Project Manual Summary: Coopers Rock High Voltage Repairs Phase 1
This is a project manual for the West Virginia Division of Natural Resources (WVDNR) addressing directional boring and conduit installation work at Coopers Rock in Bruceton Mills, West Virginia. The project represents Phase 1 of high-voltage repairs and involves the installation of medium-voltage cables and horizontal directional drilling for conduit placement. The contract documents include standard AIA forms (A101-2017, A201-2017) establishing a stipulated sum basis of payment. The project manual incorporates Division 26 (Electrical) and Division 33 (Utilities) specifications, with Miller Engineering, Inc. serving as the architect (located at 54 West Run Road, Morgantown, WV). The contractor position is listed as "TBD" (to be determined), indicating the award had not been finalized at the time of document generation on April 21, 2026.
The contract sum is listed as $0.00, suggesting this document serves as a template or preliminary project manual prior to bid award and final contract pricing determination. Standard payment procedures are outlined through progress applications and architect certification, with provisions for retainage, change orders, and substantial completion milestones. The document includes comprehensive general conditions per AIA A201-2017, supplementary conditions, and administrative requirements including contractor submittals, quality requirements, and execution protocols. Insurance and bonding requirements are specified in Exhibit A to the agreement. The project documentation establishes mechanisms for change orders, construction change directives, and dispute resolution, with provisions for claims and mediation procedures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Docs 6-11-2026.pdf | ||
| Final_CRFQ_0310_DNR2600000021_1_WV_CRFQ_FORM.PDF | ||
| Plans - Coopers Electrical Upgrade.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
FOR
COOPERS ROCK HIGH VOLTAGE
REPAIRS PHASE 1 -
DIRECTIONAL BORING AND
CONDUIT INSTALLATION
BRUCETON MILLS, WEST VIRGINIA
OWNER: WV DIVISION OF NATURAL RESOURCES
MILLER ENGINEERING
(304) 291-2234
MEI PROJECT #: 26002
21APR26
26002 / Coopers Rock High Voltage Repairs Phase 1 - Directional Boring and Conduit Installation
00 0110 - 1 Table of Contents
SECTION 00 0110
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
A. 00 0101 - Project Title Page B. 00 0110 - Table of Contents C. 00 6000 - Project Forms D. 00 7200 - General Conditions E. 00 7300 - Supplementary Conditions
SPECIFICATIONS
2.01 DIVISION 01 -- GENERAL REQUIREMENTS
A. 01 1000 - Summary B. 01 2000 - Price and Payment Procedures C. 01 2500 - Substitution Procedures D. 01 3000 - Administrative Requirements E. 01 4000 - Quality Requirements F. 01 5000 - Temporary Facilities and Controls G. 01 6000 - Product Requirements H. 01 7000 - Execution and Closeout Requirements I. 01 7800 - Closeout Submittals
2.02 DIVISION 26 -- ELECTRICAL
A. 26 0001 - Basic Electrical Materials and Methods B. 26 0513 - Medium-Voltage Cables
2.03 DIVISION 33 -- UTILITIES
A. 33 0523 - Horizontal Directional Drilling
END OF SECTION
Directional Boring and Conduit Installation
00 6000 - 1 PROJECT FORMS
SECTION 00 6000
PROJECT FORMS
THE AIA FORMS FOLLOWING THIS SECTION WILL BE UTILIZED IN THE EXECUTION OF
THE PROJECT
Document G701
– 2017
Change Order
AIA Document G701 – 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:28:39 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7ddeb6b60415508f3236d)
PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION:
WVDNR Coopers Rock High Voltage Repairs Phase 1 - Directional Boring and Conduit Installation
Contract For: Change Order Number: 001
61 County Line Drive Bruceton Mills, WV 26525
Date: 04-21-2026 Date:
OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address) West Virginia Division of Natural Resources
Miller Engineering, Inc. TBD
112 California Avenue Charleston, WV 25305
54 West Run Road Morgantown, WV 26508
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.)
The original Contract Sum was $ 0.00
The net change by previously authorized Change Orders $ 0.00
The Contract Sum prior to this Change Order was $ 0.00
The Contract Sum will be unchanged by this Change Order in the amount of $ 0.00
The new Contract Sum including this Change Order will be $ 0.00
The Contract Time will be unchanged by ( ) days.
The new date of Substantial Completion will be
NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
dae85257
ARCHITECT (Signature)
(Printed name, title, and license number if required)
Date ef9119b7
CONTRACTOR (Signature)
(Printed name and title)
Date c26a24fa
OWNER (Signature)
(Printed name and title)
Date
D o c u m e n t G
A p p lic at io n an d C er ti fi ca te fo r P ay m en t
A
IA
D o c u m e n t G C o p y ri g h t a n d A ll ri g h ts re s e rv e d “T h e A m e ri c a n In s ti tu te o f A rc h it e c ts “A m e ri c a n In s ti tu te o f A rc h it e c ts “A
IA
th e A
IA
L o g o a n d “A
IA
C o n tr a c t D o c u m e n ts a re tr a d e m a rk s o f T h e A m e ri c a n In s ti tu te o f A rc h it e c ts T h is d o c u m e n t w a s p ro d u c e d a t :2 :4 E D T o n /2 /2 u n d e r S u b s c ri p ti o n N o .2 w h ic h e x p ir e s o n /0 /2 is n o t fo r re s a le is lic e n s e d fo r o n e -t im e u s e o n ly a n d m a y o n ly b e u s e d in a c c o rd a n c e w it h th e A
IA
C o n tr a c t D o c u m e n ts T e rm s o f S e rv ic e T o re p o rt c o p y ri g h t v io la ti o n s e -m a il d o c in fo a ia c o n tr a c ts .c o m
(6 e d e b f3
T O
O W
N E
R
W es t V ir g in ia D iv is io n o f N at u ra l R es o u rc es
P R
O J
E C
T
W V D N R C o o p er s R o ck H ig h V o lt ag e R ep ai rs
P h as e D ir ec ti o n al B o ri n g an d C o n d u it
In st al la ti o n
A P
P L
IC
A
T
IO
N N
O
D is tr ib u ti o n to
C al if o rn ia A v en u e
C h ar le st o n W V
C o u n ty L in e D ri v e
B ru ce to n M il ls W V
O W
N E
R
P E
R
IO
D T
O
A p ri l
A R
C H
IT
E
C T
C O
N T
R A
C T
F O
R
C
O N
T R
A C
T O
R
F R
O M
T B D
V
IA
M il le r E n g in ee ri n g In c.
C O
N T
R A
C T
D A
T E
F
IE
L D
C O
N T
R A
C T
O
A
C H
IT
E
C T
W es t R u n R o ad
M o rg an to w n W V
P R
O J
E C
T N
O S
T
H E
R
C O
N T
R A
C T
O R
'S A
P P
L
IC
A T
IO
N
F O
R P
A Y
M E
N T
T h e u n d er si g n ed C o n tr ac to r ce rt if ie s th at to th e b es t o f th e C o n tr ac to r' s k n o w le d g e, in fo rm at io n an d b el ie f th e W o rk co v er ed b y th is A p p li ca ti o n fo r P ay m en t h as b ee n co m p le te d in ac co rd an ce w it h th e
C o n tr ac t D o cu m en ts th at al l am o u n ts h av e b ee n p ai d b y th e C o n tr ac to r fo r W o rk fo r w h ic h p re v io u s
C er ti fi ca te s fo r P ay m en t w er e is su ed an d p ay m en ts re ce iv ed fr o m th e O w n er an d th at cu rr en t p ay m en t sh o w n h er ei n is n o w d u e.
A p p li ca ti o n is m ad e fo r p ay m en t, as sh o w n b el o w in co n n ec ti o n w it h th e C o n tr ac t.
A
IA
D o cu m en t G C o n ti n u at io n S h ee t, is at ta ch ed
O R
IG
IN
A L
C O
N T
R A
C T
S U
M
.0
N E
T C
H A
N G
E B
Y C
H A
N G
E O
R D
E R
S
.0
C O
N T
R A
C T
O R
C O
N T
R A
C T
S U
M T
O D
A T
E (L in e
.0 B y si g n er T ag
D at e:
d a te
T O
T A
L C
O M
P L
E T
E D
S
T O
R E
D T
O D
A T
E (C o lu m n G o n G
.0 S ta te f:
R E
T A
IN
A
G E
C o u n ty f:
a .0 o f C o m p le te d W o rk
(C o lu m n D E o n G
.0
.0
S u b sc ri b ed an d sw o rn to b ef o re b .0 o f S to re d M at er ia l m e th is d ay o f
(C o lu m n F o n G
.0
.0
N o ta ry P u b li c:
T ta l R et ai n ag e (L in es a b o r T o ta l in C o lu m n I o f G
.0 M y C o m m is si o n ex p ir es
C H
IT
E
C T
'S C
E R
T
IF
IC
A
T E
F O
R P
A Y
M E
N T
T O
T A
L E
A R
N E
D L
E S
S R
E T
A
IN
A G
E
.0 In ac co rd an ce w it h th e C o n tr ac t D o cu m en ts b as ed o n o n -s it e o b se rv at io n s an d th e d at a co m p ri si n g th is ap p li ca ti o n th e A rc h it ec t ce rt if ie s to th e O w n er th at to th e b es t o f th e A rc h it ec t's k n o w le d g e, in fo rm at io n an d b el ie f th e W o rk h as p ro g re ss ed as in d ic at ed th e q u al it y o f th e W o rk is in ac co rd an ce w it h th e C o n tr ac t D o cu m en ts an d th e C o n tr ac to r is en ti tl ed to p ay m en t o f th e A M O U N T
C E R T
IF
IE
D
(L in e L es s L in e T o ta l)
L E
S S
P R
E V
IO
U
S C
E R
T
IF
IC
A
T E
S F
O R
P A
Y M
E N
T
.0
(L in e fr o m p ri o r C er ti fi ca te
C U
R R
E N
T P
A Y
M E
N T
D U
E
.0
A M
O U
N T
C E
R T
IF
IE
D
.0
B A
L A
N C
E T
O F
IN
IS
H
IN
C L
U D
IN
G
R E
T A
IN
A
G E
(A tt a ch ex p la n a ti o n if a m o u n t ce rt if ie d d if fe rs fr o m th e a m o u n t a p p li ed In it ia l a ll fi g u re s o n th is
A p p li ca ti o n a n d o n th e C o n ti n u a ti o n S h ee t th a t a re ch a n g ed to co n fo rm w it h th e a m o u n t ce rt if ie d
(L in e le ss L in e
.0
A R
C H
IT
E
C T
C H A N G E O R D E R S U M M A R Y
A D D
IT
IO
N S
D E D U C T
IO
N S
B y si g n er T ag
D at e:
d a te
T o ta l ch an g es ap p ro v ed in p re v io u s m o n th s b y
O w n er
.0
.0
T o ta l ap p ro v ed th is M o n th
.0
.0 T h is C er ti fi ca te is n o t n eg o ti ab le T h e A M O U N T C E R T
IF
IE
D is p ay ab le o n ly to th e C o n tr ac to r n am ed h er ei n Is su an ce p ay m en t an d ac ce p ta n ce o f p ay m en t ar e w it h o u t p re ju d ic e to an y ri g h ts o f th e
O w n er o r C o n tr ac to r u n d er th is C o n tr ac t.
T O T A L S
.0
.0
IA
D o c u m e n t G C o p y ri g h t a n d A ll ri g h ts re s e rv e d “T h e A m e ri c a n In s ti tu te o f A rc h it e c ts “A m e ri c a n In s ti tu te o f A rc h it e c ts “A
IA
th e A
IA
L o g o a n d “A
IA
C o n tr a c t D o c u m e n ts a re tr a d e m a rk s o f T h e A m e ri c a n In s ti tu te o f A rc h it e c ts T h is d o c u m e n t w a s p ro d u c e d a t :2 :4 E D T o n /2 /2 u n d e r S u b s c ri p ti o n N o .2 w h ic h e x p ir e s o n /0 /2 is n o t fo r re s a le is lic e n s e d fo r o n e -t im e u s e o n ly a n d m a y o n ly b e u s e d in a c c o rd a n c e w it h th e A
IA
C o n tr a c t D o c u m e n ts T e rm s o f S e rv ic e T o re p o rt c o p y ri g h t v io la ti o n s e -m a il d o c in fo a ia c o n tr a c ts .c o m
(6 e d e b f3
N E T C H A N G E S b y C h an g e O rd er
D c u m e n t G
C o n ti n u at io n S h ee t
A
IA
D o c u m e n t G C o p y ri g h t ,1 a n d A ll ri g h ts re s e rv e d “T h e A m e ri c a n In s ti tu te o f A rc h it e c ts “A m e ri c a n In s ti tu te o f A rc h it e c ts “A
IA
th e A
IA
L o g o a n d
“A
IA
C o n tr a c t D o c u m e n ts a re tr a d e m a rk s o f T h e A m e ri c a n In s ti tu te o f A rc h it e c ts T h is d o c u m e n t w a s p ro d u c e d a t :2 :4 E D T o n /2 /2 u n d e r S u b s c ri p ti o n N o .2 w h ic h e x p ir e s o n /0 /2 is n o t fo r re s a le is lic e n s e d fo r o n e -t im e u s e o n ly a n d m a y o n ly b e u s e d in a c c o rd a n c e w it h th e A
IA
C o n tr a c t D o c u m e n ts T e rm s o f S e rv ic e T o re p o rt c o p y ri g h t v io la ti o n s e -m a il d o c in fo a ia c o n tr a c ts .c o m
(6 e d e b f3
A
IA
D o cu m en t G A p p li ca ti o n an d C er ti fi ca ti o n fo r P ay m en t, o r G
A p p li ca ti o n an d C er ti fi ca te fo r P ay m en t, C o n st ru ct io n M an ag er as A d v is er E d it io n co n ta in in g C o n tr ac to r' s si g n ed ce rt if ic at io n is at ta ch ed
U se C o lu m n I o n C o n tr ac ts w h er e v ar ia b le re ta in ag e fo r li n e it em s m ay ap p ly
W V D N R C o o p er s R o ck H ig h
V o lt ag e R ep ai rs P h as e
D ir ec ti o n al B o ri n g an d
C o n d u it In st al la ti o n
A P
P L
IC
A
T
IO
N N
O
C o u n ty L in e D ri v e
B ru ce to n M il ls W V
A P
P L
IC
A
T
IO
N D
A T
E
-2 -2
P E
R
IO
D T
O
A p ri l
A R
C H
IT
E
C T
'S P
R O
J E
C T
N
B
C D
E F
G H
I
IT
E M
N O
D E S C R
IP
T
IO
N O F
W O R K
S C H E D U L E D
V A L U E
W O R K C O M P L E T E D
M A T E R
IA
L S
P R E S E N T L Y
S T O R E D
(N O T
IN
D O R E
T O T A L C O M P L E T E D
A N D S T O R E D T O
D A T E
(D E F
(G C
B A L A N C E T O
F
IN
IS
H
(C G
R E T A
IN
A G E
(I F V A R
IA
B L E
R A T E
F R O M P R E V
IO
U S
A P P L
IC
A T
IO
N
(D E
T H
IS
P E R
IO
D
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
G R
A N
D T
O T
A L
.0
.0
.0
.0
.0
.0
.0
Document G704
– 2017
Certificate of Substantial Completion
AIA Document G704 – 2017. Copyright © 1963, 1978, 1992, 2000 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:30:38 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7de605f1b2d23ced1f791)
PROJECT: (name and address) CONTRACT INFORMATION: CERTIFICATE INFORMATION:
WVDNR Coopers Rock High Voltage Repairs Phase 1 - Directional Boring and Conduit Installation
Contract For: Certificate Number:
61 County Line Drive Bruceton Mills, WV 26525
Date: 04-21-2026 Date:
OWNER: (name and address) ARCHITECT: (name and address) CONTRACTOR: (name and address) West Virginia Division of Natural Resources
Miller Engineering, Inc. TBD
112 California Avenue Charleston, WV 25305
The Work identified below has been reviewed and found, to the Architect s best knowledge, information, and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated below is the date established by this Certificate.
(Identify the Work, or portion thereof, that is substantially complete.)
{{@signerTag}}
ARCHITECT (Signature) (Printed name, title, and license number if required)
Date Of Substantial Completion
WARRANTIES
The date of Substantial Completion of the Project or portion designated above is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below:
(Identify warranties that do not commence on the date of Substantial Completion, if any, and indicate their date of commencement.)
WORK TO BE COMPLETED OR CORRECTED
A list of items to be completed or corrected is attached hereto, or transmitted as agreed upon by the parties, and identified as follows:
(Identify the list of Work to be completed or corrected.)
The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment, whichever occurs first. The Contractor will complete or correct the Work on the list of items attached hereto within ( ) days from the above date of Substantial Completion.
Cost estimate of Work to be completed or corrected: $
The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work, insurance, and other items identified below shall be as follows:
(Note: Owner s and Contractor s legal and insurance counsel should review insurance requirements and coverage.)
The Owner and Contractor hereby accept the responsibilities assigned to them in this Certificate of Substantial Completion:
CONTRACTOR (Signature) (Printed name and title) Date
AIA Document G704 – 2017. Copyright © 1963, 1978, 1992, 2000 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:30:38 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7de605f1b2d23ced1f791)
OWNER (Signature) (Printed name and title) Date
Document G706
– 1994
Contractor's Affidavit of Payment of Debts and Claims
AIA Document G706 – 1994. Copyright © 1970 and 1994. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:31:52 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7deabc05f35c229fa7e37)
PROJECT:(Name and address) WVDNR Coopers Rock High Voltage Repairs Phase 1 - Directional Boring and Conduit Installation 61 County Line Drive Bruceton Mills, WV 26525
TO OWNER:(Name and address) West Virginia Division of Natural Resources 112 California Avenue Charleston, WV 25305
ARCHITECT’S PROJECT NUMBER:
CONTRACT FOR:
CONTRACT DATED:
04-21-2026
OWNER:[ ]
ARCHITECT:[ ]
CONTRACTOR:[ ]
SURETY:[ ]
OTHER:[ ]
STATE OF:
COUNTY OF:
The undersigned hereby certifies that, except as listed below, payment has been made in full and all obligations have otherwise been satisfied for all materials and equipment furnished, for all work, labor, and services performed, and for all known indebtedness and claims against the Contractor for damages arising in any manner in connection with the performance of the Contract referenced above for which the Owner or Owner's property might in any way be held responsible or encumbered.
EXCEPTIONS:
SUPPORTINGDOCUMENTSATTACHED
HERETO:
CONTRACTOR:(Name and address)
1. Consent of Surety to Final Payment.
Whenever Surety is involved, Consent of Surety is required. AIA Document G707, Consent of Surety, may be used for this purpose
TBD
Indicate Attachment [ ] Yes [ ] No
CONTRACTOR'S Authorized Representative(Signature)
(Printed name and title)
Date
The following supporting documents should be attached hereto if required by the Owner:
1. Contractor's Release or Waiver of Liens, conditional upon receipt of final payment.
2. Separate Releases or Waivers of Liens from Subcontractors and material and equipment suppliers, to the extent required by the Owner, accompanied by a list thereof.
Subscribed and sworn to before me on this date:
Notary Public:
3. Contractor's Affidavit of Release of Liens (AIA Document G706A).
My Commission Expires:
Document G706
A – 1994
Contractor's Affidavit of Release of Liens
AIA Document G706A – 1994. Copyright © 1982 and 1994. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:36:17 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7dfb55f1b2d23ced1f7b8)
PROJECT: (Name and address) ARCHITECT’S PROJECT NUMBER : OWNER: [ ]
ARCHITECT: [ ]
CONTRACTOR: [ ]
SURETY: [ ]
OTHER: [ ]
WVDNR Coopers Rock High Voltage Repairs Phase 1 - Directional Boring and Conduit Installation
61 County Line Drive Bruceton Mills, WV 26525
TO OWNER: (Name and address) CONTRACT DATED:
West Virginia Division of Natural Resources 112 California Avenue Charleston, WV 25305
STATE OF:
COUNTY OF:
The undersigned hereby certifies that to the best of the undersigned's knowledge, information and belief, except as listed below, the Releases or Waivers of Lien attached hereto include the Contractor, all Subcontractors, all suppliers of materials and equipment, and all performers of Work, labor or services who have or may have liens or encumbrances or the right to assert liens or encumbrances against any property of the Owner arising in any manner out of the performance of the Contract referenced above.
EXCEPTIONS:
SUPPORTING DOCUMENTS ATTACHED
HERETO:
CONTRACTOR: (Name and address)
1. Contractor's Release or Waiver of Liens, conditional upon receipt of final payment.
2. Separate Releases or Waivers of Liens from Subcontractors and material and equipment suppliers, to the extent required by the Owner, accompanied by a list thereof.
{{@signerTag}}
CONTRACTOR'S Authorized Representative (Signature)
(Printed name and title)
Date
Subscribed and sworn to before me on this date:
Notary Public:
My Commission Expires:
Document G707
TM
– 1994
Consent of Surety to Final Payment
AIA Document G707 – 1994. Copyright © 1982 and 1994. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:43:57 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7e182c05f35c229fa7e7a)
PROJECT: (Name and address) ARCHITECT’S PROJECT NUMBER:
OWNER: [ ]
ARCHITECT: [ ]
CONTRACTOR: [ ]
SURETY: [ ]
OTHER: [ ]
WVDNR Coopers Rock High Voltage Repairs Phase 1 - Directional Boring and Conduit Installation
CONTRACT DATED:
04-21-2026
TO OWNER: (Name and address) West Virginia Division of Natural Resources 112 California Avenue Charleston, WV 25305
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (Insert name and address of Surety)
, SURETY,
on bond of (Insert name and address of Contractor)
, CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (Insert name and address of Owner)
West Virginia Division of Natural Resources 112 California Avenue Charleston, WV 25305
, OWNER,
as set forth in said Surety's bond.
IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date:
(Insert in writing the month followed by the numeric date and year.)
Attest:
(Seal):
{{@signerTag}}
SURETY (Signature)
Document G710
TM
– 2017
Architect's Supplemental Instructions
AIA Document G710 – 2017. Copyright © 1979, 1992 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:44:37 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7e1ad6b60415508f32401)
PROJECT: (name and address) CONTRACT INFORMATION: ASI INFORMATION:
WVDNR Coopers Rock High Voltage Repairs Phase 1 - Directional Boring and Conduit Installation
Contract For: ASI Number:
61 County Line Drive Bruceton Mills, WV 26525
Date: 04-21-2026 Date:
OWNER: (name and address) ARCHITECT: (name and address) CONTRACTOR: (name and address) West Virginia Division of Natural Resources
Miller Engineering, Inc. TBD
112 California Avenue Charleston, WV 25305
The Contractor shall carry out the Work in accordance with the following supplemental instructions without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgment that there will be no change in the Contract Sum or Contract Time.
(Insert a detailed description of the Architect’s supplemental instructions and, if applicable, attach or reference specific exhibits.)
ISSUED BY THE ARCHITECT:
ARCHITECT (Signature)
(Printed name, title, and license number if required)
Document G714
– 2017
Construction Change Directive
AIA Document G714 – 2017. Copyright © 2001, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:45:17 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7e1d6c05f35c229fa7e82)
PROJECT: (name and address) CONTRACT INFORMATION: CCD INFORMATION:
WVDNR Coopers Rock High Voltage Repairs Phase 1 - Directional Boring and Conduit Installation
Contract For:
Directive Number:
Date:
Date:
OWNER: (name and address) ARCHITECT: (name and address) CONTRACTOR: (name and address) West Virginia Division of Natural Resources
Miller Engineering, Inc. TBD
112 California Avenue Charleston, WV 25305
The Contractor is hereby directed to make the following change(s) in this Contract:
(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits.)
PROPOSED ADJUSTMENTS
1. The proposed basis of adjustment to the Contract Sum or Guaranteed Maximum Price is:
[ ] Lump Sum unchanged $ 0.00
[ ] Unit Price of $ 0.00 per
[ ] Cost, as defined below, plus the following fee: 0.00 (Insert a definition of, or method for determining, cost)
[ ] As follows:
2. The Contract Time will be unchanged by ( 0 ) days.
NOTE: The Owner, Architect and Contractor should execute a Change Order to supersede this Construction Change Directive to the extent they agree upon adjustments to the Contract Sum, Contract Time, or Guaranteed Maximum price for the change(s) described herein.
When signed by the Owner and Architect and received by the Contractor, this document becomes effective IMMEDIATELY as a Construction Change Directive (CCD), and the Contractor shall proceed with the change(s) described above.
Contractor signature indicates agreement with the proposed adjustments in Contract Sum and Contract Time set forth in this
CCD.
{{@signerTag}}
ARCHITECT (Signature)
(Printed name, title, and license number if required)
Date
{{@signerTag}}
OWNER (Signature)
(Printed name and title)
Date
{{@signerTag}}
CONTRACTOR (Signature)
Document A101
– 2017
Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:27:09 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7dd85c05f35c229fa7e18)
ADDITIONS AND DELETIONS:
The author of this document may have revised the text of the original
AIA standard form. An Additions and Deletions Report that notes revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
The parties should complete
A101®–2017, Exhibit A, Insurance and Bonds, contemporaneously with this Agreement. AIA Document
A201®–2017, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified.
AGREEMENT made as of the Twenty-first day of April in the year Two Thousand Twenty-Six (In words, indicate day, month and year.)
BETWEEN the Owner:
(Name, legal status, address and other information)
West Virginia Division of Natural Resources 112 California Avenue Charleston, WV 25305 304-558-2764 and the Contractor:
(Name, legal status, address and other information)
TBD
for the following Project:
(Name, location and detailed description)
WVDNR Coopers Rock High Voltage Repairs Phase 1 - Directional Boring and Conduit Installation 61 County Line Drive Bruceton Mills, WV 26525
The Architect:
(Name, legal status, address and other information)
Miller Engineering, Inc.
54 West Run Road Morgantown, WV 26508 304-291-2234
The Owner and Contractor agree as follows.
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:27:09 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7dd85c05f35c229fa7e18)
TABLE OF ARTICLES
1 THE CONTRACT DOCUMENTS
2 THE WORK OF THIS CONTRACT
3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
4 CONTRACT SUM
5 PAYMENTS
6 DISPUTE RESOLUTION
7 TERMINATION OR SUSPENSION
8 MISCELLANEOUS PROVISIONS
9 ENUMERATION OF CONTRACT DOCUMENTS
EXHIBIT A INSURANCE AND BONDS
ARTICLE 1 THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary, and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9.
ARTICLE 2 THE WORK OF THIS CONTRACT
The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others.
ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
§ 3.1 The date of commencement of the Work shall be:
(Check one of the following boxes.)
[ ] The date of this Agreement.
[ ] A date set forth in a notice to proceed issued by the Owner.
[ ] Established as follows:
(Insert a date or a means to determine the date of commencement of the Work.)
If a date of commencement of the Work is not selected, then the date of commencement shall be the date of this Agreement.
§ 3.2 The Contract Time shall be measured from the date of commencement of the Work.
§ 3.3 Substantial Completion § 3.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Contractor shall achieve Substantial Completion of the entire Work:
(Check one of the following boxes and complete the necessary information.)
[ ] Not later than ( ) calendar days from the date of commencement of the Work.
[ ] By the following date:
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:27:09 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7dd85c05f35c229fa7e18)
§ 3.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are to be completed prior to Substantial Completion of the entire Work, the Contractor shall achieve Substantial Completion of such portions by the following dates:
Portion of Work Substantial Completion Date
§ 3.3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3.3, liquidated damages, if any, shall be assessed as set forth in Section 4.5.
ARTICLE 4 CONTRACT SUM
§ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor’s performance of the Contract. The Contract Sum shall be Zero Dollars and Zero Cents ($ 0.00 ), subject to additions and deductions as provided in the Contract Documents.
§ 4.2 Alternates § 4.2.1 Alternates, if any, included in the Contract Sum:
Item Price
§ 4.2.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Agreement. Upon acceptance, the Owner shall issue a Modification to this Agreement.
(Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.)
Item Price Conditions for Acceptance
§ 4.3 Allowances, if any, included in the Contract Sum:
(Identify each allowance.)
Item Price
§ 4.4 Unit prices, if any:
(Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.)
Item Units and Limitations Price per Unit ($0.00)
§ 4.5 Liquidated damages, if any:
(Insert terms and conditions for liquidated damages, if any.)
§ 4.6 Other:
(Insert provisions for bonus or other incentives, if any, that might result in a change to the Contract Sum.)
ARTICLE 5 PAYMENTS
§ 5.1 Progress Payments § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.
§ 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows:
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:27:09 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7dd85c05f35c229fa7e18)
§ 5.1.3 Provided that an Application for Payment is received by the Architect not later than the day of a month, the Owner shall make payment of the amount certified to the Contractor not later than the day of the month. If an Application for Payment is received by the Architect after the application date fixed above, payment of the amount certified shall be made by the Owner not later than ( ) days after the Architect receives the Application for Payment.
(Federal, state or local laws may require payment within a certain period of time.)
§ 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form, and supported by such data to substantiate its accuracy, as the Architect may require. This schedule of values shall be used as a basis for reviewing the Contractor’s Applications for Payment.
§ 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment.
§ 5.1.6 In accordance with AIA Document A201™–2017, General Conditions of the Contract for Construction, and subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows:
§ 5.1.6.1 The amount of each progress payment shall first include:
.1 That portion of the Contract Sum properly allocable to completed Work;
.2 That portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction, or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing; and
.3 That portion of Construction Change Directives that the Architect determines, in the Architect’s professional judgment, to be reasonably justified.
§ 5.1.6.2 The amount of each progress payment shall then be reduced by:
.1 The aggregate of any amounts previously paid by the Owner;
.2 The amount, if any, for Work that remains uncorrected and for which the Architect has previously withheld a Certificate for Payment as provided in Article 9 of AIA Document A201–2017;
.3 Any amount for which the Contractor does not intend to pay a Subcontractor or material supplier, unless the Work has been performed by others the Contractor intends to pay;
.4 For Work performed or defects discovered since the last payment application, any amount for which the
Architect may withhold payment, or nullify a Certificate of Payment in whole or in part, as provided in Article 9 of AIA Document A201–2017; and
.5 Retainage withheld pursuant to Section 5.1.7.
§ 5.1.7 Retainage § 5.1.7.1 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold the following amount, as retainage, from the payment otherwise due:
(Insert a percentage or amount to be withheld as retainage from each Application for Payment. The amount of retainage may be limited by governing law.)
§ 5.1.7.1.1 The following items are not subject to retainage:
(Insert any items not subject to the withholding of retainage, such as general conditions, insurance, etc.)
§ 5.1.7.2 Reduction or limitation of retainage, if any, shall be as follows:
(If the retainage established in Section 5.1.7.1 is to be modified prior to Substantial Completion of the entire Work, including modifications for Substantial Completion of portions of the Work as provided in Section 3.3.2, insert provisions for such modifications.)
§ 5.1.7.3 Except as set forth in this Section 5.1.7.3, upon Substantial Completion of the Work, the Contractor may submit an Application for Payment that includes the retainage withheld from prior Applications for Payment pursuant to this
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:27:09 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7dd85c05f35c229fa7e18)
Section 5.1.7. The Application for Payment submitted at Substantial Completion shall not include retainage as follows:
(Insert any other conditions for release of retainage upon Substantial Completion.)
§ 5.1.8 If final completion of the Work is materially delayed through no fault of the Contractor, the Owner shall pay the Contractor any additional amounts in accordance with Article 9 of AIA Document A201–2017.
§ 5.1.9 Except with the Owner’s prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site.
§ 5.2 Final Payment § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when
.1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Article 12 of AIA Document A201–2017, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
§ 5.3 Interest Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located.
(Insert rate of interest agreed upon, if any.)
ARTICLE 6 DISPUTE RESOLUTION
§ 6.1 Initial Decision Maker The Architect will serve as the Initial Decision Maker pursuant to Article 15 of AIA Document A201–2017, unless the parties appoint below another individual, not a party to this Agreement, to serve as the Initial Decision Maker.
(If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.)
§ 6.2 Binding Dispute Resolution For any Claim subject to, but not resolved by, mediation pursuant to Article 15 of AIA Document A201–2017, the method of binding dispute resolution shall be as follows:
(Check the appropriate box.)
[ ] Arbitration pursuant to Section 15.4 of AIA Document A201–2017
[ ] Litigation in a court of competent jurisdiction
[ ] Other (Specify)
If the Owner and Contractor do not select a method of binding dispute resolution, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction.
ARTICLE 7 TERMINATION OR SUSPENSION
§ 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201–2017.
§ 7.1.1 If the Contract is terminated for the Owner’s convenience in accordance with Article 14 of AIA Document A201–2017, then the Owner shall pay the Contractor a termination fee as follows:
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:27:09 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7dd85c05f35c229fa7e18)
(Insert the amount of, or method for determining, the fee, if any, payable to the Contractor following a termination for the Owner’s convenience.)
§ 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201–2017.
ARTICLE 8 MISCELLANEOUS PROVISIONS
§ 8.1Where reference is made in this Agreement to a provision of AIA Document A201–2017 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents.
§ 8.2 The Owner’s representative:
(Name, address, email address, and other information)
§ 8.3 The Contractor’s representative:
(Name, address, email address, and other information)
§ 8.4 Neither the Owner’s nor the Contractor’s representative shall be changed without ten days’ prior notice to the other party.
§ 8.5 Insurance and Bonds § 8.5.1 The Owner and the Contractor shall purchase and maintain insurance as set forth in AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum, Exhibit A, Insurance and Bonds, and elsewhere in the Contract Documents.
§ 8.5.2 The Contractor shall provide bonds as set forth in AIA Document A101™–2017 Exhibit A, and elsewhere in the Contract Documents.
§ 8.6 Notice in electronic format, pursuant to Article 1 of AIA Document A201–2017, may be given in accordance with a building information modeling exhibit, if completed, or as otherwise set forth below:
(If other than in accordance with a building information modeling exhibit, insert requirements for delivering notice in electronic format such as name, title, and email address of the recipient and whether and how the system will be required to generate a read receipt for the transmission.)
§ 8.7 Other provisions:
ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS
§ 9.1 This Agreement is comprised of the following documents:
.1 AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor
.2 AIA Document A101™–2017, Exhibit A, Insurance and Bonds
.3 AIA Document A201™–2017, General Conditions of the Contract for Construction
.4 Building information modeling exhibit, dated as indicated below:
(Insert the date of the building information modeling exhibit incorporated into this Agreement.)
.5 Drawings
Number Title Date
.6 Specifications
Section Title Date Pages
AIA Document A101 – 2017. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:27:09 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7dd85c05f35c229fa7e18)
.7 Addenda, if any:
Number Date Pages
Portions of Addenda relating to bidding or proposal requirements are not part of the Contract Documents unless the bidding or proposal requirements are also enumerated in this Article 9.
.8 Other Exhibits:
(Check all boxes that apply and include appropriate information identifying the exhibit where required.)
[ ] AIA Document E204™–2017, Sustainable Projects Exhibit, dated as indicated below:
(Insert the date of the E204-2017 incorporated into this Agreement.)
[ ] The Sustainability Plan:
Title Date Pages
[ ] Supplementary and other Conditions of the Contract:
Document Title Date Pages
.9 Other documents, if any, listed below:
(List here any additional documents that are intended to form part of the Contract Documents. AIA Document A201™–2017 provides that the advertisement or invitation to bid, Instructions to Bidders, sample forms, the Contractor’s bid or proposal, portions of Addenda relating to bidding or proposal requirements, and other information furnished by the Owner in anticipation of receiving bids or proposals, are not part of the Contract Documents unless enumerated in this Agreement. Any such documents should be listed here only if intended to be part of the Contract Documents.)
This Agreement entered into as of the day and year first written above.
{{@signerTag}}
OWNER (Signature)
(Printed name and title)
{{@signerTag}}
CONTRACTOR (Signature)
Directional Boring and Conduit Installation
00 7200 - 1 General Conditions
SECTION 00 7200
GENERAL CONDITIONS
FORM OF GENERAL CONDITIONS
1.01 THE GENERAL CONDITIONS APPLICABLE TO THIS CONTRACT IS AIA A201 2017
1.02 A BLANK COPY OF THE GENERAL CONDITIONS APPLICABLE TO THIS CONTRACT
IS ATTACHED FOLLOWING THIS PAGE.
RELATED REQUIREMENTS
2.01 SECTION 00 7300 - SUPPLEMENTARY CONDITIONS.
SUPPLEMENTARY CONDITIONS
3.01 REFER TO DOCUMENT 00 7300 - SUPPLEMENTARY CONDITIONS FOR
AMENDMENTS TO THESE GENERAL CONDITIONS.
Document A201
– 2017
General Conditions of the Contract for Construction
AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 20:27:56 EDT on 04/21/2026 under Subscription No.20240066763 which expires on 10/01/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69e7ddbbc05f35c229fa7e20)
ADDITIONS AND DELETIONS:
The author of this document may have revised the text of the original
AIA standard form. An Additions and Deletions Report that notes revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
For guidance in modifying this document to include supplementary conditions, see AIA Document
A503™–2017, Guide for
Supplementary Conditions.
for the following PROJECT:
(Name and location or address)
WVDNR Coopers Rock High Voltage Repairs Phase 1 - Directional Boring and Conduit Installation 61 County Line Drive Bruceton Mills, WV 26525
THE OWNER:
(Name, legal status and address)
West Virginia Division of Natural Resources 112 California Avenue Charleston, WV 25305
THE ARCHITECT:
(Name, legal status and address)
Miller Engineering, Inc.
54 West Run Road Morgantown, WV 26508
TABLE OF ARTICLES
1 GENERAL PROVISIONS
2 OWNER
3 CONTRACTOR
4 ARCHITECT
5 SUBCONTRACTORS
6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS
7 CHANGES IN THE WORK
8 TIME
9 PAYMENTS AND COMPLETION
10 PROTECTION OF PERSONS AND PROPERTY
11 INSURANCE AND BONDS
12 UNCOVERING AND CORRECTION OF WORK
AIA Document A201 – 2017. Copyright © 1911, 1915, 1918,…