This document is a concrete vault toilet order form for a project located at Bear Creek Transfer Camp in Idaho. The form requests specifications for a single concrete vault toilet including exterior simulated finishes for the roof and walls, exterior and interior colors, interior floor color, wall vent location, and optional accessories. Delivery and installation are requested as delivered to the site, placed in a hole including excavation and backfilling. The standard delivery time is 90 days or less upon award of contract.
The related federal contract opportunity is solicitation number 1282B123Q0151 from the US Department of Agriculture Forest Service for vault toilets at the Fairfield Ranger District. No further details are provided on the products, services, response dates or pricing required for that opportunity.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No Screen Full Screen
Roof Slope (ex: 6:12)Roof Pitch Slope: Gable Style
Partial Screen
Monitor Style Roof
Toilet Type : : Single Vault
Entry Approach (for single units):
Access Screen (for single units):
Front Entry Left Hand Entry Right Hand Entry
Min. Snow load (psf) (Standard is 250 psf) Min. Wind load (mph) (Standard is 120 MPH) Seismic load category Standard is Category D)
Region 4 Concrete Vault Toilet Order Form
Roof Exterior Simulated Finish (not all options are available on all models:
Wood Shake Metal Ribbed Exposed Aggregate Other:
Wall Exterior Simulated Finish (not all options are available on all models:
Exposed Aggregate Board/Batt
Struck Trowel Skip Trowel
Split Block Everlog
Rock Lap Siding
Bottom
Barnwood
Easybrick
Dual Texture: Top
Wood Shake Metal Ribbed Exposed Aggregate Other:
Roof Exterior Color (other colors may be available):
Natural (Exposed Aggregate) Green
Light Medium Dark Other:
Wall Exterior Color (other colors may be available):
Green Brown Gray
Other:
Brown Gray
Natural (Exposed Aggregate)
Light Medium Dark
Two Tone: Top Bottom
Interior Color (other colors may be available):
White White Grays Beige Other:
Interior Floor Color (other colors may be available):
White Grays Beige Other:
Wall Vent Location (should be on side of prevailing wind):
Door Right Left Rear
Check items to be included with requirement:
Requisition #:
Project Title:
Project Location:
Quantity of this model/style to be ordered from this form.
Design Criteria:
Double Vault Double Vault w/ Chase
Form Updated 5/25/19
Bear Creek Transfer Camp Vault Toilet
Bear Creek Transfer Camp is located 34 miles north of Fairfield, Idaho.
djeppsen Cross-Out djeppsen Highlight djeppsen Highlight
Region 4 Concrete Vault Toilet Order Form (Continued) Other Options Available:
Delivery and Installation:
Delivered to Site, Placed in Hole, Including Excavation & Backfilled Delivered to Site and Placed in an Excavated Hole (Government Excavated & Backfilled)
Warranty:
Shall conform for GSA Schedule/Commercial Practice Concrete Structure - Minimum of 3 Years All other - Minimum of 1 Year.
Statement of Work:
To be attached with Directions to Site, Include Mapping and Description of Placement.
Additional Comments, Instructions or Options:
Standard Delivery Time is 90 days or Less upon award of contract.
Vault Poly Liner Coat Hooks Extended Vent Stack (for shady locations) 3 Roll Stainless Steel Paper Holder (pad-lockable) Solar Light Kit Solar Fan Kit Waste Basket Chain Door Strap Raptor Vent Screen Cap Hand Sanitizer Deadbolt Mortised Type operated by Key from Outside ONLY, US26D (Dull Chrome Finish) See additional notes below
Women Unisex Exterior Signage Color: Brown Other: Blue
Form Updated 5/25/19
Signage for Men djeppsen Cross-Out djeppsen Cross-Out
Untitled
| Wind load: 120 |
| Seismic load: D |
| Check Box1: Yes |
| Check Box2: Off |
| Check Box5: Off |
| Check Box3: Off |
| Check Box4: Yes |
| Check Box6: Yes |
| Check Box8: Off |
| Check Box10: Off |
| Check Box9: Yes |
| Snow load: 250 |
| Roof Pitch: 7:12 |
| Check Box7: Off |
| Check Box11: Yes |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box15: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Yes |
| Check Box34: Off |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
| Check Box25: Yes |
| Check Box42: Off |
| Check Box38: Off |
| Check Box39: Off |
| Check Box40: Off |
| Check Box41: Yes |
| Check Box43: Off |
| Check Box44: Yes |
| Check Box45: Off |
| Check Box46: Off |
| Check Box48: Off |
| Check Box49: Yes |
| Check Box50: Yes |
| Check Box47: Off |
| Check Box51: Yes |
| Check Box52: Yes |
| Check Box53: Off |
| Check Box54: Yes |
| Check Box56: Off |
| Check Box57: Off |
| Check Box58: Off |
| Check Box60: Off |
| Check Box61: Yes |
| Check Box64: Off |
| Check Box65: Yes |
| Quantity: |
| Project Location: |
| Project Title: |
| specify1: Board & Batt |
| specify0: |
| specify2: Horizontal Lap Siding |
| specify4: Dark Green (Granite Rock) |
| specify5: Dark Gray (Java Brown) |
| specify6: |
| specify7: |
| specify8: |
| specify9: |
| Check Box43-1: Yes |
| Check Box44-1: Off |
| Check Box45-1: Off |
| Check Box46-1: Off |
| Req Number: |
| Check Box24: Off |
| Check Box24-1: Off |
| Check Box55: Off |
| Check Box59: Off |
| Check Box66: Yes |
| Check Box63: Yes |
| Check Box63-3: Off |
| Check Box63-2: Yes |
| Check Box63-4: Off |
| Check Box63-1: Off |
| Check Box62: Yes |
| Text68: |
| Text69: The Bear Creek Transfer Camp is located approximately 34 miles north of Fairfield Idaho. It can be accessed by taking the Couch Summit Road (FSR 70094) to FSR 70227, traveling northwest for 5.5 miles and stay to the right onto Fleck Summit Road (FSR 70012). Continue on FSR 70012 for 3 miles to FSR 70079. Continue north on 70079 for approximately 7 miles. Veer left at the Bear Creek Transfer Camp sign. |
| Check Box19-1: Off |
File details come from the government source that posted it. Updated .