Procurement_Exemption_for_Yokogawa_Field_Instrument_Products.pdf

PDF 323 KB Posted

Attached to
Procurement Exemption for Yokogawa Field Instrument Products
Solicitation number
2026-PE-223
Issued by
Pierce County, Washington

About this file

This is a Sole Source Procurement Exemption document issued by Pierce County, Washington for the direct purchase of Yokogawa field instrument products. The exemption covers flowmeters, pressure transmitters, controllers, analytical sensors, and related equipment for use at various Pierce County Sewer Facilities. The public notice was released on September 10, 2026, with a deadline for questions on September 17, 2026, and a response deadline for capability statements on September 24, 2026, at 4:00 pm. The exemption will remain valid for 24 months from approval. Pierce County has determined that CB Pacific is the only entity capable of meeting the County's needs, as it is the sole authorized distributor of Yokogawa field instruments in Washington State as confirmed by the manufacturer.

The estimated cost of purchases under this exemption is $15,000.00 over the 24-month period. The sole source justification is based on the County's existing use of Yokogawa field instruments and a determination that only Yokogawa equipment possesses the specifications necessary for compatibility with existing Pierce County Sewer infrastructure. The minimum requirement identified is that the vendor must be authorized by the manufacturer to sell Yokogawa field equipment and components in Pierce County. Interested entities must submit capability statements electronically through OpenGov, which will be evaluated by the Pierce County Purchasing Agent in consultation with subject matter experts to determine whether the submitter can meet the County's stated need.

View the file

Other files

File Type Posted
Yokogawa_Justification.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLE SOURCE

2026-PE-223

PROCUREMENT EXEMPTION FOR YOKOGAWA FIELD

INSTRUMENT PRODUCTS

Pierce County

1501 Market St, Suite 420

Tacoma, WA 98402

RELEASE DATE: September 10, 2026

DEADLINE FOR QUESTIONS: September 17, 2026

RESPONSE DEADLINE: September 24, 2026, 4:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

Sole Source #2026-PE-223 Title: Procurement Exemption for Yokogawa Field Instrument Products https://procurement.opengov.com/portal/piercecountywa https://procurement.opengov.com/portal/%7bproject.government.code%7d

Pierce County

SOLE SOURCE

Procurement Exemption for Yokogawa Field Instrument Products

1. Procurement Exemption General Requirements

2. Public Notice and Capability Statement Process

3. Capability Statement Requirements

4. Exemption Information

5. Exemption Type and Intended Vendor

6. Scope of Exemption

7. Cost and Term

8. Justification

9. Minimum Requirements

10. Market Research

11. Capability Statement

Attachments:

A - Yokogawa Justification

1. Procurement Exemption General Requirements

1.1. Public Notice and Capability Statement Process

Pierce County posts public notice of all sole source, special facility, and special market condition procurement exemptions for 10 business days. Interested vendors have 5 business days to submit questions in OpenGov. A public notice is not a competitive bid or solicitation, and any bids or proposals submitted during this process will not be accepted. At minimum, the public notice will explain the following information:

• The scope of the purchase.

• The estimated cost of the purchase.

• The estimated term of the exemption.

• The intended vendor for the purchase.

• The justification for the procurement exemption.

• Any minimum requirements for a vendor to meet the County's need.

Any entity who believes they are qualified to meet the County's need as described in the public notice may submit a capability statement by the submission deadline. The Pierce County Purchasing Agent, or designee, will evaluate the capability statement in consultation with subject matter experts as appropriate to determine whether the submitter has demonstrated that they can meet the County's need.

If the capability statement demonstrates that the submitter can meet the County's need, the County will cancel the public notice and proceed with a competitive procurement. If the County determines that the capability statement has not demonstrated that the submitter can meet the County's need, the County will proceed with the procurement exemption. Entities who submit a capability statement will receive a letter explaining the County's decision.

The County reserves the right to contact entities who submit capability statements to request more information about their capabilities and qualifications.

1.2. Capability Statement Requirements

Capability statements must be submitted in OpenGov and should use the .docx or .pdf file type, or any other standard file type that can be opened in Microsoft Word or Adobe Acrobat. There are no strict formatting requirements for capability statements. To be properly evaluated, a capability statement must include the following information:

• The name of the individual or organization submitting the capability statement.

• The name, email address, and phone number of the primary contact.

• A description of how the entity meets the County's need.

The capability statement must directly address any minimum requirements described in the public notice. Any capability statement offering to provide items or services other than those specifically requested must demonstrate that they are of matching specifications and compatible with any systems with which the items or services will be integrated.

2. Exemption Information

2.1. Exemption Type and Intended Vendor

Based on a sole source exemption, Pierce County intends to purchase goods by direct negotiation. The

County has determined that CB Pacific is the only entity capable of meeting the County's need as described below.

2.2. Scope of Exemption

The goods to be purchased via this exemption include Yokogawa field instrument products (including flowmeters, pressure transmitters, controllers, analytical sensors, etc.) for use at various Pierce County

Sewer Facilities.

2.3. Cost and Term

The exemption will be valid for 24 months, and the purchases made under this exemption are estimated to cost $15,000.00 over the 24-month period.

2.4. Justification

The County requires Yokogawa field instruments for various Pierce County Sewer facilities.

The County uses Yokogawa field instruments, and the County has determined that only Yokogawa equipment have the specifications necessary to be compatible with the existing infrastructure.

The manufacturer, Yokogawa, has provided the County with a sole source letter indicating that CB

Pacific is the sole authorized distributor of Yokogawa field instruments in Washington State.

2.5. Minimum Requirements

The County has identified the following minimum requirements to meet the County's need:

1. Authorization by the manufacturer to sell Yokogawa field equipment and components in

Pierce County.

2.6. Market Research

To identify qualified vendors, support the justification of this exemption, and determine the minimum requirements to meet the County's need, the County performed the following market research:

• Consulting with industry peers confirming that Yokogawa field instruments meet or exceed

Pierce County's current needs.

2.7. Capability Statement

Please ensure that your capability statement meets the requirements described in this public notice.

1. Please upload your capability statement here.* The capability statement must demonstrate how you meet the requirements listed in this public notice and how you are capable of meeting the County's need.

*Response required

1. Procurement Exemption General Requirements
1.1. Public Notice and Capability Statement Process
1.2. Capability Statement Requirements
2. Exemption Information
2.1. Exemption Type and Intended Vendor
2.2. Scope of Exemption
2.3. Cost and Term
2.4. Justification
2.5. Minimum Requirements
2.6. Market Research
2.7. Capability Statement
1. Please upload your capability statement here.*

File details come from the government source that posted it. Updated .