QUESTIONS ANSWERS.pdf

PDF 88 KB Posted

Attached to
Power Feeder Replacement Federal contract opportunity
Solicitation number
W9128F22Q0110
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

View the file

Other files for this federal contract opportunity

Other files attached to Power Feeder Replacement, newest first.
File Type Posted
UPDATED 2 QUESTIONS ANSWER.pdf PDF
UPDATED 1 QUESTIONS ANSWER.pdf PDF
UPDATED QUESTIONS ANSWERS.pdf PDF
AMENDMENT 1.pdf PDF
DRAWINGS.pdf PDF
SPECS - W9128F22Q0110 Power Feeder Replacement Bear Creek.pdf PDF
RFQ W9128F22Q0110.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POWER FEEDER REPLACEMENT, BEAR CREEK DAM, COLORADO

W9128F22Q0110

QUESTIONS & ANSWERS

Q. On the E-101 drawing in keynote #4 it states that the 4” Conduit between the meter pedestal and Terminal box. Trenching or Directional Boring shall be utilized. See specification 33 71 02 for additional information. As there is no requirement for the conduit to be encased in concrete our preference is to use trenching with backfill of native soil and not directional boring. Please confirm if this method is acceptable.

A. As stated on the drawing and specs this method of trenching with backfill is permitted in lieu of boring. See the specification requirements for details.

Q. With the short turnaround of this information, I just wanted to see if there was any chance the bid date could extend a day or 2.

A. No time extension because we want to award by September 30th.