QASP for Role Players VG 2024.pdf

PDF 988 KB Posted

Attached to
CERFP COLLECTIVE TRAINING EVENT (VIGILANT GUARD)
Solicitation number
W912JA-24-Q-0007
Issued by

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract to provide role players, weighted manikins, and ambulance service support for the 46th CERFP (Alabama) Vigilant Guard (VG) exercise from April 29 to May 2, 2024 in Mobile, Alabama.

The QASP outlines the procedures and guidelines the Alabama USPFO Purchasing & Contracting Division will use to monitor the contractor's performance and ensure the required service levels are achieved. It defines the roles and responsibilities of the Contracting Officer and Contracting Officer's Technical Representative, the performance standards and acceptable quality levels, surveillance techniques including random monitoring and periodic inspection, and the quality assurance documentation and reporting process. The QASP provides a Performance Requirements Summary table and a Quality Assurance Monitoring Form template.

The related federal contract opportunity is Solicitation W912JA-24-Q-0007 issued by the Department of the Army Alabama Army National Guard for the CERFP Collective Training Event (Vigilant Guard). Requests for Information are due by March 28, 2024 and quotes must be submitted by April 12, 2024.

View the file

Other files

File Type Posted
W912JA-24-Q-0007 .pdf PDF
Wage Determination_Mobile County_AL.pdf PDF
Role Player PWS 13Feb2024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

46th CERFP (Alabama) Vigilant Guard (VG)

Role Player, Manikin and Ambulance Service Support

29 April - 02 May 2024 @ Gulf State Fair Grounds

Mobile, Alabama

06 December 2023

TABLE OF CONTENTS

1. INTRODUCTION

1.1 Purpose

1.2 Performance Management Approach

1.3 Performance Management Strategy

2. ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

2.2 The Contracting Officer’s Technical Representative

3. IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

4. METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

4.2 Customer Feedback

4.3 Acceptable Quality Levels

5. QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

5.2 Monitoring Forms

6. ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

6.1 Determining Performance

6.2 Reporting

6.3 Reviews and Resolution

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. Introduction

This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled 46th CERFP (Alabama) Role Player, Weighted Manikin and Ambulance Service Support for 46th CERFP (Alabama) Vigilant Guard (VG ) 29 April-02 May 2024.

This plan sets forth the procedures and guidelines Alabama USPFO Purchasing & Contracting Division will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.

1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

1.2 Performance Management Approach

1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by Alabama USPFO Purchasing & Contracting Division to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints.

The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continually improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

1.3 Performance Management Strategy

1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

2. Roles and Responsibilities

2.1 The Contracting Officer

The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Alabama USPFO Purchasing & Contracting Division and the contractor. The CO will designate one full-time COR, CPT Jordan Mims, as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.

2.2 The Contracting Officer’s Technical Representative

The contracting officer’s technical representative (COTR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COTR limitations are contained in the written appointment letter. The COTR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COTR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COTR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

3. Identification of Required Performance Standards/Quality Levels The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary. If the contractor meets the required service or performance level, it will be paid the full amount agreed on in the contract once the service is completed. Failure to meet the required service or performance level will result in a deduction from the full amount to be paid to the contractor.

4. Methodologies to Monitor Performance

4.1 Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:

Random monitoring - shall be performed by the COTR/COR designated inspector.

100% Inspection - Each month, the COTR/COR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.

Periodic Inspection - COTR/COR typically performs the periodic inspection on a monthly basis.

4.2 Customer Feedback

The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR CPT Jordan Mims, as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly in writing with the detailed nature of the complaint, and must be signed and forwarded to the COTR/COR. The COTR/COR will accept those customer complaints and investigate each issue.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

4.3 Acceptable Quality Levels

The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving Role Players, the desired performance level is established at 95 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at 46th CERFP (Alabama) Vigilant Guard Mobile, Alabama.

5. Quality Assurance Documentation

5.1 The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes.

Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.

5.2 Monitoring Forms

The government’s QA surveillance, accomplished by the COR CPT Jordan Mims, will be reported using the monitoring forms in Attachments 2. The form, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results of 95 percent support of Role Players for 46th CERFP (Alabama) Vigilant Guard are being achieved.

5.2.1 The COR, CPT Jordan Mims, will retain a copy of all completed QA surveillance forms.

6. Analysis of Quality Assurance Assessment

6.1.1 Determining Performance

6.1.2 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. Failure to provide the number of required personnel in the Performance Work Statement will result in failure to comply with the contract.

6.2 Reporting

6.2.1 At the end of each month the COR, CPT Jordan Mims, will prepare a written report for the Alabama USPFO Purchasing & Contracting Division summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling issues.

6.3 Reviews and Resolution

6.3.1 The Alabama USPFO Purchasing & Contracting Division may require the contractor’s project manager, or a designated alternate to meet with the COR CPT Jordan Mims and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR, CPT Jordan Mims, will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR CPT Jordan Mims as often as required or per the contractor’s request. The agenda of the reviews may include:

Monthly performance assessment data and trend analysis

Issues and concerns of both parties

Projected outlook for upcoming 46th CERFP (Alabama) Vigilant Guard 29 April-02 May 2024 and progress against expected trends, including a corrective action plan analysis

Recommendations for improved efficiency and/or effectiveness

Project that the contractor will not meet the required number of personnel requested within the PWS.

6.3.2 The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

6.3.3 The COR, CPT Jordan Mims, and contractor should jointly formulate tactical and long- term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the COR.

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

PWS Paragraph Task Performance Standard

Acceptable Quality Levels (AQL)

Surveillance Method / By Whom

5.1 Program

Management

5.1 100 % COR,

CPT Jordan Mims

5.2 Reporting 5.2.2 90% COR Random

5.3 Provide Role Players

& Manikins & etc.

5.3.1.1 100 % COR Verified

CPT Jordan Mims

5.4 Closeout Reports &

AAR Comments

5.4.2 100 % COR, Verified

CPT Jordan Mims

5.5 Provide

Ambulance

Service

5.5.1.5 100 % COR,

CPT Jordan Mims

ATTACHMENT 2: QUALITY ASSURANCE

MONITORING FORM

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Sampling 100% Inspection Periodic Inspection Customer Complaint

LEVEL OF SURVEILLANCE (Check):

Monthly Quarterly As needed

PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: %

Service Provider’s Performance (Check): Meets Standards

Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: DATE:

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
TABLE OF CONTENTS
1. Introduction
1.1 Purpose
1.2 Performance Management Approach
1.3 Performance Management Strategy
2. Roles and Responsibilities
2.1 The Contracting Officer
2.2 The Contracting Officer’s Technical Representative
3. Identification of Required Performance Standards/Quality Levels
4. Methodologies to Monitor Performance
4.1 Surveillance Techniques
4.2 Customer Feedback
4.3 Acceptable Quality Levels
5. Quality Assurance Documentation
5.1 The Performance Management Feedback Loop
5.2 Monitoring Forms
6. Analysis of Quality Assurance Assessment
6.1.1 Determining Performance
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
LEVEL OF SURVEILLANCE (Check):
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: %
Observed Service Provider Performance Measurement Rate: % Service Provider’s Performance (Check): Meets Standards

File details come from the government source that posted it. Updated .