About this file
This is a Request for Proposals (RFP) document issued by the Washington Suburban Sanitary Commission (WSSC) in Maryland for the Regional Water Supply Resiliency Project, known as the "Secure the Source Project." The project seeks to develop a long-term secondary water source to supplement the existing Potomac River water supply serving the metropolitan region. WSSC Water is soliciting sealed responses from qualified consulting firms to perform a preliminary engineering study and 35 percent design in accordance with the 1986 Water Resources Development Act (WRDA) Section 203, as amended by the Water Resources Reform and Development Act (WRDA 2014). The scope of work will comply with U.S. Army Corps of Engineers (USACE) requirements, with the completed study and design intended for submission to the Assistant Secretary of the Army for Congressional authorization under a subsequent WRDA Bill for project design and construction. Sealed responses must be submitted via WSSC's eProcurement Portal at https://procurement.opengov.com/portal/wsscwater prior to 9:00 a.m. on Monday, October 5, 2026, with late responses not accepted.
The solicitation requires all respondents to execute a Non-Disclosure Agreement (NDA) as a condition of participation. No additional details regarding pricing structures, contract term, award timeline, site visits, or bidder conferences are specified in this summary document. Interested firms should consult the complete RFP package and related scope of work documents available through WSSC's eProcurement Portal for comprehensive information regarding evaluation criteria, technical requirements, and submission guidelines.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 2026-70020, Regional Water Supply Resiliency Project ("Secure the Source Project") - NDA Requirement
WASHINGTON SUBURBAN SANITARY COMMISSION
SOLICITATION NO. 2026-70020
REGIONAL WATER SUPPLY RESILIENCY PROJECT ("SECURE THE
SOURCE PROJECT") - NDA REQUIREMENT
Due Date and Time: Monday, October 5, 2026, 9:00 am
Solicitation No. 2026-70020, Regional Water Supply Resiliency Project ("Secure the Source Project") - NDA Requirement
Table Of Contents
1. INTRODUCTION
2. VENDOR QUESTIONNAIRE
Solicitation No. 2026-70020, Regional Water Supply Resiliency Project ("Secure the Source Project") - NDA Requirement
1. INTRODUCTION
1.1. Summary
The Washington Suburban Sanitary Commission, MD (the "WSSC"), is soliciting sealed responses for Regional
Water Supply Resiliency Project ("Secure the Source Project") - NDA Requirement. Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO
9:00 am on Monday, October 5, 2026. Late responses will not be accepted.
Project work includes:
The purpose of the project is to develop a long-term solution that will provide a secondary water source to the
Potomac River water supply which will benefit the entire metropolitan region.
WSSC Water is seeking proposals from qualified companies (the "Consultant") to provide the services described in the scope of work to perform a preliminary engineering study and 35 percent design in accordance with the requirements outlined in the 1986 Water Resources Development Act (WRDA) Section 203, as amended by the Water Resources Reform and Development Act (WRDA, 2014). WRDA is a biennial, bipartisan federal law that authorizes the U.S. Army Corps of Engineers (USACE) to study, plan, and construct projects in the Corps' civil works program. Section 203 of WRDA authorizes non-federal agencies to perform the above work for submittal to the Assistant Secretary of the Army (ASA) for them to request authorization by the U.S. Congress under a subsequent WRDA Bill for the design and construction of the recommended project.
1.2. Timeline
Release Project Date: August 10, 2026
Response Submission Deadline: October 5, 2026, 9:00am https://procurement.opengov.com/portal/wsscwater
Solicitation No. 2026-70020, Regional Water Supply Resiliency Project ("Secure the Source Project") - NDA Requirement
2. VENDOR QUESTIONNAIRE
1. In order to be invited to participate in the Solicitation, you (Prime, Subcontractor or Joint Venture), must first complete the respective Non-Disclosure Agreement (NDA).*
Please download the below documents, complete, and upload.
• NDA_-_Individual_Primes_and...
• NDA_-_Joint_Ventures_-_8-7-...
*Response required
2. CONSENT TO USE OF ELECTRONIC SIGNATURE*
Please download the below documents, complete, and upload.
• CONSENT_TO_USE_OF_ELECTRONI...
*Response required
3. Are you registered in WSSC Water's Supplier Portal?*
☐ Yes
☐ No
*Response required
4. Provide your Supplier Portal Identification Number*
If not currently registered, register at www.wsscwater.com/supplier and provide a confirmation statement that you have registered if an identification number has not been provided to you at the time of bid. Please ensure all subcontractors are also registered at the time of bid.
*Response required https://government-project.s3.us-west-2.amazonaws.com/287475/b852cda6-9643-4e26-91c1-54f48dfd0bc1_NDA_-_Individual_Primes_and_Subcontractors_-_8-7-26.pdf https://government-project.s3.us-west-2.amazonaws.com/287475/666dd6e6-52c0-4b52-b7c1-a546ff15e293_NDA_-_Joint_Ventures_-_8-7-26.pdf https://government-project.s3.us-west-2.amazonaws.com/169983/18b654c4-4bff-4f4d-96e5-fa1159d0a5bf_CONSENT_TO_USE_OF_ELECTRONIC_SIGNATURE.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4G6Z5XPQT%2F20260810%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260810T160103Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjENj%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQC8Y5RtlYLo%2F0w%2BfBP8Du8MTTQOY2RBnItfsxx%2BNAdWwwIgDCLBprxlk8pzfdkymScx3C9fpHAiG9nylJSq7HviO4AqlQUIoP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDEhhkfTeXV4VEg%2FjyyrpBGlSFbQ4%2BsCzFn8jQsrkdOYL98BiPeWvYYsTX2eMGoSE1TIro%2F7P%2Ber7TbjxTdrjfjPVXMUnohfnChPG7iD1NhT2WO30C09kwgS1vY1VTiv5LjznFGWYfjpN2J5Kx19QXilcKVKVEd5jeQUHb3vY7OlF%2Bd0g8uqTKXfg5IfBmhsrfnJ2uVAir5t8a5W2PKmTNJfGh5twUKACfnCZeWyF8VBy1%2FK6nr2MNAIBU6wIYNlYz8A3s%2BAcea%2BB43KZQsDKsBR1rts9egq%2BCMPnRM4SJ2e49xz1rCVXElkMppIYd50afeGpaCFTTraqRLnXtAM07VeCYCq6yV36i4ubOJXtbnrGq8TG6VldNmjdla4wij3J5u9Z1%2FgHz7tFPGHtbiJmrGH1ZqW8rcDs45rk%2FUTxZcUpG9JHTXVQ7SnI%2FXQa1NejG2IbJh%2FldMSVoXRhzh3AKuldT49rP9VDqcahYhQqOsb7oF2l6nXs4qgd3soRUEU3Q5%2FbJlArFc5Ykec%2FnkVomSfutZH1lUfpiMLto3pMIxg0op4mzOMuMDctDQJCOsLkwVFL46BgcdeVESmseRqz2iivHE2P9To5OXeTc2xd5qn6VUFh0JfFZPR4JDrqeg%2B5hxFzulMSNfGBApUdF5oYGFuHZFJJl5whp6HxNn0NZPJS3G%2FSCylnK%2BFVhydD9pySdYUU1VGWcFVpZ82j6WkF%2FjDm6s7kf4b4ogEZ7nDRyAfM3takPAsZCLrKgN24Jr9Mjyjk7czSFfeReNr0QkvJrrU4pLt4k0pG%2B9KTM4BD%2Ff%2B9oI8K2sdGERONgqcFRAAkoqmSgs42K8b%2BMI7Z59MGOpkB9JWVnG68BddxK9gx0xEKaO2Hsb18XL5Bs%2B6kDurhlpKBlHwXwUjeRtTjjzQ0X195s5e%2FDQkoBh16mYqfGuStVuYbzIWIeNSSfP0Ro3uzU%2BVNGt5JlcuxLMbHriokpwqALdAq1Ysmg%2BpVGfmPpKCTU%2FOcO9r4bjlAAfwGETBoskcmBNnaqvzP5Lr%2BzrmEBUpzLjH1k0vSdMjR&X-Amz-Signature=4bf4a6bd62be5b624fcf7e6d2a82247e16a48837dae8d4b0216d5ebf81c75a6d&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22CONSENT_TO_USE_OF_ELECTRONIC_SIGNATURE.pdf%22&x-id=GetObject https://www.wsscwater.com/supplier
| 1. INTRODUCTION |
| 1.1. Summary |
| 1.2. Timeline |
| 2. VENDOR QUESTIONNAIRE |
| 1. In order to be invited to participate in the Solicitation, you (Prime, Subcontractor or Joint Venture), must first complete the respective Non-Disclosure Agreement (NDA).* |
| 2. CONSENT TO USE OF ELECTRONIC SIGNATURE* |
| 3. Are you registered in WSSC Water's Supplier Portal?* |
| 4. Provide your Supplier Portal Identification Number* |