PROJECT DESCRIPTION_MT FLAP SILVER 2021(1).pdf

PDF 269 KB Posted

Attached to
MT FLAP SILVER 2021(1), Roosevelt Drive Safety and Realignment Project
Solicitation number
69056726R000016
Issued by

About this file

This is a solicitation notice for the MT FLAP SILVER 2021 Roosevelt Drive Safety and Realignment Project located 11 miles south of Butte, Montana in Silver Bow County. The project consists of grading, mechanically stabilized earth (MSE) walls, drainage, asphalt surfacing, and guardrail installation. Three mutually exclusive bid schedules are offered: Schedule A (0.66 miles), Schedule B (1.17 miles), and Schedule C (1.72 miles), with only one schedule to be awarded. The estimated price range is $5 million to $10 million, with a tentative solicitation date of Fall/Winter 2026 and a tentative fixed completion date of Fall 2027 (exact date to be specified in SF1442 Continuation, Block 11 upon solicitation issuance).

The scope of work encompasses multiple divisions including project requirements (construction survey and staking, quality control, sampling and testing, erosion and sediment control measures), earthwork (clearing and grubbing, removal of existing infrastructure, roadway excavation, borrow materials), slope reinforcement and retaining walls (riprap, rockery, mechanically stabilized earth walls), aggregate and base courses, asphalt pavements and surface treatments, and incidental construction (pipe culverts, trench drains, guardrail systems, topsoil placement, turf establishment, temporary stream diversion, pavement markings, and temporary traffic control). Quantities for all line items vary by schedule, with Schedule C representing the largest project scope. All three schedules require rental equipment, general labor, construction scheduling, contractor quality control, contractor sampling and testing, and construction survey and staking.

View the file

Other files

File Type Posted
mta-silver2021-1_Plans_PRELIM-BID.pdf PDF
Prelim Letter_MT FLAP SILVER 2021(1) (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT FLAP SILVER 2021 (1) Roosevelt Drive Safety and Realignment Project

The work consists of grading, MSE walls, drainage, asphalt surfacing, and guardrail.

Project length: Schedule A- 0.66 miles

Schedule B- 1.17 miles

Schedule C- 1.72 miles

There are three bid schedules; only one schedule will be awarded.

Tentative Fixed Completion Date: Fall 2027

(Once solicitation is issued, see SF1442 Continuation, Block 11 for exact date.)

Tentative Solicitation Date: Fall/Winter 2026

Estimated Price Range: $5 million to $10 million

Location: 11 miles S of Butte, Montana in Silver Bow County

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-24

S ch ed u le A ed u

B ed u

C

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes Yes Yes

153 Contractor Quality Control (yes/no) Yes Yes Yes

154 Contractor Sampling & Testing (yes/no) Yes Yes Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes

157 Soil Erosion & Sediment Control, Temporary Turf Establishment 0.8 ACRE 0.9 ACRE 1.0 ACRE

157 Soil Erosion & Sediment Control, Silt Fence 900 LNFT 900 LNFT 1,170 LNFT

157 Soil Erosion & Sediment Control, Temporary Culvert Pipe 550 LNFT 550 LNFT 550 LNFT

157 Soil Erosion & Sediment Control, Fiber Roll 1,225 LNFT 4,300 LNFT 7,550 LNFT

157 Soil Erosion & Sediment Control, Check Dam (Filter Rock) 75 EACH 110 EACH 130 EACH ed u ed u ed u

DIVISION 200 – Earthwork

201 Clearing & Grubbing 1.7 ACRE 2.4 ACRE 3.5 ACRE

203 Removal of Delineator 1 EACH 1 EACH 1 EACH

203 Removal of Pipe Culvert 11 EACH 14 EACH 18 EACH

203 Removal of Sign 8 EACH

204 Roadway Excavation 2,700 CUYD 4,600 CUYD 6,500 CUYD

204 Unclassified Borrow 3,000 CUYD 2,000 CUYD 1,300 CUYD

204 Boulder 65 EACH 65 LNFT 120 EACH

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Placed Riprap, Class 3 (Riprap Headwall) 900 CUYD 900 CUYD 900 CUYD

252 Rockery 2,430 SQFT 2,430 SQFT

255 Mechanically Stabilized Earth Wall, Welded Wire Face 525 SQFT 525 SQFT 525 SQFT

DIVISION 300 – Aggregate and Base Courses

302 Roadway Aggregate, Method 2 900 TON 1,600 TON 2,700 TON

315 Recycled Aggregate Base, Method 2, 6-Inch Depth 4,700 SQYD 6,100 SQYD 7,000 SQYD

DIVISION 400 – Asphalt Pavements & Surface Treatments

403 Asphalt Concrete Pavement, Type 1 1,300 TON 2,300 TON 3,400 TON

412 Tack Coat 3.4 TON 5.9 TON 8.7 TON

413 Asphalt Pavement Milling, 6-Inch Depth 10,000 SQYD 17,800 SQYD 25,800 SQYD

DIVISION 600 – Incidental Construction

602 24-Inch Pipe Culvert 146 LNFT 184 LNFT 362 LNFT

602 36-Inch Pipe Culvert 60 LNFT 60 LNFT 60 LNFT

602 84-Inch Pipe Culver (Simulated Stream) 524 LNFT 524 LNFT 524 LNFT

602 24-Inch Equivalent Diameter Arch Or Elliptical Pipe Culvert 90 LNFT 290 LNFT 452 LNFT

602 End Section for 24-Inch Pipe Culvert 6 EACH 8 EACH 16 EACH

602 End Section for 36-Inch Pipe Culvert 2 EACH 2 EACH 2 EACH ed u ed u ed u

602 End Section for 24-Inch Equivalent Diameter Arch Or Elliptical Pipe Culvert 4 EACH 14 EACH 22 EACH

604 Trench Drain 205 LNFT 205 LNFT 205 LNFT

617 Guardrail System MGS, Type 2, Class A, Steel Posts, (8-Inch Block) 150 LNFT 150 LNFT 150 LNFT

617 Terminal System, Type MGS Tangent 2 EACH 2 EACH 2 EACH

622 Rental Equipment (yes/no) Yes Yes Yes

623 General Labor (yes/no) Yes Yes Yes

624 Providing and Placing Topsoil 980 CUYD 1,200 CUYD 1,400 CUYD

624 Placing Conserved Topsoil, 4-Inch Depth 1.4 ACRE 2.0 ACRE 2.8 ACRE

625 Turf Establishment (Hydraulic Method) 3.0 ACRE 3.9 ACRE 5.2 ACRE

628 Temporary Stream Diversion 360 LNFT 360 LNFT 360 LNFT

629 Rolled Erosion Control Product, Type 2.D 600 SQYD 1,110 SQYD 1,170 SQYD

633 Sign System 13 SQFT 22 SQFT 34 SQFT

634 Pavement Markings, Type D, Solid (White) 11,700 LNFT 17,200 LNFT 22,900 LNFT

634 Pavement Markings, Type D, Solid (Yellow) 11,700 LNFT 17,200 LNFT 23,100 LNFT

634 Pavement Markings, Type D, Dotted (White) 300 LNFT

635 Temporary Traffic Control, Tabular Marker, Type 42-Inch 200 EACH 200 EACH 200 EACH

635 Temporary Traffic Control, Portable Changeable Message Sign 2 EACH 2 EACH 2 EACH

635 Temporary Traffic Control, Traffic Signal System 2 EACH 2 EACH 2 EACH

635 Temporary Traffic Control, Construction Sign 206 SQFT 206 SQFT 206 SQFT

635 Temporary Traffic Control, Flagger 210 HOUR 210 HOUR 210 HOUR

635 Temporary Traffic Control, Pilot Car 65 DAY 70 DAY 80 HOUR

635 Temporary Traffic Control, Traffic Control Supervisor 65 DAY 70 DAY 80 DAY