About this file

This document contains a quality assurance letter of instruction and planning requirements for a federal contract. Universal Propulsion Company, Inc. (UPCO), Cage Code: 17610, is the sole source recipient of a contract to procure remanufactured explosive systems parts for the U-2 Weapon System from the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base. The contract requires UPCO to impose specific DCMA inspection points into work orders for critical flight items and identify such work orders on folders. Inspection requirements include witnessing, verifying documentation such as manufacturing plans and test reports, monitoring testing, and notifying DCMA of any additional imposed requirements. The quality assurance letter also specifies processes for validating explosive weight and leak tests, reviewing radiographic film and selecting lots for laboratory acceptance testing, ensuring proper test equipment calibration, verifying packaging and hazardous materials certification, and notifying the project engineer for additional DCMA requirements.

View the file

Other files for this federal contract opportunity

Other files attached to U-2 Remanufacture, newest first.
File Type Posted
Amendment FA821321R3043 001.pdf PDF
SPI F01-167-6621.pdf PDF
SOW Appendix A 4-27-21.pdf PDF
SOW SPI.pdf PDF
Item Description015194094.pdf PDF
CDRLS21-51268.pdf PDF
Item Description015193366.pdf PDF
CADPAD Item Mark InstrVer1.5-20190501.pdf PDF
807 NEW015193361.pdf PDF
807 NEW015193366.pdf PDF
FA821321R3043.pdf PDF
JA FD2020-21-51268_U2 Reman (all signed).pdf PDF
FORM 158 FD2020-21-51268.pdf PDF
Item Description015193361.pdf PDF
CPM Original SPREADSHEET.xls XLS spreadsheet
GFP Approval.pdf PDF
807 NEW015194094.pdf PDF
807 NEW015193370.pdf PDF
SPI F01-519-4094.pdf PDF
Item Description015193370.pdf PDF
REPSHIP 11 Mar 14.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or email

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 21-51268
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: U-2
DODIC: JM46, JM55, JM57, JM58
undefined: V
undefined_2: V
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: V
undefined_8: V
undefined_9: N
undefined_10:
undefined_11:
undefined_12:
Text19: Collins Aerospace
Text20: 17610
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements.

2. Verify gross/fine leak checks are performed per ATP requirements

3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

2021-04-08T09:50:08-0600
TANNER.MATTHEW.W.1379435919
Text46: 2021-04-08
Text49:
Type name_1:
Type name_4:
Part Number:
Noun: SO5-10109-14, SO4-10024-530, SO4-10009-13, SO4-10008-13