QALI21-51268.pdf
PDF 120 KB Posted
- Attached to
- U-2 Remanufacture Federal contract opportunity
- Solicitation number
- FA821321R3043
About this file
This document contains a quality assurance letter of instruction and planning requirements for a federal contract. Universal Propulsion Company, Inc. (UPCO), Cage Code: 17610, is the sole source recipient of a contract to procure remanufactured explosive systems parts for the U-2 Weapon System from the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base. The contract requires UPCO to impose specific DCMA inspection points into work orders for critical flight items and identify such work orders on folders. Inspection requirements include witnessing, verifying documentation such as manufacturing plans and test reports, monitoring testing, and notifying DCMA of any additional imposed requirements. The quality assurance letter also specifies processes for validating explosive weight and leak tests, reviewing radiographic film and selecting lots for laboratory acceptance testing, ensuring proper test equipment calibration, verifying packaging and hazardous materials certification, and notifying the project engineer for additional DCMA requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment FA821321R3043 001.pdf | ||
| SPI F01-167-6621.pdf | ||
| SOW Appendix A 4-27-21.pdf | ||
| SOW SPI.pdf | ||
| Item Description015194094.pdf | ||
| CDRLS21-51268.pdf | ||
| Item Description015193366.pdf | ||
| CADPAD Item Mark InstrVer1.5-20190501.pdf | ||
| 807 NEW015193361.pdf | ||
| 807 NEW015193366.pdf | ||
| FA821321R3043.pdf | ||
| JA FD2020-21-51268_U2 Reman (all signed).pdf | ||
| FORM 158 FD2020-21-51268.pdf | ||
| Item Description015193361.pdf | ||
| CPM Original SPREADSHEET.xls | XLS spreadsheet | |
| GFP Approval.pdf | ||
| 807 NEW015194094.pdf | ||
| 807 NEW015193370.pdf | ||
| SPI F01-519-4094.pdf | ||
| Item Description015193370.pdf | ||
| REPSHIP 11 Mar 14.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name CAGE code
DCMA QAR Reviewer
Date Review Completed
Date Issued to Contractor
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.
All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)
Monitor - R: Will monitor testing, may reduce to verification
Notify - N: By phone or email
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
Concurrence Signature by QAR/DCMA:
QAR/DCMA
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer
Date
Sheet1
| Contract No: 21-51268 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: U-2 |
| DODIC: JM46, JM55, JM57, JM58 |
| undefined: V |
| undefined_2: V |
| undefined_3: V |
| undefined_4: M |
| undefined_5: W |
| undefined_6: V |
| undefined_7: V |
| undefined_8: V |
| undefined_9: N |
| undefined_10: |
| undefined_11: |
| undefined_12: |
| Text19: Collins Aerospace |
| Text20: 17610 |
| Text21: |
| Text22: |
| Text23: |
| Text24: 1.Inspection |
| Text25: 2. Leak Test |
| Text26: 3. X-Ray/N-Ray |
| Text27: 4. LAT Sample Selection |
| Text28: 5. LAT |
| Text29: 6. Preparation for Shipment |
| Text30: 7. AMMO Data Card Review |
| Text31: 8. Shippers (DD250, DD1149, Reports) |
| Text32: 9. Additional Requirements |
| Text33: |
| Text34: |
| Text35: |
| Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements. |
2. Verify gross/fine leak checks are performed per ATP requirements
3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.
| 2021-04-08T09:50:08-0600 | |
| TANNER.MATTHEW.W.1379435919 |
| Text46: 2021-04-08 |
| Text49: |
| Type name_1: |
| Type name_4: |
| Part Number: |
| Noun: SO5-10109-14, SO4-10024-530, SO4-10009-13, SO4-10008-13 |
File details come from the government source that posted it. Updated .