This preliminary notice provides information for the AK BLM GFO 2019(1) Sourdough Campground Bridge project. The Federal Highway Administration will replace the existing Sourdough Creek Campground Bridge with a new approximately 100-foot long precast concrete bridge located 25 miles north of Glennallen, Alaska. Work will include reconstructing bridge approaches and installing a temporary bypass bridge for campground traffic during construction. Technical questions must be submitted by email to wfl.plans-spec@dot.gov by the winter 2022 solicitation release date, which can be monitored on sam.gov. General inquiries should be directed to wfl.contracts@dot.gov or 360-619-7520. Prospective bidders are encouraged to view the project site in the fall due to winter conditions limiting access starting in December.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ak-b-gfo201901_PreAd__PLANS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Western Federal Lands Highway Division 610 E. Fifth Street
Vancouver, WA 98661 Phone 360-619-7700
Fax 360-619-7846
NOTICE TO PROSPECTIVE BIDDERS
RE: AK BLM GFO 2019(1)
Sourdough Campground Bridge Solicitation No. 69056722B000023
The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Bidders are encouraged to view the project during fall as conditions permit. After December 20, 2022, access will be weather dependent; contact the BLM for current road conditions at 907-822-3217.
No Federal Highway Administration personnel will be available for show-me tours.
Project Location and Type of Work – All project work is located in approximately 25 miles north of Glennallen, AK within Valdez Cordova Borough, Alaska. The project will include replacement of the existing Sourdough Creek Campground Bridge with an approx. 100-feet long precast concrete bridge. Work will include reconstructing the approaches to the bridge and installing a temporary bypass bridge for campground traffic during construction.
Technical Questions – All technical questions must be submitted by email wfl.plans-spec@dot.gov .
General Questions – Contact our office at wfl.contracts@dot.gov or at 360-619-7520.
Solicitation documents – Documents will be available during the Winter of 2022. Please monitor the sam.gov site for actual date of solicitation release. To receive automatic notification, select the “Watch this opportunity” feature and follow the steps as indicated.
Thank you for your interest in this project.
September 6, 2022 mailto:wfl.plans-spec@dot.gov mailto:wfl.plans-spec@dot.gov mailto:wfl.contracts@dot.gov
File details come from the government source that posted it. Updated .