Amendment No. 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_No._0004.pdf | ||
| Amendment_No._0003.pdf | ||
| Amendment_No._0001.pdf | ||
| Solicitation_No._R17PS00780.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
R17PS00780
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Billings MT 59107
R60
PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation
08/11/20170002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/03/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Fremont Canyon Powerplant Scroll Case Recoating, North Platte Project, Wyoming
See attachment for changes incorporated by this amendment:
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Gerri Voto-Braun
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation Number R17S00153 Amendment No. 0002
Description of Changes:
1. In Part I – The Schedule, the attached Specifications Section 01 33 00 – Submittals is hereby incorporated into and made a part of the solicitation.
For convenience, essential changes on the revised solicitation pages are indicated by a vertical line in the margin where lines or paragraphs changed from the previous version. However, all portions of the revised solicitation pages shall apply whether changes thereon have or have not been indicated.
Acknowledgement: See Block 11 on the SF-30 regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of bids (See Block 10 of the Standard Form 1442).
Receipt of Proposals: The hour and date for receipt of proposals is extended to 2:00 pm MDT on August 18, 2017.
Third Party: If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
Questions from prospective contractors and their respective answers are attached for information only. The Government will only address questions received by 4:30 MDT on August 14, 2017
The following contractors were in attendance at the organized site visit, which took place on August 1, 2017:
Todd Speakman Long Painting Company todds@longpainting.com Randy Miller Hartman Walsh RMiller.HWPC@hotmail.com Jason Becker Coblaco Services jason@colaco.com
Fremont Canyon Powerplant Amendment No. 002 Scroll Case Recoating .
Submittals
01 33 00 - 1
SECTION 01 33 00
SUBMITTALS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 DEFINITIONS
A. Days: Calendar days.
B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.
1.03 REFERENCE STANDARDS
A. American Society of Mechanical Engineers (ASME)
1. ASME Y14.1-12 Decimal Inch Drawing Sheet Size and Format
B. National Institute of Building Sciences (NIBS)
1. NIBS NCS-14 United States National CAD Standards, Version 6
1.04 SUBMITTAL REQUIREMENTS
A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.
B. General:
1. Prepare in English.
2. Label with contract number and title and RSN.
3. Measurement Units: US Customary Units.
C. Product Data:
1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.
a. Identify manufacturer's name, type, model, size, and characteristics.
b. Illustrate that product or equipment meets requirements of specifications.
Fremont Canyon Powerplant Amendment No. 002 Scroll Case Recoating .
01 33 00 - 2
c. Mark items to be furnished in a manner that will photocopy (no highlighter).
d. Strike through items that do not apply.
D. Certifications:
1. Certifications by a registered professional: Signed and sealed by registered professional.
2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.
1.05 SUBMITTALS PROCEDURES
A. Submit only checked submittals. Submittals without signature of Contractor's authorized representative will be returned for resubmission.
B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.
C. Submit sets specified in “Sets to be sent:” columns in Table 01 33 00A - List of Submittals.
1. Electronic Submittals:
a. In Portable Document Format (.pdf).
b. Include RSN transmittal letter.
c. Do not include Personally Identifiable Information (PII) in electronic submittals.
d. Submittal method (size based):
1) Government can receive e-mails up to 10 MB. Receipt of e-mails exceeding 10 MB (extra-large) may be possible. E-mailing of extra-large electronic submittals may occur only after size limit for transmittal of extra-large e-mail has been verified.
2) Electronic media for submittals too large to e-mail: CD or DVD.
D. Include the following information in transmittal letters:
1. Contract number and title.
2. RSN for each attached submittal.
3. Responsible code.
4. Number of sets for each RSN.
5. Identify submittal as initial or resubmittal.
E. Resubmittal of submittals not approved:
Fremont Canyon Powerplant Amendment No. 002 Scroll Case Recoating .
01 33 00 - 3
1. Mark changes such that they are readily identifiable and show revision date.
2. Describe reasons for significant changes in transmittal letter.
3. Resubmit returned submittals within 7 days after receiving comments, unless otherwise directed.
4. Requirements for initial submittals apply to resubmittals.
F. Submit each RSN under a separate transmittal letter. Multiple RSNs submitted under a single letter will be returned for resubmittal.
1.06 REVIEW OF SUBMITTALS
A. Time Required:
1. Submittal review will require 28 days for review of each submittal or resubmittal, unless otherwise specified.
2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return mailing postmark date.
B. Time in Excess of Specified:
1. CO may extend contract completion date to allow additional time for completing work affected by excess review time.
a. Time extension will be to extent that excess review time caused delay to contract completion date.
b. Time extension will not exceed time used in excess of specified number of days for review of submittals or resubmittals.
c. Concurrent days of excess review time resulting from review of 2 or more separate submittals or resubmittals will be counted only once in extending contract completion date.
2. No time extension will be allowed if Contractor fails to make complete action submittals in sequence and within time periods specified.
3. Adjustment for delay will be made only to extent that:
a. Approval was required under contract,
b. Requests for approval were properly and timely submitted and were approved.
4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR 52.242-14, Suspension of Work; however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.
C. Submittal Response:
1. Response letter will indicate whether submittal is approved, approved subject to identified changes, or not approved.
Fremont Canyon Powerplant Amendment No. 002 Scroll Case Recoating .
01 33 00 - 4
a. Revise and resubmit submittals not approved.
b. Design changes after submittal approval, require CO approval.
1.07 TRANSMITTAL
A. Addresses for codes receiving paper copy submittals listed in Table 01 33 00A - List of Submittals:
1. CO: Bureau of Reclamation, Attention GP-5000, P.O. Box 36900, Billings, MT 59107-6900. Physical address: 2021 4th Avenue North, Billings, MT 59101.
2. COR: Bureau of Reclamation, Attention: GP-2600, P.O. Box 36900, Billings, MT 59107-6900. Physical address: 2021 4th Avenue North, Billings, MT 59101.
B. E-mail address for electronic submittals listed in Table 01 33 00A - List of Submittals:
sha-GPR-CONSTSVCS@usbr.gov.
1. Submit electronic submittals that are too large for e-mail along with paper copy.
C. Submittals required by specifications, but not listed in Table 01 33 00A - List of Submittals:
1. Submit in accordance with this section.
2. Submit to COR unless otherwise specified.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
Fremont Canyon Powerplant Amendment No. 002 Scroll Case Recoating .
01 33 00 - 5
Table 01 33 00A - List of Submittals
** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
Sets to be sent: **
CO COR
1 Performance and Payment Bonds - Construction 52.228-15
Performance and Payment Bonds
Within 10 calendar days after award
CO 1 paper 0
2 Additional Bond Security 52.228-02
Evidence of Increase in Bond Security
Within 10 calendar days after modifications increasing contract value
CO 1 paper 0
3 Insurance-Work on a Government Installation 1452.228-70
1) Written certification that the required insurance has been obtained
2) Current certification of insurance for each subcontractor
Before commencing onsite work
CO 1 paper
4 Liability Insurance 1452.228-70
Acceptable Certificate of Liability Insurance
Prior to commencement of work under the contract
CO 1 paper 0
5 Equal Opportunity 52.222-26
Information required by Executive Order
112246 (SF-100)
Within 30 days following award
CO 1 paper 0
6 Reporting Executive Compensation and First Tier Subcontract Awards 52.204-10
Certification that executive compensation and subcontract awards were reported
Within 10 days of each report being submitted
CO 1 paper 0
7 Payrolls and Basic Records 52.222-08
Copies of all payrolls
Weekly for each week of contract performance
COR 1 paper 2 paper
8 Site Security GP-7 and WBR 1452.237-80
List of contractor and subcontractor employees
At least 10 days prior to arriving at worksite
COR 0 2 paper
9 Site Security GP-7 and WBR 1452.237-80
List of vehicles and equipment to be brought onsite
At least 10 days prior to arriving at worksite
COR 0 2 paper
10 Employment Verification 52.222-56 and ET 02-20
Confirmation of Enrollment as a Federal Contractor in E-Verify
Within 30 days of contract award
CO 1 paper 0
Fremont Canyon Powerplant Amendment No. 002 Scroll Case Recoating .
01 33 00 - 6
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
Sets to be sent: **
CO COR
11 Estimate of Percentage of Recovered Material Content for EPA Designated Items 52.223-09
Documentation indicating the percentage of the total recovered material content for the EPA Designated Items delivered and/or used in the contract performance
After completion of the work and prior to final payment
CO 1 paper 0
12 Release of Claims 1452.204-70
Release of Claims (DI-137) against the Government
After completion of the work and prior to final payment
CO 1 paper 0
01 14 10-1 Use of Site Land Use and Landscape Rehabilitation Plan
At least 28 days before use of Government land
COR 0 1 paper + 1 electronic
01 32 20-1 Construction Program Baseline Schedule
Within 21 days after receipt of Notice to Proceed
COR 1 Paper 1 paper + 1
01 32 20-2 Construction Program Updated Schedule With monthly requests for progress payments
COR 1 Paper 1 paper + 1
01 35 10-1 Safety Data Sheets Complete LHM and
SDS
At least 14 days before jobsite delivery of hazardous material
01 35 10-2 Safety Data Sheets Updated LHM and
SDS
At least 14 days before jobsite delivery of hazardous material not previously listed
01 35 20-1 Safety and Health Safety Program Submitted and accepted before commencing onsite work. See Section 3 of RSHS
01 35 20-2 Safety and Health Monthly Accident Summary Report
Monthly COR 0 1 paper + 1
01 35 20-3 Safety and Health Respirator User
Documentation At least 28 days prior to beginning onsite work
Fremont Canyon Powerplant Amendment No. 002 Scroll Case Recoating .
01 33 00 - 7
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
Sets to be sent: **
CO COR
01 35 20-4 Safety and Health Crane Training Certificates
At least 28 days prior to beginning onsite work
01 35 20-5 Safety and Health Other Training
Certificates At least 28 days before beginning onsite work
01 35 30-1 Contractor’s Onsite
Safety Personnel Qualifications At least 28 days before beginning onsite work
COR 0 2 paper
01 35 30-2 Contractor’s Onsite Safety Personnel
CIH Inspection Reports
01 35 30-3 Contractor’s Onsite
Safety Personnel Safety Inspection Reports
Weekly COR 0 1 paper + 1
01 46 00-1 Quality Procedures Contractor Quality
Control Program At least 28 days before beginning onsite work
COR 0 2 paper
01 46 00-2 Quality Procedures Contractor’s Daily Reports
01 46 00-3 Quality Procedures Quality Control
Supervisor At least 28 days before beginning onsite work
COR 0 2 paper
01 46 00-4 Quality Procedures Contractor Quality Testing Plan
At least 28 days before beginning onsite work
01 46 00-5 Quality Procedures Summary Weekly
Test Results
01 46 00-6 Quality Procedures Summary Monthly Test Results
01 54 20-1 Use of Government Crane Crane Use Schedule Weekly COR 0 1 paper + 1
01 56 10-1 Protection of Existing Installations
Plan for Protecting Existing Installations
At least 28 days before starting onsite work
01 57 20-1 Environmental Controls Copy of Applicable
Air Quality Permit At least 30 days prior to starting on site work
Fremont Canyon Powerplant Amendment No. 002 Scroll Case Recoating .
01 33 00 - 8
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
Sets to be sent: **
CO COR
01 57 30-1 Water Pollution Control Pollution Prevention Plan
At least 28 days before start of onsite construction work
01 57 30-2 Water Pollution Control Spill Prevention, Control, and Countermeasure (SPCC) Plan
At least 28 days before delivery or storage of oil
01 74 00-1 Cleaning and Waste Management
Waste Production and Disposal Plan
At least 28 days before starting onsite work
01 74 00-2 Cleaning and Waste
Waste Production and Disposal Records
Within 7 days of waste disposal
01 74 00-3 Cleaning and Waste
Environmental Consultant Resume
At least 35 days before beginning environmental assessment
COR 0 2 paper
01 74 00-4 Cleaning and Waste Management
Environmental Site Assessment
Within 14 days of completion of work
02 89 10-1 Removal & Disposal of
Coatings Containing Coal Tar Products
Resumes and Certificates
At least 28 days before beginning work
COR 0 1 paper + 1 electronic
02 89 10-2 Removal & Disposal of Coatings Containing Coal Tar Products
Written Compliance Program for Worker Protection
At least 28 days prior to beginning work
COR 0 1 paper + 1 electronic
02 89 10-3 Removal & Disposal of Coatings Containing Coal Tar Products
Plans At least 28 days prior to beginning work
COR 0 1 paper + 1 electronic
02 89 10-4 Removal & Disposal of Coatings Containing Coal Tar Products
Preconstruction Test Results
At least 28 days prior to beginning work
COR 0 1 paper + 1 electronic
02 89 10-5 Removal & Disposal of Coatings Containing Coal Tar Products
Working Level Test Results
At least 28 days prior to beginning work
COR 0 1 paper + 1 electronic
02 89 10-6 Removal & Disposal of Coatings Containing Coal Tar Products
Post-Construction Test Results
At least 28 days after completion of work
COR 0 1 paper + 1 electronic
02 89 10-7 Removal & Disposal of Coatings Containing Coal Tar Products
Certificate of Disposal
At least 28 days after completion of work
COR 0 1 paper + 1 electronic
09 97 02-1 Impacted Immersion Coatings
Approval Data At least 28 days prior to starting work onsite
Fremont Canyon Powerplant Amendment No. 002 Scroll Case Recoating .
01 33 00 - 9
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
Sets to be sent: **
CO COR
09 97 02-2 Impacted Immersion Coatings
Final Approval Data At least 28 days prior to starting work onsite
09 97 02-3 Impacted Immersion
Coatings Qualifications Prior to employment COR 0 2 paper
09 97 02-4 Impacted Immersion
Coatings Corps of Engineers Quality Assurance Test Report
Within 14 days of completion of work
35 04 10-1 Removal of Water from
Penstocks Removal of Water Plan
At least 28 days prior to starting work onsite
Fremont Canyon Powerplant Amendment No. 002 Scroll Case Recoating .
01 33 00 - 10
END OF SECTION
PROSPECTIVE CONTRACTOR QUESTIONS
FREEMONT CANYON POWERPLANT – SCROLL CASE RECOATIG
SOLICITATON NO. R17PS00780
1. Can you clarify where the work scope stops for the item ‘Surface Prep and Coating of
Butterfly Valve Interior Surfaces’? Does this imply both sides of the bufferfly blade and the interior of the valve measuring 8’ 9” long? Maybe can mark on the drawings the intended start/stop lines?
A: Please refer to amended specification Section 09 97 02, Article 3.12.
2. Will the pictures from the bid walk be released in an amendment?
A: Please refer to amended specification Section 51 00 30 (Photographs) that is included with this amendment.
3. Is there access/manhole on the west side (opposite of the turbine inlet pipe) of the butterfly valve?
A: No
4. Is the height/elevation of the “roof” over the approach area outside the building available?
A: Please refer to amended specification Section 51 00 30 (Photographs) photograph 8 and 9 the underside structure of the roof is approximately 4’ above the access tunnel.
Which would put the approximate height of the underside of structural system for the rockslide protection roof at 19 feet.
5. Can you clarify where the work scope stops for the item ‘Surface Prep and Coating of Butterfly Valve?
A: Please refer to Question 1.
This page intentionally left blank