This is a Notice Inviting Bids and Specification document issued by the Eastern Municipal Water District (EMWD) for the Perris Valley Regional Water Reclamation Facility (PVRWRF) Secondary Clarifiers 5, 6, and 8 Rehabilitation Project located at 1301 Case Rd, Perris, California 92570. The project scope includes removal and replacement of secondary clarifier mechanisms and accessories, including spiral scrapers, center columns, feedwells, floor baffles, bridges, scum troughs, scum baffles, scum weirs, Stamford baffles, and electrical and control elements for three clarifiers. Additional work includes rehabilitation of concrete foundations around center columns and new Return Activated Sludge (RAS) sump installation, concrete surface rehabilitation, effluent trough coating, utility water piping replacement, replacement of existing sluice gates, installation of new stop gates, and miscellaneous improvements. A mandatory pre-bid walk-through is scheduled for Thursday, July 23, 2026, at 9:00 a.m. at the facility, with required RSVP by 12:00 p.m. on Wednesday, July 22, 2026. Electronic bids must be submitted through the District's PlanetBids procurement portal no later than 10:00 a.m. on August 13, 2026. The successful bidder must execute the contract and furnish required bonds within seven calendar days of notice of acceptance. The contract period commences seven calendar days from the Notice-of-Acceptance-of-Proposal, with all work including testing required to be completed within 730 calendar days.
Bidders must be licensed by the State of California as a Classification A General Engineering Contractor at the time of bid and award. The bid consists of 12 line items including mobilization (preset at $750,000), secondary clarifier mechanical equipment, drain and cleaning, rehabilitation work, gate replacement and installation, chlorine solution equipment demolition, CLS piping installation, utility water piping replacement, earthquake insurance, and unforeseen conditions (preset at $300,000 time and materials allowance). A bid bond of not less than 10 percent of the total contract price is required, with performance and payment bonds each equal to 100 percent of the contract amount required upon award. Prevailing wage requirements apply under California Labor Code provisions for Riverside County. All contractors and subcontractors must register with the Department of Industrial Relations and provide certified payroll records. The District will furnish approved shop drawings for secondary clarifier equipment from two pre-selected manufacturers; the contractor must procure equipment using these drawings and develop additional submittals for ancillary components. Bidders must demonstrate 8 years of experience with at least three similar public works projects valued at $5 million or greater involving wastewater treatment plant processes. Iran Contracting Act Certification is required for bids of $1,000,000 or more, and Economic Sanctions Compliance Certification is required for bids of $5,000,000 or more.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Riverside County Perris, California
SPECIFICATION NO. 1592S
PERRIS VALLEY REGIONAL WATER RECLAMATION FACILITY
SECONDARY CLARIFIERS 5, 6, AND 8 REHABILITATION
PROJECT
Project ID # PRJ-26-000633
A PUBLIC WORKS PROJECT
Contents:
Specifications | Notice Inviting Bids | Bidding Requirements | Bid Forms | Contract Forms |
Conditions of Contract
Joe Mouawad, P.E. - General Manager
Safety is of paramount and overriding importance to Eastern Municipal Water District
Access the District Procurement Portal at https://pbsystem.planetbids.com/portal/25577/portal-home to view currently advertised projects https://pbsystem.planetbids.com/portal/25577/portal-home
[PAGE LEFT INTENTIONALLY BLANK]
BLACK & VEATCH CERTIFICATIONS
BLACK & VEATCH – LANE PAGANO – CIVIL
Specifications: 01015, 01140, 01450, 01500, 01610, 01612, 01612-F1, 01612-F2, 01620, 01660, 01680, 01739, 01770, 01790, 01910, 02050, 02200, 02200-F1, 02221, 02704, 02704-S02, 02705, 06600, 09900, 09940, 11435, 14651, 15010, 15011, 15020, 15061, 15062, 15062-F3A, 15062-F3B, 15066, 15067, 15100, 15102, 15104, 15105, 15112, 15114, 15140, 15140A, 15140B, 15180,15250
Professional Engineer License Number: C-86897 Date: __June 19, 2026__
BLACK & VEATCH – MARK LOWE – STRUCTURAL
Specifications: 01611, 01611-2, 03300, 03600, 03920, 03930, 05550, 05590
Professional Engineer License Number: S-3693 Date: __June 19, 2026__
BLACK & VEATCH – PERO VRCELJ – ELECTRICAL
Specifications: 16050, 16100, 16220
Professional Engineer License Number: E-25226 Date: __June 19, 2026__
BLACK & VEATCH – MARCELINO ZAMORA – INSTRUMENTATION AND
CONTROL
Specifications: 13500, 13500A, 13500B, 13563
Professional Engineer License Number: CS-7469 Date: __June 19, 2026__
00010-1 Table of Contents
TABLE OF CONTENTS
BIDDING REQUIREMENTS PAGE
00000 Title Page 00010 Table of Contents 00012 Notice Inviting Bids NIB-1 thru NIB-6 00016 Bid Walk-thru map/directions 00018 Instructions to Bidders B-1 thru -6 00020 Bidding Sheets & Equipment & Material List (submit with bid) BS-1 thru 6 00024 Proposal (7 day) (submit with bid) C3-1 thru -2
00027 Bidder’s Experience Record & Resumes (submit with bid) BR-1 thru -2 00028 Designation of Subcontractors (submit with bid) C5a thru e 00030 Contractor's Licensing Statement (submit with bid) C6-1 thru -2 00032 Non-Collusion Declaration (submit with bid) C7-1 thru -2 00034 Agreement C8a thru d 00036 Performance Bond C9-1 thru -4 00038 Payment Bond C10-1 thru -4 00042 Worker’s Compensation Insurance Certificate C11-1 thru -2 00046 Iran Contracting Act Certification (submit with bid if over $1 million) C13-1 thru -4 00047 Economic Sanctions in Response to Russia Form (submit with bid if over $5 million) C13.1-1 thru -4 00050 Cal-OSHA form 300A (submit with bid) C16-1 thru -2 00052 Contractor’s Cal Osha Compliance History and SIC Code (submit with bid) C17-1 thru -2 00056 Employee Safety & Health Training Records C19-1 thru -2 00057 Public Works Contractor Registration C22-1 thru -2 00058 Contractor’s Proof of Insurance Certificate (submit with bid) C23-1 thru -2 00059 Contractor’s Mobile Source Acknowledgement Form (submit with bid) C24-1 thru -4
GENERAL CONDITIONS
00062 Section E, Inspection & Tests E-1 thru E-2
00064 Section F, Labor & Construction F-1 thru F-60
Includes Exhibit A – Escrow Agreement 00066 Section H, Permits H-1 thru H-2
SPECIAL CONDITIONS
00100 Special Conditions SC-1 thru SC-20
CONTRACT DRAWINGS
00200 Section P Standard & Construction Drawings (list) P-1 thru P-1
00010-2 Table of Contents
EMWD DETAILED PROVISIONS
01026 Schedule of Values 1 thru 8 01310 Project Control Schedule 1 thru 16 01381 Pre-Construction Audio Video Recording 1 thru 6 01430 Maintenance Manual Requirements 1 thru 12 02513 Asphalt Concrete Paving 1 thru 8 03150 Formwork for Cast-in-Place Concrete 1 thru 8 07920 Sealants and Caulking 1 thru 8
CUSTOM TECHNICAL SPECIFICATIONS
01015 Work Covered by Contract Documents 1 thru 4 01140 Work Restrictions 1 thru 14 01450 Quality Control 1 thru 4 01500 Temporary Facilities and Controls 1 thru 8 01610 General Equipment Stipulations 1 thru 8 01611 Meteorological and Seismic Design Criteria 1 thru 4 01612 Product Delivery Requirements (figures 1 & 2) 1 thru 4 01620 Equipment Schedule 1 thru 2 01660 Product Storage and Handling Requirements 1 thru 4 01680 Equipment and Valve Identification 1 thru 4 01739 Equipment Installation 1 thru 4 01770 Closeout Procedures 1 thru 6 01790 Demonstration and Training 1 thru 4 01910 Commissioning 1 thru 16 02050 Demolition and Salvage 1 thru 4 02200 Excavation and Fill for Structures 1 thru 22 02200-F1 Temporary Earth Retention System Design Certificate 1 thru 2 02221 Trenching, Backfilling, and Compacting 1 thru 14 02704 Pipeline Pressure and Leakage Testing 1 thru 6 02704-S02 Plant Piping Test Pressure Schedule 1 thru 2 02705 Internal Pipeline Cleaning and Inspection 1 thru 18 03150 Formwork for Cast-in-Place Concrete 1 thru 8 03300 Cast-in-Place Concrete 1 thru 38 03600 Grouting 1 thru 4 03920 Concrete Surface Repair 1 thru 14 03930 Concrete Crack Repair 1 thru 8 05550 Anchorage in Concrete and Masonry 1 thru 8 05590 Structural Metals 1 thru 6 06600 Fiberglass Reinforced Fabrications 1 thru 6 09900 Painting and Protective Coatings 1 thru 34 09940 Solvent Free Epoxy 1 thru 8 11435 Secondary Wastewater Treatment Clarifier Equipment 1 thru 26 13500 Instrumentation and Control System 1 thru 22 13500A Instrument Device Schedule (Attachment) 1 thru 2
00010-3 Table of Contents
13500B Input Output Schedule (Attachment) 1 thru 2 13563 Level Instruments 1 thru 4 14651 Portable Hoisting Equipment 1 thru 6 15010 Valve Installation 1 thru 4 15011 Gate Installation 1 thru 4 15020 Miscellaneous Piping and Accessories Installation 1 thru 14 15061 Ductile Iron Water Pipe and Fittings 1 thru 26 15062 Steel Pipe 1 thru 34 15062-F3A Field-Welded Lap joint Detail – Double Welded Bell 1 thru 2 15062-F3B Field-Welded Lap Joint – Single Welded Bell 1 thru 2 15066 Stainless Steel Pipe and Alloy Pipe, Tubing, and Accessories 1 thru 6 15067 Miscellaneous Plastic Pipe, Tubing, and Accessories 1 thru 4 15100 Miscellaneous Valves 1 thru 4 15102 Resilient Seated Gate Valves 1 thru 6 15104 Ball Valves 1 thru 2 15105 Eccentric Plug Valves 1 thru 6 15112 Stainless Steel Slide and Sluice Gates 1 thru 10 15114 Stop Gates 1 thru 6 15140 Pipe Supports 1 thru 14 15140A Hangers and Supports Details 1 thru 2 15140B Pipe Supports Details 1 thru 2 15180 Valve and Gate Actuators 1 thru 10 15250 Mechanical Insulation 1 thru 12 16050 Electrical 1 thru 32 16100 Electrical Equipment Installation 1 thru 12 16220 Common Motor Requirements for Process Equipment 1 thru 10
APPENDICES (Provided in a separate file)
Appendix A Submittals / Shop Drawings (Will be issued to the awarded Contractor) Appendix B Secondary Clarifier Vendor Contract (Will be issued via addendum) Appendix C Asbestos and Heavy Metal Testing Results (Will be issued via addendum) Appendix D PVRWRF Plant 2 As-Builts (Spec 463S) Appendix E PVRWRF Plant 2 Secondary Clarifier No. 8 As-Builts (Spec 888S) Appendix F PVRWRF Expansion Plant 3 As-Builts (Spec 1007S) Appendix G PVRWRF Plant 3 Expansion Geotechnical Report
00010-4 Table of Contents
NIB-1 00012 Notice Inviting Bid
EASTERN MUNICIPAL WATER DISTRICT
SPECIFICATION NO. 1592S
PERRIS VALLEY REGIONAL WATER RECLAMATION FACILITY SECONDARY CLARIFIER
5, 6 AND 8 REHABILITATION
NOTICE INVITING BID
NIB-1. Receipt of Bids. Electronic proposals (bids) for this project to be submitted through the District’s Procurement Portal at https://pbsystem.planetbids.com/portal/25577/portal-home. Interested contractors intending to submit a bid must register as a Vendor with the District Procurement Portal (or already be registered).
The Bid Bond shall be submitted electronically through PlanetBids utilizing Surety 2000.
Scanned pdf’s and mailed originals will not be accepted.
Proposals and Bid Bond (completed through Surety 2000) shall be submitted no later than 10:00 a.m. AUGUST 13, 2026.
Bid results will be available in PlanetBids once time for receiving bids has expired.
NIB-2. Contract Documents. The contract documents, which include instructions to bidders, plans and specifications are available on the District’s Procurement Portal at https://pbsystem.planetbids.com/portal/25577/portal-home. To view and download these documents interested contractors must register as a Vendor with the District Procurement Portal (or already be registered). Bidders shall use full size drawings to prepare bid.
NIB-3. Location and Description of Work. The work to be constructed is located at Perris Valley Regional Water Reclamation Facility, 1301 Case Rd, Perris, CA 92570.
Under these Specifications the Contractor shall perform the construction of the Perris Valley Regional Water Reclamation Facility Secondary Clarifier 5, 6 and 8 Rehabilitation. The scope of work for this project primarily includes, but is not limited to, the following:
1. Removal and replacement of secondary clarifier mechanisms and accessories within existing Secondary Clarifier Nos. 5, 6, and 8 at the Perris Valley Regional Water Reclamation Facility (PVRWRF), including new spiral scrapers, center column, feedwell, floor baffle, bridge, scum trough, scum baffle, scum weir, Stamford baffle, and electrical and control elements.
2. The District has shortlisted two secondary clarifier mechanism manufacturers, which shall be used without equal. The District has entered into contracts with both manufacturers to obtain approved shop drawings (only) for the secondary clarifier equipment to expedite the schedule.
https://pbsystem.planetbids.com/portal/25577/portal-home
NIB-2 00012 Notice Inviting Bid
The Contractor shall procure the secondary clarifier equipment using the approved shop drawings. The Contractor shall review the approved shop drawings and develop additional submittals as required for ancillary component associated with the clarifiers, which were not previously covered. The treatment plant must be kept in operation at all times, so only one clarifier may be worked on at a time.
3. Removal and replacement of the concrete foundation around the center columns and new RAS sump.
4. Rehabilitation of the existing concrete surface of the secondary clarifiers, as required.
5. Coating of the secondary clarifier effluent trough, as indicated on the contract drawings.
6. Replacement of the utility water piping supplying the secondary clarifiers.
7. Replacement of existing sluice gates upstream of Secondary Clarifier Nos. 5, 6, and 8.
8. Installation of new stop gates upstream of Secondary Clarifier Nos. 5, 6, and 8.
9. Miscellaneous improvements to the secondary clarifiers, as shown on the drawings or listed in the specifications.
Quantities are approximate. Bidders are responsible to verify actual quantities from the detailed design drawings to accurately calculate quantity take-offs.
NIB-4. Mandatory Pre-Bid Walk-Through will be conducted by EMWD on THURSDAY, JULY 23, 2026 starting at 9:00 a.m. Please RSVP to attend the walk-thru via PlanetBids when adding your company as a perspective bidder under the Pre-Bid Meeting RSVP no later than 12:00 p.m. WEDNESDAY, JULY 22, 2026.
Walk Thru: meeting at Perris Valley Regional Water Reclamation Facility, 1301 Case Rd, Perris, CA 92570. The Map and directions to the walk-through meeting location are provided in Section 00016.
Please arrive promptly! All bidders must have an employee of their firm sign-in and attend the mandatory pre-bid walk-through meeting. Failure to do so shall deem your bid non-responsive.
Personal Protective Equipment (PPE). For your safety, attendees shall bring and wear hard hats, safety vests, and close-toed shoes, if construction is present.
QUESTIONS: All questions must be submitted through PlanetBids by 5:00 p.m. on Tuesday, July 28, 2026. Please Note: Questions will be answered via Addendum only. Questions received after the deadline will be accepted. However, we do not guarantee that there will be a response to the question. Responses will be on a case-by-case basis.
NIB-5. Contract Bonds. All bonds shall be executed by admitted surety insurers, as defined in Code of Civil Procedure section 995.120. Each proposal must be accompanied by a certified check or satisfactory surety bond (by utilizing Surety 2000) for not less than 10% of the bidder's total contract price as a guarantee that the bidder shall, within seven (7) days
NIB-3 00012 Notice Inviting Bid after the mailing of a notice of acceptance of bid by the District to the bidder, enter into the written contract supplied by the District. The District shall return the bid bond, upon request.
The Contractor shall furnish a faithful performance bond in an amount equal to 100% of the amount of the contract and a labor payment bond in an amount equal to 100% of the contract amount.
Pursuant to Section 995.660(a) of the Code of Civil Procedure, the Contractor shall submit the following documents with the performance and payment bonds:
(1) The original, or a certified copy, of the unrevoked appointment, power of attorney, bylaws, or other instrument entitling or authorizing the person who executed the bond to do so;
(2) A certified copy of the certificate of authority of the insurer issued by the State of California’s Insurance Commissioner; and
(3) Copies of the insurer's most recent annual and quarterly statements filed with the Department of Insurance.
NO PAYMENT SHALL BE MADE UNTIL THE BONDS ARE APPROVED BY THE DISTRICT
NIB-6. Safety. Safety of all activities in connection with the work is of paramount and overriding importance to the District. The District is recognized by the California Occupational Safety and Health Administration (Cal OSHA) as an active participant in the California Voluntary Protection Program (Cal VPP). The District is designated a Cal STAR site due to our high-level commitment to safety. Bidders on this project will be required to comply with and meet all applicable Cal OSHA requirements of Title 8 of the California Code of Regulations, including their current Injury and Illness Prevention Plan, T8 CCR Section 3203.
All bidders shall complete the C-16 Annual Summary of Work Related Injuries and Illness (Cal/OSHA Form 300A) and the C-17 Contractor’s Cal/OSHA Compliance History and SIC Code form. Failure to fully divulge, complete and submit these forms may deem your bid non-responsive
A safety conference shall be scheduled prior to the preconstruction conference to review the experience modification rating, the respective safety requirements, and to discuss implementation of all health and safety provisions related to this project.
NIB-7. Contract Time. No bid or bid security may be withdrawn for ninety (90) calendar days after the date bids are received. The successful bidder shall, within seven (7) calendar days after the District mails a notice of acceptance of bid, return the signed agreement and bonds, and attend the pre-construction conference at the District office. The contract period shall commence seven (7) calendar days from the date of the Notice-of-Acceptance-of- Proposal. The Contractor shall complete all work, including testing, within seven hundred thirty (730) calendar days.
NIB-4 00012 Notice Inviting Bid
NIB-8. Contractor Classification. Bidders on this work will be required to be licensed by the State of California as Classification A - General Engineering Contractor at the time of the bid and at the time of award as such license is defined in Section 7056 and/or Section 7058 of the Business and Professional Code and Section 732 of the California Administrative Code.
NIB-9. Non-Discrimination. Bidders on this work will be required to comply with the provisions of the California Labor Code and with the President's Executive Order No. 11246 and supplements thereto. The requirements for bidders and contractors under this order are explained in the specifications.
NIB-10. Minimum Wages. In accordance with the provisions of the California Labor Code, the Director of Industrial Relations has ascertained the general prevailing rates of wages and the general prevailing rates for legal holiday and overtime work in Riverside County (refer to Section F-General Conditions). Copies of said rates are on file at the office of the District, which copies shall be made available for review to any interested party on request. The successful bidder shall post a copy of such determinations at the jobsite.
NIB-11. Public Works Requirements California Administrative Code, Title 8, Group 3, Section 16100 apply, which are/include:
A. all applicable requirements of sections 1771, 1774 - 1776, 1813, and 1815.
B. the appropriate number of apprentices are on the job site, as set forth in Labor Code
Section 1777.5.
C. workers' compensation coverage, set forth in Labor Code Sections 1860 and 1861.
D. to keep accurate records of the work performed on the public works project, as set forth in Labor Code Section 1812.
E. inspection of payroll records pursuant to Labor Code Section 1776, and as set forth in
Section 16400 (e) of these regulations.
F. and other requirements imposed by law.
NIB-12. Public Works Contractor and Subcontractor Registration. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
No contractor or subcontractor may be listed on a bid proposal or be awarded a contract for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
BIDDERS AND THEIR SUBCONTRACTORS (listed on the Designation of Subcontractors List C-
05) Bidders are to provide their DIR # and Expiration Date as well as all listed Subcontractors from the Public Works Contractor Registration online registration at:
https://services.dir.ca.gov/pw https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fservices.dir.ca.gov%2Fpw&data=05%7C02%7Cmorgensj%40EMWD.ORG%7C16bfce5c7a004617068208de9190c26f%7Cf7112bcf929c48f7bf407231589cba03%7C0%7C0%7C639108248276508866%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=vfFZpd8mb9QbaJDQw19cQC4dLX8PTl4zfDiaj5lDEX8%3D&reserved=0
NIB-5 00012 Notice Inviting Bid
All contractors and subcontractors, including soils, survey and inspection services must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement). Additionally, the awarded Contractor shall submit certified payroll records to the District.
In addition, awarded Contractor must post jobsite notices prescribed by regulations.
NIB-13. Ineligibility of Contractor or Subcontractor. Pursuant to Section 1777.1 and 1777.7 of the Labor Code, any contractor or subcontractor who is found by the Labor Commissioner to be in violation of certain provisions of law and is debarred for a specific period of time, is ineligible to bid or work on, or be awarded, a public works contract.
NIB-14. Substitution of Securities. Substitution of securities shall be permitted for any monies withheld to ensure contract performance, in accordance with the provisions of law and Section F-General Conditions of the contract specifications.
NIB-15. No Equal Clause. The application of California Public Contract Code Section 3400 (b) applies. The District’s Board of Directors has authorized the General Manager to approve purchase and installation of certain equipment, material and services which has been designated sole-sourced and as no-equal in order to match other equipment and services already completed or in the course of construction.
Eastern Municipal Water District
Joe Mouawad, P.E.
General Manager
Official Bid Publication through EMWD Procurement Portal:
https://pbsystem.planetbids.com/portal/25577/portal-home
Posted date: July 15, 2026
NIB-6 00012 Notice Inviting Bid
00016 Pre-Bid Walk-Thru Map/Directions
Mandatory Pre-Bid Walk-thru Map and Directions
Pre-bid walk through will be held at the following location:
Perris Valley Regional Water Reclamation Facility
1301 Case Rd
Perris, California 92570
From the north: Take 215 Freeway south to State Highway 74 East (towards Hemet). Turn right/west on Bonnie Drive and cross Case Road directly to the plant entrance. Go to the facility’s Control Building.
From the south: Take 215 Freeway north to State Highway 74 East (towards Hemet). Turn right/west and go under the freeway. Turn left on Bonnie Drive and cross Case Road directly to the plant entrance. Go to the facility’s Control Building.
00016 Pre-Bid Walk-Thru Map/Directions
Rev:06/04/25 B-1 00018 Instructions to Bidders
INSTRUCTIONS TO BIDDERS
B-01. Form of Proposal and Signature. The proposal shall be submitted on the form provided by the District If the proposal is made by an individual it shall be signed and his full name and address shall be given; if it is made by a Firm it shall be signed with the co-partnership name by a member of the firm, who shall also sign his own name, and the name and address of each member shall be given; and if it is made by a corporation the name of the corporation shall be signed by its duly authorized officer or officers, and the names and titles of all officers of the corporation shall be given.
B-02. Preparation of the Proposal. Blank spaces in the proposal shall be properly filled.
The phraseology of the proposal must not be changed and no additions shall be made to the items mentioned therein. Conditions, limitations or provisos attached to a proposal will cause its rejection. Alterations by erasure or interlineation must be explained or noted in the proposal over the signature of the Bidder. Alternative proposals will not be considered unless specifically provided via Addendum. A Bidder may withdraw his proposal before the hour fixed for opening bids, without prejudice to himself. No proposal received after the time named or at any place other than the place stated in the Notice Inviting Bids (or Bidding Information sheet) will be considered. All bids have been submitted electronically and reflect a time and date stamped of submission. The District reserves the right to waive any informality in any bid, to reject any or all proposals, to reject one part of a proposal and accept the other, and to make award to the lowest responsible Bidder as the interest of the District may require.
The Non-Collusion Declaration, Subcontractor’s List naming each subcontractor who will perform work or labor or render service to the Contractor in an amount in excess of one-half of one percent (1/2 of 1%) of the Contractor's total bid, and Bid Bond or Certified or Cashier’s Check, and all required forms shall be submitted with the proposal at time of bid. Pursuant to the Iran Contracting Act of 2010 (Pub. Cont. Code § 2200-2208), contracts of one million dollars ($1,000,000) or more shall require bidder to submit the Iran Contract Act Certification with the proposal at time of bid. Where bonds are required, the Bidder shall name in his proposal the surety or sureties, which have agreed to furnish said bonds.
B-03. Lowest Responsible Bidder. In selecting the lowest responsible Bidder, consideration will be given to the general competency of the Bidder for the performance of the work covered by the proposal, and the bidder’s financial standing, if requested. To receive favorable consideration, a bidder must present evidence satisfactory to the District that he or his associates are personally competent to manage the proposed undertaking and to carry it forward to a successful conclusion. Professional integrity and honesty of purpose shall be essential requirements.
B-2 00018 Instructions to Bidders
A showing of adequate financial resources may be requested by the District, but will not alone determine whether a bidder is competent to undertake the proposed work. Each bidder must furnish a record of past performance and experience in the form required. To this end, each proposal, except as noted below, shall be supported by a statement of the bidder's experience on the form provided. This form, completely filled out, must be submitted along with the proposal.
Incomplete or false statements submitted in connection with a proposal may, at the option of the Board of Directors of the District, be sufficient cause for its rejection. The District shall be the final authority with regard to whether a bid is responsive to the call for bids and as to whether a bidder is a responsible bidder under the conditions of his bid.
B-04. Equalizing Factors. Whenever applicable, equalizing elements or factors not specifically mentioned or provided for herein, such as costs of transportation, inspection (including salaries and travel and subsistence expenses), installation, and operation, or any other factor or element in addition to that of price which would affect the total cost or value to the District will be taken into consideration in comparing bids for award of contract.
B-05. Certified or Cashier's Check or Bond. As a guarantee of good faith, each bidder shall submit with his proposal an unconditional certified or cashier's check drawn on a solvent state or national bank (must be mailed or hand delivered to the District in 48 hours of the bid), or he may furnish a bond, utilizing Surety 2000, with a company acceptable to the District in the sum stated in the Notice Inviting Bids, payable to the Eastern Municipal Water District, said check or bond to be held uncollected until it becomes subject to disposal as herein provided. Any condition or limitation placed upon said check or bond may render it informal and may, at the option of the Board result in the rejection of the proposal under which such check is submitted. If a Bidder to whom an award is made fails or refuses to execute the contract and furnish the required bond, all within the time stated in Section B-6 hereof, said check or bond and the monies represented thereby shall be and remain the property of the District and shall be subject to deposit with the Treasurer of the District as other monies belonging to the District, the amount thereof being agreed to by the Bidder as liquidated damages due the District on account of the delay in the execution of the contract and bond, and in the performance of the work thereunder, resulting from such failure or refusal. Certified checks shall be returned at the expiration of 60 days from the date of opening bids.
B-06. Execution of Contract. A Bidder to whom the award is made shall execute and return a written contract with the District on the form of Agreement attached hereto and furnish good and approved bond as required in the following paragraph, all in accordance with the provisions hereof and within the time stated in the Notice Inviting Bids (or Bidding Information sheet) or such additional time as may be allowed by the Engineer. The District will return a copy of the fully executed contract upon completion by the General Manager.
B-3 00018 Instructions to Bidders
If a Bidder to whom the award is made fails or refuses to enter into contract as herein provided, or to conform to any of the stipulated requirements in connection therewith, his check shall become the property of the District as provided in Section B-5 hereof, the award will be annulled, and in the discretion of the District an award may be made to the Bidder whose proposal is next most acceptable to the District; and such Bidder shall fulfill every stipulation embraced herein as if he were the party to whom the first award was made. A corporation to which an award is made will be required, before the contract is finally executed, to furnish evidence of its corporate existence and of the authority of the officer signing the contract and bond for the corporation to so sign.
B-07. Bond
(a) A Bidder to whom contract is awarded shall within the time mentioned in the preceding paragraph furnish a bond with a responsible corporate surety or corporate sureties conditioned upon the faithful performance by the said Bidder of all covenants and stipulations in the contract. Said bond shall be in the amount stipulated in the Notice Inviting Bids (or Bidding Information sheet). Bonds in amounts of $1,000 or less shall be made in multiples of $100; in amounts exceeding $1,000 but not exceeding $5,000 in multiples of $500; in amounts exceeding $5,000 in multiples of $1,000; provided, that the amount of the bond shall be fixed at the lowest sum that fulfills all conditions of the contract.
(b) The surety or sureties on the bond furnished must be satisfactory to the Board.
The required bond shall be furnished by the Bidder to whom contract has been awarded at his own cost and expense.
(c) Attention is invited to the provisions of the Insurance Code of the State of California with reference to the writing of insurance policies and bonds covering risks located in this State, and the premiums and commissions thereon. A Bidder to whom contract is awarded shall furnish at the time his bond is submitted for approval, satisfactory evidence that the requirements of said code have been observed.
B-08. (d) The bond furnished by the surety shall agree to acceptance by the surety of arbitration of disputes, where selected in accordance with Section F, Arbitration. Complete Specifications and Drawings. It shall be the responsibility of the Bidder to verify the completeness of his set of specifications and drawings and neither the District nor any of its officers shall be held responsible for any omission therefrom unless such omission has been called to the attention of the District prior to the submission of bids. Bidders shall use full size drawings to prepare said bid
B-4 00018 Instructions to Bidders
B-09. Addenda and/or Letter of Clarification. Bidder shall be responsible for verifying that any addenda or letter of clarification issued by the District has been investigated and received.
By submitting a bid, Bidder certifies that any addenda and letters of clarification issued to these specifications, whether acknowledged or not on the Bidding Sheets, shall be made a part of the contract. Bidder further agrees to perform all labor and services and furnish all materials, tools and appliances necessary for completing the work called out in the addenda or letter of clarification at no additional cost to the District.
B-10. Improperly Balanced Proposals. Any proposal which in the opinion of the Engineer is so unbalanced between the various contract items as to be detrimental to the interests of the District will be rejected.
B-11. Local Conditions. Bidders shall read the specifications, any background material, examine the drawings, and make their own estimates of the existing facilities and the difficulties which will attend the execution of the work called for by the proposed contract, including local conditions, uncertainty of weather, and all other contingencies. The District will identify for Bidders the location of existing utilities located on the site of construction which require removal, relocation or protection. AN EMPLOYEE ON THE COMPANY’S PAYROLL MUST HAVE INSPECTED THE SITE OF THE PROPOSED WORK TO BE CONSIDERED A RESPONSIVE BIDDER. Bidders shall satisfy themselves by personal examination of the locations of the proposed work, and by such other means as they may choose as to actual conditions and requirements and as to the accuracy of the quantities stated in the Bidding Sheet. Information derived from the maps, plans, specifications, profiles, or drawings, or from the Engineer or his assistants, shall not relieve the bidder of this responsibility, and the interpretation of the data disclosed by borings or other preliminary investigations is not guaranteed by the District.
The quantities of work or materials stated in the unit price items of the Bidding Sheet are given only as a basis for the comparison of bids and the District does not expressly or by implication agree that the actual amount of work or material will correspond therewith, but reserves the right to increase or decrease the amount of any unit price item of the work as may be deemed necessary or expedient by the Engineer.
Bidders shall not at any time after the submission of a bid make or have any claim for damages or anticipated profits or loss of profit or otherwise because of any difference between the quantities of work actually done and material furnished and those stated in said unit price items of the Bidding Sheet.
B-5 00018 Instructions to Bidders
Pursuant to Public Contract Code section 7104, any public works contract of a local public entity which involves digging trenches or other excavations that extend deeper than four feet below the surface shall provide for the following: (a) That the contractor shall promptly, and before the following conditions are disturbed, notify the public entity, in writing, of any: (1) Material that the contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law. (2) Subsurface or latent physical conditions at the site differing from those indicated by information about the site made available to bidders prior to the deadline for submitting bids. (3) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract. (b) That the public entity shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the contractor's cost of, or the time required for, performance of any part of the work shall issue a change order under the procedures described in the contract. (c) That, in the event that a dispute arises between the public entity and the contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the contractor's cost of, or time required for, performance of any part of the work, the contractor shall not be excused from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the contract. The contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the contracting parties.
B-12. Insurance. Attention is invited to the requirements set forth in SPECIFICATION - GENERAL CONDITIONS, Art. F-04 Contractor's and Subcontractor's Insurance and the Special Conditions.
B-6 00018 Instructions to Bidders
BS-1 00020 Bidding Sheets
PERRIS VALLEY REGIONAL WATER RECLAMATION FACILITY SECONDARY CLARIFIER
5, 6 AND 8 REHABILITATION
BIDDING SHEETS
The Contractor shall construct the project under these Specifications all in conformance with the Contract Drawings listed in Section P and these Specifications.
The District reserves the right to:
A. Accept or reject any or all bids on this specification;
B. Award Contract to the lowest qualified bidder, based on the total bid price:
C. Waive any defects and informalities.
The District shall be the final authority with regard to whether a bid is responsive to the call for bids and to whether a bidder is a responsible bidder under the conditions of his bid, or for any reason.
The total contract price shall include all work, materials and equipment needed to complete the project as defined in the General Conditions, Section F. The bidder shall include costs for such other items in the most appropriate category (bid item).
TO BE INSTALLED:
The District will furnish the following item(s) to be installed by the Contractor:
None.
BS-2 00020 Bidding Sheets
BASIS OF AWARD: Additive Bid Item(s) Included in Total Bid Price.
Public Contract Code 20103.8(b) provides for basis of award as follows:
The lowest bid shall be the lowest total of the bid prices on the base contract and those additive or deductive items that were specifically identified in the bid solicitation as being used for the purpose of determining the lowest bid price.
Public Contract Code 20103.8 does not preclude the District from adding to or deducting any of the additive or deductive items after the lowest responsible bidder has been determined.
Failure to provide a cost for the additive or deductive bid items may deem your bid non-responsive.
PERRIS VALLEY REGIONAL WATER RECLAMATION FACILITY SECONDARY CLARIFIER
5, 6, AND 8 REHABILITATION
DO NOT SUBMIT WITH PROPOSAL PACKAGE
VALUES ARE TO BE UPLOADED IN PLANETBIDS
Unit Total Bid
Item
Qty
Unit Description
Price
(Figures)
Amount
BS-3 00020 Bidding Sheets
1 1 LS Mobilization and Approved: Bonds, Insurance, and Schedule of Values (see Section 01026) and Preliminary Project Schedule (PPS) (see section 01310) PRESET $750,000
2 1 LS Provide Secondary Clarifier Mechanical
Equipment for Secondary Clarifier Nos. 5, 6, and 8 Lump Sum $
3 1 LS Drain and clean Secondary Clarifier Nos. 5, 6 and 8 Lump Sum $
4 1 LS Rehabilitation of Secondary Clarifier Nos. 5, 6 and 8, including structural/concrete rehabilitation, replacement of existing mechanical equipment and associated electrical, instrumentation, and control system modifications. Lump Sum $
5 1 LS Replace existing sluice gates upstream of
Secondary Clarifier Nos. 5, 6 and 8 Lump Sum $
6 1 LS Furnish and install new stop gates upstream of Secondary Clarifier Nos. 5, 6 and 8 Lump Sum $
7 1 LS Demolition of all existing chlorine solution
(CLS) process equipment, accessories, associated exposed piping, control panels, anchor bolts, support devices, and all other appurtenances associated with the equipment and piping that is being removed within the RAS/WAS Pump Station Lump Sum $
PERRIS VALLEY REGIONAL WATER RECLAMATION FACILITY SECONDARY CLARIFIER
5, 6, AND 8 REHABILITATION
DO NOT SUBMIT WITH PROPOSAL PACKAGE
VALUES ARE TO BE UPLOADED IN PLANETBIDS
Unit Total Bid
Item
Qty
Unit Description
Price
Amount
BS-4 00020 Bidding Sheets
8 1 LS Installation of new 2” CLS piping from existing 6” CLS piping entering RAS/WAS Pump Station to the existing blind flange on the 18” RAS Pipe. Furnish and install 2” diaphragm valve with socket weld ends. Lump Sum $
9 1 LS Remove and replace ancillary utility water piping and valves Lump Sum $
10 LS Insurance premium for obtaining EARTHQUAKE insurance to indemnify the District for any damage to the work caused by an Act of God (Public Contract Code 7105) Lump Sum $
11 1 T&M Unforeseen conditions encountered during construction. This line item is an allowance and all work will be tracked in accordance with time and materials procedures and as directed by the District. Preset $300,000
12 1 LS ADDITION OR DEDUCTION Addition (+) / Deduction(-)
TOTAL BID (Basis of award)
PERRIS VALLEY REGIONAL WATER RECLAMATION FACILITY SECONDARY CLARIFIER
5, 6, AND 8 REHABILITATION
SUBMIT WITH PROPOSAL PACKAGE
BS-5 00020 Bidding Sheets
ADDITION OR DEDUCTION: Provision is made here for the bidder to include an addition/deduction in their bid, if desired, to reflect any last minute adjustments in prices. The addition/deduction, if made, will be proportionately applied to item(s) (fill in) and reflected in the unit prices for payment purposes. If the addition/deduction affects more than one bid item, the proportionate application of the addition/deduction shall be mutually agreed upon by the Contractor and the District at the prejob.
Addenda and/or Letter of Clarification By submitting a bid, Bidder certifies that any addenda and letters of clarification issued to these specifications shall be made a part of the contract. Bidder further agrees to perform all labor and services and furnish all materials, tools and appliances necessary for completing the work called out in the addenda or letter of clarification.
Person who inspected site of the proposed work as an employee of your firm: (Representative must have inspected the jobsite and be an employee on the company’s payroll to be considered a responsive bidder)
(Name) (Date of Inspection)
BS-6 00020 Bidding Sheets
EQUIPMENT AND MATERIAL
SUBMIT WITH PROPOSAL PACKAGE
No substitution will be permitted without written justification and the approval of the District prior to the bid opening.
PRODUCTS OF MANUFACTURERS LISTED AS EQUALS TO THOSE SPECIFIED IN THE CONTRACT
DOCUMENTS MUST BE SUBMITTED FOR REVIEW AND APPROVAL BY THE DISTRICT NO LATER
THAN THE TENTH (10TH) DAY PRECEDING THE DATE SET FOR RECEIPT OF BIDS.
NOTE
Please refer to Special Conditions SC-13 for Specified Equipment with No Equal Substitution.
C3-1 00024 Proposal (7 day)
P R O P O S A L
The undersigned hereby declares, as Bidder, that the only persons or parties interested in this proposal as principals are those named herein; that no director or any other officer or employee of the Eastern Municipal Water District is in any manner interested directly or indirectly in this proposal or in the profits to be derived from the contract proposed to be taken; that this bid is made without any connection with any person or persons making a bid for the same purpose; that the bid is in all respects fair and without collusion or fraud; that he has read the Notice Inviting Bids (or Bidding Information), Insurance Requirements and the Instructions to Bidders and agrees to all the stipulations contained herein; that he proposes and agrees that if his bid as submitted in the attached sheets, be accepted he will contract in the form so approved and furnish all items called for in accordance with the provisions of said approved form of Agreement, Insurance Requirements and the Specifications and to deliver the same within the time stipulated therein; and that he will accept in full payment therefore the prices named in said Bid Sheet.
The Bidder further agrees, that upon receipt of written notice of the acceptance of this proposal within 60 days after the day of opening bids (unless otherwise specified in the Notice Inviting Bids or Bidding Information) he will execute and return the Contract in accordance with the proposal as accepted and furnish the required bond(s) within SEVEN (7) days from the date of mailing the Notice of Acceptance of Proposal to him at his address given below, or within such time as allowed by the Engineer; and that upon his failure or refusal to do so within the said time, then the certified or cashier's check or bond accompanying this bid shall become the property of and be retained by the Eastern Municipal Water District as liquidated damages for such failure or refusal, and shall be deposited with the Treasurer of said Eastern Municipal Water District as monies belonging to the Eastern Municipal Water District; provided, that if said Bidder shall execute the Contract and furnish the required bond within the time aforesaid, his check or bond shall be returned to him thereafter.
The Bidder further declares that the surety or sureties named in the attached sheet have agreed to furnish bond in form and amount set forth in the accompanying Notice Inviting Bids (or Bidding Information) and paragraph B-6 of the Instructions to Bidders, in the event contract is awarded on basis of this proposal.
Company:
Address: Date:
By:
(Print Name) (Name should appear below) (Signature of Owner or Officer required)
Name(s) and Title of Member of Firm or Office of Corporation authorized to enter into a binding Contract:
Name Title
Address (if different from above)
For further details on this proposal, please contact:
Name: Address:
Email Address: Telephone:
C3-2 00024 Proposal (7 day)
BR-1 00027 Bidder’s Experience/Resumes
PERRIS VALLEY REGIONAL WATER RECLAMATION FACILITY
SECONDARY CLARIFIER 5, 6, AND 8 REHABILITATION
BIDDER’S 8-YEAR EXPERIENCE RECORD &
RESUMES OF KEY PERSONNEL
All bidders must provide a detailed 8 - year experience record showing successful completion, as a General Contractor, of at least three (3) similar projects within the last 8 years as follows:
A. Contract Type - Public Works
B. Dollar Amount - $5 Million or Greater
C. Wastewater Treatment Plant Process
Additionally, bidders must include resumes of key personnel proposed to work on this project when submitting your bid. This information will be critical in meeting requirements as a responsible bidder.
Failure to submit any of the above-mentioned information with your bid “may” deem your bid non-responsive
00027 Bidder’s Experience/Resumes
PAGE LEFT INTENTIONALLY BLANK
YEAR TYPE/DESCRIPTION OF WORK
VALUE OF
WORK
PERFORMED
LOCATION OF
WORK (CITY)
ENGINEER /
CONTACT PERSON
Address & phone #
OWNER /
(CONTACT PERSON
Address & phone #
DETAILED
EXPERIEN
CE RECO
RD
PLEASE U
SE ADDITIO
N
AL SHEETS
BR-2
00027 Bidder’ s Experience/Resum es
RESUMES OF KEY PERSONNEL
(ATTACH HERE)
C-5(a) 00028 Designation of Subcontractors
DESIGNATION OF SUBCONTRACTORS
In compliance with the provisions of Sec. 4100-4111, inclusive, of the Public Contract Code of the State of California, and any amendments thereof, each bidder shall set forth below: (a) The name and the location of the place of business of each subcontractor who will perform work or labor or render service to the Contractor in or about the construction of the work or improvement in an amount in excess of one-half of one percent (1/2 of 1%) of the Contractor's total bid; and (b) the portion of the work which will be done by each such subcontractor.
Each subcontractor shall possess, both at the time the bid is submitted and at all times when work is performed, a valid contractor's license for the appropriate classification necessary to perform the work for which that subcontractor is listed. Each subcontractor shall be registered with the Department of Industrial Relations at time of bid and during the performance of the Contract.
If the Contractor fails to specify a subcontractor for any portion of the work to be performed under the contract in excess of one-half of one percent (1/2 of 1%) of the Contractor's total bid, he agrees that he is fully qualified to perform that work himself, and that he shall perform that work himself, and that he shall perform that portion himself.
The Contractor shall not, without the consent of the District, or unless, either: (a) Substitute any person as subcontractor in place of the subcontractor designated in the original bid; (b) Permit any such subcontract to be assigned or transferred or allow it to be performed by anyone other than the original subcontractor listed in the bid; or (c) Sublet or subcontract any portion of the work in excess of one-half of one percent (1/2 of 1%) of the Contractor's total bid as to which his original bid did not designate a subcontractor.
In the following instances, the District may consent to the substitution of another subcontractor:
(1) When the subcontractor listed in the bid after having a reasonable opportunity to do so fails or refuses to execute the written contract which is based upon the general terms, conditions, plans and specifications of the involved project or the terms of the subcontractor's written bid when it is presented to the subcontractor by the prime subcontractor;
(2) When the listed subcontractor becomes bankrupt or insolvent;
(3) When the listed subcontractor fails or refuses to perform his or her subcontract;
(4) When the listed subcontractor fails or refuses to meet the bond requirements of the prime Contractor to furnish a bond guaranteeing prompt and faithful performance of the subcontract and the payment of all claims for labor and materials furnished or used pursuant to Public Contract Code 4108;
(5) When the prime Contractor demonstrates to the District, as set forth in Public Contract Code 4107.5 that the name of the subcontractor was listed as the result of an inadvertent clerical error;
C-5(b) 00028 Designation of Subcontractors
As a condition to assert claim of clerical error, the Contractor must give written notice of the inadvertent clerical error to the District with copies to both the listed and intended subcontractor within two (2) working days of the time of the prime bid opening. The District shall consent to the substitution if the prime Contractor and both subcontractor listed in error and the intended subcontractor each submit an affidavit to the District within eight (8) working days of the time of the prime bid opening indicating that an inadvertent clerical error was made.
The District shall also consent to the substitution of the intended Contractor if affidavits are filed by both the prime Contractor and the intended Subcontractor within six (6) working days and the subcontractor claimed to be listed in error does not submit within six (6) working days a written objection to the claim to both the District and the Contractor.
However, if the listed subcontractor submits a written objection to the Contractor's claim of inadvertent clerical error within six (6) working days from the time of the prime bid opening, the District shall investigate the claims of the parties and shall hold a public hearing as described herein to determine the validity of those claims.
Any declarations submitted must be submitted under penalty of perjury by all three (3) parties and supported by testimony under oath and subject to cross-examination.
(6) When the listed Contractor is not licensed pursuant to the Contractor's license law;
(7) When the District determines that the work performed by the listed subcontractor is substantially unsatisfactory and not in substantial accordance with the plans and specifications, or that the subcontractor is substantially delaying or disrupting the progress of the work.
Prior to any substitution of a subcontractor, the District shall give notice in writing to the listed subcontractor of the request to substitute subcontractors and the reasons for the request. The notice shall be served by registered or certified mail to the last known address of the subcontractor.