RDS_Only_Aggregate_Contract_Notes.xlsx
XLSX spreadsheet 549 KB Posted
- Solicitation number
- 2025-ITB-269
- Issued by
- Pierce County, Washington
About this file
This file contains aggregate contract notes and material specifications for Pierce County, Washington, outlining new material additions and specification updates for road-specific aggregate materials used in construction and stormwater management projects. The contract opportunity seeks to establish sources of supply for crushed manufactured or naturally occurring aggregates, landscape bark, and topsoil that meet specified material and technical standards. New material additions to the contract include gravel borrow conforming to WSDOT specifications, streambed cobbles meeting WSDOT specifications, bioretention planting mix per City of Seattle specifications, and sand filter blanket or C-33 concrete sand. The materials are designated for pick-up only, indicating that suppliers will be responsible for providing the materials at their locations rather than delivery to project sites.
The specifications document details updates to existing material requirements, specifically addressing backfill for sand drains. The current specification based on WSDOT Standard Specification 9-03.13 is being replaced with grading requirements per Pierce County Road Operations Specification as outlined in the Stormwater Management and Site Development Manual. The new backfill material for sand drains must conform to specific sieve size requirements, with grading percentages specified for No. 4 through No. 100 sieves, ensuring proper drainage and compaction characteristics for stormwater management applications. All percentages referenced in the specifications are measured by weight.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Packet_-_2025-ITB-269.pdf | ||
| FW__Road_Specific_Aggregate_Materials__Landscape__Bark__and_Topsoil.msg | MSG file | |
| RDS_Only_Aggregate_-ITB_20-106_Aggregate_Road_Bid.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New Material Additions
| Additions to material listed on contracts: | |
| 1 | Gravel Borrow (WSDOT Spec) |
| 2 | Streambed Cobbles (WSDOT Spec) |
| 3 | Bioretention Planting Mix (City of Seattle Spec) |
| 4 | Sand Filter Blanket/C-33 Concrete Sand: |
Backfill for Sand Drains
| Backfill for Sand Drains should be update from current spec to WSDOT Spec: |
| Spec from current bid: |
| 9-03.13 Backfill for Sand Drains |
| Sand Medium shall meet all the applicable requirements of Section 9-03.13 of the Washington State Department of Transportation (WSDOT) Standard Specifications for Road, Bridge, and Municipal Construction 2020 except as modified below. Note: All percentages are by weight. |
| #18) Backfill for Sand Drains P.C. Road Operations Specification per Stormwater Management and Site Development Manual for this material replace WSDOT Standard Specification 9-03.13 with the following: |
| Backfill for sand drains shall conform to the following grading: |
| Sieve Size Percent Passing |
| No. 4 100 |
| No. 8 70-100 |
| No. 16 40-90 |
| No. 30 25-75 |
| No. 50 2-25 |
| No. 100 <4 |
| No. 200 <2 |
| Aggregate for the sand medium shall consist of granular material, free from wood, bark or other extraneous material. (Note WSDOT Standard Specification 9-03.13 does not meet this P.C. Road Operations Specification.) |
| WSDOT Spec: |
New Vendors to Include
| New vendors to inform/encourage to Bid on this solicitation | |
| To be awarded, pick up location must be within Pierce County limits | |
| Heidelberg Resources (2 Locations Only) | |
| 18001 Meridian Rd E, Puyallup, WA 98375 | |
| 30820 Quinnon Rd Ext Sunset Quarry Buckley, WA 98321 |