ak-b-gfo201901_PreAd__PLANS.pdf

PDF 11 MB Posted

Attached to
AK BLM GFO 2019(1) Sourdough Campground Bridge
Solicitation number
69056722B000023
Issued by

About this file

This document provides details for a federal presolicitation notice regarding bridge construction services. The U.S. Department of Transportation Federal Highway Administration will issue solicitation number 69056722B000023 for bridge construction at the Sourdough Campground in Alaska. The solicitation will be full and open to all qualified contractors. The notice indicates that the agency will release a full solicitation seeking proposals to construct a new bridge at the specified campground location but does not include pricing terms, response deadlines, or other contract specifics. Interested contractors are advised to monitor the federal business opportunities portal for additional details upon issuance of the full solicitation.

View the file

Other files

File Type Posted
Preliminary Letter AK BLM GFO 2019 (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRELIMINARY - N

OT FOR CONSTRUCTION

AK BLM GFO 2019(1) A.3

STATE PLANE COORDINATES GEO COORDINATES

POINT

NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID

HEIGHT

COMBINED

FACTOR DESCRIPTION NOTE:

19101 3117130.099 1722095.848 1896.176 62°31'48.698350"N 145°30'59.027795"W 1943.1034 0.999814927 5/8" IR w/FHWA Alum Cap 1.

19102 3116146.194 1722340.289 1894.888 62°31'38.992992"N 145°30'53.975309"W 1941.7966 0.999815035 5/8" IR w/FHWA Alum Cap

19103 3116089.880 1721706.878 1887.572 62°31'38.485195"N 145°31'07.483466"W 1934.489 0.999815266 5/8" IR w/FHWA Alum Cap

PROJECT :Sourdough Campground Bridge DATE OF FIELD WORK : September 2019

EPOCH DATE : 2010.0000

PROJECT UNITS : US SURVEY FOOT

COORDINATE SYSTEM : Alaska zone 3 SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID12b

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

C

M yF ile s\

D es ig n\

S ou rd ou gh C am pg ro un d B ri dg e\ w or ki ng

S ou rd ou gh _B ri dg e_ co nt ro ls he et .x ls x]

Sh ee t 9-

N ov

-2

7:

A

M W

FL

H

D S ur ve y

W

FL

H

D S ur ve y

D es ig ne d by

C he ck ed b y:

STATE PROJECT

D.5

SHEET

NUMBER

BLM GFO 2019(1)AK

SURVEY CONTROLPRELIMINARY - N

AK BLM GFO 2019(1) E.4

AK BLM GFO 2019(1) E.5

AK BLM GFO 2019(1) E.6

AK BLM GFO 2019(1) E.7

SWPPP

Permit: 123456789 Contact: First Last Phone: 123-456-7890

SWPPP NOTICE SIGN [1]

[1] B ack border and text on white background. Fabricate sign panel from aluminum. Adjust text as needed for specific project information.

FOOTNOTE:

42"

3"

4"C

3.5"

2.5"B

3"

2"C

14"

2" 2"C

BORDER R = 11

8" TH = 5 8" IN = 38"

AK BLM GFO 2019(1) J.3

File details come from the government source that posted it. Updated .