R17PS00593_Amendment_0001.pdf
PDF 530 KB Posted
- Attached to
- Tule Lake Road Improvement Phase 2 Federal contract opportunity
- Solicitation number
- R17PS00593
About this file
Amendment 0001 to R17PS00593 to incorporate Section I - Contract Clauses
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| R17PS00201_Abstract_of_Offers.pdf | ||
| R17PS00593-Amendment_0003.pdf | ||
| SF-30_and_Attachments_-_Amendment_0002.pdf | ||
| IFB_R17PS00593_Tule_Lake_Road_Improvement_Phase_2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page of Pages
2. AMENDMENT/MODIFICATION
3. EFFECTIVE DATE
6/6/2017
4. REQUISITION/PURCHASE NO.
17-542
5. PROJECT NO.
6. ISSUED BY CODE: R20
Bureau of Reclamation Mid-Pacific Regional Office 2800 Cottage Way, Room E-1815 Sacramento, California 95825-1898
7. ADMINISTERED BY CODE: 00020
Bureau of Reclamation Mid-Pacific Regional Office 2800 Cottage Way, Room E-1815 Sacramento, California 95825-1898
8. NAME AND ADDRESS OF CONTRACTOR
X
9A. AMENDMENT OF SOLICITATION NO.
R17PS00593
9B. DATED (SEE ITEM 11)
06/05/2017
10A. MODIFICATION OF CONTRACT NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of offers ( ) is extended (x) is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS
DESCRIBED IN ITEM 14
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor ( ) is not, ( ) is required to sign and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible) The Solicitation cited in block 9A above is hereby amended.
A. Title: Tule Lake Road Improvement Project, Phase 2 B. Purpose: The purpose of this amendment is to incorporate "Section I - Contract Clauses" which was missing from the original solicitation due to an administrative error.
C. Description: This amendment hereby incorporates the attached Section I.
The offeror must acknowledge this amendment by following one of the methods mentioned in Item 11 above.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 16A. NAME AND TITLE OF CONTRACTING OFFICER
Erim Celik Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-807030-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
MICROSOFT WORD VERSION
Solicitation No. R17PS00593 Amendment 0001 Tule Lake Road Improvement, Phase 2
I-1
SECTION I - CONTRACT CLAUSES
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vfdiara.htm (DIAR 1452.XXX-XX formatted clauses) http://farsite.hill.af.mil/vffara.htm (FAR 52.XXX-XX formatted clauses)
Clause Title Date 52.202-1
Definitions NOV 2013
52.203-3
Gratuities
APR 1984
52.203-5
Covenant Against Contingent Fees
MAY 2014
52.203-6 Restrictions on Subcontractor Sales to the Government SEP 2006 52.203-7
Anti-Kickback Procedures
52.203-8
Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
52.203-10
Price or Fee Adjustment for Illegal or Improper Activity
MAY 2014
52.203-12
Limitation on Payments to Influence Certain Federal Transactions
OCT 2010
52.203-13 Contractor Code of Business Ethics and Conduct OCT 2015 52.203-17
Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights
APR 2014
52.203-19
Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements JAN 2017
52.204-4
Printing/Copying Double-Sided on Recycled Paper
MAY 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards OCT 2016
52.204-13
System for Award Management
OCT 2016
52.204-14
Service Contract Reporting Requirements
OCT 2016
52.209-6
Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, OCT 2015
I-2 or Proposed for Debarment
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
JUL 2013
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations
NOV 2015
52.214-26 Audit and Records – Sealed Bidding OCT 2010 52.214-27 Price Reduction for Defective Cost or Pricing Data –
Modifications – Sealed Bidding
AUG 2011
52.214-28 Subcontractor Cost or Pricing Data – Modifications – Sealed Bidding
OCT 2010
52.214-29 Order of Precedence – Uniformed Contract Format - Sealed Biding
JAN 1986
52.215-19 Notification of Ownership Change OCT 1997
52.219-8 Utilization of Small Business Concerns NOV 2016 52.219-27 Notice of Service-Disabled Veteran-Owned Small
Business Set-Aside
NOV 2011
52.219-28
Post-Award Small Business Program Representation JUL 2013
52.222-3
Convict Labor
JUN 2003
52.222-4 Contract Work Hours and Safety Standards Act- Overtime Compensation
MAY 2014
52.222-6
Construction Wage Rate Requirements MAY 2014
52.222-7
Withholding of Funds
52.222-8
Payrolls and Basic Records
52.222-9
Apprentices and Trainees
JUL 2005
52.222-10
Compliance with Copeland Act Requirements
FEB 1988
52.222-11
Subcontracts (Labor Standards)
52.222-12
Contract Termination – Debarment
52.222-13
Compliance with Construction Wage Rate Requirements and Related Regulations
52.222-14
Disputes Concerning Labor Standards FEB 1988
52.222-15
Certification of Eligibility
52.222-21
Prohibition of Segregated Facilities
APR 2015
52.222-26 Equal Opportunity SEP 2016 52.222-27
Affirmative Action Compliance Requirements for Construction
APR 2015
I-3
52.222-37
Employment Reports on Veterans
FEB 2016
52.222-40 Notification of Employee Rights Under the National Labor Relations Act
DEC 2010
52.222-50
Combating Trafficking in Persons
MAR 2015
52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.223-3 Alt I
Hazardous Material Identification and Material Safety Data (JAN 1997) - Alternate I
JUL 1997
52.223-5
Pollution Prevention and Right-to-Know Information
MAY 2011
52.223-6
Drug Free Workplace
MAY 2001
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving
AUG 2011
52.225-13
Restrictions on Certain Foreign Purchases
JUN 2008
52.227-1
Authorization and Consent
DEC 2007
52.227-2
Notice And Assistance Regarding Patent And Copy Infringement
DEC 2007
52.227-4 Patent Indemnity – Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work on a Government Installation JAN 1997 52.228-11 Pledges of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds - Construction OCT 2010
52.229-3
Federal, State And Local Taxes
FEB 2013
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014
52.232-17
Interest
52.232-23
Assignment Of Claims
52.232-27
Prompt Payment for Construction Contracts
52.232-33
Payment by Electronic Funds Transfer – System for Award Management
JUL 2013
52.232-39
Unenforceability of Unauthorized Obligations
JUN 2013
52.232-40 Providing Accelerated Payment to Small Business Subcontractors
DEC 2013
52.233-1 Alt I
Disputes - Alternate I (DEC 1991)
52.233-3
Protest After Award
AUG 1996
52.233-4
Applicable Law For Breach Of Contract Claim
OCT 2004
I-4
52.236-2
Differing Site Conditions
52.236-3
Site Investigation and Conditions Affecting the Work
52.236-5
Material and Workmanship
52.236-6
Superintendence by the Contractor
52.236-7
Permits and Responsibilities
NOV 1991
52.236-8 Other Contracts APR 1984
52.236-9
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
52.236-10
Operations and Storage Areas
52.236-11
Use and Possession Prior to Completion
52.236-12
Cleaning Up
52.236-13 Alt I
Accident Prevention (NOV 1991) – Alternate I
NOV 1991
52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Construction Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984
52.236-21 Alt I Specifications and Drawings for Construction (FEB 1997) – Alternate I FEB 1997
52.236-26 Preconstruction Conference FEB 1995 52.242-13
Bankruptcy
JUL 1995
52.243-4
Changes
JUN 2007
52.244-6
Subcontracts for Commercial Items
NOV 2016
52.245-1 Government Property – Alternate I JAN 2017 52.245-9 Use and Charges APR 2012 52.248-3
Value Engineering – Construction
OCT 2015
52.249-2 Alt I
Termination for Convenience of the Government (Fixed-Price) (SEP 1996) – Alternate I
APR 2012
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991
DIAR 1452.203-70 RESTRICTIONS ON ENDORSEMENTS-DEPARTMENT JUL 1996
OF THE INTERIOR
The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205-1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional
I-5 material.
DIAR 1452.204-70 RELEASE OF CLAIMS - DEPARTMENT OF JUL 1996
THE INTERIOR
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
DIAR 1452.228-70 LIABILITY INSURANCE - DEPARTMENT JUL 1996
OF THE INTERIOR
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
$100,000 each person $500,000 each occurrence $ 20,000 property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance.
The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
DIAR 1452.237-70 INFORMATION COLLECTION – DEPARTMENT JUL 1996
OF THE INTERIOR
If performance of this contract requires the contractor to collect information on identical items from ten or more public respondents, no action shall be taken or funds expended in the solicitation or collection of such information until the contractor has received from the Contracting Officer written notification that approval has been obtained from the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1980. The Contractor agrees to provide all information requested by the Contracting Officer which is necessary to obtain approval from OMB.
I-6
FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS OCT 2015
(a) Definitions. As used in this clause— “Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,” and “recently separated veteran” have the meanings given at FAR 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
52.222-36 EQUAL OPPORTUNITY FOR JUL 2014
WORKERS WITH DISABILITIES
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings
FAR 52.225-9 BUY AMERICAN ACT— CONSTRUCTION MAY 2014
MATERIALS
(a) Definitions. As used in this clause--https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2022_13.html#wp1085590
I-7
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
I-8
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: _NONE____
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.
However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable
I-9 supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) * Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material [List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.]
[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
FAR 52.228-1 BID GUARANTEE SEP 1996
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds --
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
I-10
FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES APR 1984
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any Department of the Interior or Bureau of Reclamation (48 CFR Chapter 5) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
WBR 1452.201-80 AUTHORITIES AND LIMITATIONS – JUL 1993
BUREAU OF RECLAMATION
(a) All work shall be performed under the authority exercised by the Contracting Officer who has been appointed in accordance with the requirements of the Department of the Interior Acquisition Regulation (DIAR) 1401.603 (48 CFR 1401.603).
(b) The Contracting Officer may designate other Government employees to act as authorized representatives in administering this contract in accordance with the requirements of DIAR
1401.670 (48 CFR 1401.670). Any designation shall be made to the authorized representative by an appointment memorandum signed by the Contracting Officer which contains the scope and limitations of authority delegated for purposes of administering this contract. A copy of the memorandum, and any revisions to it, shall be provided to the Contractor which shall acknowledge receipt.
(c) The Contractor shall, without unnecessary delay, comply with any written or oral direction of the contracting officer or authorized representative(s) acting within the scope and authority of their appointment memorandum. Such orders or direction include, but are not limited to, instructions, interpretations, approvals, or rejections associated with work under this contract including requirements for submission of technical data, shop drawings, samples, literature, plans, or other data required to be approved by the Government under this contract.
(d)(1) If the Contractor receives direction for work under this contract (including any written or oral orders it regards as a change order under the Changes clause of this contract) and it considers such direction to have been issued without proper authority (including instances where it believes delegated authority has been exceeded), it shall not proceed with the direction and shall notify the Contracting Officer within five (5) working days of receipt of the direction. On the basis of the most accurate information available to the Contractor, the notice shall state--
(i) The date, nature, and circumstances of the direction received;
(ii) The name, function, and activity of each Government individual and Contractor official or employee involved in or knowledgeable about such direction;
(iii) The identification of any documents and the substance of any oral communication involved in such direction;
(iv) The contract line items or other contract requirements that may be affected by the alleged direction including any suspected delays or disruption of performance; and
(v) Any other information considered pertinent.
(2) Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform under this
I-11 paragraph prior to receipt of the Contracting Officer's determination issued under paragraph (e) of this clause.
(e) The Contracting Officer shall promptly, after receipt of any notice made under paragraph (d) of this clause, respond to the notice in writing. The response shall --
(1) Confirm that the direction contained in the Contractor's notice was unauthorized and either authorize it by appropriate contract modification or countermand it;
(2) Deny that the direction contained in the Contractor's notice was outside the scope and limitations of the authority of the authorized representative who gave the direction and direct the Contractor to proceed immediately with the direction received or, when necessary, direct the mode of further performance; or
(3) In the event the information contained in the Contractor's notice is inadequate to make a decision under subparagraphs (e)(1) or (2) of this clause, advise the Contractor what additional information is required, and establish the date by which it should be furnished and the date thereafter by which the Government will respond.
(f) A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
WBR 1452.209-82 PROHIBITION ON RELEASE OF INFORMATION- JUL 1997
BUREAU OF RECLAMATION
(a) The Contractor shall not disclose information pertaining to the services performed under this contract to anyone other than Government or other personnel authorized by the Contracting Officer. The Contractor agrees that it will protect any information obtained from other companies during the performance of this contract from unauthorized use or disclosure for as long as the information remains proprietary and shall refrain from using such information for any purpose other than that for which it was furnished.
(b) In the event that the Contractor intends to employ individuals other than its own staff or other firms in the performance of the contract, each individual or firm shall be required to furnish the same written certification.
(c) The contractor shall insert, in any subcontract that requires the performance of work similar to that being performed by the Contractor, terms that shall conform substantially to the language of this clause, including this paragraph (c).
WBR 1452.223-80 ASBESTOS-FREE WARRANTY – BUREAU OCT 1992
OF RECLAMATION
(a) The Contractor warrants that all items delivered, or work required by the contract, shall be free of asbestos in any form whatsoever except for the use of asbestos cement pipe.
(b) The Contractor may request the Contracting Officer to approve an exception to this prohibition when an asbestos-free product is not available. Such requests shall be fully documented and submitted as soon as possible after the contractor determines that an asbestos-free product is not available. Contracting Officer disapproval of a request for an exception shall be final and not subject to the Disputes clause of this contract.
I-12
WBR 1452.223-81 SAFETY AND HEALTH – BUREAU OF JUN 2015
RECLAMATION
(a) The Contractor shall not require any person employed in the performance of this contract (including subcontracts) to work under conditions which are unsanitary, hazardous, or dangerous to the employee's health or safety.
(b) Contractor shall comply with the most current version of the Bureau of Reclamation Reclamation Safety and Health Standards (RSHS) and, if applicable, the requirements of the Accident Prevention Clause (FAR 52.236-13).
(1) The RSHS manual as referenced in subparagraph (b) above shall be obtained at http://www.usbr.gov/ssle/safety/RSHS/rshs.html
(c) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910 from the Occupational Safety and Health Administration, U.S. Department of Labor, www.osha.gov
(d) In the event there is a conflict between the requirements contained in paragraphs (b) and (c) referenced herein, the more stringent requirement shall prevail
(e) The Contractor shall submit a written proposed safety program as prescribed in the RSHS and the written specifications.
(f) The Contractor shall maintain an accurate record of, and shall report to the Contracting Officer (or authorized representative) in the manner prescribed by the Contracting Officer, all cases of death, occupational diseases, or traumatic injury to employees or the public involved, and property damage in accordance with the RSHS and OSHA guidelines.
(g) The rights and remedies of the Government provided in this clause are in addition to any other rights and remedies provided by law or under this contract.
(h) If the RSHS is updated or amended by Reclamation during the course of this contract, the contractor will be notified in writing. The contractor shall comply with the current RSHS immediately upon written notification. Should the contractor feel that the updated version of RSHS constitutes a substantive change to the contract, affecting price or time (or both), the contractor may request an equitable adjustment in the contract price. Any such requests shall include a price proposal submitted in compliance with Contract Clause WBR 1452.243-80, Modification Proposals - Bureau of Reclamation, and in sufficient detail to allow meaningful analysis of labor, equipment and material.
WBR 1452.223-82 PROTECTING FEDERAL EMPLOYEES AND DEC 2009
THE PUBLIC FROM EXPOSURE TO TOBACCO
SMOKE IN THE FEDERAL WORKPLACE – BUREAU OF
RECLAMATION
http://www.usbr.gov/ssle/safety/RSHS/rshs.html
I-13
(a) In performing work under this contract, the contractor shall comply with the requirements of Executive Order 13058, dated August 9, 1997, which prohibits the smoking of tobacco products in all interior space owned, rented, or leased by the executive branch of the Federal Government, and in any outdoor areas under executive branch control in front of air intake ducts.
(b) In addition, pursuant to Federal Management Regulation (FMR) Bulletin 2009-B1, effective December 22, 2008, smoking is prohibited in courtyards and within 25 feet of doorways and air intake ducts on outdoor space under the jurisdiction, custody or control of GSA.
WBR 1452.228-84 CERTIFICATION OF REPRESENTATIVES FOR SEP 1996
CORPORATE SURETIES – BUREAU OF RECLAMATION
Each surety company bond, that purports to have been executed by an agent or attorney-in-fact for the corporate surety, shall --
(1) be accompanied by a power of attorney to the signatory agent or attorney-in-fact; and
(2) the power of attorney or attorney-in-fact shall have been executed by the corporate surety upon a date prior to the date of the execution of the bond; or
(3) be accompanied by a certification of the sureties to the effect that the power of attorney was in full force and effect upon the date of the bond.
WBR 1452.231-81 EQUIPMENT OWNERSHIP AND JUL 1998
OPERATING EXPENSES -BUREAU OF
RECLAMATION
(a) Definitions. "Acquisition cost," as used in this clause means, the Contractor's original purchase price (including sales tax less salvage value) of an item of equipment including any and all accessories and expendable components required for utilization the item of equipment. For used equipment which is reconditioned and recapitalized, "acquisition cost" shall mean the adjusted amount resulting from the recapitalized value of the equipment as determined from the Contractor's accounting records.
"Equipment," as used in this clause, means equipment in sound workable condition at the construction work site, either owned or controlled by the Contractor or its subcontractors at any tier, or obtained from a commercial rental source, and furnished for use under this contract.
"Ownership cost," as used in this clause, means allowances for construction equipment depreciation and cost of facilities capital.
"Operating cost," as used in this clause, means the cost of operating equipment such as operating crew labor, servicing labor and equipment, labor and parts for all repairs and maintenance, fuel, oil, grease, supplies, tire wear and repair.
(b) Policy. Equitable adjustments made in the price of this contract pursuant to the Changes, Differing Site Condition, Suspension of Work, or other clause of the contract, may include
I-14 allowable ownership and operating costs for equipment. In accordance with FAR 31.105(d), allowable ownership and operating costs for each piece of equipment, or groups of similar serial or series equipment, shall be determined using actual cost data when such data are available from the Contractor's accounting records. When actual costs cannot be so determined or when actual cost data for a specific element of operating cost do not contain costs for individual pieces or types of equipment, the procedures in paragraph (d) of this clause shall be used to determine allowable costs (provided, in the case of operating costs, that the costs are reconciled to the Contractor's total cost for that operating element). For fully depreciated equipment, the procedures in paragraph (e) of this clause shall be used to determine allowable costs.
(c) Required data. In any request made for an equitable adjustment, the Contractor shall furnish to the Contracting Officer --
(1) A complete description of each item of equipment (including all accessory equipment attached thereto) to be used in connection with the work to be performed listing the date of manufacture, date of acquisition, make, model, size, capacity, mounting, and type of power;
(2) Evidence of the acquisition cost of new or used equipment to be used including all available current and historical supporting cost data. If evidence of acquisition cost is not provided by the Contractor or if the data provided are unacceptable to the Contracting Officer, the Contracting Officer may determine the acquisition cost by other appropriate means.
(d) Use of the predetermined rate schedule.
(1) When the Contracting Officer determines that allowable ownership and operating costs cannot be determined from the Contractor's accounting records, the U.S. Army Corps of Engineers pamphlet entitled "Construction Equipment Ownership and Operating Expense Schedule" (Schedule) for the State in which the construction site is located shall be used to calculate ownership and operating rates. Copies of the Schedules can be obtained, free of charge, from the U.S. Army Corps of Engineers, Publications Depot, 2803 52nd Avenue, Hyattsville, MD 20781-1102.
(2) For the purpose of determination of the hourly rates to be applied under this contract, working conditions shall be considered average, unless otherwise determined by the Contracting Officer.
(3) Rates for equipment not listed in the Schedule shall be calculated using the formulas in the Schedule. Alternatively, the Contracting Officer may determine to use rates in the Schedule for equipment comparable to the unlisted equipment, including horsepower and auxiliary features.
(e) Fully depreciated equipment. No depreciation or rental cost shall be allowed on equipment fully depreciated by the Contractor or by any division, subsidiary, parent company, or affiliate under common control. However, a reasonable rate for using fully depreciated equipment may be allowed by the Contracting Officer. Unless otherwise determined by the Contracting Officer, such hourly rate shall not exceed a value computed by multiplying the depreciation rate for the equipment (as shown in the Schedule table entitled "Construction Equipment Ownership and Operating Expense") by the economic index for the year of equipment manufacture (as shown in the Schedule table entitled "Economic Indexes for Construction Equipment"), divided by the economic index correspondingly with the year the Schedule is published. The year used for the
I-15 basis of the rates in the Schedule is indicated in the table entitled "Equipment Age Adjustment Factors for Ownership Costs." Idle or standby time will not be paid for fully depreciated equipment.
(f) Idle or standby time. Equipment ownership costs for idle or standby time of equipment not fully depreciated shall be determined as follows:
(1) The allowable rate shall be made at 50 percent of the hourly rate for ownership costs if actual cost data are used. The maximum hours per week allowed shall not exceed 40 hours or the amount of hours regularly worked by the Contractor, whichever is less. No allowance shall be made for Saturdays, Sundays, or holidays, when work is not actually performed.
(2) If actual cost data cannot be determined, the rate shall be computed in accordance with the Schedule.
(3) No costs shall be allowed for time when the equipment would have been otherwise idle or was not in good operating condition.
(4) Periods of time less than 2 hours on which equipment is down for normal and regular servicing and for minor field repair or field maintenance shall be considered by the Contractor to be operating time rather than idle or standby time and such periods shall not be deducted from use or operating time.
(5) No costs are allowable for fully depreciated equipment.
(g) Rental. Allowable costs for renting or leasing of equipment shall be determined in accordance with FAR 31.105(d)(2)(ii) and 31.205-36.
The U.S. Army Corps of Engineers pamphlet entitled "Construction Equipment Ownership and Operating Expense Schedule" (Schedule) for Region VII is also available at:
http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets/tabid/16440/u4 3545q/313131302D312D38/Default.aspx
WBR PAYMENT FOR MOBILIZATION AND PREPARATORY MAY 2000
1452.232-81 WORK BUREAU OF RECLAMATION – ALTERNATE I
(a) General. Payment for the Mobilization and Preparatory Work line item of the schedule will be made as reflected herein. To the extent that this line item exceeds the percentage of total contract pricing as estimated by the Contracting Officer in WBR 1452.236-85, Instruction for Mobilization and Preparatory Work Schedule Line Item, payment will be made as reflected in Section (d)(5) below. Reclamation will make payment to the Contractor in accordance with this clause for operations including, but not limited to, those necessary for --
(1) Movement of personnel, equipment, supplies, and incidentals to the project site;
(2) The establishment of offices, buildings, plants and other facilities, at the site (excludes temporary buildings (e.g. storage sheds, shops, offices) and utilities listed in the Operations and Storage Areas clause of this contract;
http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets/tabid/16440/u43545q/313131302D312D38/Default.aspx http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets/tabid/16440/u43545q/313131302D312D38/Default.aspx
I-16
(3) Payment of premiums for project bonds and insurance; and
(4) Other work and operations which must be performed or costs incurred incident to the initiation of meaningful work at the site and for which the contract does not otherwise provide for payment.
(5) Approved detailed logic diagram(s) and the baseline schedule.
(b) Facilities and equipment covered by mobilization work.
(1) All facilities, plant, and equipment which are established at, or brought to, the site shall be deemed to be subject to the provisions of this paragraph unless the Contracting Officer specifically provides other written authorization for a particular item or items.
(2) The Contractor shall be solely responsible for the adequacy, efficiency, use, protection, maintenance, repair, and preservation of all facilities, plant, and equipment on site.
(3) The facilities, plant, and equipment covered by this paragraph shall not be dismantled or removed from the site prior to completion of the work under the contract without the written authorization of the Contracting Officer.
(c) Termination for default. Should the Contractor be terminated for default as provided by the Default clause of this contract --
(1) All facilities, plant, and equipment on the site shall be subject to the Government's right to take possession of and utilize such items for the purpose of completing the work;
(2) The Contractor shall provide evidence of encumbrances, liens, or other security interests, to the Contracting Officer; and
(3) Any encumbrance, lien, or other security interest on such facilities, plant, or equipment shall be subordinated to the Government's rights under the Default clause of this contract to utilize all facilities, plant, and equipment to complete the work under the contract.
(d) Payment. Payment for mobilization and preparatory work under paragraph (a) of this clause shall be made at the contractor lump-sum price for this item as contained in the Schedule.
Progress payments for mobilization and preparatory work shall be made as follows --
(1) In accordance with paragraph (g) of the Payments under Fixed Price Construction Contracts clause of this contract and upon submission of a proper invoice, the Government will reimburse the Contractor for the total amount of premiums paid for performance and payment bonds as required by the Performance and Payment Bond Requirements clause of this contract and for any insurance which is specified as payable by the Government under this contract.
(2) Except as provided in (d)(1)above, progress payments for mobilization and preparatory work shall not be considered a separate division of work for the purposes of progress payments and shall be subject to retainage before payment of the total amount for this contract line item.
(3) When progress payments totaling 5 percent of the total original schedule amount on a schedule have been made by the Government for all other work accomplished under that schedule, the Government shall pay the Contractor 50 percent of the mobilization and preparatory work schedule line item amount or 5 percent of the total original schedule amount
I-17
(whichever is the lower) exclusive of any payment already made to the Contractor for performance and payment bond premiums and specified insurance under subparagraph (d)(1) of this clause.
(4) When progress payments totaling 10 percent of the total original contract amount have been made by the Government for all other work accomplished under the contract and upon approval of the detailed logic diagram(s) and baseline schedule, the balance of the amount for the mobilization and preparatory work contract line item or 10 percent of the total original contract amount (whichever is the lower) shall be paid to the contractor
(5) If the schedule amount for mobilization and preparatory work on a schedule exceeds the total of the payments allowed under (3) and (4) above, the balance shall be paid when the schedule work is substantially complete as determined by the Contracting Officer.
WBR 1452.232-82 OTHER INVOICE REQUIREMENTS – JUL 1998
BUREAU OF RECLAMATION
(a) As permitted by subparagraph (a)(2)(xi) of the Prompt Payment for Construction Contracts clause of this contract, to constitute a proper invoice the Contractor shall submit the update reports required by the "Construction Program" paragraph of the contract specification with each request for payment under the contract.
(b) No payment shall be authorized for work performed out of sequence. If work is performed in violation of the sequence shown on the approved logic diagram(s), but is performed in a logical sequence and in compliance with the contract requirements, the current approved logic diagram(s) shall be updated to correct the out of sequence condition, thereby allowing approval of payment. Progress payments for incomplete activities shall be approved only if the activity's original duration exceeds 15 workdays or 20 shifts and the activity is in process at the end of the billing period, or if the estimated earnings for the activity exceed $1,000.
WBR 1452.236-84 PRESERVATION OF CULTURAL RESOURCES - FEB 2000
BUREAU OF RECLAMATION
(a) General. Federal legislation provides for the protection and preservation of cultural resources that may be impacted or altered as a result of any Federal project, activity, or program or federally licensed or assisted project, activity, or program.
(b) Discovery of Resources. Should the Contractor, or any of the Contractor's employees, subcontractors, or parties operating or associated with the Contractor, in the performance of this contract discover evidence of possible cultural resources, the Contractor shall immediately cease work at that location and provide oral notification to the Contracting Officer, giving location and nature of the findings. The Contractor shall forward a written report of findings to the Contracting Officer within 48 hours.
(i) If a cultural resource is determined by Reclamation to be a Native American cultural item, then the Contractor shall cease the activity in the area of the discovery, make a reasonable
I-18 effort to protect the items discovered, and wait for written approval from the Contracting Officer before resuming activity. This requirement is prescribed under the Native American Graves Protection and Repatriation Act (NAGPRA). Many States have "burial laws" that apply to non- Federal and non-Indian lands; the Contractor is responsible for complying with applicable state law when operating on non-Federal and non-Indian lands.
(ii) If the discovery occurs on tribal lands, the Contractor shall immediately orally notify the responsible tribal official and the Contracting Officer and follow with written confirmation within 2 days to the responsible tribal official and the Contracting Officer. (The Reclamation office will supply the name and phone number of the tribal official. This information also can be obtained at <http://web.cast.uark.edu/other/nps/nacd>.)
(iii) The Contractor shall exercise care so as not to disturb or damage any cultural resources discovered during the execution of this contract, and shall provide such cooperation and assistance as may be necessary to preserve the findings for removal or other disposition by Reclamation. The Contractor shall not resume work in the area of a discovery until written notice to proceed is received from the Contracting Officer.
(c) Destruction of Archaeological Resources. Any person who excavates, removes, damages, alters or defaces or attempts to excavate, remove, damage, or otherwise alter or deface any archaeological resource located on public lands or Indian lands is subject to a maximum of five years in prison and $250,000 fine, as prescribed under Sections 6 and 7 of the Archaeological Resources Protection Act. State law may provide other penalties on non-Federal lands.
(d) Approval of Use Areas and Borrow Sources. If the Contractor proposes to use a location other than an approved location (approved locations to be provided by the Contracting Officer), the location(s) must first be approved for use by the Contracting Officer.