Att_5_-_Subcontracting_Percentage_Worksheet.pdf

PDF 16 KB Posted

Attached to
Cultural Resources IDIQ
Solicitation number
R17PS00106
Issued by

About this file

Att 5 - Subcontracting Percentage Worksheet

View the file

Other files

File Type Posted
Amend_004_Att_2_-_Updated__Section_B_Provided_in_Excel_Format_4_14_2017.xls XLS spreadsheet
Amend_004_Att_6_-_Updated_Past_Performance_Questionnaire_4_14_2017.pdf PDF
Amend_004_Att_12_-_Information_Page_and_Q-A_4_14_2014.pdf PDF
Sol_R17PS00106_Amd_000004_(1).pdf PDF
Amend_004_Att_3_-_Updated_Task_Order_4_14_2017r.pdf PDF
A4_Updated_Solicitation_No._R17PS00106_Cultural_Resources_IDIQ_4_20_2017.pdf PDF
Amend_004_Att_1_-_Updated_Volume_II_Statement_of_Work_4_14_2017.pdf PDF
R17PS00106_Amend_3.pdf PDF
R17PS00106_Amend_2.pdf PDF
Amendment_00001_Information_Page_and_Q&As.pdf PDF
Att_10_-_PaleoWest_Database_Chart.pdf PDF
Updated_Solicitation_No._R17PS00106_Cultural_Resources_IDIQ_3_3_2017.pdf PDF
Att_2_-_A1_Updated_Section_B_Provided_in_Excel_Format_3_3_17.xls XLS spreadsheet
Att_11_-_Research_Design_PaleoWest_2013_Final.pdf PDF
Sol_R17PS00106_Amd_000001.pdf PDF
Att_9_-_Ethnographic_Overview_PaleoWest_2013_Final.pdf PDF
Att_1_-_A1_Updated_Volume_II_Statement_of_Work_3_3_2017.pdf PDF
Att_6_-_Past_Performance_Questionnaire.pdf PDF
Att_8_-_NGWSP_NAGPRA_Plan_of_Action.pdf PDF
Att_3_-_Task_Order.pdf PDF
Att_2_-_Section_B_Provided_in_Excel_Format.xls XLS spreadsheet
Att_7_-_NGWSP_Programmatic_Agreement.pdf PDF
Att_1_-_Volume_II_Statement_of_Work.pdf PDF
Solicitation_No._R17PS00106_Cultural_Resources_IDIQ.pdf PDF
Sol_R17PS00106.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5: Subcontracting Percentage Worksheet

U.S. Department of the Interior

FAR Clause 52.219-14, Limitations of Subcontracting

Subcontracting Percentage Worksheet

PRIME CONTRACTOR: SOURCE:

SUBCONTRACTOR: SOURCE:

PRIME CONTRACTOR SUBCONTRACTOR

DIRECT LABOR $ $

FRINGE BENEFITS* $ $

SUB TOTAL (A) $ (B) $

LABOR G&A**@______% $ $

TOTAL LABOR COSTS (C) $ (D) $

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)** in space (B).

Next, Calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).

Calculate the subcontractor’s LABOR G&A by multiplying the subcontractor’s G&A rate by the subcontractor’s SUBTOTAL figure in (B).

Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.

Next, using the formula below, calculate the subcontracting labor percentage.

(D)

(C) + (D)

SUBCONTRACTING LABOR COST PERCENTAGE = %

* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.205- 6(m). Failure to do so will csuse the entire overhead to be eliminated from the calculations.

** G&A denotes General and Administrative Costs

*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractos’s costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor’s costs.

File details come from the government source that posted it. Updated .