PWS Standby Generators Camp Santiago Joint Training Center.pdf
PDF 205 KB Posted
- Attached to
- CSJTC Standby Power Generators Federal contract opportunity
- Solicitation number
- W912LR20B0015
- Issued by
- Department of the Army National Guard
About this file
This performance work statement and related federal contract opportunity describe requirements for the purchase and installation of standby generators at Camp Santiago Joint Training Center in Puerto Rico. The Army National Guard seeks a contractor to provide four standby generators ranging in capacity from 60KW to 300KW, including automatic and manual transfer switches, to be installed at various buildings across the facility. The period of performance is 120 calendar days. Interested vendors must visit the site and submit all required documentation by August 20th to receive a bid package for the solicitation scheduled to close on August 24th with award based on price. This is a service-disabled veteran-owned small business set-aside requiring at least 15% of work be performed by the prime contractor's own employees. The North American Industry Classification code is 238210. The not-to-exceed budget is between $250,000 and $500,000.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912LR20B00150001 Solicitation Amendment.pdf | ||
| Questions and Answers.pdf | ||
| SOW Purchase and Installation of Standby Power Generators with Automatic.pdf | ||
| W912LR20B0015 Solicitation.pdf | ||
| Standby Power Generator Bldg 769 Layout.pdf | ||
| Standby Power Generator MEDCOM 589 and 593 Layout.pdf | ||
| Standby Generator Directorate of Logistics Bldgs 28A - 32 and 33 Layout.pdf | ||
| Standby Power Generator Bulk Fuel Distribution Point Bldg 650 - 651 and 652.pdf | ||
| Pre-Bid Conference Slides.pdf | ||
| Standard Form 24.pdf | ||
| Pre-Bid Conference Attendance List.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ver. May 2018
PERFORMANCE WORK STATEMENT (PWS)
FOR
Purchase and Installation of Standby Power Generators with Automatic and Manual
Transfer Switch for Camp Santiago Joint Training Center (CSJTC)
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform the purchase and Installation of Standby Power Generators with Automatic and Manual Transfer Switch for Camp Santiago Joint Training Center (CSJTC) as defined in this PWS.
1.2 Background: The Puerto Rico Army National Guard (PRARNG) Camp Santiago Joint Training Center (CSJTC) requires the purchase and installation of four (4) standby generators with Automatic and Manual Transfer Switch in mission essential facilities to maintain continuous operations as a result of a continuous power outages. CSJTC is the strategic location selected on the Emergency Response Plan as the location for state and federal missions during emergencies. The purpose of this work is to purchase, install and connect a standby generator to each building specified in this PWS, capable of providing 72 hours of continuous operation at 50% building load capacity, that use Low Sulfur Diesel, with a sound attenuated enclosure, and a double wall fuel reserve tank.
1.3 Period of Performance (PoP): The Period of Performance shall be 120 calendar days (4 months).
1.4 General Information:
1.4.1 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award.
After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.
1.4.2 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.3 Recognized Holidays: The following are recognized United States (US) holidays.
The contractor shall not perform services on these days:
1.4.3.1 New Year’s Day: January 1st
1.4.3.2 Martin Luther King, Jr.’s Birthday
1.4.3.3 President’s Day
1.4.3.4 Memorial Day
1.4.3.5 Independence Day: July 4th
1.4.3.6 Labor Day
1.4.3.7 Columbus Day
1.4.3.8 Veteran’s Day: November 11th
1.4.3.9 Thanksgiving Day
1.4.3.10 Christmas Day: December 25th
1.4.4 Place and Performance of Services: The contractor shall provide services between the hours of 0730-1600 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at Camp Santiago Joint Training Center, Salinas, PR at the locations specified in paragraph 5. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons.
When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.4 Reserved
1.4.4.1 Reserved
1.4.4.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.4.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The Government reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the contractor from responsibility for total performance of this contract.
1.4.5 Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.5.1 Reserved
1.4.5.2 Reserved
1.4.5.3 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5.4 Reserved
1.4.5.4.1 Reserved
1.4.5.4.2 Reserved
1.4.5.4.3 Reserved
1.4.5.4.4 Reserved
1.4.5.4.5 Reserved
1.4.5.5 Protection of Personally Identifiable Information (PII). The contractor shall protect all Personally Identifiable Information (PII) encountered in the performance of services in accordance with DFARS 224.103 and DoDD 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractor’s violation of the aforementioned policies, the contractor shall bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals who’s PII has been compromised.
1.4.5.6 AT Level 1 Awareness Training (AT): All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete Level 1 AT within 10 calendar days after contract start date and within 10 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 10 calendar days after completion of training. Level 1 AT is available at http://jko.jten.mil/courses/atl1/launch.html .
1.4.5.7 Reserved
1.4.5.8 Reserved
1.4.5.9 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 10 calendar days of contract award and within 10 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR within 10 calendar days after completion of training.
1.4.5.10 OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 10 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 10 calendar days after completion of training. Level 1 OPSEC training is available at http://cdsetrain.dtic.mil/opsec/.
1.4.5.11 Reserved
1.4.5.12 Reserved
1.4.5.13 Reserved
http://jko.jten.mil/courses/atl1/launch.html http://cdsetrain.dtic.mil/opsec/
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.6.1 Reserved
1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating heavy equipment, Material Handling Equipment (MHE), welding licenses, technical certifications (i.e. electricians), used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. The Government does not provide training to contractor. Contractor must ensure that any personnel performing under a contract are fully trained, licensed, certified and qualified to provide services.
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR Subpart 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.
The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed. The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO/COR within 10 days of an employee’s departure.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17. Contractor shall complete the following online training within 10 calendar days after contract award: Course number is N-US189-HB; available at:
http://jko.jten.mil/.
1.4.12 Reserved
1.4.13 Data Rights: The Government has unlimited rights to all documents/materials produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights. Provide the original documents/materials produced under this contract to the COR 10 days after contract completion.
1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.15 Reserved
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications.
This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.5 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.6 Key Personnel: contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.8 Quality Assurance: The government procedures to verify that services being performed by the contractor are performed according to acceptable standards.
2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 Quality Control: All necessary measures taken by the contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
AR Army Regulation ATCTS Army Training Certification Tracking System AUP Acceptable Use Policy BBP Better Business Practice CDM Concept Development Meeting CCIRs Commander’s Critical Information Requirements CCE Contracting Center of Excellence CFR Code of Federal Regulations CM Contract Manager CNGB Chief National Guard Bureau COMSEC Communications Security CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf CUI Controlled Unclassified Information DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation FEMA Federal Emergency Management Agency FPCON Force Protection Condition FPM Final Planning Meeting FTE Full Time Equivalent HIPAA Health Insurance Portability and Accountability Act of 1996 HQDA Headquarter Department of Army IA Information Assurance IPM Initial Planning Meeting IT Information Technology JFHQ Joint Forces Headquarters JOC Joint Operations Center JTR Joint Travel Regulation JTF Joint Task Force KO Contracting Officer LNO Liaison Officer MHE Material Handling Equipment MOA Memorandum of Agreement MPM Mid-Planning Meeting
MSR Monthly Status Report NACI National Agency Check Inquires NGB National Guard Bureau NLT Not Later Than OCI Organizational Conflict of Interest OCONUS Outside Continental United States ODC Other Direct Costs OPSEC Operations Security PCO Procuring Contracting Officer PII Protection of Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SME Subject Matter Experts TAR Travel Authorization Request TE Technical Exhibit WWAF-RA Wide Area Workflow-Receipt and Acceptance
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):
The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract.
3.1 Property: Government will authorize contractor to an area for material storage.
3.2 Materials: None.
3.3 Equipment: None.
3.4 Services: None.
3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
4.2 Secret Facility Clearance: None
5.0 Requirements:
5.1 The Contractor shall provide non-personal services for standby generators with installation included. The Contractor shall deliver and install four (4) Standby Power Generators with Automatic and Manual Transfer Switch for Camp Santiago Joint Training Center (CSJTC) with the following capacity and to the following locations:
5.1.1 One (1) Single phase, 120/240 volts, 60 Hz Frequency, 400Amps, 125KW Standby diesel Generator, one automatic transfer switch and one manual transfer switch for States Property and Fiscal Office of Puerto Rico (USPFO-PR) – CSJTC Office, Building 769 and Public Affairs Satellite Office Building 770 located at CSJTC, Salinas, PR (refer to Technical Exhibit #3 1. SOW Purchase and Installation of Standby Power Generators with Automatic and Manual Transfer Switch for CSJTC and 2.
Standby Power Generator Bldg 769-Layout).
5.1.2 One (1) Three phase, 120/208 volts, 60 Hz Frequency 1,000Amps, 300KW Standby diesel Generator, one automatic transfer switch and one manual transfer switch for CSJTC Troop Medical Clinic Bldg. 589 and Unaccompanied Housing Bldg.
593 located at CSJTC, Salinas, PR (refer to Technical Exhibit #31. SOW Purchase and Installation of Standby Power Generators with Automatic and Manual Transfer Switch for CSJTC and 3. Standby Power Generator MEDCOM Building 589_593-Layout).
5.1.3 One (1) Single phase, 120/240 volts, 60 Hz Frequency 200Amps, 60KW Standby diesel Generator, one automatic transfer switch and one manual transfer switch for Bulk Fuel Distribution Point Bldgs. 650, 651 and 652 (refer to Technical Exhibit #3,1. SOW Purchase and Installation of Standby Power Generators with Automatic and Manual Transfer Switch for CSJTC and 4.Standby Power Generator Bulk Fuel Distribution Point Bldg 650_651_652-Layout).
5.1.4 One (1) Three phase, 120/208 volts, 60 Hz Frequency 400Amps, 125KW Standby diesel Generator, one automatic transfer switch and one manual transfer switch for CSJTC Directorate of Logistics (DOL), Bldgs. 28A, 32 and 33, Bldg. 23 Billeting Office, and Bldg. 24 Material Warehouse (refer to Technical Exhibit #3,1. SOW Purchase and Installation of Standby Power Generators with Automatic and Manual Transfer Switch for CSJTC and 5.Standby Generator Directorate of Logistics (DOL) Bldgs. 28A, 32 and 33, Bldg. 23 Billeting Office, and Bldg. 24 Material Warehouse DOL Layout).
5.2 Refer to Technical Exhibit #3 for specific technical requirements of this PWS.
5.3 Contractor Manpower Reporting Application (CMRA):
5.3.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Puerto Rico National Guard via a secure data collection site.
5.3.2 The contractor shall completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2020. Contractors may direct questions to the help desk at http://www.ecmra.mil.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
Date of Publication
Mandatory or Advisory
Website
Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar or http://farsite.hill.af.mil/
Defense Federal Acquisition Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current /index.html or http://farsite.hill.af.mil/
DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)
01/23/2014 http://www.esd.whs.mil/Directives/issuances/dod m/
Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and contractors
(paragraph 9)
August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.2 01-2.pdf
Army Directive 2014-05 Policy and Implementation
Procedures for Common Access Card Credentialing and Installation Access for Uncleared contractors
03/07/2014 http://www.apd.army.mil/ProductMaps/PubForm/ ArmyDir.aspx
AR 190-13
The Army Physical Security Program
02/25/2011 http://www.apd.army.mil/ProductMaps/PubForm/ AR.aspx
Homeland Security Presidential Directive (HSPD)-12
Policy for a Common Identification Standard for Federal Employees and contractors
08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12
DoDD 5400.11 Department of Defense Privacy
Program
10/29/2014 http://www.dtic.mil/whs/directives/corres/dir.html#
DoD 5400.11-R Department of Defense Privacy
Program
05/14/2007 http://www.dtic.mil/whs/directives/corres/pub1.htm l http://www.ecmra.mil/ http://www.ecmra.mil/ https://www.acquisition.gov/?q=browsefar http://farsite.hill.af.mil/ http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://farsite.hill.af.mil/ http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://www.apd.army.mil/ProductMaps/PubForm/ArmyDir.aspx http://www.apd.army.mil/ProductMaps/PubForm/ArmyDir.aspx http://www.apd.army.mil/ProductMaps/PubForm/AR.aspx http://www.apd.army.mil/ProductMaps/PubForm/AR.aspx https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12 http://www.dtic.mil/whs/directives/corres/dir.html http://www.dtic.mil/whs/directives/corres/pub1.html
DoDD 8140.01 Cyberspace Workforce Management
08/11/2015 OK http://www.dtic.mil/whs/directives/corres/dir.html
DoD 8570.01-M Information Assurance Workforce
Improvement Program
12/19/2005 (Change 4:
11/10/2015)
OK http://www.dtic.mil/whs/directives/corres/pub1.htm l
AR 25-2
Information Assurance
10/24/2007 OK http://armypubs.army.mil/ProductMaps/PubForm/ AR.aspx
AR 530-1
Operations Security
09/26/2014 OK http://armypubs.army.mil/ProductMaps/PubForm/ AR.aspx
DoD 5220.22-M National Industrial Security Program
Operating Manual
02/28/2006 (Change 2:
05/18/2016)
OK http://www.dtic.mil/whs/directives/corres/pub1.htm l
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
Form Date Website
DD Form 369 Police Record Check Mar 2017 Provided by COR
Submittal Register Provided by COR
Transmittal of Shop Drawings, Equipment Data, Material Samples, or Manuf. Of Certif. Compliance
ENG 4025-R
OSHA Form 300 or Certification of Incidents
Provided by COR http://www.dtic.mil/whs/directives/corres/dir.html http://www.dtic.mil/whs/directives/corres/pub1.html http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
Performance Objective
Performance Standard Acceptable Quality Levels
(AQL)
Surveillance Method / By Whom
1.4.1 Quality
Control
a. Quality of Workmanship
b. Adequacy of the QASP
c. Implementation of the
QASP
d. Quality of QC Documentation
e. Storage of Materials
f. Adequacy of Materials
g. Adequacy of Submittals
h. Adequacy of Testing
i. Adequacy of As-Built
j. Use of Specified Materials
k. Identification/Correction of deficiency works in a timely manner
Meets or exceeds the standards of quality states in the plans and specifications.
Installation Preconference.
Periodic Inspection/
COR
1.4.9 1.4.9 Contract Manager (CM):
(Effectiveness of Management)
a. Cooperation and Responsiveness
b. Management Resources & Personnel
c. Coordination
d. Adequacy of Site Clean-up
e. Effectiveness of Job Site Supervision
f. Compliance with Laws and Regulations
g. Professional Conduct
Coordinate progress meetings and inform Weekly, on Project progress.
Periodic Inspection/
COR
Timely Performance
a. Adequacy of Initial Progress Schedule
b. Adherence of Approved Schedule
c. Submission of Required Documentation
90% Work Schedule on time
Periodic Inspection (35%, 65% and
100%)/ COR
d. Completion of Punch List Items
e. Submission of Updated and Revised Progress Schedules
TECHNICAL EXHIBIT 2
Deliverables Schedule
PWS
Reference /
Deliverable Title
Frequency Number of Copies
Medium/Format Submit To
1.4.1 Quality
Control (QC)
Provide NLT 10 days after contract award.
1 Electronic Submission
COR
1.4.5.6 AT Level
1 Awareness
Training Certificates
Provide within 10 calendar days after employee completes training.
1 Electronic Submission
COR
1.4.5.9 iWatch Training
Certificates
Provide within 10 calendar days after employee completes training.
1 Electronic Submission
1.4.5.10
OPSEC
Training
Certificates
Provide within 10 calendar days after employee completes training.
1 Electronic Submission
COR
1.4.10 Identification of
contractor Employees
Provide within 10 days after contract completion or employee’s departure.
1 Hard Copy COR
1.4.11.
Combating
Trafficking in Persons
Certificate
Provide within 10 calendar days after contract award.
1 Electronic Submission
COR
1.4.13 Data
Rights
Provide the original documents/materials produced under this contract to the COR 10 days after contract completion.
1 Electronic
Work Schedule Work Schedule shall be turned-in within 15 days from the date of the preconstruction meeting in projects exceeding 30 days of duration.
1 Electronic Submission
COR
Safety Plan The Safety Plan shall be turned in within 10 days of contract start date. The plan must assess inherent risks associated with the type of labor to be executed, risk reduction controls, medical evacuation plan (for employees) and courses of action in the event of accidents or incidents related to the construction activities.
1 Electronic Submission
COR
OSHA (40 hour) Training Certificate
Provide a copy of the certificate within 5 days of contract start day.
1 Electronic
Technical Exhibit #3
1- Statement of Work: Building 769 CSJTC 2- Standby Power Generator Bldg 769-Layout 3- Standby Power Generator MEDCOM Building 589_593-Layout 4- Standby Power Generator Bulk Fuel Distribution Point Bldg 650_651_652-Layout 5- Standby Generator Directorate of Logistics (DOL) Bldgs. 28A, 32 and 33, Bldg.
23 Billeting Office, and Bldg. 24 Material Warehouse DOL Layout
File details come from the government source that posted it. Updated .