R-337632 AFSCME Checklist Request Heat Plant Metal Siding Repair.pdf

PDF 148 KB Posted

Attached to
Release Competitive Sealed Bidding IL|25-416CMS-BOPM4-P-84645
Contract number
25-416CMS-BOPM4-P-84645
Issued by
Illinois

About this file

Summary

This is a Service Procurement and Contracting Checklist (March 2014 Revised) issued by the State of Illinois for compliance with AFSCME collective bargaining agreements and personnel code requirements. The document establishes procedural guidelines that state agencies must follow when contracting for services that fall within the scope of bargaining unit work. The checklist requires agencies to identify and document the specific provisions under which services may be contracted, with particular reference to Article XXIX of the collective bargaining agreement, the Personal Service Contract Memorandum of Understanding, and the Mediated Resolution Memorandum.

The specific contract documented is for Heat Plant Metal Siding Repair at Danville Correctional Center under contract number R-337632, classified as a one-time service with an estimated amount of $6,631.14. The scope involves removing and replacing damaged metal siding at the facility. The contract was justified based on the assessment that Danville Correctional Center staff lack the necessary tools, expertise, and certifications to perform the work. The contract has been categorized as Non-AFSCME Bargaining Unit Work, indicating that comparable work is not arguably performed by bargaining unit employees, as determined by the agency's Bureau of Personnel or Division of Labor Relations. The checklist was signed by LR Administrator April Athey on April 8, 2008.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SERVICE PROCUREMENT AND CONTRACTING CHECKLIST

(March 2014 Revised)

Contracts that include services within the scope of bargaining unit work are allowed in certain circumstances. However, all such agreements shall be in accordance with Article XXIX, page 103-104; the Personal Service Contract Memorandum of Understanding (PSC MOU), page 236-237 of the 2012 AFSCME collective bargaining agreement; or the Mediated Resolution Memorandum when the work performed would arguably be performed by AFSCME represented employees if the work was performed by State Personnel.

In compliance with these agreement(s), agencies must identify and document the provisions under which the services are to be contracted. Please check the applicable paragraph below and maintain substantiating documentation:

Name: PBC/Contract # : Term: Amount:

Work Location: Date of Vacancy (if applicable)

Scope of Services:

Assessment of Need (attempts to redistribute work or TA, LOA, nature of duties, EPAR #, etc.):

I. AFSCME-Bargaining Unit Work- Same or comparable work is arguably performed by bargaining unit employees. Any contract determined to be inconsistent with guidelines below must be terminated within 45 days.

1. □ Time Limited Work – Work based on one of the following exceptions:

a. □ Emergency Work – consistent with section 8b.8 of the Personnel Code (20 ILCS 415), may be acquired for a period not to exceed 60 days. With a minimum 14-day written notice, prior to initial termination, this contract may be extended if agreed to by Council 31, in writing, in advance.

b. □ Temporary or Seasonal Work – consistent with section 8b.9 of the Personnel Code, may be acquired for a period not to exceed 6 months out of any 12 month period. With a minimum 14 day written notice, prior to initial termination, this contract may be extended if agreed to by Council 31, in writing, in advance.

c. □ No Appropriate Eligible List – consistent with section 8b.10 of the Personnel Code, may be acquired for a period not to exceed 6 months out of any 12 month period. With a minimum 14 day written notice, prior to initial termination, this contract may be extended if agreed to by Council 31, in writing, in advance.

2. □ Specialized Professional – The work to be performed under this contract requires specialized, professional or technical services which cannot reasonably be provided by employees. Use of contractual resources to perform this work is not restricted. ____________Written notice to Council 31

(date)

3. □ Time Limited Projects - The work to be performed under this contract is for time limited projects required to meet certain agency mandates for which specific funds have been dedicated. These services may be acquired for up to 12 months, renewable for an additional 12 months. __________Written notice to Council 31

(date)

4. □ Sub-contracting: Written notice provided to Council 31 Pursuant to Article XXIX on (date)

5. □ Written waiver obtained from Council 31 for exceeded time frames set forth in #(I)1.

(date)

6. □ Renewal of an existing contract, no substantial modification to the scope of work or cost of the contract. Written notice provided to AFSCME Council 31 prior to the contract’s initial term _________

(date)

II. □ Non-AFSCME Bargaining Unit Work – Same or comparable work is not arguably performed by bargaining unit employees as determined by the agency’s Bureau of Personnel or Division of Labor Relations.

LR Administrator Signature Date

Name: Heat Plant Metal Siding Repair
PBCContract: R-337632
Term: One-Time Service
Amount: Est.$ 6,631.14
Work Location: Danville Correctional Center
Date of Vacancy if applicable: N/A
Scope of Services: Remove and Replace damaged Metal Siding (Heat Plant).
Assessment of Need attempts to redistribute work or TA LOA nature of duties EPAR etc 1: Danville Correctional Center
Assessment of Need attempts to redistribute work or TA LOA nature of duties EPAR etc 2: staff does not possess the necessary tools, expertise, or certifications to perform this project.
Time Limited Work Work based on one of the following exceptions: Off
Emergency Work consistent with section 8b8 of the Personnel Code 20 ILCS 415 may be: Off
Temporary or Seasonal Work consistent with section 8b9 of the Personnel Code may be acquired: Off
No Appropriate Eligible List consistent with section 8b10 of the Personnel Code may be acquired: Off
Specialized Professional The work to be performed under this contract requires specialized: Off
resources to perform this work is not restricted:
acquired for up to 12 months renewable for an additional 12 months:
Subcontracting Written notice provided to Council 31 Pursuant to Article XXIX on:
Written waiver obtained from Council 31 for exceeded time frames set forth in I1:
Written notice provided to AFSCME Council 31 prior to the contracts initial term:
NonAFSCME Bargaining Unit Work Same or comparable work is not arguably performed by bargaining: On
2026-09-08T12:23:20-0500
April Athey
Date:
Time Limited Projects The work to be performed under this contract is for time limited projects required: Off
SubContracting: Off
Waiver: Off
Renewal: Off

File details come from the government source that posted it. Updated .