QASP.pdf
PDF 295 KB Posted
- Attached to
- F-16 Traveling Wave Tube
- Solicitation number
- FA825121R0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA825121R0005.pdf | ||
| CPI_DD254.pdf | ||
| SPI_F013415198.pdf | ||
| Transportation.pdf | ||
| Packaging_Requirements.pdf | ||
| ID_5198.pdf | ||
| Packagin_SOW.pdf | ||
| IUID_5198.pdf | ||
| PWS.pdf | ||
| CDRL-1.pdf | ||
| JQRS.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
24 Nov 2020 For:
DEPARTMENT OF THE AIR FORCE
OGDEN AIR LOGISTICS CENTER (AFMC)
HILL AFB, UTAH 84056-5609
TYPE OF WORK:
Repair
EQUIPMENT:
F-16 APG-68 Traveling Wave Tube
Written by:
Program Manager: Rustin Neilson
Quality Assurance Surveillance Plan
For Repair of the F-16 APG-68 Traveling Wave Tube
Purpose: The purpose of this Quality Assurance Surveillance Plan (QASP) is to identify the methods and procedures the Government will use to ensure it receives the services to be put under contract as identified in the Performance-based Work Statement (PWS) for the F-16 APG-68 Traveling Wave Tube. This plan is established to evaluate contract requirements and contractor's actions during the life of the contract and is designed to provide an effective method of measuring the quality and improvement of the component repair effort.
All specific contractor requirements shall be identified / authorized by individual delivery orders and the PWS. The Defense Contract Management Agency (DCMA) is delegated quality assurance responsibilities under this QASP. DCMA will act as the Contracting Officer
Representative (COR) and participate in the surveillance of the contractor IAW their approved surveillance plans.
Award of requirement will result in a 2 year, firm fixed price, contract for the repair of the F-16 APG-68 Traveling Wave Tube. Estimate of requirements is 20 assets per year for a total of 40 assets over the life of the contract.
Roles and Responsibilities of the Government Multi-function Team: The Multi-functional
Team (MFT) has developed this QASP as an avenue to develop a solid communications tool in which the government and contractor will collectively ensure that quality products are returned to the Air Force inventory within cost and schedule. The multi-functional team will remain a collective group throughout the life of the contract. Team members are representative of functional areas. The MTF members have specific functional and/or technical responsibilities that may include but are not limited to:
Contracting Officer (CO) -Contract management
Program Manager (PM) - Requirements, Asset delivery schedule, CDRLs, Quality Assurance
Production Management Specialist (PMS) -Asset delivery schedule, CAV reporting
Engineer - Technical data
Equipment Specialist (ES) - Tech/Maintenance Data, Defense Repair Information Logistics
System (DRILS)
Material Manager (MM) - Requirements, Asset delivery schedule, Inventory posture
DCMA Quality Assurance Specialist (COR) - Quality assurance
Performance Assessment of the Contractor:
Surveillance of contractor actions will be inspected and monitored IAW the DCMA's
Surveillance Plan.
A summary of any unacceptable ratings will be recorded and provided to the CO at Ogden OO-
ALC.
The contractor is responsible to ensure all-inclusive management of the quality control requirements are accomplished as outlined in the contract. This includes the establishment of a viable quality control program, detailed inspection programs, monitoring actions and effective corrective actions.
The contractor will be evaluated by surveillance of members of the MFT through inspections and/or reviews of required documents.
Surveillance will be accomplished by DCMA's surveillance plans. DCMA will review and document all complaints along with resolution of such complaints with the documentation becoming a permanent part of the surveillance records.
If at any time during the surveillance period, the results of the surveillance show that the number of unacceptable observations during the period exceeds the performance threshold, and it is determined that it is not government caused, the DCMA ACO notifies the CO in writing. The
CO and Contractor will evaluate the situation and negotiate consideration for unacceptable performance. The authority used is the Inspection of Services Clause.
All negative comments/actions/reviews will be dealt with IAW contractual arrangements.
Performance Management of Contract:
If at any time during the period of performance, the results of surveillance show that the number of unacceptable observations during the period exceeds the performance threshold, and it is determined that it is not government caused, the DCMA ACO will notify the assigned CO. The
CO will evaluate the situation discuss and discuss remedies to improve performance, negotiate consideration for unacceptable performance, and otherwise assert the Government's contractual rights when necessary.
Signature
Signatures:
Name / Title / Office
Rustin Neilson
Program Manager
416 SCMS/GUMAD
Travis Stephens Procurement Contracting Officer
AFMC OL:H/PZABB
Steven Lefevre
Engineer
416 SCMS/GUEAA
Christopher Tatro
Equipment Specialist
416 SCMS/GUMAD
Jennifer Gage Material Management Specialist
416 SCMS/GUMAD
Darin Denaughel
Production Management Specialist
416 SCMS/GUMAA
| 2020-11-24T07:58:06-0700 | |
| NEILSON.RUSTIN.L.1261010042 |
| 2020-11-24T09:14:24-0700 | |
| STEPHENS.TRAVIS.JAY.1048156360 |
| 2020-11-24T10:01:21-0700 | |
| LEFEVRE.STEVEN.R.1231476250 |
| 2020-11-24T10:20:39-0700 | |
| TATRO.CHRISTOPHER.L.1253440992 |
| 2020-11-24T10:55:21-0700 | |
| GAGE.JENNIFER.LYNN.1384281512 |
| 2020-11-24T10:49:07-0700 | |
| DENAUGHEL.DARIN.A.1513327761 |
File details come from the government source that posted it. Updated .