Project Manual .pdf

PDF 2 MB Posted

Attached to
Reforestation and Irrigation
Solicitation number
126-082
Issued by
Harris County, Houston City, Texas

About this file

Harris County MUD #387 Reforestation and Irrigation Project

This is a project manual and invitation to bid for Harris County Municipal Utility District No. 387 in Spring, Texas, detailing a landscape improvements contract for reforestation and irrigation work (CCA Project No. 126-082, Contract No. 1). The project scope includes selective tree protection, irrigation installation, tree and shrub planting, and exterior landscape maintenance. A mandatory pre-bid conference is scheduled for September 11, 2026, at 10:00 a.m. via Zoom, with attendance required for bid qualification. Bids are due on September 18, 2026, at 11:00 a.m., submitted electronically through the CivCastUSA website. The bid opening will be conducted virtually via Zoom with an option for in-person viewing at Clark Condon's office in Houston. Bidders must provide a 5 percent bid bond or certified check as bid security and must demonstrate at least five years of verifiable experience on similar projects with references. The successful bidder shall commence work within ten days of receiving the notice to proceed and must complete the project within a contractor-specified number of calendar days as proposed in the bid.

All bids are submitted on a lump-sum basis, with the contractor responsible for furnishing all materials, labor, equipment, and services necessary for project completion. The successful bidder must execute separate Performance and Payment Bonds in amounts equal to 100 percent of the total contract price, with surety companies meeting specific Texas requirements including State Board of Insurance licensing and a minimum "B+" rating in Best's Key Rating Guide. Payment will be made monthly upon engineer approval of work progress, with 10 percent retained until final completion. The District retains the right to reject any or all bids and waive technical defects. Contractor insurance requirements include workers' compensation, bodily injury liability, property damage coverage, and certificates of insurance naming the Owner and Engineer as additional insureds. The contract documents include the signed agreement, performance and payment bonds, general and special conditions, technical specifications, and all addenda, with priority of interpretation established in a specified order.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Harris County MUD #387 Reforestation and Irrigation

Harris County MUD #387

Spring, Texas

Landscape Improvements

September 2026

CCA Project No. 126-082

Technical Specifications Provided By:

Clark Condon

10401 Stella Link Road Houston, Texas 77025

Harris County MUD #387 Reforestation and Irrigation

LANDSCAPE IMPROVEMENTS

TECHNICAL SPECIFICATIONS TABLE OF CONTENTS

- INVITATION TO BIDDERS

- INSTRUCTIONS TO BIDDERS

- BID FORM

- STANDARD FORM OF AGREEMENT

- PAYMENT BOND

- PERFORMANCE BOND

- GENERAL CONDITIONS OF AGREEMENT

- SPECIAL CONDITIONS OF THE CONTRACT

- NOTICE TO PROCEED

- FORM OF AFFIDAVIT OF BILLS PAID

- LIEN RELEASE FORM

- TECHNICAL SPECIFICATIONS

Summary Section 011000

Site Preparation Section 311100 Tree & Plant Protection Section 311200 Planting Irrigation Section 328400 Plants Section 329300 Exterior Landscape Maintenance Section 329301 Machine Moved Trees Section 329500

Clark Condon Harris County MUD #387 September 2026 Reforestation and Irrigation

I. 1/1

I. INVITATION FOR BID

DISTRIBUTION: September 4, 2026, via www.CivcastUSA.com

PROJECT: Harris County MUD #387 Reforestation and Irrigation

SCOPE: Selective tree protection, irrigation, tree & shrub planting, and landscape maintenance

OWNER: Harris County MUD #387

MANDATORY PRE-BID CONFERENCE: September 11, 2026, at 10:00 a.m. Local Time via Zoom.

www.zoom.us, Meeting ID: 868 9302 4966; Passcode: 982038. Registration:

https://us02web.zoom.us/meeting/register/GHU_q749TsOS1IUyrUSw5A

BID DATE & TIME: September 18, 2026, at 11:00 AM Local Time

LOCATION OF BID SUBMITTAL: www.CivCastUSA.com

BID OPENING: https://us02web.zoom.us/j/87165756031?pwd=sFPSsRhaMCa06unztnniasufAlyaaW.1.

Meeting ID: 871 6575 6031, Passcode: 136092. In addition to Zoom, you may view the public opening at Clark Condon, 10401 Stella Link Rd., Houston, TX 77025.

Complete bid packages may be obtained electronically through the CivCastUSA website.

Subcontractors and Suppliers intending to submit bids to Bidders are required to prepare their bids based on a complete set of bidding documents.

All bids shall be submitted online through the CivCastUSA website no later than the above specified time. Bids will remain sealed until the bid time and bid results will be published on CivCastUSA after the specified time. The bidder is fully responsible for the complete and proper submission of their electronic bid. The District or its agents shall not be liable for any electronic bids that were not submitted prior to the published deadline due to any technical issues or obstructions related to the transmission system.

If, upon being opened, an electronic bid is unreadable to the degree that conformance to the essential requirements of the bid invitation cannot be ascertained, the bid will be rejected.

No bid shall be withdrawn sixty (60) days after opening of bids without written consent of the Owner. The Owner reserves the right to reject any bids and to waive any informalities in bidding. A decision concerning award of Contract will be made public as soon as practicable.

The bidder shall submit a certified or cashier’s check for a five percent (5%) bid bond of the maximum total bid amount, as a guarantee that the bidder will enter into a contract within ten (10) days after the receipt of contract documents. Scan and upload a copy of the bid bond as an attachment to the electronic bid.

The successful bidder must furnish a Payment, Performance and Maintenance Bond acceptable to the Developer.

Bidders must have at least five (5) years of verifiable experience of similar projects with references in order for their bid to be accepted.

END OF SECTION

http://www.civcastusa.com/ http://www.zoom.us/ https://us02web.zoom.us/meeting/register/GHU_q749TsOS1IUyrUSw5A http://www.civcastusa.com/ https://us02web.zoom.us/j/87165756031?pwd=sFPSsRhaMCa06unztnniasufAlyaaW.1

II. 1/3

II. INSTRUCTIONS TO BIDDERS

1. PREPARATION OF BIDS. Unless otherwise directed in the INVITATION TO BIDDERS, each bid shall be submitted on the bid forms provided, in conformity with the requirements of the INVITATION TO BIDDERS, these INSTRUCTIONS, and the instructions printed on the BID FORM.

All blanks on the bid form shall be completed, typed or written in ink, and no change shall be made on the bid form or any other of the CONTRACT DOCUMENTS. All amounts shall be written in both words and figures, with amounts extended and totaled. If there is a discrepancy between the words and the figures of any amount, the words shall govern. Any bid may be rejected if it contains any omission, erasure, alteration, addition, irregularity of any kind, or items not called for; if it does not submit prices for each of the items in the bid form; if any of the prices are obviously unbalanced; or if it shall in any manner fail to conform to the conditions of the INVITATION TO BIDDERS or these instructions.

The bidder shall sign its bid in the signature space. If the bid is made by a partnership or corporation, the name and address of the partnership or corporation shall be shown, together with the names and addresses of the partners or officers. If the bid is made by an individual, it must be acknowledged by that person; if made by a partnership, it must be acknowledged by one of the partners; or if made by a corporation, it must be acknowledged by the person signing on behalf of the corporation.

All bids shall be submitted online through the CivCastUSA website no later than the specified time.

2. CONTRACT DOCUMENTS. The instruments, plans and specifications comprising the Contract Documents are as defined in the General Conditions. The Contract Documents are complementary and must be read together and as a whole; what is called for by one is as binding as if called for by all.

Bidders desiring further information or further interpretation of any part of the Contract Documents shall submit a written request for such information to the Owner’s Representative and Owner not less than five working days before the bid opening. Answers to these requests will be given in writing to all bidders as addenda to the Contract, and each addendum will be made a part of the Contract. No explanation or interpretation of the Contract, other than written addenda, shall be binding. Should a bidder find discrepancies in or omissions from the Contract Documents or should it be in doubt as to any meaning, it should notify Owner’s Representative so a written addendum may be sent to all bidders. It is the responsibility of each bidder to determine if it has received all addenda, complete files of which will be maintained at the Owner’s Representative's office.

Each bidder shall inform itself fully of the requirements and labor conditions under which the work will be performed and shall be presumed to have inspected the work site and to have read and to be thoroughly familiar with the Contract Documents. Failure to do so will not relieve the successful bidder of its obligation to furnish all material and labor necessary to carry out the provisions of the Contract and to complete work for the consideration of its bid.

3. PRE-BID CONFERENCE. A mandatory pre-bid conference among the Owner, Landscape Architect, prospective bidders and others will be held to discuss the scope of work and to answer questions concerning the work. The mandatory pre-bid conference will be held at the time and place shown in the Invitation to Bid. Attendance at the pre-bid conference is required in order to submit a qualified bid to fully understand the scope of work and bid requirements.

4. BID SECURITY. Each Bid shall be accompanied by a bid bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than 5 percent of the total amount bid (the “Bid Security”), as a

II. 2/3

guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided and provide the required insurance certificates within 7 days after the date Contract Documents are received by the Contractor. Bid Securities will be returned to all but the three most qualified, responsible bidders within 5 days after opening of Bids, and the latter’s Bid Securities will be returned after complete execution of the Contract. The surety company providing a bid bond must conform to the same requirements for surety companies providing the performance bonds.

5. SUBCONTRACTORS. A list of all proposed subcontractors must be submitted with the bid documents.

6. SUBSTITUTIONS. When material or equipment is specified by a trade or brand name, it is not the Owner's intent to prohibit use of an equal product of another manufacturer. Such specifications are intended to set a definite standard of quality or performance and to establish an equal basis for the evaluation of bids. In preparing its bid, each bidder is expected to include in the base bid the cost of the items so specified. A bidder wishing to offer substitute items of equipment or materials for those specified by brand names must do so by indicating as an attachment to the bid form the items it wishes to substitute, the corresponding specified items to be replaced by the substitution and change (increase or deduction) in the base bid that would result if Owner were to accept the substitute items. Consideration of alternates will be limited to substitution of individual items of material or equipment specified by brand names. Each offer for a substitution shall be accompanied by duplicate copies of complete descriptive matter and information on the substitute item. Any proposed substitutions shall be requested by the bidder. Request by manufacturers or vendors will not be considered during the bid and contracting process. Owner reserves the right to accept or reject each substitution offered.

7. DELIVERY OF BIDS. Seal electronic bids, addressed to Harris County MUD #387 will be electronically received on the CivCast USA website and the Apparent Low Bidders will be automatically generated and posted for furnishing all plan, labor, material and equipment and performing all work required for the construction of Harris County MUD #387 Reforestation and Irrigation

8. AWARD OF CONTRACT. Unless it elects to reject all bids, the Owner will award the Contract after a thorough analysis of the bids submitted. The approximate contract start date will be as specified in the invitation to bid or as stated in the Prebid Conference. The award will be made on the basis of which bid, in the Owner's judgment, will be most advantageous to the Owner, will result in the best and most economical completion of the Work, and was made by a person that Owner knows to be responsible. Owner reserves the right to reject any or all bids and to waive technical defects in bidding, as the interests of Owner may require. In case of ambiguity or lack of clarity in stating the prices in any bid, Owner shall consider the construction of bid most advantageous to Owner or, at its option, reject the bid. A bidder may withdraw its bid before the Closing Time without prejudice to itself by submitting a written request for its withdrawal to the Owner's Office. Within seven days of oral notice of award of the Contract, the successful bidder shall submit to the Owner all information and other items necessary to complete the CONTRACT DOCUMENTS, including Contractor's safety program. The Owner shall then prepare the final CONTRACT DOCUMENTS for execution by the bidder. The successful bidder shall return the signed CONTRACT DOCUMENTS to the Owner within five days of receipt, or the Owner may disqualify the bid and accept another bid. CONTRACT DOCUMENTS will include AIA A101 Standard Form of Agreement between Owner and Contractor.

9. FUNDS. The Owner has available sufficient funds to pay the successful bidder in cash in accordance with the provisions of the Contract.

10. NUMBER OF SIGNED SETS OF DOCUMENTS. The CONTRACT DOCUMENTS will be prepared in at least three original sets for signature, one for delivery to the successful bidder. Owner will furnish the successful bidder five sets of PLANS and TECHNICAL SPECIFICATIONS free of charge, and additional sets may be obtained from the Owner’s Representative at the Owner’s Representative's reproduction rates.

II. 3/3

11. PRECONSTRUCTION CONFERENCE. A Preconstruction Conference will be scheduled with the successful bidder and his subcontractors upon awarding and executing the contract.

END OF SECTION

III. 1/2

III. BID

To: Harris County MUD #387

Work: Selective tree protection, irrigation, tree & shrub planting, and landscape maintenance

Name of Bidder (Company Name):

Address:

Telephone:

Email:

The undersigned bidder has carefully examined the CONTRACT DOCUMENTS for the work described above and the site of the Work and will provide at its own cost and expense all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, maintenance, and other accessories and services necessary to complete the Work upon which it bids, as provided by the CONTRACT DOCUMENTS, and binds itself on acceptance of its bid to enter into the Contract on the terms proposed by Owner for performing and completing the Work within the Contract Time, for the following prices.

The Contract time for Landscape Improvements: Contractor shall submit, in calendar days, estimated time for completion of work: _____ calendar days.

GRAND TOTAL LUMP SUM BID: $

(bid amount written)

III. 2/2

Bidder acknowledges receipt of the following addenda:

Addenda Number and Date:

Signature and Title of Bidder:

Name of Bidder Printed or Typed:

Date:

Surety Company:

State of Incorporation:

Local Agent:

Agent’s Telephone:

Insurance Carrier:

State of Incorporation:

Local Agent:

Agent’s Telephone:

Proposed Sub-Contractors:

Company Name and Type of Work:

D - 1 Revised 03/11/2023

SECTION D

AGREEMENT

STATE OF TEXAS

Spring, Texas

THIS AGREEMENT, made and entered into this ________ day of ____________, 20___, by and between Harris County Municipal Utility District No. 387 hereinafter termed OWNER, and __________________________________________________________________, a Texas corporation hereinafter termed CONTRACTOR.

WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER, and under the conditions expressed in the bond bearing even date herewith, the CONTRACTOR agrees to commence and complete the construction of certain improvements described as follows:

Harris County MUD #387 Reforestation and Irrigation CCA Project No. 126-082, Contract No. 1 Spring, Texas according to those particular Plans and Technical Specifications prepared by Landscape Architect in the initial Contract Price of $_______________ and all extra work in connection therewith, and at his (or their) own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools, to complete the said construction, in accordance with the conditions and prices stated in the Proposal attached hereto, and in accordance with the General and Special Conditions of the Agreement, Plans and other drawings and printed or written explanatory matter thereof, and the Technical Specifications and addenda therefore as prepared by Clark Condon, hereinafter termed Landscape Architect, each of which has been identified by the endorsement of the CONTRACTOR, and together with the CONTRACTOR's written Proposal, and the Performance and Payment Bonds thereto attached; all of which are made a part hereof and collectively evidence and constitute the entire contract.

The CONTRACTOR hereby agrees to commence the Work (as such term is defined in the Contract Documents) within ten days after the date written notice to do so shall be given to him by OWNER and to fully complete the Work to the satisfaction of OWNER within «Days» calendar days after the date of the written notice to commence Work.

Owner agrees to pay Contractor for completion of the Work in accordance with the Contract Documents the initial Contract Price of ___________________ ($____________), plus or minus any increases or decreases to the initial Contract Price as provided by the Contract. Contractor will be paid in current funds for the performance of the Contract in accordance with the Bid submitted therefor, subject to additions and deductions as approved by Change Order under the Contract Documents, and to make payments on account thereof as provided therein.

D - 2

The CONTRACTOR is and at all times shall remain an independent CONTRACTOR, solely responsible for the manner and method of completing its Work under this Contract, with full power and authority to select the means, method and manner of performing such Work, so long as the Work complies with this Contract including the drawings and technical specifications.

The CONTRACTOR agrees that it shall be solely responsible for the safety of its employees and all other persons and shall be solely responsible for determining the course of action necessary to protect all persons, including members of the public, from bodily injury or property damage during its Work on the project, including the erection of barricades or the installation of other traffic or pedestrian control measures.

As part of the consideration for the payments and agreements hereinafter mentioned, CONTRACTOR AGREES TO INDEMNIFY AND HOLD THE OWNER HARMLESS FROM ANY AND ALL CLAIMS, DEMANDS AND CAUSES OF ACTION OF WHATSOEVER NATURE AND CHARACTER WHICH MAY BE

ASSERTED BY ANY PERSON OR ENTITY IN CONNECTION WITH CONTRACTOR'S WORK (INCLUDING THE

WORK OF SUBCONTRACTORS) ON THE PROJECT, AND THIS INDEMNITY AND HOLD HARMLESS

AGREEMENT IS SPECIFICALLY INTENDED TO COVER ALL COSTS OF FUTURE LITIGATION, INCLUDING

ATTORNEY'S FEES AND OTHER DEFENSE COSTS.

OWNER and CONTRACTOR each binds itself, its officers, directors, shareholders, partners, successors, assigns and legal representatives to the other party hereto, its officers, directors, shareholders, partners, successors, assigns and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents.

THE GENERAL AND SPECIAL CONDITIONS ATTACHED TO THIS AGREEMENT CONTAIN PROVISIONS

THAT MAY RELIEVE ONE PARTY FOR RESPONSIBILITY IT WOULD OTHERWISE HAVE UNDER THE LAW FOR

DAMAGES OR OTHER LIABILITY ARISING OUT OF THE WORK.

EACH OF THE PARTIES HERETO SPECIFICALLY AGREES THAT IT HAS A DUTY TO READ THIS

AGREEMENT, THE GENERAL AND SPECIAL CONDITIONS, AND ALL OTHER ATTACHMENTS TO THIS

AGREEMENT AND AGREES THAT IT IS CHARGED WITH NOTICE AND KNOWLEDGE OF THE TERMS OF THIS AGREEMENT AND ALL ATTACHMENTS HERETO; THAT IT HAS IN FACT READ THIS AGREEMENT AND ALL ATTACHMENTS HERETO AND IS FULLY INFORMED AND HAS FULL NOTICE AND KNOWLEDGE OF THE TERMS, CONDITIONS AND EFFECTS OF THIS AGREEMENT; THAT IT HAS HAD THE OPPORTUNITY TO BE REPRESENTED BY INDEPENDENT LEGAL COUNSEL OF ITS CHOICE THROUGHOUT THE NEGOTIATIONS PRECEDING ITS EXECUTION OF THIS AGREEMENT AND HAS RECEIVED OR VOLUNTARILY CHOSEN NOT TO RECEIVE THE ADVICE OF ITS ATTORNEY IN ENTERING INTO THIS AGREEMENT; AND THAT IT RECOGNIZES THAT CERTAIN TERMS OF THIS AGREEMENT AND ALL ATTACHMENTS HERETO RESULT IN ONE PARTY ASSUMING THE LIABILITY INHERENT IN SOME ASPECTS OF THE TRANSACTION AND RELIEVING THE OTHER PARTY OF ITS RESPONSIBILITY FOR SUCH LIABILITY. EACH PARTY HERETO AGREES AND COVENANTS THAT IT WILL NOT CONTEST THE VALIDITY OR ENFORCEMENT OF ANY EXCULPATORY PROVISION OF THIS AGREEMENT ON THE BASIS THAT THE PARTY HAD NO NOTICE OR KNOWLEDGE OF SUCH PROVISION OR

THAT THE PROVISION IS NOT "CONSPICUOUS".

The requirements of Subchapter J, Chapter 552, Government Code, may apply to this CONTRACT and CONTRACTOR agrees that the Contract can be terminated if CONTRACTOR knowingly or intentionally fails to comply with a requirement of that subchapter.

D - 3

CONTRACTOR declares that it has not received from a governmental body a notice of noncompliance with a provision of Subchapter J, Chapter 552, Texas Government Code, or, if such a notice has been received, CONTRACTOR has taken adequate steps to ensure future compliance with such subchapter and has provided or upon request will provide documentation of same.

Fossil Fuels Boycott Verification.

As required by 2276.002, Texas Government Code, as amended, _________ hereby verifies that ____________, including any wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate of the same, does not boycott energy companies, and will not boycott energy companies during the term of this Agreement. As used in the foregoing verification, “boycott energy companies” shall have the meaning assigned to the term “boycott energy company” in Section 809.001, Texas Government Code, as amended.

Firearms Discrimination Verification.

As required by Section 2274.002, Texas Government Code, as amended, ______________ hereby verifies that __________, including any wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate of the same, (i) does not have a practice, policy, guidance or directive that discriminates against a firearm entity or firearm trade association, and (ii) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. As used in the foregoing verification, "discriminate against a firearm entity or trade association" shall have the meaning assigned to such term in Section 2274.001(3), Texas Government Code, as amended.

Israel Boycott Verification As required by Chapter 2271, Texas Government Code, as amended, __________ hereby verifies that ___________, including any wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate of the same, does not boycott Israel and will not boycott Israel through the term of this Agreement. As used in the foregoing verification, the term "boycott Israel" has the meaning assigned to such term in Section 808.001, Texas Government Code, as amended.

Anti-Terrorism Representation Pursuant to Chapter 2252, Texas Government Code, _________ represents and certifies that, at the time of execution of this Agreement neither the _________, nor any wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate of the same, is a company listed by the Texas Comptroller of Public Accounts under Sections 2270.0201 or 2252.153 of the Texas Government Code.

Lone Star Infrastructure Protection Act Verification.

Pursuant to Chapter 2275, Texas Government Code, as amended, and to the extent this Agreement grants to ____________ direct or remote access to the control of critical infrastructure, excluding access specifically allowed for product warranty and support, _____________ verifies that neither __________, including any wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate of the same, nor any of its sub-contractors are: (i) owned or controlled by (a) individuals who are citizens of China, Iran, North Korea, Russia or a designated country; or (b) a company or other entity, including a governmental entity, that is owned or controlled by citizens of or is directly controlled by the government of China, Iran, North Korea, Russia, or a designated country; or (ii) headquartered in China, Iran, North Korea, Russia or a designated country. The term "designated country" means a country designated by the Governor as a threat to critical infrastructure under Section 2275.0103, Texas Government Code. The term "critical infrastructure" shall have the meaning assigned to such term in Section 2275.0101, Texas

D - 4

Government Code.

IN WITNESS WHEREOF, the parties to these presents have executed this Agreement in the year and day first above written.

Harris County Municipal Utility District No. 387 ____________________________________

OWNER CONTRACTOR

By:___________________________________ By:_________________________________

(Certification if Bidder is a Corporation)

I, _________________________________, certify that I am the secretary of the corporation herein termed the CONTRACTOR; and that the person whose name appears above was and is ____________________________________ of said corporation, Title and that this Contract was duly signed for and in behalf of said Corporation by authority of its governing body, and such contract is within the scope of its corporate powers.

SIGNED:

(Corporate Seal)

NOTE: This form to be used only when the Construction Contract is entered into by the District. See

Private Work form for Developer Construction Contract.

Bond No.

PAYMENT BOND

STATE OF TEXAS §

§ KNOW ALL PERSONS BY THESE PRESENTS:

COUNTY OF HARRIS §

THAT of the City of , Texas, as principal and hereinafter referred to as "Principal," and authorized under the Laws of the State of Texas to act as surety on bonds for principals, as surety and hereinafter referred to as "Surety," are held and firmly bound unto , as obligee and hereinafter referred to as "Owner," in the penal sum of AND /100 DOLLARS ($ ) for the payment which said Principal and Surety bind themselves, and their officers, directors, shareholders, partners, successors and assigns, jointly and severally, pursuant to the following:

WHEREAS, the Principal has entered into a certain written contract with the Owner, dated day of , 20 , for construction of:

HARRIS COUNTY MUD #387 REFORESTATIOND AND IRRIGATION

which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein;

NOW, THEREFORE, the condition of this obligation is such, that if the said Principal shall pay all claimants supplying labor and material to it or to a subcontractor in the prosecution of the work provided for in said contract, then, this obligation shall be void; otherwise to remain in full force and effect;

PROVIDED, for value received, Surety stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in anyway affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or the work to be performed thereunder, or the plans, specifications or drawings accompanying same;

FURTHER PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute to the same extent as if it were copied at length herein.

NEW FORM: K:\Construction Contract – Payment Bond (Public)

REVISED: 5/18/15

BY: BTY

IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument the day of , 20 , to be effective as of the date of the contract.

Principal Surety

By:________________________________ By:_______________________________

Title:______________________________

Address:___________________________

Address:___________________________

(SEAL) (SEAL)

The name and address of the Resident Agent of Surety is:

The name, mailing address, physical address and telephone number, including the area code, of the Surety to which any notice of claim should be sent:

NOTE: This form to be used only when the Construction Contract is entered into by the District. See Private Work form for Developer Construction Contracts.

Bond No.

PERFORMANCE BOND

STATE OF TEXAS §

§ KNOW ALL PERSONS BY THESE PRESENTS:

COUNTY OF HARRIS §

THAT of the City of , Texas, as principal and hereinafter referred to as "Principal," and authorized under the Laws of the State of Texas to act as surety on bonds for principals, as surety and hereinafter referred to as "Surety," are held and firmly bound unto , as obligee and hereinafter referred to as "Owner," in the penal sum of AND /100 DOLLARS ($ ) for the payment which said Principal and Surety bind themselves, and their officers, directors, shareholders, partners, successors and assigns, jointly and severally, pursuant to the following:

WHEREAS, the Principal has entered into a certain written contract with the Owner, dated the day of , 20 , to be effective as of the date of the contract for construction of:

HARRIS COUNTY MUD #387 REFORESTATION AND IRRIGATION

which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein;

NOW, THEREFORE, the condition of this obligation is such, that if the said Principal shall faithfully perform the work, as defined in and in accordance with the plans, specifications and contract documents, then this obligation shall be void; otherwise to remain in full force and effect;

PROVIDED, for value received, Surety stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or the work to be performed thereunder, or the plans, specifications or drawings accompanying same.

FURTHER PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute to the same extent as if it were copied at length herein.

MASTER FORM: K:\Construction Contract - Performance Bond (Public)

Revised: 5/18/15 - BY: BTY Construction Contract - Performance Bond (Public) - template (2)

IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument the day of , 20 .

Principal Surety

By:_________________________________ By:_______________________________

Title:_______________________________

Address:_____________________________ Address:___________________________

(SEAL) (SEAL)

The name and address of the Resident Agent of Surety is:

The name, mailing address, physical address and telephone number, including the area code, of the Surety to which any notice of claim should be sent:

Revised 1/27/03 TC - 1

TABLE OF CONTENTS

FOR

GENERAL CONDITIONS OF AGREEMENT

Page

1. DEFINITION OF TERMS

1.01 Owner, Contractor and Engineer G-1

1.02 Contract Documents G-1

1.03 Subcontractor G-1

1.04 Written Notice G-1

1.05 Work G-1

1.06 Extra Work G-1

1.07 Working Day G-1

1.08 Calendar Day G-1

1.09 Substantially Completed G-2

2. RESPONSIBILITIES OF THE ENGINEER AND THE CONTRACTOR

2.01 Owner-Engineer Relationship G-2

2.02 Professional Inspection by Engineer G-2

2.03 Payments for Work G-2

2.04 Initial Determinations G-2

2.05 Objections G-2

2.06 Lines and Grades G-2

2.07 Contractor's Duty and Superintendence G-3

2.08 Contractor's Understanding G-3

2.09 Character of Workers G-3

2.10 Contractor's Building G-4

2.11 Sanitation G-4

2.12 Shop Drawings G-4

2.13 Preliminary Approval G-4

2.14 Defects and Their Remedies G-4

2.15 Changes and Alterations G-5

3. GENERAL OBLIGATIONS AND RESPONSIBILITIES

3.01 Keeping of Plans and Specifications Accessible G-5

3.02 Ownership of Drawings G-5

3.03 Right of Entry G-5

3.04 Collateral Contracts G-5

3.05 Discrepancies and Omissions G-5

3.06 Equipment, Materials and Construction Plant G-5

3.07 Damages G-5

3.08 Protection Against Accident to Employees and the Public G-6

Revised 1/27/03 TC - 2

3.09 Performance and Payment Bonds G-6

3.10 Losses from Natural Causes G-6

3.11 Protection of Adjoining Property G-7

3.12 Protection Against Claims of Subcontractors, Etc. G-7

3.13 Protection Against Royalties or Patented Invention G-7

3.14 Law and Ordinances G-7

3.15 Assignment and Subletting G-8

3.16 Indemnification G-8

3.17 Insurance G-8

3.17.1 Certificate of Insurance G-9

4. PROSECUTION AND PROGRESS

4.01 Time and Order of Completion G-9

4.02 Extension of Time G-9

4.03 Hindrances and Delays G-9

5. MEASUREMENT AND PAYMENT

5.01 Quantities and Measurements G-9

5.02 Estimated Quantities G-9

5.03 Price of Work G-10

5.04 Partial Payment G-10

5.05 Use of Completed Portions G-10

5.06 Final Completion and Acceptance G-11

5.07 Final Payment G-11

5.08 Payments Withheld G-11

5.09 Delayed Payments G-11

6. EXTRA WORK AND CLAIMS

6.01 Change Orders G-11

6.02 Minor Changes G-12

6.03 Extra Work G-12

6.04 Time of Filing Claims G-13

6.05 Arbitration G-13

7. ABANDONMENT OF CONTRACT

7.01 Abandonment by Contractor G-13

7.02 Abandonment by Owner G-15

7.03 Termination by the Owner for Cause G-15

7.04 Termination by the Owner for Convenience G-16

7.05 Suspension by the Owner for Convenience G-17

7.06 Termination by the Contractor G-17

Revised 1/27/03 G-1

GENERAL CONDITIONS OF AGREEMENT

1. DEFINITION OF TERMS

1.01 OWNER, CONTRACTOR AND ENGINEER. The OWNER, the CONTRACTOR and the ENGINEER are those persons or organization identified as such in the Agreement and are referred to throughout the Contract Documents as if singular in number and masculine in gender. The term ENGINEER means the ENGINEER or his duly authorized representative. The ENGINEER shall be understood to be the ENGINEER of the OWNER, and nothing contained in the Contract Documents shall create any contractual or agency relationship between the ENGINEER and the CONTRACTOR.

1.02 CONTRACT DOCUMENTS. The Contract Documents shall consist of the Notice to Bidders (Advertisement), Instructions to Bidders, Proposal, signed Agreement, Performance and Payment Bonds (when required), Special Bonds (when required), General Conditions of the Agreement, Special Conditions of Agreement, Technical Specifications, Plans, and all modifications thereof incorporated in any of the documents before the execution of the agreement.

The Contract Documents are complementary, and what is called for by any one shall be as binding as if called for by all. In case of conflict between any of the Contract Documents, priority of interpretation shall be in the following order: Signed Agreement, Performance and Payment Bonds, Special Bonds (if any), Proposal, Special Conditions of Agreement, Notice to Bidders, Technical Specifications, Plans, and General Conditions of Agreement.

1.03 SUBCONTRACTOR. The term Subcontractor, as employed herein, includes only those having a direct contract with the CONTRACTOR and it includes one who furnishes material worked to a special design according to the plans or specifications of this work, but does not include one who merely furnishes material not so worked.

1.04 WRITTEN NOTICE. Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered mail to the last business address known to him who gives the notice.

1.05 WORK. The CONTRACTOR shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor services, insurance, and all water, light, power, fuel, transportation and other facilities necessary for the execution and completion of the work covered by the contract documents. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The CONTRACTOR shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have a well known technical or trade meaning shall be held to refer to such recognized standards.

1.06 EXTRA WORK. The term "Extra Work" as used in this contract shall be understood to mean and include all work that may be required by the ENGINEER or OWNER to be done by the CONTRACTOR to accomplish any change, alteration or addition to the work shown upon the plans, or reasonably implied by the specifications, and not covered by the CONTRACTOR's proposal, except as provided under "Changes and Alterations", herein.

1.07 WORKING DAY. A "Working Day" is defined as any day not including Saturdays, Sundays or any legal holidays, in which weather or other conditions, not under the control of the CONTRACTOR, will permit construction of the principal units of the work for a period of not less than seven (7) hours between 7:00 a.m. and 6:00 p.m.

1.08 CALENDAR DAY. "Calendar Day" is any day of the week or month, no days being excepted.

Revised 1/27/03 G-2

1.09 SUBSTANTIALLY COMPLETED. By the term "substantially completed" is meant that the structure has been made suitable for use or occupancy or the facility is in condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment.

2. RESPONSIBILITIES OF THE ENGINEER AND THE CONTRACTOR

2.01 OWNER-ENGINEER RELATIONSHIP. The ENGINEER will be the OWNER's representative during construction. The duties, responsibilities and limitations of authority of the ENGINEER as the OWNER's representative during construction are as set forth in the Contract Documents and shall not be extended or limited without written consent of the OWNER and ENGINEER. The ENGINEER will advise and consult with the OWNER, and all of OWNER's instructions to the CONTRACTOR shall be issued through the ENGINEER.

2.02 PROFESSIONAL INSPECTION BY ENGINEER. The ENGINEER shall make periodic visits to the site to familiarize himself generally with the progress of the executed work and to determine if such work generally meets the essential performance and design features and the technical and functional engineering requirements of the Contract Documents; provided and except, however, that the ENGINEER shall not be responsible for making any detailed, exhaustive, comprehensive or continuous on-site inspection of the quality or quantity of the work or be in any way responsible, directly or indirectly, for the construction means, methods, techniques, sequences, quality, procedures, programs, safety precautions or lack of same incident thereto or in connection therewith.

Notwithstanding any other provision of this agreement or any other Contract Document, the ENGINEER shall not be in any way responsible or liable for any acts, errors, omissions or negligence of the CONTRACTOR, any subcontractor or any of the CONTRACTOR's or subcontractor's agents, servants or employees or any other person, firm or corporation performing or attempting to perform any of the work.

2.03 PAYMENTS FOR WORK. The ENGINEER shall review CONTRACTOR's applications for payment and supporting data, determine the amount owed to the CONTRACTOR and approve, in writing, payment to CONTRACTOR in such amounts; such approval of payment to CONTRACTOR constitutes a representation to the OWNER of ENGINEER's professional judgement that the work has progressed to the point indicated to the best of his knowledge, information and belief, but such approval of an application for payment to CONTRACTOR shall not be deemed as a representation by ENGINEER that ENGINEER has made any examination to determine how or for what purpose CONTRACTOR has used the moneys paid on account of the Contract price.

2.04 INITIAL DETERMINATIONS. The ENGINEER initially shall determine all claims, disputes and other matters in question between the CONTRACTOR and the OWNER relating to the execution or progress of the work or the interpretation of the Contract Documents and the ENGINEER's decision shall be rendered in writing within a reasonable time. Should the ENGINEER fail to make such a decision within a reasonable time, appeal to arbitration may be taken as if his decision had been rendered against the party appealing.

2.05 OBJECTIONS. In the event the ENGINEER renders any decision which, in the opinion of either party hereto, is not in accordance with the meaning and intent of this contract, either party may file with the ENGINEER within thirty days his written objection to the decision, and by such action may reserve the right to submit the question so raised to arbitration as hereinafter provided.

2.06 LINES AND GRADES. Unless otherwise specified, all lines and grades shall be furnished by the ENGINEER or his representative. Whenever necessary, construction work shall be suspended to permit performance of this work, but such suspension will be as brief as practicable and the CONTRACTOR shall be allowed no extra compensation therefor. The CONTRACTOR shall give the ENGINEER ample notice of the time and place where lines and grades will be needed. All stakes, marks, etc., shall be carefully preserved by the CONTRACTOR and in case of careless destruction or removal by him or his employees, such stakes, marks, etc., shall be replaced at the CONTRACTOR's expense.

Revised 1/27/03 G-3

2.07 CONTRACTOR'S DUTY AND SUPERINTENDENCE. The CONTRACTOR shall give adequate attention to the faithful prosecution and completion of this contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants. The superintendent shall represent the CONTRACTOR, in his absence and all directions given to him shall be as binding as if given to the CONTRACTOR.

The CONTRACTOR is and at all times shall remain an independent CONTRACTOR, solely responsible for the manner and method of completing his work under this contract, with full power and authority to select the means, method and manner of performing such work, so long as such methods do not adversely affect the completed improvements, the OWNER and ENGINEER being interested only in the result obtained and conformity of such completed improvements to the plans, specifications and contract.

Likewise, the CONTRACTOR shall be solely responsible for the safety of himself, his employees and other persons, as well as for the protection of the safety of the improvements being erected and the property of himself or any other person, as a result of his operations hereunder. Engineering construction drawings and specifications as well as any additional information concerning the work to be performed passing from or through the ENGINEER shall not be interpreted as requiring or allowing CONTRACTOR to deviate from the plans and specifications, the intent of such drawings, specifications and any other such instructions being to define with particularity the agreement of the parties as to the work the CONTRACTOR is to perform. CONTRACTOR shall be fully and completely liable, at his own expense, for design, construction, installation and use, or non-use, of all items and methods incident to performance of the contract, and for all loss, damage or injury incident thereto, either to person or property, including, without limitation, the adequacy of all temporary supports, shoring, bracing, scaffolding, machinery or equipment, safety precautions or devices, and similar items or devices used by him during construction.

Any review of work in process, or any visit or observation during construction, or any clarification of plans and specifications, by the ENGINEER, or any agent, employee, or representative of either of them, whether through personal observation on the project site or by means of approval of shop drawings for temporary construction or construction processes, or by other means or method, is agreed by the CONTRACTOR to be for the purpose of observing the extent and nature of work completed or being performed, as measured against the drawings and specifications constituting the contract, or for the purpose of enabling CONTRACTOR to more fully understand the plans and specifications so that the completed construction work will conform thereto, and shall in no way relieve the CONTRACTOR from full and complete responsibility for the proper performance of his work on the project, including but without limitation the propriety of means and methods of the CONTRACTOR in performing said contract, and the adequacy of any designs, plans or other facilities for accomplishing such performance.

Deviation by the CONTRACTOR from plans and specifications that may have been in evidence during any such visitation or observation by the ENGINEER, or any of his representatives, whether called to the CONTRACTOR's attention or not shall in no way relieve CONTRACTOR from his responsibility to complete all work in accordance with said plans and specifications.

2.08 CONTRACTOR'S UNDERSTANDING. It is understood and agreed that the CONTRACTOR has, by careful examination, satisfied himself as to the nature and location of the work, the conformation of the ground, the character, quality and quantity of the materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work, the general and local conditions, and all other matters which can in any way affect the work under this contract. No verbal agreement or conversation with any officer, agent or employee of the OWNER or ENGINEER either before or after the execution of this contract, shall affect or modify any of the terms or obligations herein contained.

2.09 CHARACTER OF WORKERS. The CONTRACTOR agrees to employ only orderly and competent persons, skillful in the performance of the type of work required under this contract, to do the work; and agrees that whenever the ENGINEER shall inform him in writing that any personnel on the work are, in his opinion, incompetent, unfaithful or disorderly, such person or persons shall be discharged from the work and shall not again be employed on the work without the ENGINEER's written consent.

2.10 CONTRACTOR'S BUILDINGS. The building of structures for housing personnel, or the erection of tents or other forms of protection, will be permitted only at such places as the ENGINEER shall direct, and the

Revised 1/27/03 G-4 sanitary conditions of the grounds in or about such structures shall at all times be maintained in a manner satisfactory to the ENGINEER.

2.11 SANITATION. Necessary sanitary conveniences for the use of laborers on the work, properly secluded from public observation, shall be constructed and maintained by the CONTRACTOR in such manner and at such points as shall be approved by the ENGINEER, and their use shall be strictly enforced.

2.12 SHOP DRAWINGS. The CONTRACTOR shall submit to the ENGINEER, with such promptness as to cause no delay in his own work or in that of any other CONTRACTOR, four checked copies, unless otherwise specified, of all shop and/or setting drawings and schedules required for the work of the various trades, and the ENGINEER shall pass upon them with reasonable promptness, making desired corrections. The CONTRACTOR shall make any corrections required by the ENGINEER, file with him two corrected copies and furnish such other copies as may be needed. The ENGINEER's approval of such drawings or schedules shall not relieve the CONTRACTOR from responsibility for deviations from drawings or specifications, unless he has in writing called the ENGINEER's attention to such deviations at the time of submission, nor shall it relieve him from responsibility for errors of any sort in shop drawings or schedules. It shall be the CONTRACTOR's responsibility to fully and completely review all shop drawings to ascertain their effect on his ability to perform the required contract work in accordance with the plans and specifications and within the contract time.

Such review by the ENGINEER shall be for the sole purpose of determining the sufficiency of said drawings or schedules to result in finished improvements in conformity with the plans and specifications, and shall not relieve the CONTRACTOR of his duty as an independent CONTRACTOR as previously set forth, it being expressly understood and agreed that the ENGINEER does not assume any duty to pass upon the propriety or adequacy of such drawings or schedules, or any means or methods reflected thereby, in relation to the safety of either person or property during CONTRACTOR's performance hereunder.

2.13 PRELIMINARY APPROVAL. The ENGINEER shall not have the power to waive the obligations of this contract for the furnishing by the CONTRACTOR of good material, and of his performing good work as herein described, and in full accordance with the plans and specifications. No failure or omission of the ENGINEER to discover, object to or condemn any defective work or material shall release the CONTRACTOR from the obligations to fully and properly perform the contract, including without limitations, the obligation to at once tear out, remove and properly replace the same at any time prior to final acceptance upon the discovery of said defective work or material; provided, however, that the ENGINEER shall, upon request of the CONTRACTOR, inspect and accept or reflect any material furnished, and in the event the material has been once accepted by the ENGINEER, such acceptance shall be binding on the OWNER, unless it can be clearly shown that such material furnished does not meet the specifications for this work.

Any questioned work may be ordered taken up or removed for re-examination, by the ENGINEER, prior to final acceptance, and if found not in accordance with the specifications for said work, all expense of removing, re-examination and replacement shall be borne by the CONTRACTOR, otherwise the expense thus incurred shall be allowed as EXTRA WORK, and shall be paid for by the OWNER; provided that, where inspection or approval is specifically required by the specifications prior to performance of certain work, should the CONTRACTOR proceed with such work without requesting prior inspection or approval, he shall bear all expense of taking up, removing, and replacing this work if so directed by the ENGINEER.

2.14 DEFECTS AND THEIR REMEDIES. It is further agreed that if the work or any part thereof, or any material brought on the site of the work for use in the work or selected for the same, shall be deemed by the ENGINEER as unsuitable or not in conformity with the specifications, the CONTRACTOR shall, after receipt of written notice thereof from the ENGINEER, forthwith remove such material and rebuild or otherwise remedy such work so that it shall be in full accordance with this contract.

2.15 CHANGES AND ALTERATIONS. The CONTRACTOR further agrees that the OWNER may make such changes and alterations as the OWNER may see fit, in the line, grade, form, dimensions, plans or materials for

Revised 1/27/03 G-5 the work herein contemplated, or any part…