Project Manual (5).pdf
PDF 22 MB Posted
- Attached to
- 7 Bridges Repair
- Solicitation number
- 26-008
- Issued by
- Tarrant County, Texas
About this file
This is a Project Manual containing bidding and contract requirements for the City of Keller, Texas, prepared by landscape architecture firm Kimley-Horn and Associates, Inc., for the construction of US 377 Landscape Enhancement in Keller, Tarrant County, Texas. The project consists of approximately 550 linear feet of hardscape, landscape, irrigation, and related construction work within existing parkway right-of-way areas and one median along US 377 from Johnson Road to the End of Median. Deliverables include mobilization, right-of-way preparation, vegetative watering, fertilizer application, irrigation systems (drip and bubblers), mulch installation, plant bed preparation, landscape edging, loose aggregate ground cover, plant materials in 5-gallon and 30-gallon containers, landscape establishment over 12 months, riprap installation, barricades and traffic handling, erosion control logs, and electrical conduit and services. The sealed bid deadline is 2:00 p.m. on June 30, 2026, with public bid reading to follow. Bid documents are available online through CivCast beginning June 8, 2026, and may be examined at Kimley-Horn and Associates, Inc. without charge. Questions must be submitted by 5:00 p.m. on June 22, 2026, through CivCast or directed to Laura Presley, Landscape Architect. The contract duration is 60 working days, with liquidated damages assessed for delays beyond the contract time. Work restrictions include peak and off-peak hour limitations for single and multiple lane closures, with no work restricting lanes allowed from 3 p.m. the day before to 9 a.m. the day after specified holidays and special events.
Bidders must be prequalified by TxDOT and must submit a bid bond or cashier's check equal to five percent of the total bid amount. The apparent low bidder must demonstrate financial resources and qualifications within five working days of award notification. Contract award will be made to the lowest responsive bidder from a qualified contractor, with the City reserving the right to reject any or all bids. Performance and payment bonds equal to 100 percent of the contract price are required from the successful contractor, with surety companies rated XIV or better by Best's Rating Guide. Prevailing wage rates per FHWA-1273 apply to this federally aided project. Required insurance includes workers' compensation (statutory), commercial general liability ($1,000,000 combined single limit), comprehensive automobile insurance ($1,000,000 combined single limit), and builder's risk coverage. The City of Keller must be named as an additional insured on all policies. Subcontracts of $10,000 or more must incorporate federal nondiscrimination, disadvantaged business enterprise, and equal employment opportunity provisions. The contract includes various federal and state compliance requirements, including prohibitions on certain telecommunications equipment manufacturers, railroad liability insurance, U.S. Army Corps of Engineers permitting coordination for jurisdictional areas, and migratory bird nesting prevention measures. Additional certifications required include non-boycott of energy companies and Israel, nondiscrimination against firearm entities, and public information disclosure compliance per Texas Government Code Chapter 552.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-008_Seven Bridges Repair_ProjectManual.pdf | ||
| 26-008 Sulfur Dioxide Bid Docs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US 377 Landscape Enhancement Keller, Texas
PROJECT MANUAL
FOR
THE CONSTRUCTION OF
US 377 LANDSCAPE ENHANCEMENT
PREPARED BY:
City of Keller 1100 Bear Creek Pkwy
Keller, Texas 76248
(817) 743-4000
Project Contact: Cody Maberry
Kimley-Horn and Associates, Inc.
(Project Management and Site Development)
801 Cherry Street, Unit 11, Suite 1300 Fort Worth, Texas 76102
(817) 335-6511 Project Contact: Laura Presley, PLA
April 2026
DO NOT DISASSEMBLE
CSJ 0081-02-079
Project F2026(631)
Highway US 377
County Tarrant
“The enclosed specifications, special provisions, general notes and specification data in this document have been issued by me or under my responsible supervision.”
, P.L.A. April 24, 2026
DATE
NOTE: Federal and TxDot specifications shall govern City Specifications.
TABLE OF CONTENTS
COVER SHEET
TABLE OF CONTENTS
GENERAL NOTES
The following shall be the order of precedence for the contract documents:
1. Local Government Standard Specifications
2. Local Governmental Special Provisions
3. TxDOT Standard Specifications
4. Standard General Conditions of the Construction Contract (EJCDC)
5. Bidding and Contract Requirements
6. General Notes
7. Addendum
8. Construction Plans
SECTION 1 BIDDING AND CONTRACT REQUIREMENTS
ADDENDA (Not included at this time)
ACKNOWLEDGE RECEIPT OF ADDENDA
NOTICE TO BIDDERS
INSTRUCTION TO BIDDERS
STATEMENT OF BIDDER’S QUALIFICATIONS
CONTRACTOR’S ASSURANCE
BID PROPOSAL
INSURANCE
CERTIFICATE OF INSURANCE
PROHIBITION ON CERTAIN TELECOMMUNICATIONS EQUIPMENT OR
SERVICES
CONTRACTOR’S AFFIDAVIT OF FINAL PAYMENT
STANDARD FORM OF AGREEMENT
CONTRACTOR’S ASSURANCE
PERFORMANCE BOND
PAYMENT BOND
WARRANTY BOND
WORKER’S COMPENSATION INSURANCE
CERTIFICATE OF INSURANCE (Not included at this time)
CONFLICT OF INTEREST DISCLOSURE STATEMENT
DBE COMMITMENT AGREEMENT FORM
CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY
AND VOLUNTARY EXCLUSION
DISCLOSURE OF LOBBYING ACTIVITIES
LOBBYING CERTIFICATION
CHILD SUPPORT STATEMENT
OSHA IMPLEMENTATION PROCEDURES
NON-COLLUSION STATEMENT
BUY AMERICA
STATEMENT FOR LOAN GUARANTTES AND LOAN INSURANCE
PRISON PRODUCTED MATERIALS
DIFFERING SITE CONDITIONS VERBATIM STATEMENT
STANDARD GENERAL CONDITIONS
CERTIFICATE OF INTERESTED PARTIES
SECTION 2 TEXAS DEPARTMENT OF TRANSPORTATION
Specification List -Includes TxDot Standard Specifications, Special Provisions, Special Specifications and Special Provisions to Specifications as follows:
LOCAL GOVERNMENT STANDARD SPECIFICATIONS
Item 1L Abbreviations and Definitions Item 2L Instructions to Bidders Item 3L Award and Execution of Contract Item 4L Scope of Work Item 5L Control of the Work Item 6L Control of Materials Item 7L Legal Relations and Responsibilities Item 8L Prosecution and Progress Item 9L Measurement and Payment
TXDOT STANDARD SPECIFICATIONS
Item 170 Irrigation System (618, 620, 622, 624, 628) Item 192 Landscape Planting (161, 166) Item 193 Landscape Establishment (166, 192) Item 432 Riprap (132) Item 500 Mobilization Item 502 Barricades, Signs, and Traffic Handling Item 503 Portable Changeable Message Sign Item 506 Temporary Erosion, Sedimentation, and Environmental Controls
Item 618 Conduit (170) Item 620 Electrical Conductors (170) Item 628 Electrical Services (170)
TXDOT SPECIAL SPECIFICATIONS
Item 7025 Water Mains Item 7030 Water and Wastewater Main Relocations
LOCAL GOVERNMENT SPECIAL PROVISIONS
Will govern and take precedent over the specifications enumerated here on wherever in conflict there with.
FHWA-1273 Form FHWA-1273
Wage Rates Minimum Wages and Texas County Wage Rate Zones
000-001L Nondiscrimination
000-002L Certification of Nondiscrimination in Employment
000-007L Cargo Preference Act Requirements in Federal Aid
Contracts
000-018L Schedule of Liquidated Damages
000-022L Disadvantaged Business Enterprise
002-003L Instructions to Bidders
003-006L Award and Execution of Contact
006-009L Control of Materials
506-001L Temporary Erosion, Sedimentation, and Environmental Controls
SECTION 1 – BIDDING AND CONTRACT REQUIREMENTS
US 377 LANDSCAPE ENHANCEMENT
Johnson Road to End of Median
F2026(631)
CITY OF KELLER
ACKNOWLEDGE OF RECEIPT OF ADDENDA
The undersigned Bidder hereby acknowledges receipt of the following Addenda:
Addendum Number Dated Acknowledge Receipt (initial)
No addenda were received:
Acknowledged for: _________________________________________
(Name of Bidder)
By: ________________________________________
(Signature of Authorized Representative)
Name: ______________________________________
Title: _______________________________________
Date: _____________________________________
NOTICE TO BIDDERS
FROM
CITY OF KELLER
The City of Keller, Tarrant County, Texas, will receive sealed bids in the office of Risk / Purchasing, City
Hall, 1100 Bear Creek Pkwy, Keller, TX 76248 until 2:00 pm. June 30, 2026, and then publicly read aloud for the construction of:
Project: US 377 Landscape Enhancement Project Number: F2026(631) City of Keller Bid Number: 26-008
This project consists of 550 linear feet of hardscape, landscape, and irrigation only within existing parkway ROW areas and one existing median, along US 377 from Johnson Road to the End of Median.
The total contract working days will last 60 days.
A Complete Set of Bid Documents including Plans and Specifications are available online through Civ Cast. Copies of such may be examined without charge at Kimley-Horn and Associates, Inc., 801 Cherry Street, Unit 11, Suite 1300, Fort Worth, Texas, 76102, 817-335-6511.
The City reserves the right to accept or reject, in part or in whole, any bids submitted and to waive any technicalities or formalities that are in the best interest of the City. Each bidder will be required to complete and submit the below documents in order to have a valid bid submittal:
• Qualified TxDOT contractor
• Bid Proposal Completed and Signed
• All Certifications acknowledged
• Acknowledgement of alternate bid items and addenda
• Technical qualifications met
• Signed State of Texas Child Support Business Ownership Form
• Signed Non-Collusion Statement
Each bidder shall be prequalified by TxDOT, but does not have to be published on TxDOT.gov if they can provide an approval letter from TxDOT dated before the bid opening.
INSTRUCTION TO BIDDERS
INVITATION TO BID:
Sealed bids identified on the envelope for “US 377 Landscape Enhancement” in accordance with
Drawings, Specifications, and Contract Documents adopted by the City of Keller will be received in the office of Risk / Purchasing, City Hall, 1100 Bear Creek Pkwy, Keller, TX 76248 until 2:00 pm. June 30, 2026, and then publicly read aloud. Late bids will be returned unopened.
A Complete Set of Bid Documents including Plans and Specifications will be available for online purchase, June 8, 2026, through Civ Cast. Copies of such may be examined without charge at Kimley- Horn and Associates, Inc., 801 Cherry Street, Unit 11, Ste. 1300, Fort Worth, TX 76102, 817-335-6511.
Questions regarding this project should be posted through Civ Cast or directed to Laura Presley, Landscape Architect, Kimley-Horn and Associates, Inc. at 817-349-6821, or at laura.presley@kimley-horn.com. Questions will be accepted until 5:00pm June 22, 2026.
Cashier’s check or acceptable bidders’ bond, payable to the City of Keller for a total proposal in an amount not less than five percent of the total bid submitted must accompany the bid.
The City of Keller reserves the right to reject any and all bids (and to waive informalities in any bid except the date and time of submittals).
LOCATION AND DESCRIPTION OF PROJECT:
The work to be performed under the provisions of these Contract Documents consists of furnishing all materials, equipment, supplies, and appurtenances; providing all construction plant equipment, and tools; performing all necessary labor and supervision’ and the construction complete, including all work appurtenant thereto for US 377 Landscape Enhancement for the City of Keller.
The site of the work is in Tarrant County, Texas. The project consists of approximately 550 linear feet of hardscape, landscape, and irrigation of parkway ROW areas and medians, along US 377 from Johnson
Road to the End of Median.
PROPOSAL:
No original oral, telephonic, or telegraphic proposal shall be considered. Corrections, deletions, or additions to bids may be made by wire, provided such wire are received in correct and comprehensive form prior to the opening time of bids, and confirmed by letter. No telephone corrections, deletions or additions will be accepted.
Proposals will be accepted only for the entire portion of the project described in these Drawings. Each proposal shall be submitted on the CONTRACTOR’S Proposal Form enclosed herein or one a computer-generated form, provided that the following conditions are met. All blanks shall be fully and legibly filled’ all signatures shall be in longhand. An authorized member of the contracting firm must sign the CONTRACTOR’S Proposal Form. The completed form shall show no erasures, alterations, qualifications, or additional material of any kind whatsoever.
Each bidder should have studied the Drawings and Specifications, or other proposed contract
Documents. He may submit to the ENGINEER a written request for interpretation thereof. The person submitting the request will be responsible for its prompt delivery. Interpretation of the proposed
Contract Documents will be made only by Addendum. A copy of each Addendum will be mailed, delivered, or transmitted via facsimile to each person on obtaining a set of Contract Documents from the ENGINEER. The OWNER will not be responsible for any other explanations or interpretations of the proposed Contract Documents.
Any addenda or letter of clarification issued in writing by the ENGINEER during the period of bidding shall be included in the proposal and the executed Contract; such addenda or letter of clarifications shall become a part thereof and modify the specifications and/or the Drawings accordingly.
Each bidder will be required to complete and submit all contract forms, bonds, and questionnaires, included in the contract documents in order to have a valid bid submittal.
QUALIFICATIONS OF BIDDERS:
The apparent low bidder will be required to submit, within five working days evidence that he has practical knowledge of the particular work bid upon and that he has the financial resources to complete the proposed work.
In determining the Bidder’s qualifications, the following factors will be considered: Work previously completed by the Bidder and whether the Bidder (a) maintains a permanent place of business, (b) has adequate plant and equipment to do the work properly and expeditiously, (c) has the financial resources to meet all obligations incidental to the work, and (d) has appropriate technical experience.
Each Bidder may be required to show that he has handled former work so that no just claims or judgments are pending against such work. No bid will be accepted from a Bidder who is or has been engaged on any work that would impair his ability to perform or finance this work. Each bidder shall be prequalified by TxDOT, but does not have to be published on TxDOT.gov if they can provide an approval letter from TxDOT dated before the bid opening.
SUBMISSION OF BIDS AND AWARD OF CONTRACT:
Bidders shall submit bids for the Total Base Bid. Failure to submit such bids shall result in rejection of bid as non-responsive. The City reserves the right to award the contract to the lowest responsive bidder for either the Total Base Bid. The City reserves the right to accept the bid, in its judgment, is the best bid received from a qualified Bidder; to reject any or all bids; and to waive informalities in any bid, except time of submittal. Bids received after the specified time of submittal will not be considered and will be returned unopened.
BONDING:
Each proposal must be accompanied by one (1) Bid Bond, one certified and/or Cashier’s Check (on a solvent bank in the State of Texas, drawn to order of the City of Keller) in the sum of not less than five percent (5%) of the greatest amount of the proposal. No other form of security will be accepted. Said security shall be satisfactory to the OWNER, and its amount shall be agreed upon to the measure of liquidated damages that the OWNER will sustain by the failure, neglect, or refusal of the Bidder to execute and deliver the Contract, should the Contract be awarded to him. If the Bidder defaults in the execution of the Contract to him, then the said Bid Bond, Certified Check, or Cashier’s Check will not be returned.
Upon awarding of the contract, the successful CONTRACTOR will be required to furnish the OWNER with Performance and Payment Bonds in the amount of 100 percent of the contract price for the proposed construction. The cost of such bonds shall be included in the prices bid for various construction items. The surety issuing Performance and Payment Bonds shall have a “Best’s Rating
Guide” rating of XIV or better.
QUESTIONS CONCERNING PROJECT:
Questions concerning this project should be posted to Civ Cast or directed to:
Laura Presley, Landscape Architect Kimley-Horn and Associates, Inc.
Phone: 817-349-6821 Email: laura.presley@kimley-horn.com
STATEMENT OF BIDDER'S QUALIFICATIONS
FOR APPARENT LOW BIDDER
Project: US 377 Landscape Enhancement Project Number: F2026(631) February 2026
INSTRUCTIONS. This section is to be filled out by the APPARENT LOW BIDDER upon request by the OWNER. All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets.
The BIDDER may submit any additional information he/she desires.
Name of bidder and any previous company names:
Permanent main office address:
When organized:
If a corporation, when incorporated:
Number of years have you been engaged in the contracting business under your present firm or trade name:
General type and discipline of work performed by your company:
Have you ever failed to complete any work awarded to you?
If Yes, where, why, and when?
Have you ever defaulted on a contract?
Has your company ever been terminated from a contract for any reason?
What experience and references (especially municipal) construction work similar in size and type to this project do you have? Provide a minimum of 5. Separate lists are acceptable but not preferred.
Project Name Amount Client Contact Name, Phone, Email
Give the background and experience of the principal members of your organization, including officers:
List the more important projects recently completed by your company, stating the approximate cost for each, the type work, the month and year completed, finished on-time or late and provide the name, phone number and address of the Owner and the Engineer and the Inspector on the project:
List the projects your organization is now engaged (in progress) and percent complete. Give the same information as above, but rather than date completed include anticipated date of completion:
For each of the projects listed above (completed and in-progress), attach a list of all major subcontractors whether they completed the contract or not. Include any subcontractor that has more than five (5) percent of the contractor cost and all concrete, structural steel, masons, electrical, Hvac, site utilities, plumbing, and glazing subcontractors. State the name, phone number, and address of each subcontractor (attach additional sheets).
List the Surety Bonds in force on the above uncompleted work. Indicate which project each is for, the amount of the bond, and the name and addresses of the Surety Company and Resident Agent:
List equipment owned by the Bidder that is in operable condition and available for use on this contract:
List employees directly employed by the Bidder (work force statement) including position held (classification) and type of work they will be performing on this project.
Name Classification Type of Work On This Project
List portions of the work the Bidder proposes to sublet in case of award of contract. Include the amount and type of work.
Sub-Contractor / Firm Name Address Telephone No. Type Work
Are there any judgments, claims, arbitration or mediation proceedings, suits or liens pending or outstanding against your company or its officers?
Has your company ever files bankruptcy under the current or any other name?
If yes please attach the details
Hay your company ever filed any lawsuits, requested arbitration or mediation with regard to construction contracts within the last seven (7) years?
If yes please attach the details
Within the last seven (7) years, has any officer or principal of your company ever been an officer or principal of another company when it failed to complete a construction project?
If yes please attach the details
Credit available: $
Bank reference:
A balance sheet and income statement certified by a CPA from the previous three fiscal years shall be provided with this Statement of Qualifications to be reviewed prior to contract award.
The attached Statement of Contractor’s Surety must be completed by the Surety which the Contractor intends to use for obtaining bonds for this project. It must be mailed directly from the Surety to the City prior to contract award.
Are the Surety companies used to provide bonds for this project certified by the U.S. Department of Treasure and currently listed in Treasury Circular 570?
Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER?: YES ; NO.
The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recitals comprising this Statement of Bidder's Qualifications.
Dated at this day of , 2022.
(Name of Bidder)
By:
Title:
STATE OF
COUNTY OF
being duly sworn deposes and says that he is of (Name of Organization) and that the answers to the forgoing questions and all statements therein contained are true and correct.
Subscribed and sworn to before me this day of , 2022.
Notary Public
My commission expires , 20__.
CCSJ: 0081-02-079 Sheet: 1
County: TARRANT Control: 0081
Highway: US 377
General Notes
Specification Data
Basis of Estimate
Item Description Rate Unit
166 Fertilizer (16-8-8) 600 lb./acre** ton
168 Vegetative Watering 169,400 gal./acre 1,000 gal.
Special Notes
Electronic files containing answered pre-letting questions and other project related design information will be placed in the following FTP site periodically. Check this site for new information. Notices of new postings will not be sent out by the city or Engineer.
The data located in these files is for non-construction purposes only and can be found at https://cityofkeller.ionwave.net/Login.aspx
Access is read-only. All files in the FTP site are subject to the License Agreement shown on the FTP site.
Contractor questions on this project are to be addressed to the following individual(s):
City of Keller Contact: cmaberry@cityofkeller.com Landscape Architect, Kimley-Horn: laura.presley@kimley-horn.com
For Q&A’s on Proposals navigate to https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors. Use the dashboard to navigate to the project you are interested in by scrolling or filtering the dashboard using the controls on the left. Hover over the blue hyperlink for the project you want to view the Q&A for and click on the link in the window that pops up.
All questions submitted that generate a response will be posted through this site.
Single lane closures, except as otherwise shown in the plans, will be restricted to off-peak hours as defined in the following table:
Peak Hours Off-Peak Hours
6 to 9 AM Monday through Friday
3 to 7 PM Monday through Friday
9 AM to 3 PM and 7 PM to 6 AM Monday through Friday
All day Saturday and Sunday
Work that requires closure of multiple travel lanes in the same direction, except as otherwise shown in the plans, are restricted to night hours between 9 PM and 6 AM.
https://cityofkeller.ionwave.net/Login.aspx mailto:cmaberry@cityofkeller.com mailto:laura.presley@kimley-horn.com https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors
CCSJ: 0081-02-079 Sheet: 2
Existing storm sewers and utilities are shown from the best available information. Verify the location of all underground facilities prior to starting work.
For dimensions of right-of-way not shown on the plans, see right-of-way map on file at the TxDOT District Office.
Modifications to Lane Closure / Work Restrictions:
Submit a request in writing for approval by the Engineer a minimum of 10 days in advance of implementing a change to lane closure restrictions.
When deemed necessary, the Engineer will lengthen, shorten, or otherwise modify lane closure restrictions as traffic conditions warrant.
When deemed necessary, the Engineer will modify the list of major events when new events develop, existing events are rescheduled, or when warranted.
Special Events/ Special Situations will be handled on a case-by-case basis. No work restricting lane closures is allowed from 3 PM a day before to 9 AM the day after the Special Event or Special Situation.
Provide all-weather surface for temporary ingress and egress to adjacent property, as directed. Materials, labor, equipment and incidentals necessary to provide temporary ingress and egress will not be paid for directly, but will be subsidiary to the various bid items.
Where necessary, the governing slopes indicated herein may be varied from the limits shown, to the extent approved.
On superelevated curves the shoulders will have the same cross-slope as the pavement, unless otherwise indicated.
On superelevated curves where the grade line is in a sag or on a flat grade, overlay the shoulders to the extent necessary to prevent trapping of water on the high side.
All driveway openings will be determined by the Engineer and will conform with Texas Department of Transportation "Regulations for Access Driveways to State Highways" adopted September 1953, and revised June 2004.
Locations and lengths of all private entrances are approximate only. The actual locations, lengths, lines, and grades are to be established in the field.
Locations and lengths of all private entrances are approximate only. The actual locations, lengths, lines and grades are to be determined by the Engineer and shall conform to the regulations of The City of Keller.
Do not discolor or damage existing curb and curb and gutter during construction operations. In the event of discoloration or damage, clean or repair as directed.
CCSJ: 0081-02-079 Sheet: 3
Remove the grass from the crown of shoulders or pavement edges by blading or other approved methods.
Payment for this work will not be made directly, but will be subsidiary to the various items of the contract.
Locations shown for drainage structures refer to the control points of structures as follows:
1) Manholes, Inlets, and Junction Boxes—Locations are at the centroid of the structure; when two structure types are specified, location is at the centroid of the top structure. Bottom structure may be positioned as required to align with top structure, storm drain pipes and other adjacent structures.
2) Street Inlets—Locations are at the face of curb at a distance of L/2 from the end of the inlet.
3) Headwalls—Locations are to the outside face of the headwall at the centerline of the pipe or box structure. For pipe headwalls with Type "P" or "C" safety end treatment, locations are on the centerline of the pipe structure at the limit of payment for pipe.
Plugging of pipes or culverts will not be paid for directly, but will be subsidiary to the various bid items, unless otherwise shown on the plans.
Provide temporary drain openings at all low points or other drainage structures, as required, at the Contractor's expense.
Remove any obstructions to existing drainage due to the contractor's operations, as required, at the Contractor's expense.
Install all required concrete riprap flumes immediately following the construction of ditches in which they are to be placed. In addition, apply all erosion control measures as shown on the plans or as directed, immediately following construction of channels to their required line, grade, and section.
The following standard detail sheets have been modified:
Item 4. Scope of Work
Reimbursement for project overhead will not be considered until project completion has extended beyond the original Contract Time.
Item 5. Control of the Work
When supplementary bridge plans, shop drawings, shop details, erection drawings, working drawings, forming plans, or other drawings are required, prepare and submit drawings electronically for the fabrication of structural items in accordance with the TxDOT Guide to Shop Drawing Submittal available on the Department’s website (https://www.txdot.gov/business/resources/highway/bridge/shop-drawing-submittal-cycle.html) and as directed for other items required by the Contract. Typical electronic sheet size shall be 11 inches x 17 inches with ½ inch margins.
When submitting shop drawings for review and approval, the “To” field in the email shall be the reviewing office only. The “CC” field shall include the following at a minimum; Prime Contractor, FTW Shop Plan https://www.txdot.gov/business/resources/highway/bridge/shop-drawing-submittal-cycle.html https://www.txdot.gov/business/resources/highway/bridge/shop-drawing-submittal-cycle.html
CCSJ: 0081-02-079 Sheet: 4
Email Address (FTW_ShopPlanReview@txdot.gov) (if not the reviewing office), and Area Office Personnel.
Items requiring shop drawings for review and approval are identified in the “Table of Structural Items and Construction Processes” located in the shop drawing submittal cycle TxDOT website (https://www.txdot.gov/business/resources/highway/bridge/shop-drawing-submittal-cycle.html).
Provide a minimum of 10 working days for shop drawing review if time requirement has not already been provided elsewhere on the plan set.
Submit all sheets with a title in the lower right hand corner. The title must include the sheet index data shown on the lower right corner of the project plans, name of the structure or element or stream, sheet numbering for the shop drawings, name of the fabricator and the name of the Contractor.
Standard Operating Procedure for Alternate Precast Proposal Submission” found online at https://www.txdot.gov/inside-txdot/forms-publications/consultants-contractors/publications/bridge.html#design. Acceptance or denial of an alternate is at the sole discretion of the Engineer. Impacts to the project schedule and any additional costs resulting from the use of alternates are the sole responsibility of the Contractor.
Item 6. Control of Materials
The Buy America Material Classification Sheet is located at the below link.
https://www.txdot.gov/business/resources/materials/buy-america-material-classification-sheet.html for clarification on material categorization.
Item 7. Legal Relations and Responsibilities
This contract requires work to be done on railroad property. Cooperate with the railroads and comply with all of their requirements including obtaining any required training before performing work on railroad property.
Submit to the Engineer an original railroad liability insurance policy.
Do not initiate activities in a project specific location (PSL) associated with a U.S. Army Corps of Engineers (USACE) permit area that has not been previously evaluated by the USACE as part of the permit review of this project. Such activities include, but are not limited to haul roads, equipment staging areas, borrow and disposal sites. “Associated” as defined here means materials are delivered to or from the PSL. The permit area includes all waters of the U.S. or associated wetlands affected by activities associated with this project.
Special restrictions may be required for such work. The contractor will be responsible for all consultations with the USACE regarding activities, including project specific locations (PSLs) that have not been previously evaluated by the USACE. Provide the Department with a copy of all consultations or approvals from the USACE prior to initiating activities.
The Contractor may proceed with activities in PSLs that do not affect a USACE permit area if a self-determination has been made that the PSL is non-jurisdictional or proper USACE clearances have been obtained in jurisdictional areas or have been previously evaluated by the USACE as part of the permit https://www.txdot.gov/business/resources/highway/bridge/shop-drawing-submittal-cycle.html https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.txdot.gov%2Finside-txdot%2Fforms-publications%2Fconsultants-contractors%2Fpublications%2Fbridge.html%23design&data=04%7C01%7CJavier.Salinas%40txdot.gov%7Ce8aab05860d1432a4e9108d8d5122fe4%7C39dba4765c094c6391dace7a3ab5224d%7C0%7C0%7C637493621373670079%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=6O99V1%2BqTq4NvkB03GWzxT084Jt3MGBwvzjEM%2BiTZho%3D&reserved=0 https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.txdot.gov%2Finside-txdot%2Fforms-publications%2Fconsultants-contractors%2Fpublications%2Fbridge.html%23design&data=04%7C01%7CJavier.Salinas%40txdot.gov%7Ce8aab05860d1432a4e9108d8d5122fe4%7C39dba4765c094c6391dace7a3ab5224d%7C0%7C0%7C637493621373670079%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=6O99V1%2BqTq4NvkB03GWzxT084Jt3MGBwvzjEM%2BiTZho%3D&reserved=0 https://www.txdot.gov/business/resources/materials/buy-america-material-classification-sheet.html
CCSJ: 0081-02-079 Sheet: 5 review of this project. The contractor is solely responsible for documenting any determinations that their activities do not affect a USACE permit area. Maintain copies of these determinations for review by the Department or any regulatory agency.
Document and coordinate with the USACE, if required, prior to any excavation hauled from or embankment hauled into a USACE permit area by either (1) or (2) below.
(1) Restricted Use of Materials for Previously Evaluated Permit Areas. Document both the project specific location (PSL) and its authorization. Maintain copies for review by the Department or any regulatory agency. When an area within the project limits has been evaluated by the USACE as part of the permit process for this project:
a. Suitable excavation of required material in the areas shown on the plans and cross sections as specified in Item 110 is used for permanent or temporary fill (Item 132, Embankment) within a USACE permit area;
b. Suitable embankment (Item 132) from within the USACE permit area is used as fill within a USACE evaluated area; and,
c. Unsuitable excavation or excess excavation [“Waste”] (Item 110) that is disposed of at a location approved by the Engineer within a USACE evaluated area.
(2) Contractor Materials from Areas Other than Previously Evaluated Areas. Provide the Department with a copy of all USACE coordination or approvals prior to initiating any activities for an area within the project limits that has not been evaluated by the USACE or for any off right of way locations used for the following, but not limited to haul roads, equipment staging areas, borrow and disposal sites:
a. Item 132, Embankment, used for temporary or permanent fill within a USACE permit area;
and,
b. Unsuitable excavation or excess excavation [“Waste”] (Item 110, Excavation) that is disposed of outside a USACE evaluated area.
The total area disturbed for this project is 0.28 acres. The disturbed area in this project, all project locations in the Contract, and the Contractor project specific locations (PSLs), within 1 mile of the project limits, for the Contract will further establish the authorization requirements for storm water discharges. The Department will obtain an authorization to discharge storm water from the Texas Commission on Environmental Quality (TCEQ) for the construction activities shown on the plans. The Contractor is to obtain required authorization from the TCEQ for Contractor PSLs for construction support activities on or off the right of way. When the total area disturbed in the Contract and PSLs within 1 mile of the project limits exceeds 5 acres, provide a copy of the Contractor NOI for PSLs on the right of way to the Engineer and to the local government that operates a separate storm sewer system.
When a bridge deck is milled, seal coated and overlaid, remove excess material. Do not just broom to the sides of the bridge, under guardrail, etc. Cover or protect all sealed expansion joints and rails on bridges and all railroad tracks encountered as approved. Clean and repair all of these features if they weren’t properly protected at contractor’s expense. This work is subsidiary work to applicable bid items.
Prevention of Migratory Bird Nesting
It is anticipated that migratory birds, a protected group of species, may try to nest on bridges, culverts, vegetation, or gravel substrate, at any time of the year. The preferred nesting season for migratory birds is
CCSJ: 0081-02-079 Sheet: 6 from February 15 through October 1. When practicable, schedule construction operations outside of the preferred nesting season. Otherwise, avoid nests containing migratory birds and perform no work in the nesting areas until the young birds have fledged.
Structures Do not begin bridge and culvert construction operations until swallow nesting prevention is implemented, until after October 1 if it’s determined that swallow nesting is actively occurring, or until it’s determined swallow nests have been abandoned.
If the State installed nesting deterrent on the bridges and culverts, maintain the existing nesting deterrent to prevent swallow nesting until October 1 or completion of the bridge and culvert work, whichever occurs earlier. If new nests are built and occupied after the beginning of the work, do not perform work that can interfere with or discourage swallows from returning to their nests. Prevention of swallow nesting can be performed by one of the following methods:
1. By February 15 begin the removal of any existing mud nests and all other mud placed by swallows for the construction of nests on any portion of the bridge and culverts. The Engineer will inspect the bridges and culverts for nest building activity. If swallows begin nest building, scrape or wash down all nest sites.
Perform these activities daily unless the Engineer determines the need to do this work more frequently.
Remove nests and mud through October 1 or until bridge and culvert construction operations are completed.
2. By February 15 place a nesting deterrent (which prevents access to the bridge and culvert by swallows) on the entire bridge (except deck and railing) and culverts.
No extension of time or compensation payment will be granted for a delay or suspension of work caused by nesting swallows. This work is subsidiary to the various bid items.
The following Holiday/Event lane closure restriction requirements apply to this project:
No work that restricts or interferes with traffic shall be allowed between 3 PM on the day preceding a Holiday or Event and 9 AM on the day after the Holiday or Event.
Holiday Lane Closure Restrictions New Year’s Eve and New Year’s Day (December 31 through January 1)
3 PM December 30 through 9 AM January 2
Easter Holiday Weekend (Friday through Sunday)
3PM Thursday through 9 AM Monday
Memorial Day Weekend (Friday through Monday)
3 PM Thursday through 9 AM Tuesday
Independence Day (July 3 through July 5)
3 PM July 2 through 9 AM July 6
Labor Day Weekend (Friday through Monday) 3 PM Thursday through 9 AM Tuesday Thanksgiving Holiday (Wednesday through Sunday)
3 PM Tuesday through 9 AM Monday
Christmas Holiday (December 23 through December 26)
3 PM December 22 through 9 AM December 27
CCSJ: 0081-02-079 Sheet: 7
Item 8. Prosecution and Progress
Working days will be computed and charged in accordance with Section 8.3.1.4, ‘Standard Workweek.’
The number of working days for final acceptance will be 60 working days.
Workweek.’
Item 100. Preparing Right of Way
Measurement for this item will be along the centerline of the project with the limits of measurements as shown on the plans.
Removal of existing concrete pavement will be in accordance with Item 104, “Removing Concrete” except that this work will not be paid for directly, but will be subsidiary to Item 100, “Preparing Right of Way.”
Item 162. Sodding for Erosion Control
Furnish and place Bermudagrass sod.
Item 164. Seeding for Erosion Control
Apply seeding required between December 1 and January 31 using seed types and mixtures as shown in Item 164.2.1, Table 3. If, in the opinion of the Engineer, this does not provide an effective vegetative cover, apply “straw or hay mulch” as specified in Article 164.3.2, “Straw or Hay Mulch Seeding” as soon as possible. After February 1, apply warm season seeding in order to establish a permanent protective vegetative cover.
Item 166. Fertilizer
Fertilize all areas of project to be seeded or sodded.
Item 168. Vegetative Watering
Furnish and install an approved rain gauge at the project site, as directed. Furnishing and installation of the rain gauge will not be paid for directly, but will be subsidiary to Item 168.
Apply vegetative watering for an establishment period of thirteen weeks following application of seed or installation of sod, at a rate of 1/2 inch of water depth per week (approximately 13,030 gallons per acre).
During the first four weeks after seeding, apply water twice per week, on non-consecutive days, each at half the weekly application rate. For the remainder of the establishment period, apply vegetative watering once per week during the months of January through June or September through December, at the weekly application rate; apply watering twice per week, on non-consecutive days during the months of July and August, each at one-half the weekly application rate.
Average weekly rainfall rates for the District are:
CCSJ: 0081-02-079 Sheet: 8
January—0.39" April—0.86" July—0.48" October—0.68" February—0.46" May—1.00" August—0.47" November—0.46"
March—0.48" June—0.63" September—0.74" December—0.37"
Item 432. Riprap
Provide weep holes as directed.
The quantities for riprap at the location indicated may be varied to the extent necessary to ensure proper functioning for the purpose intended.
All concrete riprap will be 4" (.33') in thickness, unless otherwise shown on the plans, and must be reinforced.
An 4 inch (.33 ft.) by 18 inch (1.5 ft.) concrete mow strip is required at the exposed edges of all concrete riprap, unless otherwise directed.
Locations and lengths of riprap flumes shown on the plans are approximate. Actual lengths and locations are to be determined in the field.
When synthetic fiber reinforcement concrete option is chosen, provide the following:
• At all construction joints (vertical or horizontal) provide #3 bars 24 in. long and placed on 18 in.
centers along joint length. Bars should be centered in concrete cross section.
• At all toe wall locations #3 L-bars will be required on 18 in. centers with a length 2 times the depth of the toe wall. Place three #3 bars the length of the toe wall and equally spaced on the L-bars.
Item 502. Barricades, Signs, and Traffic Handling
The contractor force account ‘safety contingency’ that has been established for this project is intended to be utilized for work zone enhancements to improve the effectiveness of the traffic control plan that could typically not be foreseen in the project planning and design stage. These enhancements will be mutually agreed upon by the Engineer and the Contractor’s responsible person based on weekly or more frequent traffic management reviews on the project. The Engineer may choose to use existing bid items if it does not slow the implementation of enhancement.
Maintenance of roadways, not paid as Item 508, "Constructing Detours," and designated in the traffic control plan to carry traffic, will be the responsibility of the Contractor and will be paid for by "Contractor Force Account or Agreed Unit Price".
Permanent signs may be installed when construction in an area is complete and they will not conflict with the traffic control plan for the remainder of the job.
CCSJ: 0081-02-079 Sheet: 9
Existing signs are to remain as long as they do not interfere with construction and they do not conflict with the traffic control plan.
Any sign not detailed in the plans but called for in the layout will be as shown in the current "Standard Highway Sign Designs for Texas”.
When traffic is obstructed, arrange warning devices in accordance with the latest edition of the "Texas Manual on Uniform Traffic Control Devices".
Cover or remove any work zone signs when work or condition referenced is not occurring.
Do not place barricades, signs, or any other traffic control devices where they interfere with sight distance at driveways or side streets. Provide access to all driveways during all phases of construction unless otherwise noted in the plans or as directed.
Item 503. Portable Changeable Message Signs
Provide all portable changeable message signs and arrow panels with a photoelectric device to allow for automatic dimming of operations to approximately 50% of their normal brightness when ambient light drops to approximately five footcandles, and then increase back again for daytime operations.
Two electronic portable changeable message sign unit(s) will be required. Individual or collective use of signs will be required by the Engineer when deemed necessary to supplement the traffic control plan.
Each sign must have programmed in its permanent memory the following 15 messages:
1. Exit Closed Ahead
2. Use Other Routes
3. Right Lane
4. Left Lane
5. Closed Ahead
6. Two Lane
7. Detour Ahead
8. Thru Traffic
9. Prepare To Stop
10. Merging Traffic
11. Expect 15 Minute Delay
12. Max Speed ** MPH
13. Merge Right
14. Merge Left
15. No Exit Next ** Miles
Item 506. Temporary Erosion, Sedimentation, and Environmental Controls
The SW3P for this project will consist of using the following items as directed:
• Temporary rock filter dams
• Temporary pipe slope drains
CCSJ: 0081-02-079 Sheet: 10
• Baled hay
• Temporary paved flumes
• Temporary sediment control fence
• Construction exits
• Gabions and gabion mattresses
• Earthwork for erosion control
• Construction perimeter fence
• Erosion control logs
Remove accumulated sediment or replace SW3P controls when the capacity has been reduced by 50% or when the depth of sediment at the control structure exceeds one foot.
Special Notes
Contact the TXDOT Signal Shop at 817-370-3661 prior to delivery of equipment, request for electrical inspection, placing signals into flash or turn on, or set up of signal detection.
Personnel will be experienced in items of work in the contract, which they will be performing. Provide a qualified technician, approved by the Engineer, on the project site to place the traffic signals in flash or in full operations. A qualified TXDOT signal technician must also be present.
The contractor is responsible for picking up materials furnished by the State with a forty-eight (48) hour notice to the signal shop. Contact Texas excavation safety system at 1-800-dig-tess or 1-800-344-8377, and TxDOT Signal Shop at 817-370-3661 prior to beginning any excavation work in the area of existing utilities, to prevent any damage or interference with present facilities.
Item 618. Conduit
ITS:
The subsidiary items shall consist of, but are not limited to the following:
• Stainless Steel Junction Box (24” x 24” x 16”)
Quantities for subsidiary items are shown on the plans.
No payment shall be made directly for all the subsidiary items furnished and installed, or other incidentals required to complete the work, but shall be considered subsidiary to this item.
Use materials from prequalified producer list as shown on the Texas Department of Transportation (TxDOT) materials producer list, category “Roadway Illumination and Electrical Supplies.”
Place conduit runs behind curbs at all locations where curbs exist.
Place conduit along the frontage road a minimum clearance of six (6) feet from the back of curbs, unless such clearance shall interfere with "straight through" conduit placement, conflict with retaining walls or utilities, or introduce additional or unnecessary right-angle bends into the cable path. Adjust, with Engineer's approval, the placement of conduit and ground boxes to ensure the "straight through" conduit concept and avoid the aforementioned interference, conflict, or introduction of additional, unnecessary bends.
CCSJ: 0081-02-079 Sheet: 11
Install a continuous bare or green insulated copper wire no. 8 AWG or larger in every conduit throughout the electrical system in accordance with the electrical detail sheets, and the latest edition of the national electrical code.
For power carrying conduit, provide a continuous grounded system. If PVC or HDPEC is used, the continuous system shall be accomplished by running 1-#8 AWG bare copper wire in conduit between foundations and grounding it at each foundation ground rod. If rigid metal conduit is used, it shall be bonded to form a continuous system.
After installing conduit and pulling cables, leave a high tensile strength polyester fiber pull tape in the conduit for future use. Install pull tape in all empty conduits.
All conduit elbows and rigid metal extensions required to be installed on PVC conduit systems will not be paid for separately but will be considered subsidiary to various bid items.
High-density polyethylene (HDPE) pipe may be threaded and used with threaded PVC connectors or couplings.
PVC conduit systems that snap or lock together without glue that are designed and UL listed to be used for bored PVC electrical conduit applications will be allowed for bored PVC Schedule 80, when approved by the Engineer.
No additional compensation will be paid to the Contractor when these specific purpose conduit systems are substituted for this purpose.
Place conduit under existing pavement at a minimum depth of four (4) feet below the pavement surface.
If the Contractor is required to place conduit under existing riprap, remove and replace riprap according to Item 432, “Riprap,” except for measurement and payment. Replace riprap to a depth and finish matching that of the original riprap. Measurement and payment for riprap shall be subsidiary to Item 618 and no additional payment shall be made for this work.
Refer to TxDOT standard ITS(27)-16 for trenching of ITS conduit regarding depth of conduit, spacing of conduit, flowable backfill and concrete encasement.
Conduit entry to ITS ground boxes shall be perpendicular to the perforated sidewall. Do not use 90 degree or right-angle fittings to achieve perpendicular conduit alignment. Where approved by the Engineer, use 3-foot minimum long radius bends. Where conduit is placed by jacking or boring, adjust the conduit placement to accommodate perpendicular entry and long sweep bends.
Seal all conduits in the cabinets and ground boxes with expandable urethane foam.
Place cables in conduit to provide maximum use of each conduit’s capacity, as defined by the NEC. Each conduit shall be completely filled, according to NEC guidelines, before cables may be placed in another conduit; however, the Contractor is still responsible for mandated cable separations as directed by the Engineer (e.g., placing power cables in separate conduit from communications cables).
Backfill all open trench/excavation by dusk. Do not leave any open trench/excavation overnight.
CCSJ: 0081-02-079 Sheet: 12
The plans show the conduits numbered and specific cables in specific conduits. The purpose of these notes is to instruct the Contractor on how to group the cables in the conduits and not to specify the exact conduit that is to carry the cables i.e., the numbering system used is arbitrary and may be set by the Contractor with Engineer's approval.
CONTRACTOR’S ASSURANCE
(Subcontracts Federal Aid Projects)
By signing this Contract, the Contractor is giving assurances that all subcontract agreements of $10,000 or more on this project will incorporate the following provisions:
Special Provision “Certification of Nondiscrimination in Employment”
Special Provision “Disadvantaged Business Enterprise in Federal-Aid Construction”
Special Provision “Measurement and Payment” (Article 9.2)
Special Provision “Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity” (Executive Order 11246)
Special Provision “Standard Federal Equal Employment Opportunity Construction Contract Specifications” (Executive Order 11246)
Form FHWA 1273 “Required Contract Provisions Federal-aid Construction Contracts” (Form FHWA 1273 must also be physically attached to subcontracts and purchase orders of $10,000 or more)
Applicable “Wage Determination Decision”
Revised 01-18
BID PROPOSAL FOR
US 377 LANDSCAPE ENHANCEMENT
for the
CITY OF KELLER, TEXAS
(THIS PROPOSAL MUST NOT BE REMOVED FROM THE CONTRACT DOCUMENTS)
DATE:
TO: CITY of KELLER, TEXAS
1100 BEAR CREEK PKWY
KELLER, TEXAS 76248
FOR: US 377 LANDSCAPE ENHANCEMENT
The budget estimate for this project is ____________________.
Pursuant to the foregoing "NOTICE TO BIDDERS", the undersigned bidder, having thoroughly examined the Contract Documents, the site of the project and understanding the amount of work to be done and the prevailing conditions, hereby proposes to fully complete all of the work and requirements as provided in the plans and Contract Documents and binds himself I herself upon acceptance of this proposal to execute a contract and furnish such bonds as required and proposes to complete the work within the time stated and for the following price:
P-1
BID PROPOSAL FORM: US 377 LANDSCAPE ENHANCEMENT
City of Keller Federal Aid Project No. F2026(631)
BASE BID
ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST
500 7001 MOBILIZATION LS 1 $ $
500 7001 PREPARING ROW STA 5.5 $ $
168 7001 VEGETATIVE WATERING TGL 11.0 $ $
166 7001 FERTILIZER AC 0.24 $ $
170 7001 IRRIGATION SYSTEM (DRIP & BUBBLERS) LS 1 $ $
192 7001 MULCH CY 32 $ $
192 7009 PLANT BED PREP SY 1,146 $ $
192 7016 LANDSCAPE EDGE LF 500 $ $
192 7024 LOOSE AGGREGATE FOR GRND COVER
(TY I)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .