Asbestos Abatement Flatiron Power and Pumping Plant
Solicitation number
R16PS01264
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
R16PS01264_Amendment_0002.pdf PDF
R16PS01264.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

R16PS01264

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Billings MT 59107

R60

PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation

08/05/2016000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/18/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project Title: Asbestos Abatement, Flatiron Power and Pumping Plant

See attachments for changes incorporated by this amendment

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Gerri Voto-Braun

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0001 Solicitation No. R16PS01264

Description of Changes:

1. Section F – Remove Section F in its entirety and substitute therefor the attached revised

Section F.

2. In Section L – Remove Pages L-17 and L18 and substitute therefor the attached revised Pages L-17 and L18.

3. In Section M – Remove Section M in its entirety and substitute therefor the attached revised Section M.

Receipt of Proposals: The hour and date for receipt of proposals remains the same; 3:00 p.m.

MT, on August 18, 2016.

The Pre-Proposal Site Visit Sign-in Sheet is attached to this amendment and is provided for informational purposes only.

Document No.

R16PS01264

Document Title Asbestos Abatement, Flatiron Power and Pumping Plant

F - 1

SECTION F -- DELIVERIES OR PERFORMANCE

F.1 52.211-10

ALT 1

COMMENCEMENT, PROSECUTION, AND COMPLETION

OF WORK

APR 1984

The Contractor shall be required to:

(a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,

(b) Prosecute the work diligently, and

(c) Complete the entire work ready for use not later than August 31, 2017. The time stated for completion shall include final cleanup of the premises.

(d) The completion date is based on the assumption that the successful offeror will receive the notice to proceed by October 14, 2016. The completion date will be extended by the number of calendar days after the above date that the Contractor received the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

* The cable tunnel and switchyard entry area will be deenergized for on-site performance of this work August 3, 2017 through August 31, 2017. The contractor will be allowed to mobilize and perform limited tasks away from the energized cables or equipment as early as July 28, 2017 and as late as September 5, 2017.

F.2 52.211-18 VARIATION IN ESTIMATED QUANTITY APR 1984

If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgment of the Contracting Officer, is justified.

F.3 52.242-14 SUSPENSION OF WORK APR 1984

(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.

(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not

F - 2 specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.

(c) A claim under this clause shall not be allowed -

(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and

(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

L - 17

(3) Enclosures. The enclosures shall include a list of any tables, drawings, charts, and any other enclosures which summarize data or information;

(4) The evaluation factors for this procurement are shown below. The detail that must be addressed and how they are to be evaluated are shown in Section M.

Factor 1 - Technical Plan for Project

A. Technical Plan B. Project Schedule

Factor 2 – Company Experience

Factor 3 – Key Personnel

Factor 4 – Past Performance

Factor 5 – Safety

(5) Reserved

(6) Reserved

(7) Reserved

(8) Reserved

(d) Cost/Price Information. To permit objective evaluation of the technical proposal, no cost or price information shall be included in the technical proposal. However, the proposal shall include:

(1) A breakdown of unpriced labor hour estimates for each labor category proposed to accomplish each task or phase of the work and the basis for each estimate;

(2) Identification of the types and quanities of proposed materials and equipment necessary to perform the work; and

(3) The number, duration, destination and purpose of each trip proposed for performing the work.

(e) Reserved

L.19 WBR

1452.215-83

PRICING PROPOSAL INSTRUCTIONS -- BUREAU OF

RECLAMATION

JAN 1998

(a) General - The pricing proposal shall be identified as Volume III of the offeror's proposal and shall be an orderly, specific, and complete document in every detail. It should be a coherent document free of internal inconsistencies and should be consistent with the technical approach(es) proposed in the technical proposal (Volume II). Offerors are hereby notified that even though cost or pricing data are not initially requested in this

L - 18 solicitation, the Contracting Officer reserves the right to request such data if they are later found necessary pursuant to FAR 15.403-5(a)(1).

(b) Use and Disclosure of Proposal Information - In accordance with the Use and Disclosure of Proposal Information -- Department of the Interior provision of this solicitation, offerors shall mark trade secret or confidential commercial or financial information contained in the proposal with the restrictive legends specified.

The offeror shall also clearly and separately mark all proprietary information (as defined in FAR 3.104-3) contained in the proposal with the restrictive legend "Proprietary Information."

(c) Format and Content - To assist in the uniform evaluation of proposals, the following format shall be utilized in preparing the pricing proposal:

(1) Table of contents. The Table of Contents shall list all sections of the pricing proposal. Any modifications or revisions to the proposal, up to the date of agreement on price, shall include an updated Table of Contents;

(2) Index. The index shall cross reference the work statement to the terms of the proposal and indicate how the proposal conforms to the evaluation factors contained in Part IV, Section M of this solicitation;

(3) Enclosures. A list shall be included of all enclosures, attachments, tables, drawings, charts, and any other material which summarize data or information contained or referenced in the pricing proposal.

(4) Pricing proposal breakdown. The offeror shall submit Section B of the contract Schedule (Part I of this solicitation) with its proposed total prices/costs for each contract line item (including any options) and proposed unit price(s), if required. In addition, a total proposed price consisting of the sum of all contract line items (excluding options) shall be submitted. Offerors are hereby notified that even though additional data to support proposed prices are not initially requested in this solicitation, the Contracting Officer reserves the right to request such data if they are later found necessary.

(d) Cost Information in Other Volumes - No cost information shall be included in any other volume of a proposal unless required by paragraph (d) of the Technical Proposal Instructions -- Bureau of Reclamation provision of this solicitation.

(e) Page Numbering - All pages in the cost proposal should be consecutively numbered (including pages with tables and exhibits). The offeror shall clearly identify all exhibits and supporting information.

(f) Rounding of Costs - All price or cost amounts proposed shall be expressed to the nearest whole dollar except for individual hourly labor rates (if required). All percentages shall be expressed to one decimal place.

(g) Alternate Proposals - If submission of alternate technical proposals is permitted by the General Proposal Instructions -- Bureau of Reclamation provision of this solicitation, the offeror shall submit a separate, detached pricing proposal conforming to the requirements of this provision for each alternate submitted. The alternate pricing proposal(s) shall be clearly labeled and identified

L.20 WBR

1452.236-85

INSTRUCTION FOR MOBILIZATION AND PREPARATORY

WORK SCHEDULE LINE ITEM

MAY 2000

The Contracting Officer estimates that the Section B Mobilization and Preparatory Work schedule line item should not exceed 15 percent of the total bid price. Your attention is directed to contract clause WBR 1452.232-81 Payment for Mobilization and Preparatory Work, which reflects how the Government will pay for

M - 1

SECTION M -- EVALUATION FACTORS FOR AWARD

M.1 WBR

1452.215-85

EVALUATION FACTORS FOR AWARD - QUALITY

PREDOMINANCE -- BUREAU OF RECLAMATION

MAY 2005

(a) Award will be made to the responsible offeror submitting a proposal which conforms to the solicitation and is most advantageous to the Government considering the factors and any significant subfactors listed in this provision.

(b) In the evaluation of proposals, all evaluation factors other than cost or price (listed in this provision), when combined, are considered to be significantly more important than cost or price. The relative importance to be placed on the factors in relation to each other is contained in paragraph (e) of this provision. However, the degree of importance of cost or price may increase with the degree of non-cost or non-price equality between the proposals. If a proposal is determined by the Contracting Officer to be "technically unacceptable" as a result of evaluating all factors other than cost or price, the proposal may be rejected from further consideration. The Contracting Officer reserves the right to make award to other than the technically-acceptable offeror with the lowest cost/price proposal if it is determined that the technical benefits of another offeror's proposal justify its higher cost/price. The Contracting Officer also reserves the right to make award to a lower-cost/price, lower-scored offeror if it is determined that the cost/price premium involved in awarding to a higher-rated, higher-cost/price offeror is not justified.

(c) Pursuant to FAR 15.305, a cost or price evaluation may be performed to determine the reasonableness of costs or prices proposed and the offeror's understanding of, and ability to perform, the prospective contract. All proposed prices will be evaluated for price reasonableness and any instances of unbalanced pricing, in accordance with FAR 15.404-1.

(d) The following factors and significant subfactors (if listed) , will be considered in evaluating proposals and making the source selection:

1. Technical Plan for Project

a. Technical Plan

Provide a detailed narrative work plan describing the sequence of activities as well as the means and methods of asbestos abatement to accomplish the work required under the contract. At a minimum the plan shall include, but not be limited to the following:

(1) Construction details of containment(s) and description of removal activities, including details on how asbestos containing electrical cable tray liners in the tunnel and erection bay, asbestos dust contamination from within the tunnel, and asbestos tape wrapped insulation within the Unit 1 and Unit 3 air housings will be contained and abated.

(2) Methodology for cleaning, lifting, and supporting the cables off of the existing asbestos containing electrical cable tray liners in the tunnel and erection bay.

(3) Methodology for removal of the existing asbestos containing electrical cable tray liners in the tunnel and erection bay, and installation of the replacement cable tray liners

M - 2

b. Project Schedule

Provide a detailed schedule for completing the work within the specified work restrictions and contract duration. The schedule shall show submittals that must be approved prior to mobilizing to the site and prior to commencement of onsite work activities. The schedule shall also show mobilization to the site, commencement of onsite work, material procurement, and sequence and duration of abatement activities required to complete the work. The schedule shall clearly identify the shifts per week, shifts per day, duration of each shift, estimated crew sizes, and number of crews required to complete the work.

The Technical Plan and Project Schedule will be evaluated based on the completeness of the technical data and project schedule provided for the scope of work. Proposals with extensive technical data, descriptions of equipment, ratings, removal/installation methods and procedures, work schedule, and general engineering approach will be evaluated more favorably. Factors 1a and 1b shall be addressed in complete detail. Failure to address any of the factor requirements in complete detail may result in an unacceptable rating.

2. Company Experience

The offeror’s company experience will be evaluated to assess the experience level of the offeror and/or subcontractors on recent contracts of similar work. The proposal will be evaluated on the detail to which the offeror can demonstrate successful completion of projects in similar size and complexity.

The offeror shall furnish a list of no more than five Federal, State, local government or commercial projects completed within the last ten years similar in scope and complexity to the work required in this solicitation. The project list must clearly demonstrate the ability to successfully complete projects in a timely manner, utilize the required resources, and coordinate the work with subcontractors and owners. Projects of a similar nature are defined as asbestos abatement work in an industrial facility with ongoing operations.

The following information must be provided for each project:

a. Name and location of project.

b. Detailed description of work.

c. Describe whether or not the offeror was the prime contractor and what portion of the work was performed by the offeror and what portion was performed by subcontractors.

d. Original completion date and duration, and actual contract completion date and duration for each project (including modifications).

e. Initial contract amount and final contract amount (including modifications).

f. Name, address and phone number of Contracting Officer (CO)/owner/Contracting Officer’s

Representative (COR)/point of contact that may verify information for this project.

g. Describe in detail any problems encountered during the performance of the contract and corrective actions taken to mitigate the issue(s).

M - 3

Failure to provide any of the information listed above may result in a lower rating. References with incorrect or missing phone numbers and contact names may not be able to be evaluated, which may result in a lower rating. If an offeror intends to subcontract any of the major components of the specified work, all of the above information shall be provided for each proposed subcontractor.

3. Key Personnel

The offeror’s key personnel will be evaluated to assess their experience on recent work of similar scope and complexity. The greater the extent to which the key personnel participated in projects of similar size and complexity, the more favorably the proposal will be rated.

The offer shall provide detailed resumes for all key personnel. At a minimum, the key personnel shall include the Project Manager, Project Superintendent, Onsite Safety Representative, Quality Control Manager, Certified Industrial Hygienist, and any other staff who will be involved in the major components of the work.

Resumes shall be limited to three pages per individual. Resumes shall include but not be limited to the following:

a. Name, role, and responsibilities for the project.

b. Professional registrations, certifications, and educational background.

c. Qualifying experience over the last five years to include but not limited to the following:

1. Project names, locations, and dates of assignments.

2. Detailed description of duties and or responsibilities for each assignment.

3. Accomplishments or other pertinent information which demonstrates their ability to complete the anticipated work for this project.

If an offeror intends to subcontract any of the major components of the specified work, the key personnel information shall be submitted for those individuals as well.

The offeror shall provide a written statement of assurance indicating the proposed key personnel will be assigned to work on this project if awarded the contract.

4. Past Performance

Offerors will be evaluated on the degree to which they have completed similar projects on schedule and without performance problems. Information submitted regarding adverse performance problems will be considered, as well as mitigating circumstances detailed in the proposal.

(1) Offerors shall have a Past Performance Questionnaire (PPQ), contained in Section J, completed by at least three (3) of the offeror’s previous clients/owners. Offerors are strongly encouraged to inform previous clients of the importance of the questionnaires as it is a determining factor in rating the proposal. It is the offeror’s responsibility to ensure that the

M - 4 government receives the requested questionnaires by the time and date specified in the solicitation for the receipt of proposals.

(2) If an offeror intends on utilizing subcontractors to perform any of the work beyond supplying materials, PPQs shall be submitted on behalf of each proposed subcontractor as well.

(3) The Government may also use past performance information obtained by other sources than those identified by the offeror. The Government will utilize the Past Performance Information Retrieval System (PPIRS) database located at http://www.ppirs.gov for obtaining past performance information.

5. Safety

Provide the following safety information:

A. A detailed description of your company’s safety program. Include information such as safety professional(s) on staff, safety committee, regular consultation, etc. Descriptions of employee safety training or certifications, hazard recognition, abatement methods, and provisions for subcontractor safety shall be included. Include descriptions of any serious, willful, or repeat violations that the company has been either cited for or assessed penalties for over the past five years by Federal or State OSHA. Provide any supporting information that demonstrates how corrective actions occurred to mitigate the issues. Furthermore, provide a description of any citations or assessed penalties during the past five years by the EPA, Air Quality Management District or any Regional Water Quality Control Board. Provide any supporting information that demonstrates corrective actions taken. Additionally, list any safety or environmental awards or recognition your company has received during the past five years.

B. Include a Job Hazard Analysis (JHA) which addresses the primary phases of the project.

The JHA will be used to determine the offeror’s understanding of the occupational safety and health issues associated with the project. A general company safety program with references to regulations and/or general references to meeting the safety requirements in the specifications is not acceptable and will result in a lower rating.

(e) The relative importance of the non-price factors is as follows:

1. Technical Plan for Project

a. Technical Plan

b. Project Schedule

2. Company Experience

3. Key Personnel http://www.ppirs.gov/

M - 5

4. Past Performance

5. Safety

a. Safety Management

Factors 1a and 1b are significantly more important than Factors 2 through 3, which are relatively equal to each other. Factor 5 is slightly more important than Factor 4. Subfactor 5a is slightly more important than Subfactor 5b. Factors 1 through 5 are significantly more important than price.

NOTE 1 - If an offeror intends on utilizing subcontractors to perform any of the work, all of the above information must be provided for each subcontractor.

NOTE 2 - The Government intends to award this contract without conducting negotiations;

therefore failure to submit any of the information addressed above for each of the factors and/or subfactors may result in an unacceptable proposal.

M.2 WBR

1452.225-82

NOTICE OF WORLD TRADE ORGANIZATION

GOVERNMENT PROCUREMENT AGREEMENT

EVALUATIONS--BUREAU OF RECLAMATION

MAY 2005

In accordance with the Agreement on Government Procurement, as amended by the Uruguay Round Agreements Act (Pub. L. 103-465), and other trade agreements, FAR Subpart 25.4, World Trade Organization Government Procurement Agreement, applies to Bureau of Reclamation acquisitions. In order to apply trade agreements unique to Reclamation, the contracting officer will (irrespective of any other provision or clause of this solicitation) evaluate acquisitions at or above the dollar thresholds listed in FAR 25.402(b) without regard to the restrictions of the Buy American Act.

This Page Intentionally Left Blank

Pre-Bid Site Visit Sign-in Sheet Solicitation No. R16PS01264 Request for Proposal

Date: August 2, 2016 Time: 8:00 a.m. MDT

Solicitation Title: Asbestos Abatement Flatiron Power and Pumping Plant Name Company Phone Email Don Brewer Vrus 720.447.9224 imbrewer@vetconstr.com

Charles Reichert Golden Environmental 720.425.1208 charles@golden-environmental.com

Marvin Mendoza Golden Environmental 720.284.4919 marvin@golden-environmental.com

Petar Bubalo Penns Contracting Inc. 973.670.4307 petar@pennsinc.com

Jack Morrow Black Bear Construction 214.876.0864 Jackm@blackbearcsi.com

Bruce Jensen Horsley Specialties 605.390.5943 brucej@horsleyspecialties.com

David Starks JKS Industries 303.238.0207 dstarks@jksindustries.net

Travis Ayuda Services 303.612.3496 travis@ayudaenv.com

Kerri Valdez Acumen Environmental 719.432.5774 kerri@acumenenv.com

Jimmy Valdez Acumen Environmental 719.432.5774 jim@acumenenv.com

Shane Redenberg Peak Environmental 720.269.9438 Shane@peakenviro.com

Kenda Ennez Hudspeth Inc. 303.250.7539 kenda@hudspethinc.com

Primo Navarrete Hudspeth Inc. 303.847.6367 pnavarrete@hudspethinc.com

Scott Wilson Earth Services & Abatement 720.626.0408 swilson@esasiteco.com

File details come from the government source that posted it. Updated .