This is a Notice to Prospective Bidders for a federal highway construction project issued by the Western Federal Lands Highway Division. Solicitation No. 69056726B000011 concerns the reconstruction and paving of Riley Creek Campground roads located within Denali National Park, Alaska, at coordinates 63.730535 N, -148.893913 W. The project scope includes reconstructing and paving roadways within three campground loops to a width of 12 feet or no wider than existing width, constructing a deep patch along the park road at mile post 14.8, and performing roadway reconstruction and paving within the USPS parking lot, mercantile parking lot adjacent to the campground, and the frontage road.

The document issued on September 10, 2026, indicates that prospective bidders are encouraged to view the project site during fall when conditions permit, as the project will be advertised during winter when snow may prevent access and no Federal Highway Administration personnel will be available for site tours. All material sources and materials incorporated into the work must be certified as free from noxious weeds and invasive plants by a federal, state, or local public agency, or through the North American Weed Free Forage Program standard or similarly recognized certification. Contractors must arrange for weed inspections during fall to determine acceptable sources. Full solicitation documents will be available during winter 2026/2027 on SAM.gov. Technical questions should be directed to wfl.plansspec@dot.gov, and general questions to wfl.contracts@dot.gov or 360-619-7520.

View the file

Other files

File Type Posted
plans-Pre ad_AK NPS DENA 10(64).pdf PDF
Project Description_AK NPS DENA 10(64).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661 Phone 360-619-7700

Fax 360-619-7846

September 10, 2026

NOTICE TO PROSPECTIVE BIDDERS

RE: AK NPS DENA 10(64)

Re-pave Riley Creek CG Roads

Solicitation No. 69056726B000011

The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Offerors are encouraged to view the project as soon as possible during fall as conditions permit. The campground is open year round however weather conditions may affect access; No Federal

Highway Administration personnel will be available for show-me tours.

Project Location and Type of Work - All project work is located within Denali National Park, Alaska.. The proposed project is located just inside the park entrance This project is located at approximate coordinates 63.730535 N, -148.893913 W.

The purpose of the project is to reconstruct and pave the Riley Creek Campground. Specifically;

• The roadway within the 3 campground loops will be reconstructed and paved to be 12’ wide and/or no wider than the existing width.

• A deep patch will be constructed along the park road at MP 14.8.

• Additional roadway reconstruction and paving will occur within the USPS parking lot, the mercantile parking lot adjacent to the campground and the frontage road.

Technical Questions – All technical questions must be submitted by email wfl.plans-spec@dot.gov .

General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.

Special Notice - Fall Weed Inspection May be Necessary

All material sources and materials incorporated into the work must be certified to be free from noxious weeds, invasive plants, and other deleterious materials by a federal, state or local public agency.

Commercial certifications may be acceptable if materials have been certified through the North American

Weed Free Forage Program standard or a similarly recognized certification process. To determine if a source is acceptable, contractors must arrange for a weed inspection this Fall.

mailto:plans-spec@dot.gov mailto:plans-spec@dot.gov mailto:wfl.contracts@dot.gov

Preliminary Plans letter

Solicitation documents - Documents will be available during the winter of 2026/2027. Please monitor the SAM site (www.sam.gov) for actual date of solicitation release. To receive automatic notification through SAM, you must be logged in and select the “Follow” feature. For more information go to How do I follow items on SAM.gov?.

Thank you for your interest in this project.

http://www.sam.gov/ https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=ad9c8da01bfbe1502fe5ed7ae54bcbc8