807 NEW015193370.pdf
PDF 88 KB Posted
- Attached to
- U-2 Remanufacture Federal contract opportunity
- Solicitation number
- FA821321R3043
About this file
This document contains recommended quality assurance provisions and special inspection requirements for a sole source procurement of remanufactured items for the U-2 weapons system by the Department of the Air Force Materiel Command Lifecycle Management Center. The procurement includes 80 initiators with part number S04-10008-13, 20 initiators with part number S04-10009-13, and 32 initiators with part numbers S04-10024-530 and S05-10109-14. Source inspection is required due to safety and quality concerns with munitions items. Universal Propulsion Company, Inc. with Cage Code 17610 will remanufacture the specified items as the incumbent under solicitation number FA821321R3043.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment FA821321R3043 001.pdf | ||
| SPI F01-167-6621.pdf | ||
| SOW Appendix A 4-27-21.pdf | ||
| SOW SPI.pdf | ||
| Item Description015194094.pdf | ||
| CDRLS21-51268.pdf | ||
| QALI21-51268.pdf | ||
| Item Description015193366.pdf | ||
| CADPAD Item Mark InstrVer1.5-20190501.pdf | ||
| 807 NEW015193361.pdf | ||
| 807 NEW015193366.pdf | ||
| FA821321R3043.pdf | ||
| SPI F01-519-4094.pdf | ||
| Item Description015193370.pdf | ||
| REPSHIP 11 Mar 14.pdf | ||
| JA FD2020-21-51268_U2 Reman (all signed).pdf | ||
| FORM 158 FD2020-21-51268.pdf | ||
| Item Description015193361.pdf | ||
| CPM Original SPREADSHEET.xls | XLS spreadsheet | |
| GFP Approval.pdf | ||
| 807 NEW015194094.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECOMMENDED QUALITY ASSURANCE PROVISIONS
AND SPECIAL INSPECTION REQUIREMENTS
1. PR / MIPR NUMBER
2. NATIONAL STOCK NUMBER
1377015193370ES
3. POINT OF INSPECTION
SOURCE DESTINATION
X
SEE DFARS 246.402
4. POINT OF ACCEPTANCE
SOURCE DESTINATION
X
5. ITEM MANAGER / PHONE
Umbaugh, Brian S / 801-586-2328
6. EQUIPMENT SPEC / PHONE
Shimer, Richard B / 801-777-3421
7. CONTRACT QUALITY REQUIREMENTS/SPECIAL INSPECTION REQUIREMENTS
CERTIFICATE OF CONFORMANCE
FAR 52.246-15
CONTRACT RESPONSIBILITY
FOR INSPECTION
FAR 52.246-1
STANDARD INSPECTION
FAR 52.246-2,-3,-4,-5 OR -6
AS APPLICABLE TO CONTRACT
X HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS
ISO 9001:2000
COMMERCIAL ITEM INSPECTION
FAR 52.212-4
OTHER (Describe in Block 8)
8. REMARKS
Monk, David BNAME: 26 SEP 2016DATE:
Noun: Initiator, Aneroid Actuated
P/N: SO4-10024-530
NHA: TU/U-2
T.O.: 11P3-20-7
In accordance with AFMCI 23-102, paragraph 14.2.1, the chief engineer has determined source inspection is required for airmunitions procurements. The following statements, submitted by the chief engineer in accordance with FAR 46.402(f), provide further support for source inspection of munitions items: Quality assurance inspection of explosives and munitions items must be completed at the source to reduce the risk of defective or improperly marked explosives reaching the end-user. The safety consequences of a single defective explosive or improperly marked explosive reaching the end-user are very severe. Customers of typical industrial commodities may be able to tolerate a percent defective of 1% - 3%. In the case of explosives procurement, this percent defective may result in the maiming or death of personnel involved in the handling and use of the items. Airmunitions contracts (under $250K) are primarily for delivery of explosive components used in ammunition, precision guided weapons and the ejection seats of combat aircraft. The lives of transportation and combat personnel are directly related to the successful performance these items. Thus, to ensure explosives safety and quality, source inspection is required for this airmunition procurement.
Quality system ISO 9001:2015 is current revision and is acceptable as well as ISO 9001:2008. Other quality systems are acceptable with concurrence of project engineer.
McCormick, Kenneth GNAME: 26 SEP 2016DATE:
Noun: Initiator, Aneroid Actuated
P/N: SO4-10024-530
NHA: TU/U-2
T.O.: 11P3-20-7
In accordance with AFMCI 23-102, paragraph 14.2.1, the chief engineer has determined source inspection is required for airmunitions procurements. The following statements, submitted by the chief engineer in accordance with FAR 46.402(f), provide further support for source inspection of munitions items: Quality assurance inspection of explosives and munitions items must be completed at the source to reduce the risk of defective or improperly marked explosives reaching the end-user. The safety consequences of a single defective explosive or improperly marked explosive reaching the end-user are very severe. Customers of typical industrial commodities may be able to tolerate a percent defective of 1% - 3%. In the case of explosives procurement, this percent defective may result in the maiming or death of personnel involved in the handling and use of the items. Airmunitions contracts (under $250K) are primarily for delivery of explosive components used in ammunition, precision guided weapons and the ejection seats of combat aircraft. The lives of transportation and combat personnel are directly related to the successful performance these items. Thus, to ensure explosives safety and quality, source inspection is required for this airmunition procurement.
8a. OZONE DEPLETING SUBSTANCES (ODS)
X STATEMENT
"I HAVE REVIEWED THE REQUIREMENT, INCLUDING AVAILABLE TECHNICAL DOCUMENTATION, AND BELIEVE THAT IT DOES NOT REQUIRE THE CONTRACTOR USE CLASS I OZONE DEPLETING SUBSTANCES (ODS) IDENTIFIED IN AIR FORCE POLICY, NOR IS IT WRITTEN SO THAT IT CAN
ONLY BE MET BY THE USE OF A CLASS I ODS."
WAIVER (SEE AF FARS 5323)
NOTE: Quality provisions as annotated hereon will not be downgraded without Technical Authority coordination. The Technical Authority must be notified if award selection is made to a new source using Acquisition Method Code (AMC) 3, 4, or 5.
Page 1 of 2AFMC FORM 807, 20060111, V1 Version 6Generated by PRPS using Jasper Reports on 09 Apr 2021
RECOMMENDED QUALITY ASSURANCE PROVISIONS
AND SPECIAL INSPECTION REQUIREMENTS
1. PR / MIPR NUMBER
2. NATIONAL STOCK NUMBER
1377015193370ES
9. QUALITY PRE-AWARD SURVEY
YES NEW SOURCE
X PREVIOUS SOURCEX NO
AFMC PARTICIPATION
RECOMMENDED
10. CODES
A. I&A
B. CQR
G
11. SIGNATURE OF TECHNICAL AUTHORITY
Tanner, Matthew W
ORGANIZATION / SYMBOL
AFLCMC / EBHJ
PHONE
801-777-2926 / 777-2926
DATE
07 APR 2021
Page 2 of 2AFMC FORM 807, 20060111, V1 Version 6Generated by PRPS using Jasper Reports on 09 Apr 2021
File details come from the government source that posted it. Updated .