redacted other than full.pdf

PDF 487 KB Posted

Attached to
USNS ROBERT E PEARY FIRE SPRINKLER PUMP PARTS
Solicitation number
N3220525Q2230
Issued by

About this file

This is a Justification for Other Than Full and Open Competition (JOTFOC) memorandum for repair parts for the No. 3 Fire Sprinkler Pump aboard the USNS ROBERT E PEARY (T-AKE 5). The sole source procurement is from Air & Liquid Systems Corporation, who owns proprietary rights to the drawings and materials.

The requirement is for delivery by August 29, 2025, with an estimated production lead time of 170 days. The justification cites restrictive rights, standardization requirements (for T-AKE 1-10 vessels), and unusual/compelling urgency as bases for the sole source award. The requirement was identified on November 9, 2024, and the parts are needed for safe operation of ammunition storage capability, with 3 of 4 fire sprinkling pumps currently operational. The specific part number is MFR ID-NA2006-PMPEND. The procurement falls under the simplified acquisition threshold and has CASREP number 24035.

View the file

Other files

File Type Posted
Combined_Synopsis_Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .