This document provides details for a federal contract solicitation seeking bids for construction services on the Cherokee National Forest in Tennessee. The solicitation is for Project TN ERFO FS 2019-1(4) with number 693C73-23-B-000001 and is open only to certified Small Business Concerns. Work includes roadway resurfacing, construction of gabion walls, replacement of existing gabion walls, cleaning and replacing culverts, and other miscellaneous tasks. The project value is estimated between $2,000,000 to $5,000,000. Bid documents were to be issued on or around September 6, 2022 with the bid due date and location specified on the SF 1442 form. Interested vendors must register at www.sam.gov to receive email notifications or access solicitation documents. Annual Representations and Certifications must also be completed at this site. All questions should be directed to eflhd.contracts@dot.gov and include the solicitation number, project name and number, firm details, and point of contact.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ROBO - TN ERFO FS 2019-1(4).pdf | ||
| VETS-4212 Form.pdf | ||
| FP14_Eng.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| IFB Solicitation - TN ERFO FS 2019-1(4).pdf | ||
| Geotech Report_adv.pdf | ||
| Categorical Exclusion Form (NEPA).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title Sheet
Symbols And Abbreviations
Location Map
Typical Sections
Tabulation of Quantities
Construction Plans And Profiles (Round Knob Road)
Erosion & Sediment Control Narrative
Standards And Details
Cross Sections
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
PLANS PREPARED BY
GREENE COUNTY, TENNESSEE
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 2.30 Miles
ADT (2021)
ADT (2031)
DHV
%Truck
D
V (MPH)
N/A
50/50
None
SPECIFICATIONS:
DESIGN DESIGNATION:
e(max) N/A
C/A None
<100
<100
GREYSTONE MOUNTAIN SPUR & GREENE MOUNTAIN ROAD
SLIDE REPAIR & ROADWAY RESURFACING ON ROUND KNOB ROAD,
TN ERFO FS 2019-1(4)
culverts is also included.
Other miscellaneous work such as cleaning and replacing of gabion walls, and replacement of existing gabion walls.
This project consists of roadway resurfacing, construction
Know what'sbelow.
before you dig.Call
R
U.S. Department of Transportation
Administration
Federal Highway
SHEET
NO
A01
A02-A03
A04-A05
B01-B07
C01
D01-D06
M01
S01-S07
T01-T46
LANE MILES:
DISASTER NO. TN2019-1-FS
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
U.S. DEPARTMENT OF AGRICULTURE
U.S. FOREST SERVICE
CHEROKEE NATIONAL FOREST
BRIDGE:
ROAD: WIDTH
10' - 14'
13'
SURFACE BASE
N/A N/A
SUBGRADE
6" Agg. N/A N/A
6" Agg.
13' N/A N/A6" Agg.
N/A
Round Knob Road (FS-88)
JULY, 2022
Project Manager
DAN WESTON
Lead Designer
CHRIS BURNELL
Highway Design Manager
MICHAEL TOOMER
SCALE IN MILES
70 70
KEY MAP
STATE OF TENNESSEE
NASHVILLE KNOXVILLE
MEMPHIS
CHATTANOOGA
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
N
Greystone Mountain Spur (FS-88A)
Greene Mountain Road (FS-98)
Spur (FS-88A)
Greystone Mountain
Road (FS-88)
Round Knob
Road (FS-98)
Greene Mountain
N/A
50/50
None
N/A
None
<100
<100
N/A
50/50
None
N/A
None
<100
<100
TN ERFO FS 2019-1(4)
TN ERFO FS 2019-1(4)
Road (FS-98)
Greene Mountain
Road (FS-88)
Round Knob
Spur (FS-88A)
Greystone Mountain
NO SCALE
K01-K02 Drainage Profiles
Road Number
Forest Service
A
A
FS-88
FS-88A
FS-98
Round Knob Road
Greystone Mountain Spur
Greene Mountain Road
2.11
0.10
0.09
100+40 to 212+00
400+00 to 405+40
500+10 to 504+70
DescriptionSchedule Station to Station (miles)
Length
2.30 Miles
A06-A12 Survey Control Data
A13 Alignment Data
M02-M08 Erosion & Sediment Control Plans
N
C02-C04 Summaries and Schedules
E01-E08 Construction Plans And Profiles (Greene Mountain Road)
:0
P
M
F e b r u a r y
S h e e t
A
T it le
S h e e t
C
P R
O J E
C T
S
F S
\T N
\2
-1 (4
H
W Y
D
E S
\C A
D D
\A
T N
E
R F
O
F S
-1
(4 tt l.
d g n
STATE PROJECT
NUMBER
SHEET
TN TN ERFO FS 2019-1(4) A01
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve original ground outside diameter out to out ordinary high water mark on center nominal maximum size aggregate normal crown north mon.
min.
max.
MP
ML
monument minimum maximum mile post main line spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south spa.
shldr.
sec.
SC
SADT
S
NMSA
NC
N
OG
OD
o. to o.
ohwm
o. c.
pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot sym.
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SS
SRS
sqyd sqft typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed
W west
1 6
1 6
SEC.
SEC.
0.00EL. E
N 0
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SYMBOLS AND ABBREVIATIONS
CHEROKEE NATIONAL FOREST
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CO
CMP
CL
cc or c. to c.
brg.
br.
BP
BM
BK
appr.
AH
ADT
ACP
abut.
double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column contracting officer corrugated metal pipe centerline center to center bearing bridge balance point benck mark back approach ahead average daily traffic asphalt concrete pavement abutment expansion joint excavation edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation elevation with number superelevation rate east flg.
fin.
flange finish exp. jt.
exc.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elev.
e
E θs Ø ∆c spiral central angle diameter curve central angle total central angle ftg.
galv.
ga.
HW
hex.
hdwl.
ID
jt.
footing galvanized gage (gauge) high water hexagon headwall inside diameter joint lat.
lam.
L latitude lamination length of curve
LW
lt. or LT Ls
LPSM
long.
LOD
low water left length of spiral lump sum longitudinal Limits of Disturbance
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
Spring or Seep
Treeline; Individual Trees, Pine
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:4
J u n e
S
H E
E T
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\A -A
T
N E
R F
O F
S -1
(4 s y m
.d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) A02
N
AREA PATTERN
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
Gabion Wall Section
Riprap
NTS Not to Scale
SYMBOLS AND ABBREVIATIONS
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Reconstruction
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Sheet 2 of 2
:4
J u n e
S
H E
E
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\T N
E R
F O
F S
-1 (4
C
A D
D \A
-A
T N
E
R F
O
F S
-1
(4 s y m .d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) A03
TN ERFO FS 2019-1(4)
TN ERFO FS 2019-1(4)
work limits, and staging area.
See Sheet A05 for detailed map, (Sta. 400+00 to Sta. 405+40)
Greystone Mountain Spur
(Sta. 100+40 to Sta. 212+00)
Round Knob Road and work limits.
See Sheet A05 for detailed map
(Sta. 500+10 to Sta. 504+70)
Greene Mountain Road
M il e s
A s h e v il le
N C
M il e s
Jo h n s o n C it y T N
NOT TO SCALE
LOCATION MAP
Sheet 1 of 2
:3
J u n e
S h e e t
A
L o c a ti o n
M a p
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\A -A
T
N E
R F
O F
S -1
(4 lo c .d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) A04
BEGIN WORK
BEGIN WORK
BEGIN WORK
END WORK
END WORK
END WORK
-82.680454°
36.064871°
STA. 100+40
ROUND KNOB ROAD
-82.685389°
36.086474°
STA. 212+00
ROUND KNOB ROAD
-82.68812°
36.072128°
STA. 405+40
MOUNTAIN SPUR
GREYSTONE
-82.687107
36.071193°
STA. 400+00
MOUNTAIN SPUR
GREYSTONE
-82.7767361°
36.0206525°
STA. 504+70
GREENE MOUNTAIN ROAD
-82.7762251°
36.0198701°
STA. 500+10
GREENE MOUNTAIN ROAD
See Typical Section & Sheet DO1-D04
STA. 121+83 to STA. 123+64
GABION WALL SECTION
See Typical Section & Sheet DO5-D06
STA. 208+85 to STA. 210+30
GABION WALL SECTION
For work on Greene Mountain Road
See Typical Section & Sheets E01-E08
Mountain Spur at all times.
Mountain Spur and Ggreystone
Round Knob Road up to Greystone construction. Maintain access to
Mountain Spur during
Round Knob Road past Greystone
Close Greene Mountain Road and
NOTE:
N
SCALE IN MILES
0.0 0.3 0.6 for the staging area.
Use Round Knob Road Parking Area
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
LOCATION MAP
Sheet 2 of 2
:3
M a y
S h e e t
A
Z o o m
L o c a ti o n M p
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\A -A
T
N E
R F
O F
S -1
(4 lo c .d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) A05
CAP2817.9692947506.382650748.48207
CAP2809.872947507.405650937.838206
CAP2807.7322947381.756651086.0048205
CAP2810.5222947553.897651220.6318204
CAP2812.5212947831.066651226.944108203
CAP2795.0852947960.934651494.8748202
CAP2765.182948275.292651817.8648201
CAP2771.0282948264.601651694.4858200
CAP2762.2942948213.112651941.328145
CAP2757.8842948210.837652112.1118144
CAP2744.4842947932.785652097.4978143
CAP2740.7782947805.182652277.0548142
CAP2737.8272947639.329652315.4698141
CAP2730.8712947507.745652543.4718139
CAP2727.9532947375.615652625.1638138
CAP2723.6222947384.206652773.1468137
CAP2721.4132947253.327652843.6148136
TBAR2717.9672947214.485652991.9488135
CAP2715.2362947239.84653140.0398134
CAP2710.0452947143.074653311.1238133
CAP2695.0752947294.373653455.5128132
CAP2683.5712947286.965653580.1618131
CAP2666.3242947404.718653718.6948130
CAP2636.6292947766.126653815.3928129
CAP2620.5622947856.005653971.88128
CAP2609.742947833.511654101.6988127
CAP2594.3882948000.607654170.9978126
CAP2583.442948094.196654284.6818125
CAP2573.6892948002.915654313.6438124
CAP2551.4572947766.133654439.3838123
TBAR2545.7212947738.781654488.8058122SL
CAP2533.1782947764.704654608.2718122
CAP2519.842947685.616654754.9968121
CAP2501.0252947798.789654974.1698120
CAP2471.0582947485.204655027.1718119
TBAR2450.4552947400.956655237.5488118
CAP2433.1492947376.359655462.028117
CAP2417.3262947203.332655524.4018116
CAP2398.1372947026.943655404.7438115
CAP2379.292946930.659655229.9838114
CAP2360.0122946727.865655119.9428113
CAP2342.3232946762.403654915.0038112
CAP2329.7312946639.302654841.0188111
CAP2314.5292946578.062654650.2378110
CAP2290.4172946495.064654314.0948109
CAP2227.872946251.605654863.9328108
CAP2213.4262946135.886654951.7598107
CAP2200.0032945973.706654821.7348106
CAP2160.8132945696.125655193.2498105
CAP2140.3672945452.758655218.2878104
CAP2108.9392945079.959655096.7958103
CAP2085.4292944772.25655046.7378102
NUMBER
REMARKSELEVATIONEASTINGNORTHINGPOINT
CAP3081.1172949374.159647031.4588301
CAP3073.7492949448.916647248.5818225
CAP3059.0812949220.457647440.1318224
CAP3045.2362949141.289647650.0768223
CAP3033.4562948986.408647717.1818222
CAP3028.6552948971.171647868.6428221
CAP3011.3582948685.182648018.6858220
CAP3000.1922948501.477648153.6418219
CAP2976.8182948192.118648356.8658218
TBAR2967.1622948050.36648353.1648217SL
CAP2961.6912947948.436648340.4268217
TBAR2959.2412947918.137648363.6428216SL
CAP2947.3912947744.663648488.9918216
CAP2924.3342947533.33648578.6388215
CAP2884.92947382.156648894.9688214
CAP2865.5622947372.967649124.5788213
CAP2862.6582947415.386649428.6178212
CAP2845.8922947297.747649838.5558211
CAP2840.7682947367.716650039.798210
NAIL2837.1732947382.978650149.7018209SL
CAP2835.7642947423.741650350.948209
CAP2830.4152947269.264650500.6718208
NUMBER
REMARKSELEVATIONEASTINGNORTHINGPOINT
PROJECT SURVEY CONTROL POINTS
PROJECT COORDINATE SYSTEM
Project Site : Round Knob RD.
Geoid Model : GEIOD18 (Conus)
Vert. Datum : NAVD 1988 (Conus)
Hor. Datum : NAD 1983 (Conus)
Zone : Tennesse 4100
Coordinate System : US State Plane 1983
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
SURVEY CONTROL DATA
ROUND KNOB ROAD
Sheet 1 of 6
:1
M a y
S h e e t
A
S u r v e y
I n f o r m a ti o n
R
K
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\A -A
T
N E
R F
O F
S -1
(4 s u r.
d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) A06
SURVEY CONTROL POINTS REFERENCES
8"Ø
C M
P x .9
10"Ø
8"Ø
CAP
CP
CAP
CP
CAP
CP
CAP
CP
AZ 80.
76°
311.7 5'
AZ 93.31°
166.98'
To 81 03 ->
SIGN
CHEROKEE NF
AZ 260
.76°
311.7 5'
A Z
.3
.5
AZ 7
1.9
5° .1'
<- To
To
4 -
A Z
.7
.5
AZ 2
51.
95°
.1' AZ 95.87°
244.65' To 8105 ->
To
AZ 275.87°
244.65'
A Z 1.
9.
A Z
.2
.7
T o
<- To 8104
NTS NTS NTS NTS
OAK
21"Ø
POPLAR
TULIP
16"Ø
C P P x .3
CAP
CP
A Z
.4
.0
- T o
A Z
.2
.7
A Z 1.
7.
To
NTSNTS
12"Ø
CAP
CP
CAP
CP
CAP
CP
CAP
CP
T o
A Z
.1
.3
A Z .2 8°
7.
To
A Z 127.2°
145.27'
A Z
.9
.2
T o
T o
A Z
.1
.3
AZ 7
0.9
6°14 .65
A Z
.8
.2
T o
A Z
.8
.3
A Z
.8
.2
T o
NTSNTSNTS
C M
P x .3
18"x25.16'
CMP
OAK
16"Ø
CAP
CP
CAP
CP
CAP
CP
A Z
.4
.8
T o
A Z
.8
.3
T o
AZ
8.
3.
T o
A Z
.4
.8
AZ
.5 1°23
0.
To
NTSNTS
OAK
12" Ø
CMP
12"/18"x25.35'
CAP
CP
CAP
CP
CAP
CP
T o
A Z
.8
.5
AZ
1.
0.
T o
A Z
.8
.5
AZ
.8 5°
3.
AZ 7
5.75
80.8
3'
T o
To 8117 ->
AZ 109.83°
183.93'
NTS NTS
C M P
15"x25.14'
C M P
"x2
.6
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
N N N N
N N N
NN
NN
NOT TO SCALE
Sheet 2 of 6
:2
M a y
S h e e t
A
S u r v e y
I n f o r m a ti o n
R
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\A -A
T
N E
R F
O F
S -1
(4 s u r.
d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) A07
CAP
CP
TBAR
CP
CAP
CP
T o
A Z
.7
.8
A Z
.0
.4
AZ 289.83°
183.93'
<- To 8116
T o
A Z
.7
.8
T o
A Z
.1
.6
T o
To 8120 ->
AZ 99.59°
318.03'
A Z
.1
.6
A Z
.7
.6
NTS NTS NTS
N N N
15"x28.74'
"x
.1 ' C
M P
CAP
CP
<- To 8119
AZ 279.59°
318.03'
A Z
.3
.6
T o
NTS
N
CMP15"
x29 .15
6"Ø
CAP
CP
CAP
CP
CAP
CP
TBAR
8122SL
CP
CAP
CP
CAP
CP
A Z
.6
.6
T o
A Z
.3
.6
T o
T o
S
L
A Z
.2
.2
A Z
.6
.6
- T o
A Z 128.73°
38.26'
To 8124 ->
AZ 117.97°
268.1'
A Z
.0
.4
AZ 284.7°
31.12'
A Z
.2
.2
T o
To
A Z
.4
.2
AZ 107.6°
95.77'
AZ 297.97°
268.1'
<- To 8123
A Z
.9
.4
NTSNTSNTSNTS
NNNN
IN
V
.4 2'
IN
V
.48
CMP18
"x
.27
15"Ø
C M
P "x
.8
CMP
15"x26.28'
IN
V
.2
IN
V
.9
C M
P x .8
CAP
CP
CAP
CP
CAP
CP
CAP
CP
CAP
CP
A Z
.2
.9
AZ 2
.47
°18 0.9
A Z
.4
.2
AZ
.5 °53
.0 1'
To
To
8"Ø
To
AZ 6
7.4
7°18 0.9
A Z .8
.6
A Z
.1
.8
T o
A Z
.8
.3
To 8
AZ 262.
93°
119.05
AZ 2
55.
02° .12
A Z
.8
.3
T o
A Z
.3
.8
To
To 8
AZ 7
5.0
2° .12
NTS NTS NTS NTS
N N
N N
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
Sheet 3 of 6
:2
M a y
S h e e t
A
S u r v e y
I n f o r m a ti o n
R
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\A -A
T
N E
R F
O F
S -1
(4 s u r.
d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) A08
CMP
15"x30.69'
CAP
CP
CAP
CP
To
AZ 125.9°
26.83'
A Z
.6
.8
A Z
.3
.8
To
.3
.1
NTS
N
CMP
15"x
30.3 0'
MAPLE
7"Ø
TBAR
CP
CAP
CP
CAP
CP
T o
A Z
.5
.5
A Z .3
.1
AZ 102.43°
28.86'
To
- T o
A Z
.5
.5
A Z
.7
.2
T o
A Z .7
.3
A Z
.3
.3
T o
T o
A Z .7
.2
NTSNTSNTSNTSNTS
NNN
8"Ø
C M P
"x
.2
IN
V .8
IN
V .5
8"Ø
C M P
"x
.5
CAP
CP
CAP
CP
CAP
CP
CAP
CP
T o
A Z .3
.2
AZ 121.73°
155.34'
A Z
.0
.5
A Z
.0
.2
T o
A Z
.5
.2
T o
A Z
.3
.2
A Z
.9
.9
AZ 118.3°
148.64'
T o
A Z
.3
.3
A Z
.2
.3
NTSNTS
NN
20"Ø
CAP
CP
CAP
CP
CAP
CP
T o
A Z
.6
.2
AZ 103.04°
170.24'
A Z .5
- T o
A Z
.0
.2
To 8144 ->
AZ 86.99°
278.44' A Z 2.
.4 6'
A Z
.6
.2
- T o
POPLAR
TWIN
20"&22"Ø
NTS NTS
N
N
CAP
CP
CAP
CP
CAP
CP
CAP
CP
T o
A Z
.2
.8
AZ 266.99°
278.44'
<- To 8143
T o
A Z
.2
.2
A Z
.2
.8
T o
- T o
A Z
.2
.2
A Z
.9
.8
AZ
6.
3.
4'
To
NTS NTS NTS
N
N N
CAP
CP
CAP
CP
CAP
CP
CAP
CP
T o
A Z
.2
.8
AZ 266.99°
278.44'
<- To 8143
T o
A Z
.2
.2
A Z
.2
.8
T o
- T o
A Z
.2
.2
A Z
.9
.8
AZ
6.
3.
4'
To
NTS NTS NTS
N
N N
CAP
CP
A Z
.8
.7
AZ
.6 8°
3.
4'
To
T o
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
Sheet 4 of 6
:2
M a y
S h e e t
A
S u r v e y
I n f o r m a ti o n
R
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\A -A
T
N E
R F
O F
S -1
(4 s u r.
d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) A09
CP
CAP
CP
CAP
CP
CAP
108203
CP
CMP
18"x34.52'
<- To 8204
AZ 268.7°
277.24'
T o
A Z
.8
.7
To
To 108204 ->
AZ 88.7°
277.24'
A Z .9 7°
8.
A Z
.7
.2
A Z 1.
8.
To
To
T o
A Z
.3
.4
A Z
.7
.2
- To
A Z
.9
.6
NN
N
N
CAP
CP
CAP
CP
CAP
CP
NAIL
8209SL
CP
CAP
CP
12"Ø
CM
P
15"x24.59'
T o
A Z
.3
.4
A Z .7
.9
A Z .1
.1
AZ
3.
3.
To
A Z .7
.9
To
A Z .1
.1
To
- To
A Z .1
.1
AZ 112.92°
7.02'
A Z
.4
.3
T o
S
L
T o
A Z
.4
.3
A Z
.9
.9
T o
A Z
.1
.0
NTSNTSNTSNTS
N N N N
CMP
24" x36 .84
MAPLE
16"Ø
CAP
CP
T o
A Z
.1
.0
A Z
.9
.4
T o
AZ 101.83°
20.18'
NTS
N
INV 2841.58'
INV 2843.97'
MAPLE
9"Ø
CMP
15"x27.05'
CAP
CP
CAP
CP
CAP
CP
T o
A Z
.7
.7
A Z
.8
.5
A Z
.4
.6
T o
T o
A Z .9
.9
.7
.7
T o
T o
A Z
.9
.4
A Z
.9
.9
AZ 108.82°
7.84'
T o
NTS NTS NTS
NNN
21"Ø
15"Ø
OAK
12"Ø
15"Ø
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
Sheet 5 of 6
:2
M a y
S h e e t
A
S u r v e y
I n f o r m a ti o n
R
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\A -A
T
N E
R F
O F
S -1
(4 s u r.
d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) A10
CP
CAP
CP
MAPLE
8"Ø
19"Ø
<- To 8215
AZ 292.99°
229.56'
AZ 125.85°
214.02'
To 8216SL ->
AZ 298.28°
9.79'
AZ 112.99°
229.56'
To 8216 ->
T o
A Z
.4
.6
NTS NTS
NN
TBAR
8216SL
CP
CAP
CP
TBAR
8217SL
CP
CAP
CP
C M
P x .0
BH
BH AZ 123.3°
370.14'
To 8219 ->
AZ 88.5°
141.81'
<- To 8
AZ 262.
88°
102.72
To 821
7SL ->
AZ 82.8
8°
102.72
A Z 127.46°
38.17'
- To 8216
AZ 305.85°
126.45'
A Z .1
.2
NTSNTS
N N
CAP
CP
CAP
CP
CAP
CP
x .0
<- To 8220
T o
A Z
.2
.2
AZ 297.68°
322.96'
To 8221 ->
AZ 117.68°
322.96'
AZ 306.3°
227.95'
- To 8219
AZ 126.3°
227.95'
To 8220 ->
AZ 303.3°
370.14'
- To 8218
A Z
.1
.5
NTSNTSNTSNTS
N N N
CAP
CP
CAP
CP
T o
1A Z
.2
.2
AZ 113.43°
168.79'
T o
A Z
.3
.3
NTS
N
C M P
"x
.0 9'
CAP
CP
CAP
CP
CAP
CP
T o
AZ 7
4.2
1° 49.
65'
A Z
.4
.4
A Z
.6
A Z .9
.1
- To 8
A Z
.6
T o
A Z
.3
.3
A Z 309.41°
49.32'
A Z .9
.1
To 8
T o
NTS NTS NTS
N N N
"x
.4
B U R R
IE
D
C M P
IN
LE
T
IN
V .5
OAK
12"Ø
OAK
19"Ø
OAK
21"Ø
OAK
18"Ø
OAK
21"Ø
OAK
TWIN
15"&20"Ø
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
Sheet 6 of 6
:2
M a y
S h e e t
A
S u r v e y
I n f o r m a ti o n
R
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\A -A
T
N E
R F
O F
S -1
(4 s u r.
d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) A11
To 1504 ->
To 1502 ->
To 1501 ->
AZ 113.94°
201.24'
<- To 1500
AZ 293.94°
201.24'
AZ 115.24°
147.38'
AZ 124.6°
143.45'
A Z .4
.3
A Z .6
.4
A Z
.2
.0
A Z
.9
.5
A Z .9
.1
AZ 281.87°
12.44'
A Z
.5
.9
N NNN
NTS NTSNTSNTS
AZ 278.62°
5.01'
BOULDER
2.5'x2'
BOULDER
2.5'x2'
.0 'x
C M P
E le v.
.5
E le v.
.5
RBAR
RBAR
RBAR
RBAR
RBAR
PROJECT COORDINATE SYSTEM
Project Site : Greene Mountain RD.
Geoid Model : GEIOD18 (Conus)
Vert. Datum : NAVD 1988 (Conus)
Hor. Datum : NAD 1983 (Conus)
Zone : Tennesse 4100
Coordinate System : US State Plane 1983
PROJECT SURVEY CONTROL POINTS
REBAR/wCap2472.9662921750.725629776.9511504
REBAR/wCap2474.5182921709.480629636.0131503
REBAR/wCap2473.5652921735.496629758.3281502
REBAR/wCap2473.5702921617.418629839.7951501
REBAR/wCap2476.6112921433.497629921.4701500
NUMBER
REMARKSELEVATIONEASTINGNORTHINGPOINT
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
GREENE MOUNTAIN ROAD
N N N N
:2
M a y
S h e e t
A
S u r v e y I n f o r m a ti o n
G
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\A -A
T
N E
R F
O F
S -1
(4 s u r.
d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) A12
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
ALIGNMENT DATA
:3
M a y
S h e e t
A
A li g n m e n t D ta
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\T N
E R
F O
F S
-1 (4
C
A D
D \A
T
N
E R
F O
F
S
-1 (4 a li
.d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) A13
CL
Aggregate surface course, 6-inch depth
1V:6H
& Varies
Varies, Match Existing
Varies (12' - 14')
Roadway Width
Ditch Reconditioning, see Detail A
Aggregate surface course, 6-inch depth 1V:3H
& Varies
Varies, Match Existing
ROUND KNOB ROAD
PARKING AREA REHABILITATION SECTION
STA. 100+40 to STA. 102+22
Varies (63' max.)
Parking Area Width, Match Existing
CL
1V:3H
& Varies
Existing ground
Existing ground
Varies, Match Existing 1. Adjust the construction limits to fit field conditions as approved or directed by the CO.
2. Apply 4-inch aggregate-topsoil and turf establishment to all disturbed areas except traveled way, ditch, or rock face.
NOTES:
ROUND KNOB ROAD
ROADWAY REHABILITATION SECTION
STA. 102+22 to STA. 122+13
STA. 122+58 to STA. 123+13
STA. 123+34 to STA. 209+15
STA. 209+99 to STA. 212+00
CL
Aggregate surface course, 6-inch depth
1V:6H
& Varies
Varies, Match Existing
Varies (13')
Roadway Width, Match Existing
Ditch Reconditioning, see Detail A
Existing ground
GREYSTONE MOUNTAIN SPUR
ROADWAY REHABILITATION SECTION
STA. 400+00 to STA. 405+40
Limits of construction
Limits of disturbance
Limits of construction
Limits of disturbance
NOT TO SCALE
Scarify existing aggregate surface
DETAIL A - Ditch Reconditioning
1V:4 H
1V:3H & Varies traveled way
Edge of
Existing ground
See Note 2.
See Note 2.
See Note 2. See Note 2.
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
TYPICAL SECTION
ROUND KNOB ROAD AND
GREYSTONE MOUNTAIN SPUR REHABILITATION
Limits of construction
6"
:0
J u n e
S h e e t
B
R o u n d
K n o b a n d G r e y s to n e S p u r R e c o n d it io n in g
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\T N
E R
F O
F S
-1 (4
C
A D
D \B
-B
T N
E
R F
O
F S
(4 ty p .d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) B01
Existing ground
Varies(1V:2H or flatter)
See Note 3
Granular Backfill (#57 Stone)
Varies geotextile, class 2, type B
Separation-stabilization
Varies, see table
Aggregate surface course, 6-inch depth
See Note 4.
Excavation limit
Roadway width, 12'
3'
CL
class 2
Riprap, method A, see Detail E253-A
Aluminized Coated (typ.), Gabions, Galvinized or grade
Profile
Centerline/
STA. 122+13 to STA. 122+28
STA. 122+43 to STA. 122+58
STA. 209+15 to STA. 209+99
ROUND KNOB ROAD
GABION WALL (H=9') SECTION
DETAIL A - Ditch Reconditioning
See D sheets for limits
1V:4 H
1V:3H & Varies traveled way
Edge of
Existing ground
1. Adjust the construction limits to fit field conditions as approved or directed by the CO.
2. Apply 4-inch aggregate-topsoil and turf establishment to all disturbed areas except traveled way, ditch, or rock face.
3. Furnish granular backfill (#57 stone) conforming to Subsection 703.03.
4. The excavation slope is assumed at 1V:1H for the design and excavation quantities. See
Section 208 for excavation requirements.
NOTES:
Limits of disturbance
NOT TO SCALE
See Detail E605-A
Underdrain system
122+13 to 122+28 VARIES (See D02)
STATION
CROSS
SLOPE
Grade to drain
H e ig h t =
Scarify existing aggregate surface turf establishment
Aggregate-Topsoil with
209+15 to 209+99 -6%
122+43 to 122+58 VARIES (See D02) see Detail A
Ditch Reconditioning
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
TYPICAL SECTION
ROUND KNOB ROAD GABION WALL (H=9') SECTION
9'
6"
:1
A p r il
S h e e t
B
R o u n d
K n o b
G a b io n
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\T N
E R
F O
F S
-1 (4
C
A D
D \B
-B
T N
E
R F
O
F S
(4 ty p .d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) B02
See Note 3
Granular Backfill (#57 Stone)
Varies geotextile, class 2, type B
Separation-stabilization
Varies, see table
Aggregate surface course, 6-inch depth
See Note 4.
Excavation limit
Roadway width, 12'
3'
CL
class 2
Riprap, method A, grade
Profile
Centerline/
STA. 122+28 to STA. 122+43
ROUND KNOB ROAD
GABION WALL (H=10') SECTION
DETAIL A - Ditch Reconditioning
See D sheets for limits
1V:4 H
1V:3H & Varies traveled way
Edge of
Existing ground
1. Adjust the construction limits to fit field conditions as approved or directed by the CO.
2. Apply 4-inch aggregate-topsoil and turf establishment to all disturbed areas except traveled way, ditch, or rock face.
3. Furnish granular backfill (#57 stone) conforming to Subsection 703.03.
4. The excavation slope is assumed at 1V:1H for the design and excavation quantities. See
Section 208 for excavation requirements.
NOTES:
Limits of disturbance
NOT TO SCALE
See Detail E605-A
Underdrain system
122+28 to 122+43 VARIES (See D02)
STATION
CROSS
SLOPE
Grade to drain H e ig h t =
Scarify existing aggregate surface turf establishment
Aggregate-Topsoil with see Detail A
Ditch Reconditioning see Detail E253-A
Aluminized Coated (typ.), Gabions, Galvinized or
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
ROUND KNOB ROAD GABION WALL (H=10') SECTION
6"
:1
A p r il
S h e e t
B
R o u n d
K n o b
G a b
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\T N
E R
F O
F S
-1 (4
C
A D
D \B
-B
T N
E
R F
O
F S
(4 ty p .d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) B03
See Note 3
Granular Backfill (#57 Stone) geotextile, class 2, type B
Separation-stabilization
Varies, see D04
Aggregate surface course, 6-inch depth
See Note 4.
Excavation limit
Roadway Width 12'
DETAIL A - Ditch Reconditioning
See D sheets for limits
CL
grade
Profile
Centerline/ class 2
Riprap, method A, ROUND KNOB ROAD
GABION WALL (H=6') SECTION
STA. 123+13 to STA. 123+34
1V:4 H
1V:3H & Varies traveled way
Edge of
Existing ground
1. Adjust the construction limits to fit field conditions as approved or directed by the CO.
2. Apply 4-inch aggregate-topsoil and turf establishment to all disturbed areas except traveled way, ditch, or rock face.
3. Furnish granular backfill (#57 stone) conforming to Subsection 703.03.
4. The excavation slope is assumed at 1V:1H for the design and excavation quantities. See
Section 208 for excavation requirements.
NOTES:
NOT TO SCALE
See Detail E605-A
Underdrain system
Grade to drain
H e ig h t =
Scarify existing aggregate surface see Detail E253-A
Gabions, Galvinized or Aluminized Coated (typ.), see Detail A
Ditch Reconditioning turf establishment
Aggregate-Topsoil with
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTION
ROUND KNOB ROAD GABION WALL (H=6') SECTION
CHEROKEE NATIONAL FOREST
6'
Limits of disturbance
3'
6"
:1
A p r il
S h e e t
B
R o u n d
K n o b
G a b
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\T N
E R
F O
F S
-1 (4
C
A D
D \B
-B
T N
E
R F
O
F S
(4 ty p .d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) B04
1V:4H 1V:3
H & Va rie s traveled way
Edge of
Existing ground
DETAIL A - Ditch Reconditioning
1. Adjust the construction limits to fit field conditions as approved or directed by the CO.
2. Apply turf establishment to all disturbed areas except paved surfaces, traveled way, or rock faces.
NOTES:
Va rie s
(m in.
V:
2H)
CL
4%
Aggregate surface course, 6-inch depth
Roadway width, 13' grade
Profile
Centerline/
Ditch Reconditioning, see Detail A
Limits of construction
GREENE MOUNTAIN ROAD
ROADWAY REHABILITATION SECTION
STA. 500+10 to STA. 500+42
STA. 502+70 to STA. 503+45
STA. 504+38 to STA. 504+70
Limits of disturbance
NOT TO SCALE
Scarify existing aggregate surface
See Note 2.
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTION
GREENE MOUNTAIN ROAD REHABILITATION
CHEROKEE NATIONAL FOREST
6"
:1
A p r il
S h e e t
B
G r e e n e M o u n ta in R e h a b il it a ti o
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\T N
E R
F O
F S
-1 (4
C
A D
D \B
-B
T N
E
R F
O
F S
(4 ty p .d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) B05
Va rie s
(1 V:
2H or fl at te r)
CL
See Note 3
(#57 Stone)
Granular Backfill
See Detail E605-A
Underdrain system type B geotextile, class 2, Separation-stabilization
4%
Aggregate surface course, 6-inch depth
See Note 4.
Excavation limit
Roadway width, 13'
3' grade
Profile
Centerline/ class 2
Riprap, method A, see Detail E253-A
Gabions, Galvinized or Aluminized Coated (typ.), GREENE MOUNTAIN ROAD
GABION WALL (H=VARIES) SECTION
STA. 500+42 to STA. 502+70
1. Adjust the construction limits to fit field conditions as approved or directed by the CO.
2. Apply 4-inch aggregate-topsoil and turf establishment to all disturbed areas except traveled way, ditch, or rock face.
3. Furnish granular backfill (#57 stone) conforming to Subsection 703.03.
4. The excavation slope is assumed at 1V:1H for the design and excavation quantities. See
Section 208 for excavation requirements.
NOTES:
500+42 to 500+51
500+51 to 500+75
6'
9'
WALL
HEIGHT
STATION
500+75 to 501+11 12'
501+11 to 501+74 9'
501+74 to 502+37 12'
502+37 to 502+49 9'
502+49 to 502+70 6'
1V:4H 1V:3
H & Va rie s traveled way
Edge of
Existing ground
DETAIL A - Ditch Reconditioning
Ditch Reconditioning, see Detail A
NOT TO SCALE
Grade to drain
H e ig h t
V a r ie s
S e e T a b le A
Scarify existing aggregate surface turf establishment
Table A - Wall Heights and Ranges
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTION
GREENE MOUNTAIN ROAD GABION WALL (H=VARIES) SECTION
CHEROKEE NATIONAL FOREST
Varies
Limits of disturbance
6"
:5
A p r il
S h e e t
B
G r e e n e M o u n ta in
V a r ie s G a b
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\T N
E R
F O
F S
-1 (4
C
A D
D \B
-B
T N
E
R F
O
F S
(4 ty p .d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) B06
Va rie s
(1 V:
2H or fl at te r)
CL
See Note 3
Granular Backfill (#57 Stone) geotextile, class 2, type B
Separation-stabilization
4%
Aggregate surface course, 6-inch depth
See Note 4.
Excavation limit
Roadway width, 13'
Underdrain system
See Detail E605-A
3' grade
Profile
Centerline/ see Detail E253-A
Gabions, Galvinized or Aluminized Coated (typ.), class 2
Riprap, method A, GREENE MOUNTAIN ROAD
GABION WALL (H=9') SECTION
STA. 503+45 to STA. 504+38
1. Adjust the construction limits to fit field conditions as approved or directed by the CO.
2. Apply 4-inch aggregate-topsoil and turf establishment to all disturbed areas except traveled way, ditch, or rock face.
3. Furnish granular backfill (#57 stone) conforming to Subsection 703.03.
4. The excavation slope is assumed at 1V:1H for the design and excavation quantities. See
Section 208 for excavation requirements.
NOTES:
1V:4H 1V:3
H & Va rie s traveled way
Edge of
Existing ground
DETAIL A - Ditch Reconditioning
Ditch Reconditioning, see Detail A
NOT TO SCALE
Grade to drain
H e ig h t
Scarify existing aggregate surface turf establishment
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
GREENE MOUNTAIN ROAD GABION WALL (H=9') SECTION
Limits of disturbance
6"
:4
A p r il
S h e e t
B
G r e e n e M o u n ta in
G a b
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\T N
E R
F O
F S
-1 (4
C
A D
D \B
-B
T N
E
R F
O
F S
(4 ty p .d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) B07
U.S. DEPARTMENT OF TRANSPORTATION
TABULATION OF QUANTITIES
SCHEDULE A
:5
M a y
C
Q u a n ti ty
T a b u la ti o
U s e r s \m ic h a e l.
to o m e r \D e s k to p
\C u r r e n t W o r k
\T N
E R
F O
F S
\C
A D
D \C
C
T
N
E R
F O
F
S q n t.
d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) C01
Sheet 1 of 3
U.S. DEPARTMENT OF TRANSPORTATION
SUMMARIES AND SCHEDULES
SCHEDULE A
CHEROKEE NATIONAL FOREST
:2
M a r c h
B a s e .B
.U S
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) C02
Sheet 2 of 3
U.S. DEPARTMENT OF TRANSPORTATION
SUMMARIES AND SCHEDULES
SCHEDULE A
CHEROKEE NATIONAL FOREST
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) C03
Sheet 3 of 3
U.S. DEPARTMENT OF TRANSPORTATION
SUMMARIES AND SCHEDULES
SCHEDULE A
CHEROKEE NATIONAL FOREST
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) C04
NAIL
8217SL
N
SCALE IN FEET
0 5 10
S T
A
M A
T C
H L I
E
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
CONSTRUCTION PLAN
ROUND KNOB ROAD
STA. 121+60 - STA. 122+80
WALL SECTION
BEGIN GABION
See Typical Section and Detail E253-A
Sta. 122+28 to Sta. 122+58
Top of wall to be covered
Proposed Gabion Wall (H=9')
Proposed Toe of Gabion Walls
Round Knob Road Centerline
Proposed Edge of Roadway
L = 114.59'
T = 60.06'
R = 155.00'
Δ = 42°21'30" (LT)
PI 121+32.32
See Typical Section and Detail E253-A Sta. 122+13 to Sta. 122+28
Top of wall to be covered Proposed Gabion Wall (H=9')
See Typical Section Sta. 122+13 to Sta. 122+58 Riprap, method A, class 2, 7 tons
S84°44'24"W
.8
PT
:1
M a y
S h e e t
D
R
K
P la
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\D -D
T
N E
R F
O F
S -1
(4
R K
-1 -1 p ln
-p ro
.d g n
E 2948134.52 N 648353.59
STA. 121+83
' (ty p
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) D01
Transition Lt.
Rt. Rt.
Lt.
122+58
2%
-2%
121+83
2%
-2%
121+60 121+70 121+80 121+90 122+00 122+10 122+20 122+30 122+40 122+50 122+60 122+70 122+80
2,955 2,955
2,960 2,960
2,965 2,965
2,970 2,970
2,975 2,975
2,980 2,980
-7.266%
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
CONSTRUCTION PROFILE
ROUND KNOB ROAD
STA. 121+60 - STA. 122+80
SECTION WORK
BEGIN GABION WALL
Proposed profile grade
Toe elev. = 2958.25'
Sta. 122+58
End Proposed Gabion Wall of proposed gabion wall
Existing ground at toe
Elev. 2970.25'
Sta. 122+28
Elev. 2967.25'
Sta. 122+43 Elev. 2967.25'
Sta. 122+58
See Detail E253-A
Gabion Baskets (typ.)
Top of proposed gabion wall
Elev. 2968.25'
Sta. 122+28
Toe Elev. 2961.25'
Sta. 122+13
Begin Proposed Gabion Wall
Elev. 2961.25'
Sta. 122+28
Elev. 2958.25'
Sta. 122+28
Elev. 2968.25'
Sta. 122+43
Elev. 2970.25'
Sta. 122+13 at centerline
Existing ground
:4
A p r il
S h e e t
D
R K
P r o f il
U s e r s \m ic h a e l.
to o m e r \D e s k to p
\C u r r e n t W o r k
\T N
E R
F O
F S
\C
A D
D \D
D
T
N
E R
F O
F
S
R
K p ln p r o
.d g n
STA. 121+83
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) D02
TBAR
8216SL
TBAR
BH
N
SCALE IN FEET
0 5 10
S T
A
M A
T C
H L I
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
CONSTRUCTION PLAN
ROUND KNOB ROAD
STA. 122+80 - STA. 124+00
WALL SECTION
END GABION
Proposed Toe of Gabion Wall
See Typical Section and Detail E253-A
Sta. 123+13 to Sta. 123+34
Top of wall to be covered
Proposed Gabion Wall (H=6')
Round Knob Road Centerline
Proposed Edge of Roadway
L = 214.19'
T = 113.09'
R = 270.00'
Δ = 45°27'08" (RT)
PI 124+03.49
See Typical Section Sta. 123+13 to Sta. 123+34 Riprap, method A, class 2, 4 tons
.4
' (ty p
:3
M a y
S h e e t
D
R
K
P
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\D -D
T
N E
R F
O F
S -1
(4
R K
-1 -1 p ln
-p ro
.d g n
E 2947954.27 N 648347.05
STA. 123+64
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) D03
Lt.
Rt.
123+13
4%
123+64
4%
-4% -4%
Transition Lt.
Rt.
122+80 122+90 123+00 123+10 123+20 123+30 123+40 123+50 123+60 123+70 123+80 123+90 124+00
2,950 2,950
2,955 2,955
2,960 2,960
2,965 2,965
2,970 2,970
-5.083%
.8
78' VC
K = 3545
SSD = 658.19'
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
CONSTRUCTION PROFILE
ROUND KNOB ROAD
STA. 122+80 - STA. 124+00
SECTION WORK
END GABION WALL
Toe elev. = 2956'
Sta. 123+34
End Proposed Gabion Wall of proposed gabion wall
Existing ground at toe
See Detail E253-A
Gabion Baskets (typ.)
at centerline
Existing ground
Proposed profile grade
Elev. 2962'
Sta. 122+13
Elev. 2962'
Sta. 123+34
Top of proposed gabion wall
Toe Elev. 2956'
Sta. 123+13
Begin Proposed Gabion Wall
:1 a y
S h e e t
D
R K
P r o f
U s e r s \m ic h a e l.
to o m e r \D e s k to p
\C u r r e n t W o r k
\T N
E R
F O
F S
\C
A D
D \D
D
T
N
E R
F O
F
S
R
K p ln p r o
.d g n
STA. 123+64
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) D04
I N
V
.1
C M
P x .1
TBAR
S L
I N
V
.2
N
SCALE IN FEET
0 5 10
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
CONSTRUCTION PLAN
ROUND KNOB ROAD
STA. 208+85 - STA. 210+30
WALL SECTION
BEGIN GABION
WALL SECTION
END GABION
Proposed Edge of Roadway
Round Knob Road Centerline
See Typical Section and Detail E253-A
Sta. 209+15 to Sta. 209+42
Top of wall to be covered
Proposed Gabion Wall (H=9')
Proposed Toe of Gabion Walls
Sta. 209+45
See Sheet K01
Install 24" x 31' CMP Pipe Culvert
Remove existing 15" x 29.15' CMP Pipe Culvert
L = 88.74'
T = 52.84'
R = 65.00'
Δ = 78°13'15" (RT)
PI 209+47.12
L = 85.78' T = 46.46' R = 90.00'
Δ = 54°36'26" (LT)
PI 210+71.40
drain into culvert inlet.
of existing ground. Grade to Excavate approx. 2.5 cuyd
See Typical Section and Detail E253-A Sta. 209+69 to Sta. 209+99
Top of wall to be covered Proposed Gabion Wall (H=9')
See Typical Section and Detail E253-A Sta. 209+42 to Sta. 209+69
Top of wall to be covered Proposed Gabion Wall (H=9')
See Typical Section Sta. 209+15 to Sta. 209+99 Riprap, method A, class 2, 13 tons
N24°35'21"E
.9
8+
.2
PC
.0
12' (typ.)
.2
' (ty p
8'
:5
J u n e
S h e e t
D
R
K
P
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\D -D
T
N E
R F
O F
S -1
(4
R K
-2 p ln
-p ro
.d g n
E 2947758.09 N 654454.50
STA. 208+85
E 2947749.48 N 654582.17
STA. 210+30
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) D05
208+80 208+90 209+00 209+10 209+20 209+30 209+40 209+50 209+60 209+70 209+80 209+90 210+00 210+10 210+20 210+30
2,530 2,530
2,535 2,535
2,540 2,540
2,545 2,545
2,550 2,550
2,555 2,555
-7.619%
-11.084%
-5.828%
-9.823%
-9.241%
-15.242%
-12.646%
-11.581%
9' VC
K = 225
SSD = 274.58'
.1
17' VC
K = 607.14
SSD = 390.54'
.8
12' VC
K = 500.00
SSD = 466.85'
.4
14' VC
K = 388.89
SSD = 301.95'
.9
.4
7' VC
K = 389
HLSD = 5076.95'
.2
7' VC
K = 205.88
HLSD = 127.68'
.5
12' VC
K = 292.68
HLSD = 93.56'
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
CONSTRUCTION PROFILE
ROUND KNOB ROAD
STA. 208+85 - STA. 210+30
Elev. 2545'
Sta. 209+15
Elev. 2533'
Sta. 209+42
Elev. 2536'
Sta. 209+42
Elev. 2533'
Sta. 209+69
Elev. 2530'
Sta. 209+69
Elev. 2539'
Sta. 209+69
Elev. 2542'
Sta. 209+69
Elev. 2539'
Sta. 209+99
Elev. 2542'
Sta. 209+42
Elev. 2545'
Sta. 209+42
See Detail E253-A
Gabion Baskets (typ.)
SECTION WORK
BEGIN GABION WALL
SECTION WORK
END GABION WALL
Toe Elev. 2530'
Sta. 209+99
End Proposed Gabion Wall of proposed gabion wall
Existing ground at toe
Toe Elev. 2536'
Sta. 209+15
Begin Proposed Gabion Wall
Existing ground at centerline
Proposed profile grade
Sta. 209+45
See Sheet K01
Install 24" x 31' CMP Pipe Culvert
Sta. 209+45
See Sheet K01
CMP Pipe Culvert
Remove existing 15" x 29.15'
:5
M a y
S h e e t
D
R K
P r o f
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\D -D
T
N E
R F
O F
S -1
(4
R K
-2 p ln
-p ro
.d g n
STA. 208+85
STA. 210+30
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) D06
IN
V
.4
MARKER OBJECT
.6
S x .6
R C
M P
IN
V
.1
.4
RBAR
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
CONSTRUCTION PLAN
GREENE MOUNTAIN ROAD
STA. 500+00 - STA. 501+40
S T A
M A T C
H L
IN
E
SCALE IN FEET
0 5 10
WALL SECTION
BEGIN GABION
Proposed Edge of Roadway
See Typical Section and Detail E253-A
Sta. 501+11 to Sta. 501+74
Proposed Gabion Wall (H=9')
Greene Mountain Road Centerline
Proposed Toe of Gabion Wall
Sta. 500+47 to Sta. 501+54
Remove Existing Gabion Wall
Sta. 501+02
See Sheet K02
Install 30" x 29' CMP Pipe Culvert
CMP Arch Culvert
Remove existing 33.6" S x 24.6" R x 27.43
L = 91.07'
T = 50.88'
R = 82.00'
Δ = 63°38'05" (LT)
PI 500+96.47
See Typical Section and Detail E253-A Sta. 500+51 to Sta. 500+75 Proposed Gabion Wall (H=9')
See Typical Section and Detail E253-A Sta. 500+75 to Sta. 501+11
Proposed Gabion Wall (H=12')
See Typical Section and Detail E253-A Sta. 500+42 to Sta. 500+51 Proposed Gabion Wall (H=6')
See Typical Section Sta. 500+42 to Sta. 502+70 Riprap, method A, class 2, 35 tons drain into culvert inlet.
of existing ground. Grade to
Excavate approx. 1.5 cuyd
N65°41'19"E
.6
1+
.6
PT
.0
P O
B
(t y p .) 1
.5
.7
.7
10'
:0
M a y
S h e e t
E
G
M
P
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\E -E
T
N E
R F
O F
S -1
(4
G M p ln
-p ro
.d g n
E 2921675.54 N 629610.14
STA. 500+10
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) E01
500+00 500+10 500+20 500+30 500+40 500+50 500+60 500+70 500+80 500+90 501+00 501+10 501+20 501+30 501+40
2,460 2,460
2,465 2,465
2,470 2,470
2,475 2,475
2,480 2,480
2,485 2,485
-2.260%
+0.104% +0.812% +0.026%
.7
17' VC
K = 708.33
HLSD = 357.13'
.7
12' VC
K = 1714.29
.9
17' VC
K = 772.73
HLSD = 502.75'
5' VC
K = 625.00
SSD = 1376.03'
.9
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
CONSTRUCTION PROFILE
GREENE MOUNTAIN ROAD
STA. 500+00 - STA. 501+40
SECTION WORK
BEGIN GABION WALL
Proposed profile grade
Existing ground at centerline of proposed gabion wall
Existing ground at toe
Top of proposed grabion wall
Elev. 2473'
Sta. 500+75
Elev. 2473'
Sta. 501+11
Elev. 2464'
Sta. 501+11
Elev. 2461'
Sta. 501+11
Elev. 2461'
Sta. 500+75
Elev. 2464'
Sta. 500+75
Elev. 2464'
Sta. 500+51
Elev. 2467'
Sta. 500+51
Elev. 2473'
Sta. 500+42
Elev. 2473'
Sta. 500+51
Toe Elev. 2467'
Sta. 500+42
Begin Proposed Gabion Wall
See Detail E253-A
Gabion Baskets (typ.)
Sta. 501+02
See Sheet K02
CMP Pipe Culvert
Install 30" x 29'
Sta. 501+02
See Sheet K02
CPM Arch Culvert
Remove existing 33.6" S x 24.6" R x 27.43'
:5
M a y
S h e e t
E
G M
P r o f
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\E -E
T
N E
R F
O F
S -1
(4
G M p ln
-p ro
.d g n
STA. 500+10
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) E02
I N
V
.5
I N
V
.5
Ø C
M P
.0
CARSONI
TE
RBAR
RBAR
MARKER
OBJECT
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
CONSTRUCTION PLAN
GREENE MOUNTAIN ROAD
STA. 501+40 - STA. 502+60
S T A
M A T C
H L
IN
E
S T A
M A T C
H L
IN
E
SCALE IN FEET
0 5 10
See Typical Section and Detail E253-A
Sta. 502+49 to Sta. 502+70
Proposed Gabion Wall (H=6')
See Typical Section and Detail E253-A
Sta. 502+37 to Sta. 502+49
Proposed Gabion Wall (H=9')
See Typical Section and Detail E253-A
Sta. 501+74 to Sta. 502+37
Proposed Gabion Wall (H=12')
Proposed Toe of Wall
Sta. 501+60 to Sta. 502+70
Remove Existing Gabion Wall
Proposed Edge of Roadway
Greene Mountain Road Centerline
Sta. 500+47 to Sta. 501+54
Remove Existing Gabion Wall
Sta. 502+17.48
See Sheet K02
Install 24" x 38' CMP Pipe Culvert
Remove existing 24" x 39.09' CMP Pipe Culvert
Sta. 502+17
See Detail ET 601-4
Install Concrete Headwall for 24-Inch Pipe Culvert
L = 103.23'
T = 57.37'
R = 95.00'
Δ = 62°15'25" (LT)
PI 502+08.54
See Typical Section and Detail E253-A Sta. 501+11 to Sta. 501+74 Proposed Gabion Wall (H=9')
See Typical Section Sta. 500+42 to Sta. 502+70
Riprap, method A, class 2, 35 tons
N02°03'14"E
.1
.3
(t y p
.7
.7
.5
:1
M a y
S h e e t
E
G
M
P
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\E -E
T
N E
R F
O F
S -1
(4
G M p ln
-p ro
.d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) E03
501+40 501+50 501+60 501+70 501+80 501+90 502+00 502+10 502+20 502+30 502+40 502+50 502+60
2,465 2,465
2,470 2,470
2,475 2,475
2,480 2,480
2,485 2,485
-2.158%
.1
116' VC
K = 4461.54
HLSD = 420.79'
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
CONSTRUCTION PROFILE
GREENE MOUNTAIN ROAD
STA. 501+40 - STA. 502+60
Elev. 2473'
Sta. 501+74
Elev. 2473'
Sta. 502+37
Elev. 2473'
Sta. 502+49
Elev. 2467'
Sta. 502+49
Elev. 2464'
Sta. 502+49
Elev. 2464'
Sta. 502+37
Elev. 2461'
Sta. 502+37 Elev. 2461'
Sta. 501+74
Elev. 2464'
Sta. 501+74 of proposed gabion wall
Existing ground at toe
Top of proposed gabion wall
Proposed profile grade
Existing ground at centerline
See Detail E253-A
Gabion Baskets (typ.)
Sta. 502+17.48
See Sheet K02
Install 24" x 38' CMP Pipe Culvert
Sta. 502+17.48
See Sheet K02
Remove existing 24" x 39.09' CMP Pipe Culvert
:1
M a y
S h e e t
E
G M
P r o f
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\E -E
T
N E
R F
O F
S -1
(4
G M p ln
-p ro
.d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) E04
RBAR
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
CONSTRUCTION PLAN
GREENE MOUNTAIN ROAD
STA. 502+60 - STA. 504+00
S T
A
M A
T C
H L I N
E
S T
A
M A
T C
H L I N
E
SCALE IN FEET
0 5 10
See Typical Section and Detail E253-A
Sta. 502+49 to Sta. 502+70
Proposed Gabion Wall (H=6')
Greene Mountain Road Centerline
Proposed Edge of Roadway
Proposed Toe of Gabion Wall
Proposed Toe of Gabion Wall
Sta. 501+60 to Sta. 502+70
Remove Existing Gabion Wall
L = 101.32'
T = 50.83'
R = 500.00'
Δ = 11°36'36" (LT)
PI 503+91.94
See Typical Section and Detail E253-A Sta. 503+45 to Sta. 504+38 Proposed Gabion Wall (H=9')
See Typical Section Sta. 500+42 to Sta. 502+70 Riprap, method A, class 2, 35 tons
See Typical Section Sta. 503+45 to Sta. 504+38
Riprap, method A, class 2, 15 tons
N60°12'11"W
.1 ty p
.5
.5
:1
M a y
S h e e t
E
G
M
P
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\E -E
T
N E
R F
O F
S -1
(4
G M p ln
-p ro
.d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) E05
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
CONSTRUCTION PROFILE
GREENE MOUNTAIN ROAD
STA. 502+60 - STA. 504+00
See Detail E253-A
Gabion Baskets (typ.)
See Detail E253-A
Gabion Baskets (typ.)
Toe Elev. 2467'
Sta. 502+70
End Proposed Gabion Wall
Toe Elev. 2464'
Sta. 503+45
Begin Proposed Gabion Wall
Elev. 2473'
Sta. 502+70
Elev. 2473'
Sta. 503+45
Proposed profile grade
Existing ground at centerline of proposed gabion wall
Existing ground at toe of proposed gabion wall
Existing ground at toe
Top of proposed gabion wall
Top of proposed gabion wall
502+60 502+70 502+80 502+90 503+00 503+10 503+20 503+30 503+40 503+50 503+60 503+70 503+80 503+90 504+00
2,460 2,460
2,465 2,465
2,470 2,470
2,475 2,475
2,480 2,480
2,485 2,485
+0.423% +0.423%
:0
M a y
S h e e t
E
G M
P r o f
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\E -E
T
N E
R F
O F
S -1
(4
G M p ln
-p ro
.d g n
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) E06
N
GM-3
1"=10'
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
CONSTRUCTION PLAN
GREENE MOUNTAIN ROAD
STA. 504+00 - STA. 505+30
S T
A
M A
T C
H L I N
E
SCALE IN FEET
0 5 10
See Typical Section and Detail E253-A
Sta. 503+45 to Sta. 504+38
Proposed Gabion Wall (H=9')
Proposed Edge of Roadway
Proposed Toe of Gabion Wall
Greene Mountain Road Centerline
WALL SECTION
END GABION
L = 59.61'
T = 29.90'
R = 300.00'
Δ = 11°23'02" (RT)
PI 504+92.87
See Typical Section Sta. 503+45 to Sta. 504+38 Riprap, method A, class 2, 15 tons
N71°48'47"W
N60°25'45"W
.4
.9
C 5
.5
.2
P
O
4 5
' (ty p
:1
M a y
S h e e t
E
G
M
P
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\E -E
T
N E
R F
O F
S -1
(4
G M p ln
-p ro
.d g n
E 2921515.13 N 629889.82
STA. 504+70
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) E07
504+00 504+10 504+20 504+30 504+40 504+50 504+60 504+70 504+80 504+90 505+00 505+10 505+20 505+30
2,465 2,465
2,470 2,470
2,475 2,475
2,480 2,480
2,485 2,485
+1.899%
.9
83' VC
K = 5533.33
U.S. DEPARTMENT OF TRANSPORTATION CHEROKEE NATIONAL FOREST
CONSTRUCTION PROFILE
GREENE MOUNTAIN ROAD
STA. 504+00 - STA. 505+30
SECTION WORK
END GABION WALL
Elev. 2473'
Sta. 504+38
Toe Elev. 2464'
Sta. 504+38
End Proposed Gabion Wall of proposed gabion wall
Existing ground at toe
See Detail E253-A
Gabion Baskets (typ.)
Top of proposed gabion wall
Existing ground at centerline
Proposed profile grade
:0
M a y
S h e e t
E
G M
P r o f
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\E -E
T
N E
R F
O F
S -1
(4
G M p ln
-p ro
.d g n
STA. 504+70
STATE PROJECT
NUMBER
TN TN ERFO FS 2019-1(4) E08
Skew = 9.9° Lt
Length = 31.00'
24" CMP Pipe Culvert
STA. 209+45.00
-30 -20 -10 0 10 20 30
2,500 2,500
2,510 2,510
2,520 2,520
2,530 2,530
2,540 2,540
2,550 2,550
2,560 2,560
2,570 2,570
Offset 16.00'
El. 2539.11'
Sta. 209+50.19
Proposed Invert Outlet
Offset 14.08'
El. 2544.31'
Sta. 209+42.64
Proposed Invert Inlet
16.8%
Remove existing 15" x 29.15' CMP Culvert installation through gabion walls
See Detail E253-A for culvert
See Details E602-01 and ET602-3
Install 24" x 31' CMP Pipe Culvert drain into culvert inlet.
of existing ground. Grade to
Excavate approx. 2.5 cuyd
U.S. DEPARTMENT OF TRANSPORTATION
ROUND KNOB ROAD
CHEROKEE NATIONAL FOREST
DRAINAGE PROFILES
STA. 209+45
1:2.05
1:1.92
-7.7% +7.7%1:35.55
:1
M a y
S h e e t
K
C u lv e r t
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p \C u rr e n t
W o rk
\T N
E R
F O
F S
-1
(4
C A
D D
\K T
N E
R F
O F
S -1
(4
R K
D
X S
.d g
TN ERFO FS 2019-1(4) K01
STATE PROJECT
TN
-30 -20 -10 0 10 20
2,440 2,440
2,450 2,450
2,460 2,460
2,470 2,470
2,480 2,480
Length = 29.00'
30" CMP Pipe Culvert
STA. 501+02.00
Offset 12.50'
El. 2471.98'
Sta. 501+02.00
Proposed Invert Inlet
Install 30" x 29' CMP Pipe Culvert
CMP Arch Culvert
Remove existing 33.6" S x 24.6" R x 27.43' installation through gabion walls
See Detail E253-A for culvert
Offset 16.29'
El. 2468.52'
Sta. 501+02.00
Proposed Invert Outlet
12.00% drain into culvert inlet.
of existing ground. Grade to
Excavate approx. 1.5 cuyd
-4.0%
1:2 .71
1:
1:4.6 +4.0%
-30 -20 -10 0 10 20 30
2,440 2,440
2,450 2,450
2,460 2,460
2,470 2,470
2,480 2,480
Length = 38.00'
24" CMP Pipe Culvert
STA. 502+17.48
Offset 21.05'
El. 2470.81'
Sta. 502+17.48
Proposed Invert Inlet installation through gabion walls
See Detail E253-A for culvert
Remove existing 24" x 39.09' CMP Culvert
Install 24" x 38' CMP Pipe Culvert
10.00%
See Detail ET 601-4
Concrete Headwall for 24-Inch Pipe Culvert
Offset 16.76'
El. 2467.02'
Sta. 502+17.48
Proposed Invert Outlet
U.S. DEPARTMENT OF TRANSPORTATION
GREENE MOUNTAIN ROAD
CHEROKEE NATIONAL FOREST
DRAINAGE PROFILES
STA. 501+02 & STA. 502+17.48
-3.9%1:26.92
1:
1:0 +3.9%
:1
M a y
S h e e t
K
C u lv e r ts
U s e rs
\m ic h a e l.
to o m e r\
D e s k to p
\C u rr e n t W o rk
\T N
E R
F O
F S
-1 (4
C
A D
D \K
T
N
E R
F O
F
S
-1 (4
G
M
D X
S .d g
TN ERFO FS 2019-1(4) K02
STATE PROJECT
TN
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.
measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous waste materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-wate…
This is the start of the file's text. The full file is on GovTribe.