About this file

This is a project manual and bid document for the Highland Shores Subdivision infrastructure construction project issued by the East Lake Houston Management District in Harris County, Texas. The project encompasses water, sanitary sewer, storm drainage and detention, paving, clearing and grubbing, demolition, mass grading, and lot grading work at 306 Highland Shores Drive in Highlands, Texas. The work includes 111 line items covering mobilization, stormwater pollution prevention plan (SWPPP) items, clearing and grubbing, demolition, earthwork, sanitary sewer installation, water utilities, storm sewer installation, and pavement work with quantities ranging from single units to thousands of linear feet and square yards. A non-mandatory pre-bid conference was held on September 24, 2026, with sealed electronic bids due by 2:00 p.m. on October 5, 2026, through CivCast with public opening via Zoom. The contract includes three milestones: initial grading at 50 days, final grading at 80 days, and paving completion at 102 days, with substantial completion required within 120 days and final completion within 150 days of the contract commencement date.

The contract is awarded on a lump sum and unit price basis to the lowest responsive, responsible bidder. Bid security of 2 percent of the total bid amount is required in the form of a certified check, cashier's check, or bid bond. The successful bidder must execute the contract and furnish performance bonds, payment bonds, and maintenance bonds within seven days of award. Progress payments are made at 90 percent of work completed with 10 percent retainage in accordance with Texas Water Code Section 49.276. Liquidated damages are assessed at $1,000 per day for failure to meet milestone dates, substantial completion, or final completion deadlines. The developer, 48 Highland Shores, Ltd., is responsible for payment to the contractor, though the District may make payments from available funds; the District retains no obligation for payment beyond written assignment of the developer's obligations. The project manual references standard specifications from the City of Houston, Harris County, and TCEQ, with a geotechnical report provided separately. Four alternates are included for bidder consideration regarding subgrade treatment, off-site disposal of excavated materials, and additional storm line and catch basin options.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EAST LAKE HOUSTON MANAGEMENT DISTRICT

BID DOCUMENTS

CONTRACT DOCUMENTS & TECHNICAL SPECIFICATIONS

FOR CONSTRUCTION OF

Highland Shores Subdivision

FOR

306 Highland Shores Dr. & East Lake Houston Management District

IN

Harris County, Texas

TETRA LAND SERVICES

5304 Ashbrook, 1st Floor

Houston, Texas 77081

Office: 713-462-6100 www.tlstx.com

DISTRICT JOB NO. 25-0040.05

September 1, 2026 http://www.tlstx.com/ jagu Model jagu Seal Aug 10

East Lake Houston Management District Highland Shores Subdivision

GENERAL TABLE OF CONTENTS

00111 – Advertisement for Bids

00200 – Instruction to Bidders

00410 – Bid Form

00430 – Bid Bond

00510 - Notice of Award

00520 - Agreement Between District and Contractor for Construction Contract (Stipulated Price)

00550 – Notice to Proceed

00610 – Performance Bond (Public)

00615 – Payment Bond (Public)

00618 – Maintenance Bond

00625 – Certificate of Substantial Completion

00630 – Certificate of Final Completion

00700 – General Conditions

00800 – Supplementary Conditions

00850 – District’s Special Conditions

00931 – Request for Information (RFI)

00940 – Work Change Directive

00941 – Change Order

00942 – Field Order

East Lake Houston Management District

ADDITIONAL SUPPORTING DOCUMENTS

Certificate of Insurance

Memorandum of Contract

Texas Government Code Chapter 2252 Certification Form (PUR-FRM-018/PUR-FRM-019)

Certification of no Boycott

Certificate of Interested Parties (Form 1295)

Form CIQ Conflict of Interest Questionnaire

PUR-FRM-018/PUR-FORM-019

Construction Plans (Provided Separately 22” x 34” Drawings)

Geotechnical Report (Provided Separately)

SECTION 00111

ADVERTISEMENT FOR BIDS

INVITATION TO BIDDERS Sealed electronic Bids for Highland Shores Subdivision – Water, Sanitary Sewer, Storm Drainage and Detention, Paving, Clearing and Grubbing, Demolition, Mass Grading and Lot Grading will be received through CivCast by EAST LAKE HOUSTON MANAGEMENT DISTRICT until 2:00 p.m., October 5, 2026, and publicly opened and read via Zoom Meeting at 1(346) 248-7799; Meeting ID: 995 2005 5748#. Bidding Documents are available at www.CivcastUSA.com. They may be examined at TETRA LAND SERVICES, 5304 ASHBROOK, 1st FLOOR, HOUSTON, TEXAS 77081, 713-462-6100. Contact: DWAYNE E. CULP, P.E., dculp@tlstx.com. A NON-MANDATORY pre-bid conference will be held at 2:00 p.m., September 24, 2026, remotely and at the Engineer’s office listed above. Zoom Meeting: 1(346) 248-7799; Meeting ID: 998 5958 2883#. Each Bid must include a Bid Bond or certified/cashier’s check in an amount not less than 2% of the total Bid. The successful bidder shall execute the Contract and furnish required Bonds and insurance certificates within seven (7) days after receipt of the Contract Documents. If submitting a certified/cashier’s check, the original must be delivered to the Engineer’s office within one (1) business day after bid opening.

Advertisement Dates: 9/16/2026 & 9/23/2026

END OF ADVERTISEMENT FOR BIDS

http://www.civcastusa.com/ mailto:dculp@tlstx.com

SECTION 00200

INSTRUCTIONS TO BIDDERS

ARTICLE 1 – DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office – The office from which the Bidding Documents are to be issued.

ARTICLE 2 – COPIES OF BIDDING DOCUMENTS

2.01 Complete sets of the Bidding Documents may be viewed at the Issuing Office.

2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither District nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.03 District and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.

ARTICLE 3 – QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within 10 days of District’s request, Bidder shall submit (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:

A. Evidence of Bidder’s authority to do business in the state where the Project is located.

B. Bidder’s state or other contractor license number, if applicable.

C. Subcontractor and Supplier qualification information; coordinate with provisions of Article 12 of these Instructions, “Subcontractors, Suppliers, and Others.”

3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

3.03 No requirement in this Article 3 to submit information will prejudice the right of District to seek additional pertinent information regarding Bidder’s qualifications.

3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.

ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITION; EXAMINATION OF SITE; DISTRICT’S SAFTEY

PROGRAM; OTHER WORK AT THE SITE

4.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by District for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

4.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions:

1. The Supplementary Conditions identify:

a. those reports known to District of explorations and tests of subsurface conditions at or adjacent to the Site.

b. those drawings known to District of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).

c. reports and drawings known to District relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. District will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.

B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to District and Engineer by Districts of such Underground Facilities, including District, or others.

C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.

4.03 Site Visit and Testing by Bidders

A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.

B. Bidder shall contact the Engineer for information regarding access to the site.

C. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site Conditions.

D. On request, and to the extent District has control over the Site, and schedule permitting, the District will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. District will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on District’s authority regarding the Site.

E. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by District or by property Districts or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

F. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

4.04 District’s Safety Program

A. Site visits and work at the Site may be governed by a District safety program. As the General Conditions indicate, if a District safety program exists, it will be noted in the Supplementary Conditions.

4.05 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which District is aware (if any) that is to be performed at the Site by District or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If District is party to a written contract for such other work, then on request, District will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 5 – BIDDER’S REPRESENTATIONS

5.01 It is the responsibility of each Bidder before submitting a Bid to:

A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;

B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;

C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;

D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;

E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;

F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;

G. become aware of the general nature of the work to be performed by District and others at the Site that relates to the Work as indicated in the Bidding Documents;

H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;

I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work; and

J. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

ARTICLE 6 – PRE-BID CONFERENCE

6.01 A non-mandatory pre-Bid conference will be held at the time and location stated in the invitation or advertisement to bid. Representatives of District and Engineer will be present to discuss the Project.

Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.

ARTICLE 7 – INTERPRETATIONS AND ADDENDA

7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents.

Questions received less than three days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.

ARTICLE 8 – BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to District in an amount of five percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions.

8.02 The Bid security of the apparent Successful Bidder will be retained until District awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 10 days after the Notice of Award, District may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be District’s exclusive remedy if Bidder defaults.

8.03 The Bid security of other Bidders that District believes to have a reasonable chance of receiving the award may be retained by District until the earlier of seven days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.

8.04 Bid security of other Bidders that District believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.

ARTICLE 9 – CONTRACT TIMES

9.01 The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Agreement.

ARTICLE 10 – LIQUIDADED DAMAGES

10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS

11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date for receipt of Bids. Each such request shall comply with the requirements of Paragraphs

7.04 and 7.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.

ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS

12.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.

12.02 Subsequent to the submittal of the Bid, District may not require the Successful Bidder or Contractor to retain any Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.

12.03 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to District a list of the Subcontractors or Suppliers proposed for the following portions of the Work.

If requested by District, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity. If District or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, District may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and District may consider such price adjustment in evaluating Bids and making the Contract award.

12.04 If apparent Successful Bidder declines to make any such substitution, District may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which District or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to District and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.

ARTICLE 13 – PREPERATION OF BID

13.01 The Bid Form is included with the Bidding Documents.

A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.

B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”

13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.

13.03 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown.

13.04 A Bid by an individual shall show the Bidder’s name and official address.

13.05 A Bid by a joint venture shall be executed by an authorized representative of each joint venture in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.

13.06 All names shall be printed in ink below the signatures.

13.07 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.

13.08 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.

13.09 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.

ARTICLE 14 – BASIS OF BID

14.01 Lump Sum

A. Bidders shall submit a Bid on a lump sum basis as set forth in the Bid Form.

14.02 Unit Price

A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.

B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which District or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by District for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

D. Alternative Work unit prices will not be considered in evaluating the lowest price qualified bidder. Unreasonable unit prices for Alternative Work may result in Engineer disqualifying the bid.

14.03 Allowances

A. For cash allowances the Bid price shall include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General Conditions.

ARTICLE 15 – SUBMITTAL OF BID

15.01 A Bid shall be received no later than the date and time prescribed and at the place indicated in the advertisement or invitation to bid and shall be enclosed in a plainly marked package with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED FOR HIGHLAND SHORES.” A mailed Bid shall be addressed to District, TETRA LAND SERVICES, 5304 ASHBROOK, 1ST

FLOOR, HOUSTON, TEXAS 77081.

15.02 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.

ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID

16.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.

16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of Bids.

16.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with District and promptly thereafter demonstrates to the reasonable satisfaction of District that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.

ARTICLE 17 – OPEING OF BIDS

17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE

18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but District may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT

19.01 District reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. District will reject the Bid of any Bidder that District finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the District will reject the Bid as nonresponsive; provided that District also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.

19.02 If District awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Bid.

19.03 Evaluation of Bids

A. In evaluating Bids, District will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.

B. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.

19.04 In evaluating whether a Bidder is responsible, District will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

19.05 District may conduct such investigations as District deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

ARTICLE 20 – ADDITIONAL REQUIREMENTS

20.01 Pursuant to Chapter 176, Local Government Code, the Conflict-of-Interest Questionnaire, located behind Section 00410 – Bid Form of the project manual, is to be filled out where applicable and submitted at the time of bid.

20.02 Pursuant to Texas Government Code § 2252.908, you must provide EAST LAKE HOUSTON MANAGEMENT DISTRICT (the "District") with a completed original of the Certificate of Interested Parties form (TEC Form 1295) at the time of bid. Failure to do so will result in the District's inability to accept the bid. To complete the Certificate of Interested Parties form, or for further information, please visit the Texas Ethics Commission's website at https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm. Additionally, TEC Form 1295 may be required for any amended, extended, or renewed contract.

Please use the following information to fill out the form:

“Governmental Entity (District) Name”: EAST LAKE HOUSTON MANAGEMENT DISTRICT

“Identification Number RN111328597

“Description of goods and services to be provided”: CONSTRUCTION SERVICES

ARTICLE 20 – ADDITIONAL REQUIREMENTS

21.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth District’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the Agreement (executed by Successful Bidder) to District, it shall be accompanied by required bonds and insurance documentation.

ARTICLE 22- SIGNING OF AGREEMENT

22.01 When District issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 10 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to District. Within ten days thereafter, District shall deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.

ARTICLE 23 – SALES AND USE TAXES

23.01 District is exempt from Texas state sales and use taxes on materials and equipment to be incorporated in the Work. (See attached). Said taxes shall not be included in the Bid. Refer to Paragraph SC-7.09 of the Supplementary Conditions for additional information.

ARTICLE 24- WAGE SCALE FOR UTILITIES CONSTRUCTION

24.01 In accordance with Chapter 2258, Texas Government Code, the public body awarding the contract does hereby specify Attachment A to be the general prevailing rates in the locality in which the work is being performed.

https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm

24.02 This prevailing wage rates schedule does not prohibit the payment of more than the rates stated.

24.03 The wage scale for engineering construction is to be applied to all site work greater than 5 feet from an exterior wall of a new building under construction or from an exterior wall of an existing building.

SECTION 00410

BID FORM

District Project Number 25-0040.05

ARTICLE 1 – BID RECIPIENT

1.01 This Bid is submitted to:

East Lake Houston Management District C/O Tetra Land Services 5304 Ashbrook, 1st Floor, Houston, TX 77081

1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with District in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS

2.01 Bidder accepts all of the terms and conditions of the Instruction to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60-Days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request to the District.

ARTICLE 3 – BIDDER’S REPRSENTATIONS

3.01 In submitting this Bid, Bidder represents that:

A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:

Addendum Number Addendum Date

B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.

D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.

E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.

F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.

G. Bidder is aware of the general nature of work to be performed by District and others at the Site that relates to the Work as indicated in the Bidding Documents.

H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents and confirms that the written resolution thereof by Engineer is acceptable to Bidder.

I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.

J. The submission of this Bid constitutes an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, and that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

ARTICLE 4 – BIDDER’S CERTIFICATION

4.01 Bidder Certifies that:

A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation.

B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.

C. Bidder has not solicited or induced any individual or entity to refrain from bidding

D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:

1. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process;

2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to Influence the bidding process to the detriment of District, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive District of the benefits of free and open competition;

3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of District, a purpose of which is to establish bid prices at artificial, non-competitive levels; and

4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.

ARTICLE 5 – BASIS OF THE BID

5.01 Bidder will complete the Work in accordance with the Contract Documents and Bid Documents provided (see Bid Documents).

5.02 Bidder acknowledges that (1) each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and (2) estimate quantities are not guaranteed, and are solely for the purpose of comparison Bids, and final payment for all unit price. Bid items will be based on actual quantities, determined as provided in the Contract Documents.

ARTICLE 6 – TIME OF COMPLETION

6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.

6.02 Bidder accepts the provision of the Agreement as to liquidated damages.

ARTICLE 7 – ATTACHEMNTS OF THIS BID

7.01 The following documents are submitted with and made a condition of the Bid:

A. Required Bid security.

B. Conflict of Interest.

ARTICLE 8 – DEFINED TERMS

8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.

ARTICLE 9 – BID SUBMITTAL

BIDDER COMPANY NAME:

By:

[Signature] _______________________________________________________________________________

[Printed Name] _______________________________________________________________________________ (If Bidder is a corporation, a limited liability company, a partnership, or a joint venture, attach evidence of authority to sign.)

Attest:

[Signature] _______________________________________________________________________________

[Printed Name] _______________________________________________________________________________

Title: _______________________________________________________________________________

Submittal Date:

Address for giving notices:

Telephone Number: _______________________________________________________________________

Fax Number: _______________________________________________________________________

Contact Name and Email Address: ________________________________________________________________

HIGHLAND SHORES SUBDIVISION - PROJECT#25-0040.05 9/16/2026

SECTION TITLE ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE BID PRICE

Mobilization 1 Mobilization (Includes Bonds, Insurance, Etc.) (Not to exceed 2% of total) LS 1

TOTAL MOBILIZATION:

SWPPP Items 2 TCEQ TPDES General Stormwater Permit & NOI. LS 1

SWPPP Items 3 Reinforced Filter Fabric Per Harris County Regulations. Complete and in Place. LF 5,524

SWPPP Items 4 Stabilized Construction Access Per Harris County Regulations. Complete and in Place. EA 1

SWPPP Items 5 Concrete Washout Structures Per Harris County Regulations. Complete and in Place. EA 1

SWPPP Items 6 Inlet Protection Barriers, Type I & II, Per Harris County Regulations. Complete and in Place. EA 40

SWPPP Items 7 Rock Filter Dam, Per Harris County Regulations. Complete and in Place. EA 1

SWPPP Items 8 SWPPP Maintenance, Per Harris County Regulations. Complete and in Place. MO 5

SWPPP Items 9 Hydro mulch, ROW areas not paved. Per Harris

County Regulations Item 164 and TxDOT Item 164. Complete and in Place.

AC 2.7

SWPPP Items 10

Hydro mulch, Detention Basin side slopes above static water level after Mass-grading is complete and surrounding area. Per Harris County Regulations Item 164 and TxDOT Item

164. Complete and in Place.

AC 8.1

SWPPP Items 11 Broadcast Seeding, All flat areas Disturbed , but Not Yet Under Building Construction per

Harris County Regulations Item 164 and TxDOT Item 164, Complete and in place.

AC 23

SWPPP Items 12 5' Min. Block Sodding at back of curb. Complete in Place. SY 6,081

SWPPP Items 13

Armor Flex® Articulated Concrete Block. An engineered hard armoring revetment system that is an flexible, interlocking matrix of uniform size, shape, and weight.

It consists of Cementous materials conforming with specifications, Revetment Cable and

Fittings (polyester or galvanized), Anchors, and Filter Fabric; Complete in place.

SY 862

SWPPP Items 14

Shoreflex®. Tied concrete block with erosion control mat. It consists of Concrete casted blocks meeting specification, Polypropylene geogrid system for interlocking concrete blocks, Polypropylene turf reinforcement backing, and Galvanized mechanical hog rings; Complete in place.

SY 2,360

SWPPP Items 15

Armormax®. A High-Performance Turf Reinforcement Mat. It consists of Engineered Earth

Anchor, Rolled Erosion Control Product, Securing Pin, and Trilobal Monofilament Yarn;

Complete in place

SY 6,032

SWPPP Items 16 Floating Turbididty Curtain. Complete in place with removal. LF 340

TOTAL SWPPP ITEMS:

SECTION TITLE ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE BID PRICE

Clearing & Grubbing 17

Demolish existing driveway and remove existing culvert once roads are constructed.

Includes removal and legally disposing/recycling at a licensed and permitted Facility of all materials demolished. Complete and in Place. EXISTING DRIVEWAY TO BE USED AS THE

PROPOSED CONSTRUCTION ACCESS UNTIL CONTRACTOR ESTABLISHES ANOTHER.

LS 1 `

Clearing & Grubbing 18

CLEARING & GRUBBING - 6" below surface including Removal of Cleared Debris from Site;

by means of haul off. This includes removal and legally disposing/recycling at a licensed and permitted facility of any unsuitable materials, wood debris and stumps.)

AC 42

Clearing & Grubbing 19 Root Raking and Striping, including Off-site Disposal and Removal of all Debris encountered from Site

AC 42

TOTAL CLEARING & GRUBBING:

SECTION TITLE ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE BID PRICE

Demolition 20 Remove Existing Chain Link Fence by means of haul off. This includes removal and legally disposing/recycling at a licensed and permitted facility

LF 1,651

Demolition 21 Remove Existing Cattle Guard by means of haul off. This includes removal and legally disposing/recycling at a licensed and permitted facility

EA 1

Demolition 22 Demuck, Proofroll, and Fill Swales/Pond SF 32,723

Demolition 23 Remove Existing/Abandoned Power Poles and Associated Structures by means of haul off. This includes removal and legally disposing/recycling at a licensed and permitted facility

EA 2

Demolition 24 Demuck, Proofroll, and Install Proposed Culvert - in location of proposed driveway connection

SF 3,459

Demolition 25 Removal & Disposal of Non-Organic Trash & Debris, Within Project Limits. TON 1

Demolition 26 Protect Wetland Area - Install a silt fence barrier 2-feet to the east of the demarked area LF 2,576

TOTAL DEMOLITION:

Earthwork 27

Detention/Amenity Basin Excavation - Excavate the basin pond per the plans. Fill from the proposed Detention/Amenity Basins. This line is for excavation/dirt work only. Complete in

Place

CY 40,449

Earthwork 28 Mass-grading. Uncludes fill from the proposed Detention/Amenity Basins and site grading as per Grading Plan, Complete and in Place.

CY 73,301

Earthwork 29 Sanitary Spoils Excavation - To be distributed and final graded over the entire 42 acres.

Complete in Place.

CY 24,463

Earthwork 30 Stormwater Spoils Excavation - To be distributed and final graded over the entire 42 acres.

Complete in Place.

CY 22,243

Earthwork 31 Waterline Spoils Excavation -To be distributed and final graded over the entire 42 acres.

Complete in Place.

CY 592

Earthwork 32 Well Point Dewatering for Pond Excavation, Complete and in Pace. DAY 60

TOTAL EARTHWORK:

SECTION TITLE ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE BID PRICE

Sanitary Sewer 33

Furnish & Install 4' DIA PRECAST SANITARY MANHOLE, Complete in place, including bedding and backfill, 3 rings minimum per manhole, (Depths up to 8'). To include all drops where required by regulations and apparatuses.

EA 6

Sanitary Sewer 34

Furnish & Install 5' DIA PRECAST SANITARY MANHOLE, Complete in place, including bedding and backfill, 3 rings minimum per manhole, (8'-12' depths). To include all drops where required by regulations and apparatuses.

EA 11

Sanitary Sewer 35

Furnish & Install 5' DIA PRECAST SANITARY MANHOLE, Complete in place, including bedding and backfill, 3 rings minimum per manhole, (12'-16' depths). To include all drops where required by regulations and apparatuses.

EA 11

Sanitary Sewer 36

Furnish & Install 5' DIA PRECAST SANITARY MANHOLE, Complete in place, including bedding and backfill, 3 rings minimum per manhole, (16'-20' depths). To include all drops where required by regulations and apparatuses.

EA 3

Sanitary Sewer 37 Furnish & Install 6" Sewer Clean-out, Complete in Place. EA 164

Sanitary Sewer 38

4" (Short) Service Lead, Single 4" Sch 40 PVC to include tee into main trunk line and/or tap into sanitary manhole, Contractor to provide marker at the end of the service lead, Complete in Place. To include all drops, stacks, risers and apparatuses.

EA 8

Sanitary Sewer 39

4" (Long) Service Lead, Single 4" Sch 40 PVC to include tee into main trunk line and/or tap into sanitary manhole, Contractor to provide marker at the end of the service lead, Complete in Place. To include all drops, stacks, risers and apparatuses.

EA 18

Sanitary Sewer 40

6" (Short) Service Lead; Double to include 4"x 4"x 6" Sch 40 PVC tee into main trunk line and/or tap into sanitary manhole, Contractor to provide marker at the end of the service lead, Complete in Place. To include all drops, stacks, risers and apparatuses.

EA 50

Sanitary Sewer 41

6" (Long) Service Lead; Double to include 4"x 4"x 6" Sch 40 PVC tee into main trunk line and/or tap into sanitary manhole, Contractor to provide marker at the end of the service lead, Comple in Place. To include all drops, stacks, risers and apparatuses.

EA 19

Sanitary Sewer 42 Trench Safety (Sanitary Sewer), Complete in place (all depths). LF 5,809

Sanitary Sewer 43 Furnish & Install 8" SDR 26, Sanitary Sewer, Complete in place, To include bedding, backfill, all apparatuses and testing.

LF 5,809

TOTAL SANITARY SEWER:

SECTION TITLE ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE BID PRICE

Water Utilities 44 Trench Safety (Water), Complete in place (all depths). LF 6,202

Water Utilities 45 Furnish & Install 6" Water Line, C-900, Complete in place, To include bedding and backfill, fittings, bend, tees, thrust blocking, restrained joints, all other apparatuses, and testing.

LF 852

Water Utilities 46 Furnish & Install 8" Water Line, C-900, Complete in place, To include bedding and backfill, fittings, bend, tees, thrust blocking, restrained joints, all other apparatuses, and testing.

LF 5,350

Water Utilities 47

Furnish & Install long connection 1" Sch 40 PVC for double service tap with double yoke, curb stop and water meter box, Complete in place, To include bedding and backfill, fittings, bend, tees, all apparatuses, and testing (Long Connection).

EA 43

Water Utilities 48

Furnish & Install short connection 1" Sch 40 PVC for double service tap with double yoke, curb stop and water meter box, Complete in place, To include bedding and backfill, fittings, bend, tees, all apparatuses, and testing (Short Connection).

EA 21

Water Utilities 49

Furnish & Install long connection 1" Sch 40 PVC for single service tap with single yoke, curb stop and water meter box, Complete in place, To include bedding and backfill, fittings, bend, tees, all apparatuses, and testing (Long Connection).

EA 21

Water Utilities 50

Furnish & Install short connection 1" Sch 40 PVC for single service tap with single yoke, curb stop and water meter box, Complete in place, To include bedding and backfill, fittings, bend, tees, all apparatuses, and testing (Short Connection).

EA 15

Water Utilities 51 Furnish & Install 6" Gate Valve in Box, With Thrust Block Complete in Place. EA 3

Water Utilities 52 Furnish & Install 8" Gate Valve in Box ,With Thrust Block Complete in Place. EA 16

Water Utilities 53 Furnish & Install 6" Plug & Clamp, With Thrust Block Complete in Place. EA 3

Water Utilities 54 Furnish & Install 2" Blow-Off Valve In Box, With Thrust Block Complete in Place. EA 3

Water Utilities 55 Furnish & Install 8"x8"x6" Tees. With Thrust Block in place, Complete in Place. To include bedding and backfill, fittings, and testing.

EA 2

Water Utilities 56 Furnish & Install 8"x8"x8" Tees. With Thrust Block Complete in place, To include bedding and backfill, fittings, and testing.

EA 7

Water Utilities 57 Furnish & Install 8"x8"x12" Tees. With Thrust Block Complete in place, To include bedding and backfill, fittings, and testing.

EA 1

Water Utilities 58

Furnish & Install 8"x8"x6" Tees With Thrust Block for Future Flushing Valve/Fire Hydrant with 6" Gate Valve, Plug & Clamp. Complete in place including above ground metal fence "T" marker. To include bedding and backfill, fittings, and testing.

EA 13

Water Utilities 59 Furnish & Install 45 Degree Bends- 8" LINE, With Thrust Block Complete in place. EA 4

Water Utilities 60 Furnish & Install 45 Degree Bends- 6" LINE, With Thrust Block Complete in place. EA 8

Water Utilities 61 Furnish & Install Fire Hydrant Assembly, With Thrust Block Complete in place. Complete in

Place.

EA 13