Office | 5,502 | |
| S-1504 | KSC Heating/DLO office | 3,972 | |
| S-1515 | KSC Company Office (REIMB) | 2,644 | |
| S-1517 | Road/Ground office | 1,698 | |
| S-1523 | Subsistence Supply Management Office | 3,580 | |
| T-1817 | Theater | 5,915 | |
| S-2101 | Driver Testing Room | 3,822 | |
| S-2127 | EEO Office | 1,400 | |
| S-2144 | Admin Gen Purp | 4,700 | |
| S-2236 | Recreation Center | 20,210 | |
| S-2306 | Visual Information Support Center | 3,663 | |
| S-2313 | Chaplain Office | 1,897 | |
| S-2322A | Logistic Management Office | 7,537 | |
| S-2322B | DPTMS Office | 4,158 | |
| T-2345 | EWHA Pear Blossom | 3,040 | |
| S-2346 | Chapel | 6,806 | |
| S-2388 | TMP Public Latrine | 521 | |
| S-2400 | Garrison HQ Office | 40,368 | |
| S-2408 | ACAP (1st Floor only) | 2,640 | |
| S-2409 | DPW Office | 38,594 | |
| S-2411 | Network Enterprise Center (NEC) | 15,042 | |
| S-2451 | Army Community Service (ACS) | 12,008 | |
| S-2475 | Army Community Service (ACS) | 13,232 | |
| S-2533 | PMO/DEC | 24,180 | |
| S-2537 | SG Office & Pass Inspection area | 1,632 | |
| S-2607 | DES Office/Fire Prevention Office (1st Floor only) | 6,339 | |
| S-2611 | Bus Station | 1,666 | |
| S-2648 | USO | 4,574 | |
| S-3001 | Post Office | 4,018 | |
| S-3002 | Credit Union | 2,810 | |
| S-3013 | Bank | 5,037 | |
| Sub Total 42 Bldgs | 296,193 | ||
| Cp Hovey | Bldg No. | Utilization | Sq Ft |
| S-3455 | CIF | 7,835 | |
| S-3592 | Chapel | 3,275 | |
| S-3754 | Education Center/Library | 11,716 | |
| S-3902 | Logistic Training Room | 1,841 | |
| S-3974B | Community Activity Center | 5,712 | |
| Sub Total 5 Bldgs | 30,379 | ||
| N-Castle | Bldg No. | Utilization | Sq Ft |
| S-2824 | CSD Service Branch Office | 3,894 | |
| S-2849 | Housing Office | 1,215 | |
| Sub Total 2 Bldgs | 5,109 | ||
| H-220 | Bldg No. | Utilization | Sq Ft |
| S-2671 | Safety Class Room | 1,283 | |
| Sub Total 1 Bldg | 1,283 | ||
| Schedule II (1 BLDG: 1,178SF) : Twice per Week | |||
| Cp Casey | Bldg No. | Utilization | Sq Ft |
| S-2604 | Gen Item Repair, CECOM (REIMB) | 1,178 | |
| Sub Total 1 Bldg | 1,178 | ||
| Schedule III (3 BLDGS: 20,642SF) : 5 Times per Week (Fitness Center) | |||
| Cp Casey | Bldg No. | Utilization | Sq Ft |
| S-3015 | Gymnasium | 7926 | |
| S-3030 | Fitness Center | 6,252 | |
| Sub Total 2 Bldgs | 14,178 | ||
| Cp Hovey | Bldg No. | Utilization | Sq Ft |
| S-3415 | Gymnasium | 6,464 | |
| Sub Total 1 Bldg | 6,464 | ||
| Schedule IV (8 BLDGS: 96,197SF) : 5 Times per Week (Community Buildings) | |||
| Cp Casey | Bldg No. | Utilization | Sq Ft |
| S-432 | Simulation Center (REIMB) | 7,848 | |
| S-447 | Admin Bldg (REIMB) | 800 | |
| S-456 | Operation Office (REIMB) | 2,309 | |
| S-479 | CCTT (REIMB) | 6,852 | |
| S-802 | ASAP (1st & 2nd Floor) | 14,925 | |
| S-802 | IH/EH Office (3rd Floor) (REIMB) | 1,832 | |
| S-1757 | Education Center (Reimb) | 12,701 | |
| S-2440 | Maude Hall (One stop service building) | 35,184 | |
| S-3003 | Commissary(REIMB) | 13,746 | |
| Sub Total 8 Bldgs | 96,197 | ||
| Schedule V (1 BLDG: 9,705SF) : 3 Times per Week for Latrine + 2 Times per Week for other area | |||
| Cp Kwangsari | Bldg No. | Utilization | Sq Ft |
| S-1605 | Operation Office (REIMB) | 9,705 | |
| Sub Total 1 Bldg | 9,705 | ||
| Schedule VI (1 BLDG:34,600SF) : 7 Times per Week (Refer Para 8.3 of the PWS) | |||
| Cp Casey | Bldg No. | Utilization | Sq Ft |
| S-1715 | Gymnasium (Carey Fitness Center) | 34,600 | |
| Sub Total 1 Bldg | 34,600 |
Restroom Fixture
| BUILDING LIST FOR CUSTODIAL SERVICE CONTRACT FOR CAMP CASEY ENCLAVE | INFORMATION FOR RESTROOM FIXTURE | |||||||||||
| As of 22 Jun 20 | ||||||||||||
| Schedule I (50 BLDGS: 332,964SF) : Administrative & Community Offices | QUANTITY | AREA | ||||||||||
| Latrine | Commode | Urinal | Lavatory | Drinking Fountain | Carpet | VAT | ||||||
| Cp Casey | Bldg No. | Utilization | Sq Ft | (EA) | (SF) | (EA) | (EA) | (EA) | (EA) | (SF) | (SF) | |
| T-1 | CG's Office | 4,561 | 3 | 232 | 4 | 2 | 4 | 1 | 4,305 | 0 | ||
| T-43 | Judge Advocate Office | 4,314 | 2 | 120 | 2 | 1 | 2 | 0 | 0 | 4,194 | ||
| S-50 | Memorial Chapel | 4,845 | 2 | 246 | 2 | 1 | 2 | 0 | 4,044 | 120 | ||
| S-62 | Court Room | 6,562 | 2 | 277 | 4 | 2 | 4 | 0 | 0 | 6,285 | ||
| S-504 | Tel Exchange | 2,360 | 2 | 169 | 2 | 1 | 2 | 0 | 0 | 2,191 | ||
| S-599 | Utility Office | 4,771 | 3 | 424 | 6 | 9 | 7 | 0 | 0 | 4,347 | ||
| S-600 | Bldg/Ground Office | 1,118 | 1 | 418 | 2 | 1 | 2 | 0 | 0 | 594 | ||
| T-606 | Supply Office | 2,915 | 2 | 168 | 2 | 1 | 2 | 0 | 0 | 2,717 | ||
| S-617 | P&I Office/Conference room | 4,402 | 3 | 288 | 3 | 3 | 4 | 1 | 0 | 2,841 | ||
| S-620 | BO&I Office | 5,892 | 1 | 325 | 4 | 2 | 4 | 1 | 0 | 5,567 | ||
| T-647 | Motor Pool Office | 1,248 | 1 | 119 | 1 | 2 | 3 | 0 | 0 | 1,129 | ||
| S-712 | Garrison HQ Office | 5,502 | 4 | 502 | 6 | 3 | 6 | 3 | 295 | 4,705 | ||
| S-1504 | KSC Heating/DLO office | 3,972 | 2 | 328 | 6 | 6 | 4 | 0 | 0 | 2,884 | ||
| S-1515 | KSC Company Office (REIMB) | 2,644 | 2 | 244 | 3 | 2 | 3 | 0 | 0 | 1,986 | ||
| S-1517 | Road/Ground office | 1,698 | 1 | 174 | 3 | 2 | 2 | 0 | 0 | 1,326 | ||
| S-1523 | Subsistence Supply Management Office | 3,580 | 2 | 270 | 2 | 1 | 2 | 0 | 0 | 3,310 | ||
| T-1817 | Theater | 5,915 | 5 | 600 | 7 | 3 | 8 | 0 | 3,778 | 1,537 | ||
| S-2101 | Driver Testing Room | 3,822 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3,822 | ||
| S-2127 | EEO Office | 1,400 | 2 | 130 | 2 | 0 | 2 | 0 | 0 | 1,270 | ||
| S-2144 | Admin Gen Purp | 4,700 | 2 | 500 | 5 | 2 | 6 | 0 | 0 | 4,200 | ||
| S-2236 | Recreation Center | 20,210 | 5 | 880 | 9 | 5 | 10 | 2 | 7,977 | 11,353 | ||
| S-2306 | Visual Information Support Center | 3,663 | 2 | 242 | 6 | 3 | 3 | 0 | 0 | 3,421 | ||
| S-2313 | Chaplain Office | 1,897 | 2 | 260 | 2 | 1 | 3 | 0 | 0 | 1,897 | ||
| S-2322A | Logistic Management Office | 7,537 | 2 | 178 | 2 | 1 | 2 | 1 | 0 | 7,359 | ||
| S-2322B | DPTMS Office | 4,158 | 2 | 178 | 2 | 1 | 2 | 1 | 0 | 3,980 | ||
| T-2345 | EWHA Pear Blossom | 3,040 | 1 | 132 | 1 | 0 | 1 | 0 | 1,627 | 1,281 | ||
| S-2346 | Chapel | 6,806 | 4 | 401 | 6 | 1 | 6 | 0 | 2,354 | 4,051 | ||
| S-2388 | TMP Public Latrine | 521 | 1 | 521 | 6 | 5 | 6 | 0 | 0 | 0 | ||
| S-2400 | Garrison HQ Office | 40,368 | 13 | 1,800 | 22 | 6 | 22 | 6 | 9,376 | 29,192 | ||
| S-2408 | ACAP (1st Floor only) | 2,640 | 2 | 316 | 2 | 1 | 3 | 2 | 0 | 2,324 | ||
| S-2409 | DPW Office | 38,594 | 14 | 2,004 | 22 | 12 | 22 | 8 | 7,060 | 28,401 | ||
| S-2411 | Network Enterprise Center (NEC) | 15,042 | 2 | 666 | 7 | 1 | 7 | 2 | 716 | 13,560 | ||
| S-2451 | Army Community Service (ACS) | 12,008 | 3 | 642 | 6 | 3 | 7 | 2 | 2,408 | 8,958 | ||
| S-2475 | Army Community Service (ACS) | 13,232 | 6 | 670 | 7 | 4 | 7 | 0 | 500 | 12,062 | ||
| S-2533 | PMO/DEC | 24,180 | 9 | 2,070 | 15 | 5 | 16 | 3 | 0 | 22,110 | ||
| S-2537 | SG Office & Pass Inspection area | 1,632 | 2 | 148 | 2 | 1 | 2 | 0 | 0 | 1,484 | ||
| S-2607 | DES Office/Fire Prevention Office (1st Floor only) | 6,339 | 2 | 142 | 3 | 1 | 3 | 2 | 0 | 6,197 | ||
| S-2611 | Bus Station | 1,666 | 2 | 243 | 2 | 1 | 2 | 1 | 0 | 1,423 | ||
| S-2648 | USO | 4,574 | 2 | 373 | 4 | 2 | 3 | 2 | 0 | 3,824 | ||
| S-3001 | Post Office | 4,018 | 2 | 124 | 2 | 0 | 2 | 1 | 0 | 3,894 | ||
| S-3002 | Credit Union | 2,810 | 2 | 244 | 2 | 1 | 2 | 1 | 528 | 2,038 | ||
| S-3013 | Bank | 5,037 | 2 | 277 | 4 | 2 | 4 | 0 | 1,950 | 2,810 | ||
| Sub Total 42 Bldgs | 296,193 | |||||||||||
| Cp Hovey | Bldg No. | Utilization | Sq Ft | |||||||||
| S-3455 | CIF | 7,835 | 4 | 718 | 9 | 5 | 8 | 0 | 0 | 7,117 | ||
| S-3592 | Chapel | 3,275 | 2 | 170 | 2 | 1 | 3 | 1 | 0 | 3,105 | ||
| S-3754 | Education Center/Library | 11,716 | 4 | 575 | 6 | 4 | 10 | 4 | 8,432 | 2,709 | ||
| S-3902 | Logistic Training Room (REIMB) | 1,841 | 1 | 114 | 2 | 1 | 2 | 0 | 0 | 1,666 | ||
| S-3974B | Community Activity Center | 5,712 | 2 | 207 | 2 | 1 | 2 | 2 | 3,028 | 2,477 | ||
| Sub Total 5 Bldgs | 30,379 | |||||||||||
| N-Castle | Bldg No. | Utilization | Sq Ft | |||||||||
| S-2824 | CSD Service Branch Office | 3,894 | 2 | 420 | 3 | 2 | 2 | 0 | 0 | 3,474 | ||
| S-2849 | Housing Office | 1,215 | 2 | 196 | 2 | 1 | 4 | 0 | 0 | 1,019 | ||
| Sub Total 2 Bldgs | 5,109 | |||||||||||
| H-220 | Bldg No. | Utilization | Sq Ft | |||||||||
| S-2671 | Safety Class Room | 1,283 | 2 | 128 | 2 | 0 | 2 | 0 | 0 | 1,155 | ||
| Sub Total 1 Bldg | 1,283 | Sub-Total: | 143 | 20,573 | 228 | 116 | 237 | 47 | 58,378 | 249,366 | ||
| Schedule II (1 BLDG: 1,178SF) : Twice per Week | ||||||||||||
| Cp Casey | Bldg No. | Utilization | Sq Ft | |||||||||
| S-2604 | Gen Item Repair, CECOM (REIMB) | 1,178 | 2 | 162 | 2 | 1 | 2 | 1 | 0 | 1,016 | ||
| Sub Total 1 Bldg | 1,178 | Sub-Total: | 2 | 162 | 2 | 1 | 2 | 1 | 0 | 1,016 | ||
| Schedule III (3 BLDGS: 20,642SF) : 5 Times per Week (Fitness Center) | ||||||||||||
| Cp Casey | Bldg No. | Utilization | Sq Ft | |||||||||
| S-3015 | Gymnasium | 7,926 | 7 | 1,669 | 17 | 9 | 20 | 2 | 0 | 6,257 | ||
| S-3030 | Fitness Center | 6,252 | 2 | 442 | 3 | 2 | 4 | 0 | 0 | 5,810 | ||
| Sub Total 2 Bldgs | 14,178 | |||||||||||
| Cp Hovey | Bldg No. | Utilization | Sq Ft | |||||||||
| S-3415 | Gymnasium | 6,464 | 4 | 755 | 10 | 6 | 11 | 5 | 0 | 5,709 | ||
| Sub Total 1 Bldg | 6,464 | Sub-Total: | 13 | 2,866 | 30 | 17 | 35 | 7 | 0 | 17,776 | ||
| Schedule IV (8 BLDGS: 96,197SF) : 5 Times per Week (Community Buildings) | ||||||||||||
| Cp Casey | Bldg No. | Utilization | Sq Ft | |||||||||
| S-432 | Simulation Center (REIMB) | 7,848 | 1 | 212 | 3 | 6 | 3 | 2 | 1,432 | 6,204 | ||
| S-447 | Admin Bldg (REIMB) | 800 | 2 | 85 | 3 | 2 | 2 | 0 | 502 | 213 | ||
| S-456 | Operation Office (REIMB) | 2,309 | 3 | 480 | 8 | 4 | 8 | 2 | 0 | 1,829 | ||
| S-479 | CCTT (REIMB) | 6,852 | 4 | 828 | 11 | 3 | 9 | 4 | 0 | 6,024 | ||
| S-802 | ASAP (1st & 2nd Floor) | 14,925 | 7 | 803 | 10 | 6 | 14 | 1 | 0 | 14,122 | ||
| S-802 | IH/EH Office (3rd Floor) (REIMB) | 1,832 | 4 | 192 | 4 | 0 | 4 | 0 | 0 | 1,640 | ||
| S-1757 | Education Center (Reimb) | 12,701 | 6 | 980 | 12 | 6 | 10 | 1 | 1,760 | 9,961 | ||
| S-2440 | Maude Hall | 35,184 | 4 | 1,490 | 18 | 8 | 20 | 4 | 24,457 | 9,237 | ||
| S-3003 | Commissary(REIMB) | 13,746 | 2 | 373 | 5 | 3 | 4 | 0 | 0 | 13,373 | ||
| Sub Total 8 Bldgs | 96,197 | Sub-Total: | 33 | 5,443 | 74 | 38 | 74 | 14 | 28,151 | 62,603 | ||
| Schedule V (1 BLDG: 9,705SF) : 3 Times per Week for Latrine + 2 Times per Week for other area | ||||||||||||
| Cp Kwangsari | Bldg No. | Utilization | Sq Ft | |||||||||
| S-1605 | Operation Office (REIMB) | 9,705 | 3 | 452 | 7 | 3 | 7 | 0 | 0 | 9,253 | ||
| Sub Total 1 Bldg | 9,705 | Sub-Total: | 3 | 452 | 7 | 3 | 7 | 0 | 0 | 9,253 | ||
| Schedule VI (1 BLDG:34,600SF) : 7 Times per Week (Refer Para 8.3 of the PWS) | ||||||||||||
| Cp Casey | Bldg No. | Utilization | Sq Ft | |||||||||
| S-1715 | Gymnasium (Carey Fitness Center) | 34,600 | 2 | 3,295 | 18 | 9 | 15 | 4 | 900 | 614 | ||
| Sub Total 1 Bldg | 34,600 | Sub-Total: | 2 | 3,295 | 18 | 9 | 15 | 4 | 900 | 614 | ||
| Grand-Total: | 196 | 32,791 | 359 | 184 | 370 | 73 | 87,429 | 340,628 |
File details come from the government source that posted it. Updated .