Amendment No. 0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_No._0004.pdf | ||
| Amendment_No._0002.pdf | ||
| Amendment_No._0001.pdf | ||
| Solicitation_No._R17PS00780.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
R17PS00780
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Billings MT 59107
R60
PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation
08/16/20170003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/03/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Fremont Canyon Powerplant Scroll Case Recoating, North Platte Project, Wyoming
See attachment for changes incorporated by this amendment:
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Gerri Voto-Braun
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation Number R17S00780 Amendment No. 0003
Description of Changes:
1. In Part I – The Schedule, remove Specifications Section 01 14 30 – Interruption of Service in its entirety and substitute therefor the attached revised Section 01 14 30.
2. In Part I – The Schedule, remove Specification Section 01 51 00 – Temporary Utilities in its entirety and substitute therefor the attached revised Section 01 51 00.
3. In Part I – The Schedule, Specification Section 09 97 02 – Coatings, remove Page 09 97 02-17 and 09 97 02-18 and substitute therefor the attached revised page 09 97 02-17 and 09 97 02-18.
4. In Part I – The Schedule, the attached new Specification Section 51 00 30 – Photographs is incorporated into and made a part of the solicitation.
5. In Part I – The Schedule, Specification Section 52 00 00 – Drawings, remove Page 52 00 00-3 and 52 00 00-4 and substitute therefor the attached revised page 52 00 00-3 and 52 00 00-4.
6. In Part I – The Schedule, Specification Section 52 00 00 – Drawings, the attached new Sheet No.
18, Drawing No. 449-D-1242 is incorporated into and made a part of the solicitation.
For convenience, essential changes on the revised solicitation pages are indicated by a vertical line in the margin where lines or paragraphs changed from the previous version. However, all portions of the revised solicitation pages shall apply whether changes thereon have or have not been indicated.
Acknowledgement: See Block 11 on the SF-30 regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of bids (See Block 10 of the Standard Form 1442).
Receipt of Proposals: The hour and date for receipt of proposals is extended to 2:00 pm MDT on September 7, 2017.
Third Party: If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
Fremont Canyon Powerplant Amendment No. 003 Scroll Case Recoating
Interruption of Service Revised 01 14 30 - 1
SECTION 01 14 30
INTERRUPTION OF SERVICE
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include cost in prices offered in the Price Schedule for items of work for which interruption of services are required.
1.02 PROJECT CONDITIONS
A. Government will unwater penstocks October 1, 2018.
B. Onsite work may begin prior to October 1, 2018.
C. All coating work must be done October 1, 2018 through December 31, 2018.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION
Interruption of Service Revised 01 14 30 - 2
This page intentionally left blank.
Temporary Utilities
Revised 01 51 00 - 1
SECTION 01 51 00
TEMPORARY UTILITIES
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 REFERENCE STANDARDS
A. Institute of Electrical and Electronics Engineers (IEEE)
1. IEEE C2-12 National Electrical Safety Code (NESC)
1.03 TEMPORARY ELECTRICITY
A. Electric power of limited capacity will be available for work to be performed under these specifications.
1. Single-phase 120-volt, (20 amp service), power is available at maintenance receptacles.
2. Three-phase 480-volt, power is available at existing receptacle locations.
a. The powerplant has two 480-Volt circuits on the lower level.
1) One Crouse-Hinds 100 amp receptacle.
2) One Crouse-Hinds 60 amp receptacle.
b. The powerplant has two 480-Volt circuits on the generator level.
1) Two Crouse-Hinds 60 amp receptacles.
c. Contractor shall coordinate plug type to match exiting receptacle configuration.
3. No charge will be made for power obtained from the source.
B. Provide generators, distribution circuits, transformers, and other electrical equipment and facilities required for obtaining power and distributing power to points of use.
C. Comply with IEEE C2 clearances and spacing for temporary communications and supply lines.
1.04 TEMPORARY WATER
A. No water is available from the powerplant. Contractor may use water from the river.
B. Provide means of conveying water to points of use.
Temporary Utilities
Revised 01 51 00 - 2
1.05 TELEPHONE
A. Cell service is not readily available at the location.
1.06 SANITARY FACILITIES
A. Restroom facilities will not be available to Contractor personnel.
B. Contractor shall provide sanitary facilities including hand washing and decontamination.
1. Hand washing stations may be located inside the plant.
1.07 INTERNET SERVICE
A. Internet service is not available at work site.
1.08 TOOLS AND EQUIPMENT:
A. Government tools and equipment are not available for Contractor use.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 REMOVAL
A. Remove temporary equipment and facilities upon completion of work under this contract.
Impacted Immersion Coatings
Revised 09 97 02 - 17
3.12 COATING TABULATIONS
Tabulation No. 1 - Impacted Immersion
Items to be coated:
1. Interior surfaces of scroll cases and stay vanes
2. Interior surface of turbine inlet tube
3. Interior surfaces of butterfly valve including both sides of the butterfly blade to the upstream transition of the concrete lined penstock approximately the outside of the west wall as shown on drawing 449-D-451
Notes:
1. Do not paint aluminum-brass, brass, and stainless steel metalwork and seals.
2. Do not coat seals and machined surfaces where paint could interfere with proper operation or fit.
Coating materials Number and thickness of coats
Surface preparation method
Primer: VZ-108D
Intermediate coats: V-766E
Topcoat:
V‐766E gray
Color (approximate):
FED‐STD‐595
26231 gray
1 primer double spray coat, apply at 2.5 mils DFT, minimum, plus stripe coats.
3 intermediate double spray coats, with stripe coats.
1 double spray topcoat, with stripe coats.
Total system thickness, excluding stripe coats:
Average: 8.0-mil DFT, minimum; with no single spot less than 6.5-mil DFT.
SSPC-SP1 followed by for steel:
SSPC-SP5/NACE 1
1.5-2.0 mil surface profile
Tab IE‐04.DOC
Impacted Immersion Coatings
Revised 09 97 02 - 18
Photographs
Revised 51 00 30 - 5
Photograph #6 – Fremont Canyon Tunnel Entrance (1959)
Photograph # 7- Close-up of Scroll Case Surface
Revised 51 00 30 - 6
Photograph #8 - Penstock Butterfly Valve
Revised 51 00 30 - 7
Photograph #9 – Beneath Rock Fall Protection Canopy, facing west
Photograph #10 – Beneath Rock Fall Protection Canopy, facing south toward tunnel entrance
Revised 51 00 30 - 8
Photograph #11 – Beneath Rock Fall Protection Canopy, facing north toward Powerplant entrance
Photograph #12 – Beneath Rock Fall Protection Canopy, facing east
Revised 51 00 30 - 9
Photograph #13 – West side of powerplant facing south toward rock fall protection canopy
Photograph #14 – North side of powerplant facing east toward Platte River
Revised 51 00 30 - 10
Photograph #15 – Oil storage and purification room
Photograph #16 – Oil storage and purification room
Revised 51 00 30 - 11
Photograph #17 – Unit 2 Scroll Case Man Door
Photograph #18 – Unit 1 Scroll Case Man Door
Revised 51 00 30 - 12
Photograph #19 – West wall oil purification room
Photograph #20 – Manway Penstock Unit 1
Revised 51 00 30 - 13
Photograph #21 – Manway Penstock Unit 2
Photograph #22 – Alcova laydown yard
Revised 51 00 30 - 14
Photograph #23 – Access gate to laydown yard, view northwest
Photograph #24 – Access gate to laydown yard, view southwest
Revised 51 00 30 - 15
Revised 51 00 30 - 16
Drawings
Revised 52 00 00 - 3
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
16 449-M-D-57-8 Newport News Shipbuilding and Dry Dock Company – Newport News Virginia – Engineering Design Division – Hydraulic & Industrial Department – Spiral Case Assembly
– Hydraulic Turbine
17 449-M-D-57-5 Newport News Shipbuilding and Dry Dock Company – Newport News Virginia – Engineering Design Division – Hydraulic & Industrial Department – General Arrangement
– Hydraulic Turbine
18 449-D-1242 Fremont Canyon Power Plant – Approach Area Protective Roof – General Arrangement
Drawings
Revised 52 00 00 - 4
NDSkinner Polygonal Line
NDSkinner Text Box
FOR INFORMATION ONLY
NDSkinner Typewritten Text
FOR INFORMATION ONLY