mta-silver2021-1_Plans_PRELIM-BID.pdf
PDF 45 MB Posted
- Solicitation number
- 69056726R000016
About this file
This is a preliminary bid plan document for the MT FLAP SILVER 2021(1) Roosevelt Drive Safety and Realignment Project, a 1.72-mile highway improvement project located 11 miles south of Butte, Montana. The project, managed by W. Schmidt under the Federal Highway Administration and U.S. Department of Transportation, involves grading, MSE walls, drainage, asphalt surfacing, and guardrail installation with a tentative completion date of Fall 2027. The preliminary plans depict traffic control measures, pavement markings, sign installations, and construction staging across multiple schedules, including temporary traffic control details per FLH Standard 635-14 and permanent traffic control plans with specified pavement markings (solid white and yellow type D markings), edge-of-pavement delineation, and sign placement at designated stations along the project corridor.
This Firm-Fixed-Price Task Order contract is estimated between $5,000,000 and $10,000,000 and will be solicited to Idaho, Montana, and Surrounding Areas MATOC contractors under an IDIQ contract vehicle. The project is anticipated to be solicited in Fall/Winter 2026 with three bid schedules available, of which only one will be awarded. Interested vendors may register with SAM.gov to access the Interested Vendors List, and prospective bidders are advised to follow the opportunity to receive notifications when the Request for Proposals with final specifications and plans are posted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PROJECT DESCRIPTION_MT FLAP SILVER 2021(1).pdf | ||
| Prelim Letter_MT FLAP SILVER 2021(1) (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mil e
Ni�etee �
R
E N
OR
A I
N
N
ST F
R
I
D
D E P A
T
NT
OFT A SP
T T
O
U
TE
ATESO
AMER
IC
A
M
PROJECT MANAGER
W. SCHMIDT
NOT
FOR
CONSTRUCTI
ON
N
IR
RIVER
R I
V E
R
PARK
NATIONAL
GLACIER
PARK
NATIONAL
YELLOWSTONE
WILDLIFE RANGE
NATIONAL
CHARLES M. RUSSELL
Lake Flathead
Elwell Lake
M
Lake Fort Peck
I SOS U
EN
O
T S
W O
LLEY
KALISPELL
MISSOULA
Anaconda
HELENA
BUTTE
BOZEMAN
Livingston
BILLINGS
City Miles
Glendive
Point Wolf
Glasgow
HAVRE
Shelby
FALLS
GREAT
Lewistown
Dillon
MONTANA KEY MAP
COLUMBIA
BRITISH
ALBERTA SASKATCHEWAN
N O
R T
H D
A K
O T A
S O
U T
H D
A K
O T A
WYOMING
ID
A
H O
2 2
MONTANA
93 12
90 15
UNITED STATES
CANADA
MONTANA
D iv id e
C o n ti n e n ta l
32101
Scale in miles
114+00.00
0+13.00
112°28'50"W 45°51'17"N
112°27'21" 45°52'23"
FOR
PREL
IM
IN
ARY
PLANS PREPARED BY
Project Location
JEFFERSON CO.
SILVER BOW CO.
INTERSTATE
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
AND REALIGNMENT PROJECT
ROOSEVELT DRIVE SAFETY
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
e (max) V
ADT (2027)
ADT (2021)
0.060
25 MPH
<540 <540
SPECIFICATION:
on Federal Highway Projects, FP-24 Construction of Roads and Bridges Standard Specifications for
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
SCHEDULE C LENGTH 1.72 MILES
SCHEDULE B LENGTH 1.17 MILES
SCHEDULE A LENGTH 0.66 MILES
PLANS FOR PROPOSED PROJECT
END PROJECT
BEGIN PROJECT
MT FLAP SILVER 2021(1)
MONTANA
SILVER BOW COUNTY
BEAVERHEAD-DEERLODGE NATIONAL FOREST
APPROVED:
Western Federal Lands Highway Division Chief of Engineering, DATE
See Sheet A.2 for complete Sheet Index.
HELENA, MONTANA
ROBERT PECCIA AND ASSOCIATES
asphalt surfacing, and guardrail.
Grading, MSE walls, drainage, NATIONAL FOREST
BEAVERHEAD-DEERLODGE
BUTTE
:3
A
M
J u ly
T it le
S h e e t
R
P A
-H L N
-0 \S h a re d \h ig h w a y s \F
H W
A \2 m ta -s il v e r2
-1
R o o s e v e lt D ri v e \D
G N
\A L T
E R
N A
T
IV
E
M
P H
\G e n e ra l In fo rm a ti o n \m ta -s il v e r2
-1 p ln g e n .d g n
PROJECT
NUMBER
SHEET
A.1
MT FLAP SILVER 2021(1)
PRELIMINARY - NOT FOR CONSTRUCTION
PRELIMINARY - N
OT FOR CONSTRUCTION
BH TP
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
M.P.
M.L.
monument minimum thousand gallon maximum material mile post main line
W
RIP
DI
G W G WV
CP GPS
36 31
36 31
N
E
N 1000EL. 1234.56
TP
TP
SEC.
SEC.
θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
between bearing bridge balance point bench mark back face back btwn brg.
br.
BP
BM
b.f.
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
NO SCALE
NOTE:
1.
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
W west drwg(s).
dist.
diaph.
dia.
DHV
D exp. jt.
exc.
EW
EQ or eq.
EOP
emb.
elev.
El. 94.16 e.f.
e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge) jt.
IE
ID
joint invert elevation inside diameter ftg.
flg.
fin.
f.f.
footing flange finish front face
LW
lt. or LT Ls
LPSM
long.
LNFT
lat.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph V vertical point of intersection vehicles per hour design speed (velocity)
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sect.
SC
SADT
S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
KSI
square inch thousand pounds per pvmt.
PT
PST
PSC
PSI
PSF
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve
OHWM
OG
OD
o. to o.
o.c.
ordinary high water mark original ground outside diameter out to out on center
NC
N normal crown north
A A
DI
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Control Point (Terrestrial and GPS)
Gas & Water Meter; Gas & Water Valve
Flagpole; Fire Hydrant
Cooking Grate; Garbage Can; Picnic Table
Boulder; Well; Antenna; Grave
Above Ground Tank; Underground Tank
Spot Elevation; Coordinate Grid Tick
Material Source; Bore Hole; Test Pit
Treeline; Individual Trees
Spring or Seep
Section Line 4
Section Corner (Found, Projected) 4
Section Line 16
Section Corner (Found, Projected)16
Property Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
North Arrow
Slope Stake Limits Top of Cut
Toe of Fill
Construction Limits
Bottom of Ditch
Fence
Gate with Fence
Cattleguard
Guardrail
Concrete Barrier and Guard Wall
Retaining Wall wall face
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
Overhead/Above Ground Utilities
Underground Utilities
Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
Building
Right-of-Way Line
Permanent Easement
Construction Easement
Riprap
- no symbol -
Section A-A
EXISTING PROPOSED
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,
- no symbol -
ABBREVIATIONS
PLAN SYMBOLS AND
101-1W
6/2022
WFLHD DETAIL
:0
P
F e b ru a ry
D e t W
-1 rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m ta -s il v e r2
-1
R o o s e v e lt D ri v e \D
G N
\A L T
E R
N A
T
IV
E
M
P H
\G e n e ra l In fo rm a ti o n \m ta -s il v e r2
-1 p ln
W
-1
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
A.3
EL. 6453
Pipestone Pass
MONTANA
MONTANA
"MAIN 01" 0+13.00
"MAIN 01" 114+00.00
W h ite h a ll m ile s to
B u tte m ile s to
N
Scale in feet
1000 0 1000 40002000 3000
"MAIN 01" 6+30.00
"MAIN 01" 7+25.00
"MAIN 01" 24+00.00
"MAIN 01" 58+00.00
"MAIN 01" 85+00.00
See Sheet J.2 for details.
Staging area
B la c k ta il C re e k
Li tt le P ip es to n e
C re ek
FOREST
NATIONAL
DEERLODGE
BEAVERHEAD -
ROOSEVELT
DR
Z B
A R T R
D
LIM
E K
ILN
R
D
HERMAN GULCH RD
BEGIN PROJECT
END SCHEDULE C
END PROJECT
H
IG
H L
A N
D R
D
R O
O S
E V
E L T D
R
S
IL
V E
R B
O W C
O
J E F F E
R S
O N C
O
T. 1 N., R. 7 W.
T. 2 N., R. 7 W.
D iv id e
C o n ti n e n ta l
BEGIN SCHEDULE A
SUSPEND SCHEDULE A
RESUME SCHEDULE A
BEGIN SCHEDULE B
END SCHEDULE A
BEGIN SCHEDULE C
END SCHEDULE B
:4 u ly
V ic in it y
M a p
R
P A
-H L
N -0
\S h a re d \h ig h w a y s \F
H W
A \2 m ta
-s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\G e n e ra l In fo rm a ti o n
\m ta
-s il v e r2
-1 p ln g e n
.d g n
VICINITY MAP
PROJECT
A.4
FOOTNOTE:
NOTE:
of culvert excavation to provide a 6-inch compacted base.
to a depth of 6 inches. Remove and conserve material in locations
Perform asphalt pavement milling of existing pavement and base [3]
Vary shoulder width as shown in plans and in the staking report.
[2]
Construct slopes and ditches as shown in the staking report.[1]
1. See Sheet D.2 - D.3 for quantities.
CL
9'9'
Travel way Travel way
Existing ground Existing ground
[1]
Variable
[1]
1'-0" min.
6+30 TO 7+25
""MAIN 01
[1]
Match existing Match existing
(hydraulic method) Turf establishment
Placing conserved topsoil,4-inch depth and Providing and placing topsoil or
Turf establishment (hydraulic method) Placing conserved topsoil,4-inch depth and Providing and placing topsoil or
Slope stake limits construction limits
Slope stake and Profile grade
See edge detail
1:3
1:3
[2]
Varies
5'
Construction limit
6-inch compacted depth
Recycled aggregate base, method 2, 3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 1, Tack coat (between lifts)
EDGE DETAIL
Red top in survey notes
Point available
Asphalt concrete pavement to cover safety edge
Pull base material
, method 2, 6-inch compacted depthRecycled aggregate base
30°
Red top in survey notesPoint available
First lift of asphalt to cover safety edgePull recycled aggregate base
Recycled aggregate base, 6" depth
[3]
6-inch depth
Asphalt pavement milling, :4 u ly
T y p ic a l
S e c ti o n
R
P A
-H L
N -0
\S h a re d \h ig h w a y s \F
H W
A \2 m ta
-s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\T y p ic a l
S e c ti o n s \m ta -s il v e r2
-1 p ln ty p
.d g n
SHEET 1 OF 5
TYPICAL SECTION
PROJECT
C.1 from 82+80 to 83+30 from 79+00 to 79+50 sections between the following:
Transition shoulder width to match typical [4] compacted base.
of culvert excavation to provide a 6-inch
Remove and conserve material in locations pavement and base to a depth of 6 inches.
Perform asphalt pavement milling of existing [3] staking report.
Construct slopes and ditches as shown in the [2] as indicated on the plan and profile curve data.
Superelevate roadway on curves at the rate 'e' [1]
1. See Sheet D.2 - D.3 for roadway quantities.
CL
9'9'
Travel way Travel way
Existing ground Existing ground
82+80 TO 114+00
53+25 TO 79+50
41+30 TO 51+00
33+00 TO 39+75
24+00 TO 26+00
"MAIN 01"
[2]
[2]
2.00% 2.00% [1][1]
(hydraulic method) Turf establishment
Placing conserved topsoil, 4-inch depth, and Providing and placing topsoil or
Turf establishment (hydraulic method) Placing conserved topsoil, 4-inch depth and Providing and placing topsoil or
Slope stake limits construction limits
Slope stake and Profile grade
See edge detail
1:3
[4]
1' Shoulder [4]
1' Shoulder
5'
Construction limit
50+90.80 to 51+00 RT
Variable[2]
1' Shoulder
2'
5'
(hydraulic method) Turf establishment
Placing conserved topsoil, 4-inch depth and Providing and placing topsoil or
Construction limit
Slope stake limits
6-inch compacted depth
Recycled aggregate base, method 2, 3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 1, Tack coat (between lifts)
50+90 to 51+00 LT
1' Shoulder
See Sheet G.16 for details.
Trench drain
Turf establishment (hydraulic method) Placing conserved topsoil, 4-inch depth and Providing and placing topsoil or
V ariab le [2 construction limits
Slope stake and
Guardrail, See Section I for details
EDGE DETAIL
Red top in survey notes
Point available
Asphalt concrete pavement to cover safety edge
Pull base material
, method 2, 6-inch compacted depthRecycled aggregate base
30°
Red top in survey notesPoint available
First lift of asphalt
Asphalt pavement milling, :4 u ly
T y p ic a l
S e c ti o
R
P A
-H L
N -0
\S h a re d \h ig h w a y s \F
H W
A \2 m ta
-s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\T y p ic a l
S e c ti o n s \m ta -s il v e r2
-1 p ln ty p
.d g n
SHEET 2 OF 5
TYPICAL SECTION
PROJECT
C.2
6-inch compacted base.
Remove and conserve material to provide a pavement and base to a depth of 6 inches.
Perform asphalt pavement milling of existing [3] staking report.
Construct slopes and ditches as shown in the [2] as indicated on the plan and profile curve data.
Superelevate roadway on curves at the rate 'e' [1]
1. See Sheet D.2 - D.3 for roadway quantities.
CL
9'9'
Travel way Travel way
Existing ground
Existing ground
Variable
52+65 TO 53+25
51+00 TO 51+55
39+75 TO 41+30
26+00 TO 33+00
"MAIN 01"
[2]
2.00% 2.00% [1][1]
(hydraulic method) Turf establishment
Placing conserved topsoil, 4-inch depth and Providing and placing topsoil or
Turf establishment (hydraulic method) Placing conserved topsoil, 4-inch depth and Providing and placing topsoil or
Slope stake limits construction limits
Slope stake and
Profile grade
See edge detail
1:3
1:3
1:3
1' Shoulder 1' Shoulder
5' Construction limits
Asphalt pavement milling, 6-inch depth
52+65 to 52+86.52 RT
51+00 to 51+55 RT
Variable[2]
1' Shoulder
2'
5'
(hydraulic method) Turf establishment
Placing conserved topsoil, 4-inch depth and Providing and placing topsoil or
Construction limit
Slope stake limits
6-inch compacted depth
Recycled aggregate base, method 2, 3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 1, Tack coat (between lifts)
52+65 to 52+95 LT
51+00 to 51+55 LT
1' Shoulder
See Sheet G.16 for details.
Trench drain
Turf establishment (hydraulic method) Placing conserved topsoil, 4-inch depth and Providing and placing topsoil or
V ariab le [2 construction limits
Slope stake and
Guardrail, See Section I for details
Unclassified borrow
EDGE DETAIL
Red top in survey notes
Point available
Asphalt concrete pavement to cover safety edge
Pull base material
, method 2, 6-inch compacted depthRecycled aggregate base
30°
Red top in survey notesPoint available
First lift of asphalt to cover safety edgePull recycled aggregate base
Recycled aggregate base, 6" depth
:4 u ly
T y p ic a l
S e c ti o
R
P A
-H L
N -0
\S h a re d \h ig h w a y s \F
H W
A \2 m ta
-s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\T y p ic a l
S e c ti o n s \m ta -s il v e r2
-1 p ln ty p
.d g n
SHEET 3 OF 5
TYPICAL SECTION
PROJECT
C.3
Existing ground
NOTE:
6-inch compacted base.
Remove and conserve material to provide a pavement and base to a depth of 6 inches.
Perform asphalt pavement milling of existing [3] staking report.
Construct slopes and ditches as shown in the [2] as indicated on the plan and profile curve data.
Superelevate roadway on curves at the rate 'e' [1]
1. See Sheet D.2 - D.3 for roadway quantities.
10'
51+55 TO 52+65
"MAIN 01"
2.00% [1]
Profile grade
Travel way
9'
CL
2.00% [1]
Travel way
9'
1' Shoulder
1:1.5
2'
1' Shoulder
See Section H for details wall welded wire face.
Mechanically-stabilized earth
Guardrail, See Section I for details
Construction limits
Slope stake limits
(hydraulic method) Turf establishment
Placing conserved topsoil, 4-inch depth and Providing and placing topsoil or
Existing ground
See Sheet G.16 for details.
Trench drain
Turf establishment (hydraulic method) Placing conserved topsoil, 4-inch depth and Providing and placing topsoil or
V ariab le [2 construction limits
Slope stake and
Unclassified borrow
Asphalt pavement milling, 6-inch depth
6-inch compacted depth
Recycled aggregate base, method 2, 3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 1, Tack coat (between lifts)
:4 u ly
T y p ic a l
S e c ti o
R
P A
-H L
N -0
\S h a re d \h ig h w a y s \F
H W
A \2 m ta
-s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\T y p ic a l
S e c ti o n s \m ta -s il v e r2
-1 p ln ty p
.d g n
SHEET 4 OF 5
TYPICAL SECTION
PROJECT
C.4 of culvert excavation to provide a 6-inch compacted base.
to a depth of 6 inches. Remove and conserve material in locations
Perform asphalt pavement milling of existing pavement and base [3]
Construct slopes and ditches as shown in the staking report.[2] on the plan and profile curve data.
Superelevate roadway on curves at the rate 'e' as indicated[1]
1. See Sheet D.2 - D.3 for roadway quantities.
10'
CL
9'9'
Travel way Travel way
Existing ground
Existing ground
Va ria ble
79+50 TO 82+80
"MAIN 01"
[2
2.00% 2.00% [1][1]
(hydraulic method) Turf establishment
Placing conserved topsoil, 4-inch depth and Providing and placing topsoil or
(hydraulic method) Turf establishment 4-inch depth and
Placing conserved topsoil, Providing and placing topsoil or
Slope stake limits
Profile grade
See edge detail
1:3 1:3
5'
Construction limits
Slope stake limits
Construction limits
6-inch compacted depth
Recycled aggregate base, method 2, 3-inch compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 1, 1:
See Section H for details
Rockery
Turf establishment (hydraulic method) Placing conserved topsoil, 4-inch depth and Providing and placing topsoil or
Tack coat (between lifts)
EDGE DETAIL
Red top in survey notes
Point available
Asphalt concrete pavement to cover safety edge
Pull base material
, method 2, 6-inch compacted depthRecycled aggregate base
30°
Red top in survey notesPoint available
First lift of asphalt
Asphalt pavement milling, :5 u ly
T y p ic a l
S e c ti o rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m ta -s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\T y p ic a l
S e c ti o n s \m ta -s il v e r2
-1 p ln ty p .d g n
SHEET 5 OF 5
TYPICAL SECTION
PROJECT
C.5
TP
C P
TP
TP
ROOSEVELT DRIVE
"MAIN 01" line to be constructed
Slope stake limits
Slope stake limits
Edges of pavement
Edge of surfacing
TURNOUT ROAD SECTION DETAIL
[1]Varies
Edge of shoulder
Clearing and slope stake limits
(hydraulic method) and turf establishment
4-inch depth, Placing conserved topsoil, 6-inch compacted depth
Roadway aggregate, method 2, Existing ground
Drainage swale
FOOTNOTE:
Construct slopes and ditches as shown in the staking report[1]
R
R
R
P T
.4
:5 u ly
T u r n o u t
T u r n o u t
S h e t] rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m ta -s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\A p p ro a c h R o a d s \m ta -s il v e r2
-1 p ln p p .d g n
TURNOUT LAYOUT
PROJECT
E.2
N to be constructed
"APPR 01" line
Edges of surfacing
Slope stake limits
Slope stake limits
Do not disturb
Existing bridge
"MAIN 01"
Profile grade ground
Existing
499+50 500+00 500+50
6,402 6,402
6,404 6,404
6,406 6,406
6,408 6,408
6,410 6,410
,4
.8
,4
.5
-2.05% -0.34%
.1
.0
L T
.5
.5
L
T
.1
.0
R
T
.6
.6
R T
"MAIN 01" 103+01.00
= 500+00.00 "APPR 01"
CONSTRUCTION
500+43.12 "APPR 01"
N= 599823.7536
E= 1210576.5236
CONSTRUCTION
500+10.00 "APPR 01"
N= 599852.2040
E= 1210559.5696
,4
.6
:4 u ly
A p p r
A P
P R
S h e rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m ta -s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\A p p ro a c h R o a d s \m ta -s il v e r2
-1 p ln p p .d g n
PROJECT
E.3
BEGIN
END
R O
O S
E V
E L T D
R I V
E
R
R
Construct slopes and ditches as shown in the staking report.[1]
1. See Sheet E.1 for quantities.
C of mainline L
C of designed approachL
Mainline xxx+xx =
Approach xx+xx
LOCATION SYMBOL
FULL-DESIGN APPROACH ROAD
APPROACH ROAD SECTION DETAIL
LC
W
2% Crown
Profile grade
2% Crown 1:41:4
[1]
Variable
Clearing and slope stake limits
(hydraulic method) and turf establishment
4-inch depth and Placing conserved topsoil, Providing and placing topsoil or
Existing ground
6-inch compacted depth
Roadway aggregate, method 2, (hydraulic method) and turf establishment
Placing conserved topsoil, 4-inch depth and Providing and placing topsoil or
1' min.
Existing ground
Slope stake limit
1:4
5'
Clearing limit
:4 u ly
A p p r o a c h
R o a d
D e ta il s r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m ta s il v e r
R o o s e v e lt
D r iv e \D
G N
\A L
T E
R N
A T
I V
E
M P
H \A p p r o a c h
R o a d s \m ta s il v e r p ln a p p r o a c h ty p
.d g n
APPROACH ROAD DETAILS
PROJECT
E.4
2'2'2'2'
A
B B
Flow
SECTION A-A SECTION B-B
SECTION A-A
SECTION B-B
Flow
Flow
Flow embankment
Roadway
NOTE:
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
Flow
Sandbags
SECTION B-BPLAN
DIVERSION CHANNEL
Plastic linerSandbagsPlastic liner temporary barrier
Use sandbags to construct
Permanent culvert
Roadway centerline
Permanent natural channel
Earthwork limits
Subgrade
Temporary culvert backfill
Natural ground with plastic liner or riprap
Temporary diversion channel
Ø
1:1 1:
6"
1:1 1:
6"
1:1 1:
1:1
1:
whichever is greater.
Ø = 2' or diameter of temporary culvert, see Section A-A backflow into natural channel, Use sandbags to prevent
Riprap, class 1 Riprap, class 1
Silt fence (typ.)
sandbags.
6" deep and secure with riprap or upstream edge of the liner a minimum of joints if using a plastic liner. Bury the
Do not construct channel with longitudinal
Sandbag (typ.)
embankment
Roadway
Ø
Bedding (typ.)
TEMPORARY CULVERT(S)
See note 6
Temporary culvert(s) see note 5
Diversion channel, and secure with sandbags (typ.)
Bury plastic liner 6" deep
2Ø
4Ø4Ø
2Ø
4Ø
2Ø
4Ø
2Ø when scheduled)
Silt fence (typ.
NO SCALE
when scheduled)
Silt fence (typ.
ØØ
Ø Ø
(typ.)
Sandbag
Subsection 157.10.
be used. Conform to the requirements of
Single or multiple temporary culverts may type E, nonwoven
Geotextile, class 2, type E, nonwoven
Geotextile, class 2,
0.5 percent.
Construct channel at a minimum grade of diversion channel.
length and width of the temporary
Use plastic liner or riprap along the entire channel locations.
See Sheet F.1 for temporary diversion methods listed in Subsection 204.11(a).
Compact temporary culvert backfill using with temporary culvert as approved.
channel through the roadway embankment
Replace the portion of the diversion
8.
7.
6.
5.
4.
3.
2.
1.
as approved by the CO.
in Subsection 157.10 may be used, Alternate methods of diversions listed
:3 a r c h
T e m p o r a r y
D iv e r s io n C h a n n ls rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m ta -s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\E ro s io n C o n tr o l\ m ta
-s il v e r2
-1 p ln e c d iv c h a n n e l.
d g n
CHANNELS
TEMPORARY DIVERSION
PROJECT
F.7
NO SCALE
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fi ll slo pe
T o e o f s lo p e
PLAN
ELEVATION
4.
3.
2.
1.
T o e o f s lo p e
Fi ll sl op e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
Geotextile
Steel or wood post
Backfilled and compacted soil f o r s p a c in g
S e e N o te
Limits of clearing
(undisturbed)
Existing ground
Silt fence reinforcement
NOTE:
Staple or tie
Section B
Geotextile fabric, Tie top of posts together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric See Note 3
End Posts Detail
End posts, see
End Posts Detail
End posts, see
See Note 3 fabric, Section A
Geotextile
Flow
Flow
Flow running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed m in m in m in
6-foot (max.) spacing without silt fence reinforcement.
10-foot (max.) spacing with silt fence reinforcement.
4" min.
6" min. trench
DETAIL APPROVED FOR USE 10/2016
REVISED:
157-1W
WFLHD DETAIL
SILT FENCE
:2
J u n e
D e t
W rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m ta -s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\E ro s io n C o n tr o l\ m ta
-s il v e r2
-1 p ln e c W
-1
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
F.8
Se e N ote
6%
5%
4%
3%
2%
NO SCALE
6%
5%
4%
3%
2%
5%
4%
3%
2%
7.
6.
5.
4.
3.
2.
1.
Adjust check dam spacing based on site-specific conditions.
around the ends of the fiber roll.
Provide sufficient length to prevent water from flowing
Drive stakes into undisturbed soil of trench bottom.
stakes. Drive stakes at each end of the fiber roll and at
Install check dams in ditches perpendicular to the flowline.
installation.
Repair all rills or gullies and properly compact prior to functional requirements of the check dam device.
gravel bags as approved by the CO, to meet the
Construct check dams from fiber rolls, filter rock, or
MODERATE GRADES
CHECK DAM
CROSS SECTION
V-DITCH
CROSS SECTION
FLAT-BOTTOM DTICH
CROSS SECTION
CROSS SECTION
STAKING DETAIL
FIBER ROLL
PLAN
are similar for flat-bottom ditches
Check dam installation details
V-ditch design shown.
Flow line
GRADE
DITCH
(See Note 7)
CHECK DAM SPACING*
GRAVEL BAG
Gravel bag the ends. See Note 6 to prevent flow around
Curve ends upstream
Filter rock
Filter rock
FIBER ROLL CHECK DAM
GRAVEL BAG CHECK DAM
SPACING (max.)
CHECK DAM
See Note 5
NOTE:
GRADE
DITCH
SPACING (max.)
CHECK DAM
(See Note 7)
CHECK DAM SPACING
FILTER ROCK
GRADE
DITCH
(See Note 7)
CHECK DAM SPACING*
FIBER ROLL
SPACING (max.)
CHECK DAM
FILTER ROCK CHECK DAM
uphill side of fiber roll trench material on
Place excavated
Flow
F lo w on ditch grades steeper than 5%.
Do not use fiber roll check dams
* Spacing calculated based on on ditch grades steeper than 6%.
* Do not use gravel bag check dams
(FT)
(FT)
(FT)
Trench 2" (min.)
m in
Fiber roll 9" Ø (min.)
Trench 2" (min.)
-inch wood 8 1-inch x 18
1Stake fiber rolls in place with 1
Expose stakes 2-inches (min.) above top of fiber roll.
2-foot (max.) spacing.
m in
"6 m in m in .6
9" Ø minimum fiber roll.
DETAIL APPROVED FOR USE 7/2016
157-15W
WFLHD DETAIL
:1 u n e
D e t
W rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m ta -s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\E ro s io n C o n tr o l\ m ta
-s il v e r2
-1 p ln e c W
-1
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
F.9
EROSION CONTROL PRODUCT
CHECK DAM WITH ROLLED
m in
"6 m in
"6
3.
2.
1.
PROFILE VIEW
V-DITCH
CROSS SECTION
FLAT-BOTTOM DITCH
CROSS SECTION
(G)
GRADE
DITCH
≥10%
8% and 9%
7%
Rolled erosion control product
1:
(t yp
Rolled erosion control product Rolled erosion control product
NOTE:
Adjust check dam spacing based on site-specific conditions.
Install check dams in ditches perpendicular to the flowline.
to installation.
Repair all rills or gullies and properly compact prior
Filter rock
Filter rock
Ponded water
(See Note 3)
CHECK DAM SPACING
FILTER ROCK
Filter rock
SPACING (S)
MAX. CHECK DAM
ROLLED EROSION CONTROL PRODUCT
FILTER ROCK CHECK DAM WITH
(FT)
Check Dam spacing (S)
Ditch Grad e (G)
WFLHD DETAIL
DETAIL APPROVED FOR USE 7/2016
157-16W
:1 u n e
D e t W rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m ta -s il v e r2
-1
R o o s e v e lt D ri v e \D
G N
\A L T
E R
N A
T
IV
E
M
P H
\E ro s io n C o n tr o l\ m ta -s il v e r2
-1 p ln e c W
-1
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
F.10
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
FIBER ROLL
(FT)
(FT)
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
NOTE:
WFLHD DETAIL
DETAIL APPROVED FOR USE 10/2014
7/2016 REVISED:
157-21W
:1 u n e
D e t
W rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m ta -s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\E ro s io n C o n tr o l\ m ta
-s il v e r2
-1 p ln e c W
-2
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
F.11
NO SCALE
84-inch pipe culvert
Flow
SECTION B-B
Length (L)
Culvert outlet
PLAN
LC
Flow
BB
Culvert wall
In fi ll D e p th section at inlet and outlet as approved.
cross section to match stream cross
Smoothly transition infill treatment 2.
material is exhausted.
only after conserved streambed
Use imported streambed material1.
SECTION A-A
10' (typ.)
Culvert centerline
I n f il l d e p th
Flowline to fill void space in between riprap.
Wash streambed material into place [1]
Length (L)10' (typ.)
outlet
Culvert
Placed riprap, class 2 (culvert infill)
[1] material
Streambed
[1] Streambed material
Placed riprap, class 2 (culvert infill)
(retention sill) (typ.)
Placed riprap, class 3
(retention sill) (typ.)
Placed riprap, class 3
[1] Streambed material
A
A
Flow
Culvert wall
Retention sill spacing
Retention sill spacing
:2 u ly
D e s ig n I n tl rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m ta
-s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\D ra in a g e \m ta -s il v e r2
-1 p ln h y
C u lv
In fi ll D e ta il .d g n
TREATMENT
CULVERT INFILL
SIMULATED STREAM AND
PROJECT
G.14
A
RIPRAP HEADWALL DETAILS
ELEVATION - SINGLE PIPE ELEVATION - DOUBLE PIPE
D or S D or S D or S
D o r R
V a r ia b le
[3]X
FOOTNOTE:
Slope to match headwall layout points.[1] W1 W1 W2W2
1. See Sheets G.1 - G.2 for estimated quantities.
installations.
minimum pipe spacing as shown on Standard 602-3 for new pipe
Existing spacing for headwall installations at existing pipes or [3]
SKEW ANGLE DIAGRAM
c e n te r li n e
R o a d w a y
Cu lv er t ce nt er lin e
BOP
EOP
Placed riprap, class 3 (riprap headwall) class 3 (riprap headwall)
Placed riprap, Skew angle
SECTION A-A
Pipe culvert or end section
V a r ia non-woven
Separation geotextile, Pipe invert
[1](riprap headwall)
Placed riprap, class 3
Adjust to meet top back layout point elevation.[2]
V a r ia
D o r
R
A
A layout point
Front top
Embedded pipe flowline layout point
Top back
Non-embedded pipe flowline
:3 u ly
D e s ig n I n tl rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m ta
-s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\D ra in a g e \m ta -s il v e r2
-1 p ln h y
H e a d w a ll
D e ta il s .d g n
DETAILS
RIPRAP HEADWALL
PROJECT
G.15
TYPICAL SECTION
TRENCH DRAIN
LC
Roosevelt Drive
Shld
1'
Traveled Way
See Detail A
NOTE:
Minimum underdrain pipe grade is 0.5%.1.
Existing ground
S lo p e s ta k e a n d and turf establishment (dry method)
Placing conserved topsoil, 4-inch depth
FOOTNOTE:
Construct slopes as shown in the cross sections.
[1
V aries c o n s tr u c ti o n l im it s
9'Variable
See Sheets C.2 - C.4 for details
Pavement structure
DETAIL A
against sides, bottom and back of excavation
Geotextile filter, class 1, nonwoven, over granular backfill zone
Geotextile filter, class 1, nonwoven, 6" dia. perforated corrugated polyethylene drainage pipe
Filter rock surrounding pipe
Granular backfill (min.) 4" depth
Edge of pavement near vertical as possible cut per contractor as
Stable temporary
Existing ground m in m in
2' (min.)
m in
:3 u ly
S
T A
N D
A R
D U
N D
E R
D R
A
IN
S Y
S T
E M
T Y
P E rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m ta -s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\D ra in a g e \m ta -s il v e r2
-1 p ln h y T re n c h D ra in
D e ta il .d g n
DETAIL
TRENCH DRAIN
PROJECT
G.16
2.
3.
4.
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
STANDARD APPROVED FOR USE 12/1993
6/2005 4/1994 REVISED:
602-1
:3
F e b r u a r y
S td r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m ta s il v e r R o o s e v e lt
D r iv e \D
G N
\A L
T E
R N
A T
I V
E
M
P H
\D r a in a g e \S ta n d a r d D e ta il s \m ta s il v e r p ln h y S td .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
G.17
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
W
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W
BoltsBand
WW
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
rerolled with 3" × 1" pipe corrugations.
COUPLING BAND
METAL PIPE CULVERT
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 corrugations on rerolled pipe ends.
diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
NOTE:
underdrain [6]
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
602-2
:3
F e b r u a r y
S td r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m ta s il v e r R o o s e v e lt
D r iv e \D
G N
\A L
T E
R N
A T
I V
E
M
P H
\D r a in a g e \S ta n d a r d D e ta il s \m ta s il v e r p ln h y S td .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
G.18
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
LEGEND:
Bedding material (uncompacted)
Impermeable backfill material.
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove unstable material to
Bedding
Bedding
Bedding
Bedding
H
Half diameter or whichever is less
(see table)
Minimum spacing or Span
Diameter or Span
Diameter section
Metal endMetal end section or 36" (max.) for embankment installations not exceeding 6" compacted depth.
exceeding 6" compacted depth; or lean concrete
> 54"
12" to 54"
6"
4"
18" (min.)
6" in uncompacted depth.
* Reduce to 18" for
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
2'-0" ±
1'-0" ±
18" ±
18" ±18"±
(min.)
6"
(min.)
6"
12" (min.), 24" (max.)
"/foot of cover,2 minimum
1'-0"
NOTE:
2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)
2H or 12' (max.)2H or 12' (max.)
2H or 12' (max.) 2H or 12' (max.)
STANDARD APPROVED FOR USE 12/1993
10/2017 DRAFT:
6/2005 4/1994 REVISED:
602-3
:3
F e b r u a r y
S td r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m ta s il v e r R o o s e v e lt
D r iv e \D
G N
\A L
T E
R N
A T
I V
E
M
P H
\D r a in a g e \S ta n d a r d D e ta il s \m ta s il v e r p ln h y S td .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
G.19
2.
3.
6.
7.
8.
ROUND OR PIPE ARCH CULVERT
PIPE ARCH CULVERTROUND PIPE CULVERT
DESIGN C
CONNECTION TO METAL PIPE
OR OUTLET END OF CONCRETE PIPE
SECTION A-APLAN
ELEVATION ELEVATION
Slope
Toe plateToe plate riveted or welded connection
For all sizes of round pipe and pipe arch
END SECTIONS FOR ROUND PIPE CULVERT
END SECTIONS FOR PIPE ARCH CULVERT
A (min) B (max) H (min) W (max)
SLOPE
Approx.
A (min) B (max) H (min) W (max)
SLOPE
Approx.
A
A
DESIGN B
CONNECTION TO CONCRETE
PIPE INLET END
DESIGN A
CONNECTION TO ANNULAR
CORRUGATED METAL PIPE
diameter
Span or
B
L
AWA
End Section
SpanR is e
Di am et er
Toe plate extension
(min. width A+W)
Toe plate extension
Corner plate
(min. width A+W)
Toe plate extension
Corner plate
Reinforced edge
Pipe coupling band shop bolted to
End section
Pipe culvert
Expander lug End section steel or aluminum pipe
Smooth galvanized
Bolted or welded
Threaded rod
Rod holder connector
Flat strap Pipe culvert Pipe culvert
End section End section
Strap bolt
Pivot bolt
H H reinforcement bolted or riveted under the center panel seam.
Supplement the reinforced edges of end sections for
Variations in design and dimensions are permitted to allow for manufacturer's standards.
Fabricate the diameter of the end section of Design B to match the inside diameter of the concrete pipe culvert.
Design C may be used in lieu of design A for all metal pipe culvert sizes. Coupling bands may be any acceptable type for the pipe culvert specified.
Fabricate multiple piece bodies with lap seams tightly joined attached with bolts or rivets.
Fabricate connector section, corner plate and toe plate extensions from the same metal thickness as the panel body.
Use toe plate extension where shown on the plans.
Warp embankment slopes to match the slope of the flared end sections.
METAL END SECTIONS
60" and larger diameter pipe and 66" and larger
" bolts8 3spacing for
35" × 24" thru 66" × 51" pipe arch
For 30" thru 60" round pipe and
17" × 13" thru 28" × 20" pipe arch
For 12" thru 24" round pipe and
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.079
0.079
0.064
0.064
0.064
0.064
0.064
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.075
0.075
0.060
0.060
0.060
0.060
0.060
112 × 75
103 × 71
95 × 67
87 × 63
83 × 57
81 × 59
77 × 52
73 × 55
71 × 47
66 × 51
64 × 43
60 × 46
57 × 38
49 × 33
42 × 29
35 × 24
28 × 20
24 × 18
21 × 15
17 × 13
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.079
0.079
0.064
0.064
0.064
0.064
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.075
0.075
0.060
0.060
0.060
0.060
INCHES
SPAN × RISE
PIPE SIZE METAL THICKNESS
STEEL ALUMINUM
INCHES GAGE INCHES GAGE
INCHES
DIMENSIONS
L (±2")(INCHES)
DIAM.
VALENT
EQUI-
INCHES
DIAMETER
PIPE SIZE
STEEL
METAL THICKNESS
INCHES GAGE
ALUMINUM
INCHES GAGE
INCHES
DIMENSIONS
L (±2") m in
12" (max.) hole lap after expansion
1" Minimum
13" for 30" dia. and over.
culvert less than 30" dia.
7" for concrete pipe
" bolts8 3spacing for m in
12" (max.) hole at 6" centers (max.) or equivalent
" angle4 1" × 2
1" × 22 1equivalent pipe arch provide 2
" bolts8 3flared end section with
" rivets or bolts. Fabricate end section center panels 8 3by
On end section center panels for 66" and larger from 0.138 inch steel or 0.135 inch aluminum.
for 60" and larger diameter pipe and equivalent pipe arch
" stiffener angles 4 1" × 2
1" × 22 1equivalent pipe arch with 2
NOTE:
edge
Reinforced
Pay Limit
Pipe Culvert
STANDARD APPROVED FOR USE 12/1993
10/2007 DRAFT:
6/2005 4/1994 REVISED:
602-4
:3
F e b r u a r y
S td r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m ta s il v e r R o o s e v e lt
D r iv e \D
G N
\A L
T E
R N
A T
I V
E
M
P H
\D r a in a g e \S ta n d a r d D e ta il s \m ta s il v e r p ln h y S td .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
G.20 dimension of all pipe arch culverts.
D equals the diameter of all round pipe or the rise 1.
TYPE II
TYPE I
SECTION B-B
SECTION A-A
N o r m a l d it c h l in e
S u b g r a d e s h o u ld e r
Pipe culvert
E n d o f p ip e
FLOW
Flat b ottom di tch a t culv ert in let
FLOW
Tape r at 1
0:1 r atio
Taper a t 10:1 ratio
FLOW
2D or
FLOW
Taper at 10
:1 rat io
2D or
N o r m a l d it c h l in e subgrade elevation
Maximum 2D or
S u b g r a d e s h o u ld e r o r e n d s e c ti o n
E n d o f p ip e b e v e l
PIPE SIZE (D) WIDENING
DITCH WIDENING
Flat b ottom ditc h at c ulvert inlet
A
A
B
B section
End
PLAN PLAN
Original ground in mountainous terrain flat terrain. Taper at 5:1
Taper at 10:1 in rolling or 5:1 in mountainous terrain.
or flat terrain. Taper at
Taper at 10:1 in rolling
Normal ditch line
Pipe culvert
Original ground cut slope
Normal
(See table)
Ditch widening
Subgrade shoulder Normal ditch lineSubgrade shoulder
Pavement surface
Berm
Pavement surface
Subgrade
End section
Berm pipe as staked
Slope at ditch at end section
Flow line of pipe as staked
Slope at cut slope
Normal
D in lieu of 45° pipe elbow
30° pipe elbows may be required
At skewed pipe locations, 22.5° or
Standard 45° pipe elbow.
slope
1:3 max ditch line
Normal maximum slope
1:1.5
Cut Slope slope
1:3 max maximum slope
1:1.5
Cut Slope
D ditch line
Normal
Subgrade
TREATMENT IN CUT SLOPES
PIPE CULVERT INLET 30"
24"
18"
7'
6'
5'
1'
1'
NOTE:
B e rm
D
B e rm
D
(min.)
4' d ip a t c e n te r
(Min.)
4'
602-6
:3
F e b r u a r y
S td r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m ta s il v e r R o o s e v e lt
D r iv e \D
G N
\A L
T E
R N
A T
I V
E
M
P H
\D r a in a g e \S ta n d a r d D e ta il s \m ta s il v e r p ln h y S td .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
G.21
87°
Existing ground form (typ.)
Welded wire
9'
WITH WELDED WIRE FORM FACE
MECHANICALLY-STABILIZED EARTH WALL
wide sheets spaced 4' apart) at 50% coverage (i.e., 4' up excavation slope 2/3 H
Geocomposite sheet drain
Unclassified borrow
H
LC
length (L)= 6' Reinforcement
Mainline profile grade
6" (min.)
(min.)
4' Set back
W a ll p a y m e n t li m it s
See Detail A
Underdrain system
Wall excavation
[2]1
1:1.5
See Sheet C.4 for details
Pavement structure
FACING DETAIL - ROCK FILL
Select granular backfill
Select granular backfill grid, 3 per panel (typ.)
on facing and
Tie transverse bars m in
4' geotextile return (min.)
Welded wire form facing
WELDED WIRE FORM
adjoining wire form for support, 4"
Place edge of wire inside of
4 x 4 W5 x W5
Inset end struts 6"
24" C to C or as needed.
Support struts spaced maximum
NOTE:
FOOTNOTE:
Min. gradient = 2.0%
UNDERDRAIN SYSTEM
PERFORATED PIPE
DETAIL A
Granular backfill
Foundation fill
12"
Flow
24"
Geocomposite drain beneath leveling course. Minimum gradient 0.5%
6" Ø Perforated pipe underdrain system pipe drain every 110 feet (max.)
6" Ø Rigid outlet
2%
See Facing Detail
8'-0" ±
Geotextile filter, class 2, non-woven class 2, non-woven
Geotextile filter, 18" m in
(2) 45° Elbows
Friction angle = 34° for backfill material.
Unit weight of backfill material 125 pcf
Design assumptions:
The heights and quantities are subject to field adjustment.
2.
See Section I for details
Guardrail.
6"
1' 2'
24" Embedment
Slope to drain
Edge of surfacing
[3]Extend 6" beyond facing
Foundation fill
[1]Rodent guard drain towards underdrain system.
Slope bottom of excavation at a minimum 2 percent grade to [3] accordance with Subsection 208.03.
1:1 Slope shown. Construct slopes at stable inclinations in[2] per manufacturer's recommendation
-inch. Install2
Opening in rodent guard not to exceed [1]
Reinforcement geogrid, type 3 geogrid, type 3
Reinforcement
H
H e ig h t v a r ie s
Embankment
Gabion rock
:5
M a r c h
M
S E
W a ll
D e ta il s
R
P A
-H L
N -0
\S h a re d \h ig h w a y s \F
H W
A \2 m ta
-s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\R e ta in in g W a ll s \m ta -s il v e r2
-1 p ln w a ll
M
S E
W a ll
D e ta il o f
.d g n
SHEET 1 OF 2
EARTH WALL DETAILS
MECHANICALLY-STABILIZED
PROJECT
H.4
Underlying mats
Return mat
Welded wire form
(PLAN VIEWS)
GEOGRID BUTT DETAIL
Adjacent geogrids
TANGENT WALL FACE
backside without overlap
Butt adjacent geogrids at
Wall face
CURVE LEFT WALL FACE
Adjacent geogrids
Backside overlap acceptable
Wall face
CURVE RIGHT WALL FACE
Adjacent geogrids
Backside separation acceptable
Wall face wall face without overlap
Butt adjacent geogrids at wall face without overlap
Butt adjacent geogrids at
Reinforcement length (L) wall face without overlap
Butt adjacent geogrids at
4' (min.)
recommended method.
with hog rings, wire ties, spiral binders, or the manufacturers
Connect adjacent welded wire reinforcement facing elements[1]
[1]Connect reinforcement
AND RETURN MAT DETAILS
MSE WALL FACING , CORNER
Reinforcement geogrid length (L)
Machine
(roll direction)
Machine
(roll direction)
Reinforcement length (L) Reinforcement length (L) perpendicular to front wall face with strongest axis
Reinforcement geogrid, type 3
Wall face
:5 e b r u a r y
M
E C
H A
N
IC
A L
L Y
-S T
A B
IL
IZ
D
R
T H
W A
L L
D E
T A
IL
S rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m ta
-s il v e r2
-1
R o o s e v e lt
D ri v e \D
G N
\A L
T E
R N
A T
IV
E
M
P H
\R e ta in in g W a ll s \m ta -s il v e r2
-1 p ln w a ll
M
S E
W a ll
D e ta il o f
.d g n
SHEET 2 OF 2
EARTH WALL DETAILS
MECHANICALLY-STABILIZED
PROJECT
H.5
3.
2.
1.
NOTE:
prior written approval by the CO.
Do not construct rockery heights exceeding 11' without supplemental recommendations.
conditions are encountered, contact the CO for
Where loose, soft, or otherwise unsuitable foundation soil face of rockery.
dimension of the base, facing, and cap rocks is parallel to dimension is not greater than their width. The longest
Place base, facing, and cap rocks so that their height with widths less than 5.0 feet.
equaling 2.5 feet. Do not consecutively place base rocks the total base rock width. Use rock with minimum length
A maximum tolerance of 6 inches may be applied toward replace loose rocks.
and supported by two underlying rocks. Reposition or and shape specified. Ensure that each rock is firmly set suitable for lifting, rotating, and placing rocks of the size according to Section 252. Place each rock by equipment
Construct rockery and place base, facing, and cap rocks
NO SCALE
Retained soil
Base rock
Cap rock
Top of rockery…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .