R4-ConcreteVaultToiletOrderForm_NortonCreek.pdf
PDF 31 KB Posted
- Attached to
- Fairfield Ranger District Vault Toilet
- Solicitation number
- 1282B123Q0151
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a concrete vault toilet order form for the Fairfield Ranger District Vault Toilet solicitation issued by the Department of Agriculture Forest Service. The form requests pricing and specifications for one or more concrete vault toilets to be delivered to and installed at the Norton Creek Trailhead located 22 miles northwest of Ketchum, Idaho. Details include options for single or double vault models, entry configurations, roof styles, exterior finishes, colors, interior features, and delivery with or without excavation and backfilling. The form seeks a 90-day or less delivery time upon contract award and warrants the concrete structure for a minimum of three years and all other components for one year. Additional comments are requested to attach directions to the site and describe toilet placement.
Standard contract clauses are excluded from this summary as they do not provide salient details regarding the products or services required by the solicitation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form Updated 5/25/19
Norton Creek Trailhead
Region 4 Concrete Vault Toilet Order Form
Requisition #:
Project Title:
Project Location:
Norton Creek Trailhead is located 22 miles northwest of Ketchum along Forest
Service Road 70162.
Quantity of this model/style to be ordered from this form.
Design Criteria:
Min. Snow load (psf) (Standard is 250 psf)
Min. Wind load (mph) (Standard is 120 MPH)
Seismic load category Standard is Category D)
Check items to be included with requirement:
Toilet Typ: e: Single Vault Double Vault Double Vault w/ Chase
Left Hand Entry Right Hand Entry Front Entry
Access Screen (for single units): No Screen Full Screen Partial Screen
Roof Pitch Slope: Roof Slope (ex: 6:12) Gable Style Monitor Style Roof
Roof Exterior Simulated Finish (not all options are available on all models:
Wood Shake Metal Ribbed Exposed Aggregate Other:
Wall Exterior Simulated Finish (not all options are available on all models:
Barnwood Board/Batt Exposed Aggregate Split Block Everlog
Easybrick
Dual Texture:
Struck Trowel
Top
Skip Trowel
Bottom
Rock Lap Siding
Roof Exterior Color (other colors may be available):
Natural (Exposed Aggregate) Green
Light Dark Other:
Wall Exterior Color (other colors may be available):
Brown Gray
Natural (Exposed Aggregate)
Light Dark
Green
Other:
Brown Gray
Two Tone: Top Bottom
Interior Color (other colors may be available):
White Grays Beige Other:
Interior Floor Color (other colors may be available):
White Grays Beige Other:
Wall Vent Location (should be on side of prevailing wind):
Door Right Left Rear
Entry Approach (for single units):
X
X
7:12
D
Form Updated 5/25/19
Region 4 Concrete Vault Toilet Order Form (Continued)
Other Options Available:
Vault Poly Liner
Coat Hooks
Extended Vent Stack (for shady locations)
3 Roll Stainless Steel Paper Holder (pad-lockable)
Solar Light Kit
Solar Fan Kit
Waste Basket
Chain Door Strap
Raptor Vent Screen Cap
Hand Sanitizer
Deadbolt Mortised Type operated by Key from Outside ONLY, US26D (Dull
Chrome Finish) See additional notes below
Signage for Men Women Unisex
Exterior Signage Color:
Delivery and Installation:
Brown Blue Other:
Delivered to Site, Placed in Hole, Including Excavation & Backfilled
Delivered to Site and Placed in an Excavated Hole (Government Excavated
& Backfilled)
Warranty:
Shall conform for GSA Schedule/Commercial Practice
Concrete Structure - Minimum of 3 Years
All other - Minimum of 1 Year.
Statement of Work:
To be attached with Directions to Site, Include Mapping and Description of Placement.
Additional Comments, Instructions or Options:
From Ketchum, travel north of State Highway 75 for 15.2 miles to Baker Creek. Turn left onto Baker Creek and travel along Baker Creek Road for 6.0 miles to Norton Creek. Turn onto Norton Creek Road and travel roughly 1.3 miles to Norton Creek Trailhead.
Standard Delivery Time is 90 days or Less upon award of contract.
File details come from the government source that posted it. Updated .