QUESTIONS ANSWERS.pdf
PDF 88 KB Posted
- Attached to
- Power Feeder Replacement Federal contract opportunity
- Solicitation number
- W9128F22Q0110
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| UPDATED 2 QUESTIONS ANSWER.pdf | ||
| UPDATED 1 QUESTIONS ANSWER.pdf | ||
| UPDATED QUESTIONS ANSWERS.pdf | ||
| AMENDMENT 1.pdf | ||
| DRAWINGS.pdf | ||
| SPECS - W9128F22Q0110 Power Feeder Replacement Bear Creek.pdf | ||
| RFQ W9128F22Q0110.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POWER FEEDER REPLACEMENT, BEAR CREEK DAM, COLORADO
W9128F22Q0110
QUESTIONS & ANSWERS
Q. On the E-101 drawing in keynote #4 it states that the 4” Conduit between the meter pedestal and Terminal box. Trenching or Directional Boring shall be utilized. See specification 33 71 02 for additional information. As there is no requirement for the conduit to be encased in concrete our preference is to use trenching with backfill of native soil and not directional boring. Please confirm if this method is acceptable.
A. As stated on the drawing and specs this method of trenching with backfill is permitted in lieu of boring. See the specification requirements for details.
Q. With the short turnaround of this information, I just wanted to see if there was any chance the bid date could extend a day or 2.
A. No time extension because we want to award by September 30th.