These construction plans, prepared by KSA Engineering (a Pape-Dawson company) for the Shreveport Airport Authority, detail the West Cargo Apron Pavement Rehabilitation Phase II and Airfield Markings project scheduled for July 2025. The project involves comprehensive pavement rehabilitation and marking work at the Shreveport Regional Airport in Louisiana, specifically focusing on the West Cargo Apron and various runway and taxiway areas. The plans include detailed markings for Runway 6-24, multiple taxiways (including Taxiways A, B, C, D, and others), and comprehensive joint layout and surface preparation specifications. The project scope encompasses rerouting and cleaning existing concrete joints, surface preparation, and applying various reflective markings in white, yellow, red, and black across approximately 160,300 square feet of surface area.
The project documents indicate a comprehensive approach to airport infrastructure improvement, with meticulous attention to marking details, safety considerations, and operational continuity. The specifications include precise requirements for barricades, equipment access, safety protocols, and coordination with airport operations. The estimated quantities suggest a significant rehabilitation effort, with specific provisions for maintaining airport functionality during construction, including requirements for foreign object debris (FOD) prevention, coordinating with airport staff, and minimizing disruption to existing airport operations. The plans also outline specific phasing strategies, with particular emphasis on maintaining access to critical airport areas and ensuring safe aircraft movement during the rehabilitation process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
XX
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
24-6
24-6
24-6
6-24
6-24
32-
14-32
32-
32-
32-
24-6
24-6
6-24
32-
14-32
32-
32-
24-6
6-24
\\ksa.net\gateway\Projects\104049\008 CAD\30 Sheets\02 Civil\104049-C-GI-COVER-0001.dwg : LAYOUT1
1111 Hawn Ave.
Shreveport, LA 71107
T. 318-221-7501 www.ksaeng.com a Pape-Dawson company
RECOMMENDED BY:
KSA
LOUISIANA STATE REGISTRATION NO. EF-476
JONATHAN N. FARMER, P.E. DATE
PROJECT MANAGER
PROJECT
LOCATION
VICINITY MAP
SHREVEPORT REGIONAL AIRPORT
SHREVEPORT, LOUISIANA
CONSTRUCTION PLANS FOR
WEST CARGO APRON PAVEMENT
REHABILITATION PHASE II
& AIRFIELD MARKINGS
JULY 2025
DESCRIPTION OF WORK:
CONCRETE PAVEMENT JOINT SEAL, PAVEMENT MARKINGS
SCHEDULE OF REVISIONS
NO. REVISION DATE APPROVED
LOCATION MAP
G
EN
ER
AL
N O
TE
S, SU
M
M
AR
Y O
F Q
U
AN
TI
TI
ES
, A
N D
S H
EE
T
IN
D
EX
KS
A
JO
B N
O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -G
I-N O
TE
S-
.D W
G
G
EN
ER
AL
N O
TE
S
| 7 /1
8/
8:
A M
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
GENERAL NOTES
1. NO VEHICLE OR EQUIPMENT SHALL MOVE UPON APRONS, TAXIWAYS AND/OR RUNWAYS, UNLESS THE
VEHICLE:
A. IS IDENTIFIED BY A 3'X3' ORANGE AND WHITE CHECKERED FLAG OR FLASHING AMBER LIGHT, AND
B. IS UNDER ESCORT BY A VEHICLE MONITORING GROUND CONTROL 121.175.
2. IT IS THE INTENT OF THESE PLANS TO MINIMIZE INTERFERENCE TO AIRCRAFT MOVEMENT; THEREFORE, IN
UNCLOSED PORTIONS, AIRCRAFT MOVEMENT SHALL HAVE THE RIGHT-OF-WAY.
3. AIRPORT SECURITY IS OF UTMOST IMPORTANCE. SHREVEPORT AIRPORT POLICE DEPARTMENT OR SHREVEPORT AIRPORT AUTHORITY SHALL SUPPLY A KEY FOR ACCESS GATES, AND SHALL KEEP THE GATES LOCKED OR GUARDED AT ALL TIMES, EXCEPT FOR THE BRIEF PERIOD REQUIRED FOR PASSAGE OF
AUTHORIZED VEHICLES OR EQUIPMENT.
4. FLAGMEN WILL BE REQUIRED TO DIRECT THE CONTRACTOR'S TRUCKS AND EQUIPMENT WHICH ARE
OPERATING IN THE AREA OF MOVING AIRCRAFT.
5. EACH CONSTRUCTION AREA SHALL BE SHAPED TO ALLOW DRAINAGE OF SURFACE WATER DURING EACH WORK OPERATION. IF NECESSARY, SURFACE WATER SHALL BE PUMPED IMMEDIATELY FROM EACH
CONSTRUCTION AREA AFTER EACH RAIN.
6. CONSTRUCTION PERSONNEL AND EQUIPMENT WILL NOT BE ALLOWED WITHIN THE AIRPORT OPERATIONS
AREA (AOA) UNTIL THE AREA HAS BEEN CLOSED TO AIRCRAFT AND NOTAMS ISSUED.
7. ALL WORK WILL BE ACCOMPLISHED DURING NORMAL DAYTIME WORKING HOURS ONLY OR AS APPROVED BY
THE ENGINEER.
8. REFERENCE AC 150/5370-2G, "OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION", FOR
ADDITIONAL SAFETY INFORMATION.
9. STOCKPILE LOCATION MAY BE ADJUSTED IN THE FIELD AND COORDINATED WITH THE OWNER AND THE ENGINEER. STOCKPILE SHALL NOT CREATE ANY PONDING OF WATER OR ALTER DRAINAGE PATTERNS OF THE AIRPORT PROPERTY. CONTRACTOR SHALL KEEP STAGING AREAS FREE OF FOOD AND WILDLIFE
ATTRACTANTS.
10. DURING PERFORMANCE OF THIS CONTRACT, THE AIRPORT RUNWAYS, TAXIWAYS, AND AIRCRAFT PARKING APRONS SHALL REMAIN IN USE BY AIRCRAFT TO THE MAXIMUM EXTENT POSSIBLE. AIRCRAFT USE OF AREAS NEAR THE CONTRACTOR'S WORK WILL BE CONTROLLED TO MINIMIZE DISTURBANCE TO THE CONTRACTOR'S OPERATION. THE CONTRACTOR SHALL NOT ALLOW HIS/HER EMPLOYEES, SUBCONTRACTOR'S SUPPLIERS, OR ANY PERSON OVER WHO HE/SHE HAS CONTROL TO ENTER OR REMAIN IN ANY PART OF THE AIRPORT
WHICH WOULD BE HAZARDOUS TO PERSONS OR TO AIRCRAFT OPERATIONS. WHENEVER AIRCRAFT
OPERATIONS REQUIRE, THE ENGINEER MAY ORDER THE CONTRACTOR TO SUSPEND OPERATIONS, MOVE PLANT, PERSONNEL, EQUIPMENT, AND MATERIALS TO A SAFE LOCATION AND STAND BY UNTIL AIRCRAFT USE
IS COMPLETED.
11. CONSTRUCTION ACTIVITY WITHIN AN OBSTACLE FREE ZONE (OFZ) WILL REQUIRE CLOSING PART OR ALL OF THE AFFECTED RUNWAY. PERSONNEL, MATERIAL, AND/OR EQUIPMENT MUST NOT PENETRATE THE OFZ.
THE OFZ EXTENDS 200 FEET BEYOND EACH END OF THE RUNWAY WITH A WIDTH OF 400 FEET CENTERED ON
THE RUNWAY CENTERLINE.
12. CONSTRUCTION ACTIVITY WITHIN A RUNWAY SAFETY AREA WILL REQUIRE CLOSING PART OR ALL OF THE AFFECTED RUNWAY. EXCAVATION OR TRENCHING WITHIN A TAXIWAY SAFETY AREA WILL REQUIRE CLOSURE OF THE IMPACTED TAXIWAY. OTHER CONSTRUCTION ACTIVITY WITHIN TAXIWAY SAFETY AREA IS
PERMISSIBLE WHEN THE TAXIWAY IS OPEN TO AIRCRAFT TRAFFIC IF:
A. ADEQUATE WINGTIP/EMPENNAGE CLEARANCE EXIST BETWEEN THE AIRCRAFT AND
EQUIPMENT/MATERIAL,
B. NOTICES TO AIRMEN ARE IN EFFECT CONCERNING THE ACTIVITY, USUALLY "PERSONNEL AND EQUIPMENT ADJACENT TO TAXIWAY _____." (CODED AS "PAEW"). SAFETY AREA DIMENSIONS CAN BE
FOUND IN AC 150/5300-13B.
13. CONTRACTOR VEHICLES AND EQUIPMENT SHALL BE IDENTIFIED BY 3'x3' ORANGE AND WHITE CHECKERED FLAGS OR AMBER FLASHING LIGHTS. EMPLOYEE PARKING SHALL BE AS DESIGNATED BY THE ENGINEER.
ACCESS TO THE JOB SITE SHALL BE AS SHOWN ON THE PLANS OR AS DESIGNATED BY THE ENGINEER.
14. ALL MATERIALS SHALL BE DISPOSED OF OFF SITE BY THE CONTRACTOR AT NO DIRECT PAY. ANY WASTE AND/OR SPOIL MATERIAL PLACED ONTO THE AIRPORT PROPERTY SHALL BE GRADED SMOOTH AND SHALL NOT CAUSE ANY PONDING ON THE AIRPORT PROPERTY NOR CAUSE ANY PROPERTY DAMAGE TO THE AIRPORT OR THE ADJACENT PROPERTY OWNERS. THE CONTRACTOR SHALL NOT PLACE ANY WASTE AND/OR
SPOIL MATERIAL IN AN AREA OR AT A HEIGHT WHICH PENETRATES THE PRIMARY SURFACE OR
TRANSITIONAL SURFACE FOR THE RUNWAY.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO EXISTING PAVEMENTS NOT DESIGNATED FOR RECONSTRUCTION OR REPLACEMENT, UNDERGROUND CABLES, PIPELINES, ETC.
ENCOUNTERED DURING CONSTRUCTION. NO DIGGING SHALL BE PERFORMED WITHOUT CONTACTING THE AIRPORT MANAGER. ALL REPAIRS MUST BE MADE IN COMPLIANCE WITH THE AIRPORT MANAGEMENT, THE
ENGINEER, AND FAA REQUIREMENTS.
16. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND ACQUIRING AN ACCEPTABLE WATER SOURCE AS
REQUIRED FOR CONSTRUCTION.
17. THE CONTRACTOR SHALL ANTICIPATE ALL UNDERGROUND OBSTRUCTIONS SUCH AS, BUT NOT LIMITED TO, WATER MAINS, GAS LINES, STORM AND SANITARY SEWERS, TELEPHONE OR ELECTRIC LIGHT OR POWER DUCTS, CONCRETE, AND DEBRIS. ANY SUCH LINES OR OBSTRUCTIONS INDICATED ON THE DRAWINGS SHOW ONLY THE APPROXIMATE LOCATIONS AND SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR. THE OWNER AND ENGINEER WILL ENDEAVOR TO FAMILIARIZE THE CONTRACTOR WITH ALL KNOWN UTILITIES AND OBSTRUCTIONS, BUT THIS SHALL NOT RELIEVE THE CONTRACTOR FROM FULL RESPONSIBILITY IN
ANTICIPATING ALL UNDERGROUND OBSTRUCTIONS WHETHER OR NOT SHOWN ON THE DRAWINGS.
18. THE CONTRACTOR SHALL, AT HIS OWN EXPENSE, MAINTAIN IN PROPER WORKING ORDER AND WITHOUT INTERRUPTION OF SERVICE ALL EXISTING UTILITIES AND SERVICES WHICH MAY BE ENCOUNTERED IN THE WORK. WITH THE CONSENT OF THE ENGINEER AND UTILITY OWNER, SUCH SERVICE CONNECTIONS MAY BE TEMPORARILY INTERRUPTED TO PERMIT THE CONTRACTOR TO REMOVE DESIGNATED LINES OR TO MAKE TEMPORARY CHANGES IN THE LOCATIONS OF SERVICES. THE COST OF MAKING ANY CHANGES SHALL BE AT
THE CONTRACTOR'S EXPENSE.
19. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES INVOLVED TO HAVE THEIR UTILITIES LOCATED AND MARKED IN THE FIELD. ALL UNDERGROUND UTILITIES SHALL THEN BE UNCOVERED TO VERIFY LOCATION AND ELEVATION BEFORE CONSTRUCTION BEGINS. COORDINATE WITH UTILITY OWNER IF UTILITY INSPECTOR
MUST BE ON SITE WHEN LOCATING OR EXCAVATING NEAR UTILITIES.
20. THE CONTRACTOR SHALL KEEP WORK FREE FROM GROUND OR SURFACE WATER AT ALL TIMES. PROVIDE PUMPS OF ADEQUATE CAPACITY OR OTHER APPROVED METHOD TO REMOVE WATER FROM THE EXCAVATION IN SUCH A MANNER THAT IT WILL NOT INTERFERE WITH THE PROGRESS OF THE WORK OR THE PROPER PLACING OF OTHER WORK. THE COST OF DEWATERING THE EXCAVATION SHALL BE SUBSIDIARY TO
CONSTRUCTION.
21. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL HORIZONTAL AND VERTICAL CONSTRUCTION STAKING
AS REQUIRED FOR THE PROJECT DEVELOPMENT.
22. TEMPORARY FENCING WITH GATES SHALL BE PROVIDED BY THE CONTRACTOR. THE CONTRACTOR SHALL
KEEP THE CONSTRUCTION SITE SECURE AT ALL TIMES.
23. THE CONTRACTOR SHALL PROVIDE SHV OPS NUMBER (318-771-8059), TO EACH FLAGMAN, SUPERVISORY INDIVIDUAL AND RESIDENT PROJECT REPRESENTATIVE SO THAT THEY MAY KEEP IN CONSTANT CONTACT AT
ALL TIMES WITH THE AIRPORT OPERATIONS OFFICE.
24. THE CONTRACTOR SHALL SUBMIT HIS CONSTRUCTION WORK SCHEDULE TO THE ENGINEER AND SHV PROJECTING HIS UPCOMING WORK FOR THE NEXT THREE WEEKS. THE CONTRACTOR SHALL REVIEW THIS PLAN WEEKLY WITH THE RPR. UPDATES SHALL CONTAIN CRITICAL PATH AND RUNWAY SHUTDOWN DATES.
INTERIM PROJECT SCHEDULES SHALL BE PROVIDED ON THE FIRST OF EACH MONTH AND INCLUDE: ORIGINAL BASELINE UPDATED TO CURRENT CONSTRUCTION ACTIVITY, ADJUSTED CRITICAL PATH, AND RUNWAY
SHUTDOWN DATES TO BE CLEARLY NOTED.
25. THE CONTRACTOR SHALL MAINTAIN A CLEAN SAFE CONSTRUCTION WORK AREA. THE CONTRACTOR SHALL PERFORM CLEANUP OPERATIONS ON DAILY BASIS, PER AC 150/5370-2G, "OPERATIONAL SAFETY ON
AIRPORTS DURING CONSTRUCTION."
26. THE CONTRACTOR SHALL HAVE SUFFICIENT EQUIPMENT AND PERSONNEL ON SITE TO ACCOMPLISH EFFICIENT AND PROMPT CONSTRUCTION OF THE VARIOUS WORK ITEMS, INCLUDING WORK ON MORE THAN
ONE WORK ITEM SIMULTANEOUSLY.
27. THE CONTRACTOR SHALL NOT DEVIATE FROM THE APPROVED CONSTRUCTION SAFETY PLAN WITHOUT FIRST
OBTAINING APPROVAL FROM THE ENGINEER.
28. NO TRENCHES IN OR DIRECTLY ADJACENT TO OPERATIONAL PAVEMENT SHALL REMAIN OPEN OVERNIGHT OR WHEN THE CONTRACTOR FINISHES WORK FOR THE DAY IN THE AREA. TRENCHES NOT BACKFILLED SHALL BE COVERED WITH STEEL PLATES TO ALLOW SAFE PASSAGE BY AIRCRAFT ACROSS THE TRENCH, IF
APPROVED BY THE ENGINEER.
29. THE CONTRACTOR SHALL VIDEO TAPE THE ENTIRE WORK AREA AFTER THE PRE-CONSTRUCTION MEETING AND PRIOR TO MOBILIZATION OF PERSONNEL AND EQUIPMENT. IN AREAS WHERE CONSTRUCTION EQUIPMENT CROSSES EXISTING PAVEMENTS, THE CONTRACTOR SHALL TAKE PICTURES OR VIDEO OF THE PAVEMENT PRIOR TO COMMENCING OPERATIONS. THE CONTRACTOR SHALL PROVIDE THE ENGINEER AND AIRPORT MANAGER WITH ONE COPY OF EACH OF THE PHOTOGRAPHS AND VIDEO TAPE(S) TAKEN. THIS DOCUMENTATION SHALL BE USED TO DETERMINE THE AMOUNT OF DAMAGE, IF ANY, CAUSED TO THE PAVEMENTS BY THE CONSTRUCTION EQUIPMENT CROSSINGS AND THE QUALITY OF CONSTRUCTION WHICH
SHALL BE REQUIRED FOR THE REPAIRS.
30. CONSTRUCTION EQUIPMENT AND VEHICLES SHALL TRAVEL A MINIMUM AMOUNT ON NEWLY CONSTRUCTED OR REHABILITATED PAVEMENTS SO THAT THE NEWLY CONSTRUCTED AND REHABILITATED AREAS WILL NOT BE DAMAGED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO THE NEWLY
CONSTRUCTED PAVEMENTS AT THE CONTRACTOR'S EXPENSE.
31. CONTRACTOR SHALL PROVIDE A MOTORIZED MECHANICAL SWEEPER, ALONG WITH A "FOREIGN OBJECTS DEBRIS" (FOD) PLAN, PRIOR TO BEGINNING WORK. THE FOD PLAN SHALL BE PRESENTED BY THE CONTRACTOR AT THE PRE-CONSTRUCTION MEETING. THE FOD PLAN IS SUBJECT TO APPROVAL BY THE
ENGINEER.
32. CONSTRUCTION WORKERS WILL NOT BE ALLOWED TO ESTABLISH OVERNIGHT RESIDENCE ON THE PREMISES. ALL CONSTRUCTION WORKERS SHALL LEAVE THE CONSTRUCTION SITE AT THE END OF THEIR
WORK PERIOD.
33. WORK CANNOT COMMENCE IN EACH PHASE UNTIL:
A. SUFFICIENT BARRICADES ARE IN PLACE TO CONFINE THE WORK AREA AND CREATE A BARRIER
BETWEEN AIRCRAFT AND VEHICLE MOVEMENT AREAS AND THE CONSTRUCTION AREA.
B. ALL SAFETY EQUIPMENT FOR PERSONNEL AND CONSTRUCTION EQUIPMENT IS IN PLACE AND
OPERABLE.
C. ALL RUNWAY AND TAXIWAY SAFETY AREAS HAVE BEEN MARKED AND STAKED. STAKES SHALL BE
MAINTAINED FOR THE ENTIRE COURSE OF THE PROJECT BY THE CONTRACTOR.
D. THE COMPLETE PROJECT SITE, AND ANY AREAS THAT MAY BE AFFECTED BY THE CONSTRUCTION
PROJECT SUCH AS HAUL ROUTES, HAVE BEEN VIDEOTAPED BY THE CONTRACTOR AND THIS VIDEO
PROVIDED TO THE ENGINEER AND AIRPORT MANAGER.
E. A NOTICE TO PROCEED HAS BEEN ISSUED.
38. ALL MATERIAL SUBMITTALS FOR ITEMS TO BE USED IN CONSTRUCTION OF THE PROJECT SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL 10 DAYS PRIOR TO COMMENCEMENT OF WORK
FOR EACH ITEM.
39. A COMPLETE PROJECT SCHEDULE SHALL BE PROVIDED AT THE PRE-CONSTRUCTION MEETING AND PRESENTED AND EXPLAINED BY THE CONTRACTOR TO THE MEETING ATTENDEES. RUNWAY SHUTDOWN DATES MAY BE DETERMINED AT THE PRE-CONSTRUCTION MEETING, OR AT A LATER TIME, AS APPROVED BY
THE ENGINEER AND COORDINATED BY THE RPR.
40. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND RESTRICTIONS FOR SERVICING AND MAINTAINING EQUIPMENT AND DISPOSAL OF USED LUBRICANTS, ETC. ACCORDING TO THE PERTINENT LAW
AND REGULATIONS.
41. BI-WEEKLY PROGRESS MEETINGS ARE MANDATORY. THE DAY OF THE WEEK FOR THESE MEETINGS MAY BE
DETERMINED BY AGREEMENT BETWEEN THE AIRPORT MANAGER, THE RPR AND THE CONTRACTOR.
42. RUNWAY SHUTDOWN DATES TO BE APPROVED AND COORDINATED BY THE ENGINEER. REQUESTS 45 DAY
NOTICE FOR CLOSURE.
43. IN THE EVENT THAT UNANTICIPATED HAZARDOUS MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION, WORK IN THE IMMEDIATE AREA WILL CEASE AND THE FAA PROJECT MANAGER WILL BE NOTIFIED.
44. CONTRACTOR SHALL MAINTAIN ALL HAUL ROUTES AND HAVE SUFFICIENT EQUIPMENT IN THE FORM OF
WATER TRUCKS FOR DUST CONTROL ON SAID HAUL ROUTES.
DEMOBILIZATION NOTES
1. CONDITIONS OF THE PROJECT AREA UPON COMPLETION OF THE JOB SHALL BE AS GOOD AS OR BETTER
THAN THE CONDITION PRIOR TO STARTING WORK, IN ADDITION TO THE WORK ITEMS LISTED.
2. THE PROJECT AREA SHALL BE FREE OF ANY CONTRACTOR STOCKPILE MATERIALS UPON COMPLETION OF
THE JOB UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
3. UPON COMPLETION OF THE PROJECT, ALL THE HAUL ROUTES SHALL BE PROPERLY CLEANED TO PREVENT OBSTRUCTION AND/OR CAUSE INCONVENIENCE TO NORMAL REGULAR TRAFFIC. ALL TEMPORARY HAUL
ROUTES SHALL BE REMOVED AND BROUGHT BACK TO ORIGINAL CONDITION OR BETTER.
4. ALL OF THE CONSTRUCTION EQUIPMENT AND ANY FACILITIES TEMPORARILY PLACED ON SITE FOR THE
PROJECT SHALL BE REMOVED FROM THE SITE.
5. ANY PROPERTIES BELONGING TO THE AIRPORT SHALL BE RETURNED TO THE AIRPORT OWNER.
6. PROPER DRAINAGE (NO LOCALIZED PONDING) SHALL BE MAINTAINED, DURING AND AFTER MOBILIZATION.
7. DEMOBILIZATION SHALL BE COMPLETED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
8. DEMOBILIZATION SHALL BE COMPLETED IN A MANNER THAT WILL MINIMIZE ANY INCONVENIENCE TO AIRPORT
OPERATIONS.
9. SAFETY REGULATIONS SHALL BE OBSERVED AT ALL TIMES DURING DEMOBILIZATION.
10. THE COST OF DEMOBILIZATION SHALL BE CONSIDERED SUBSIDIARY TO ITEM C-105, MOBILIZATION.
SUMMARY OF QUANTITIES
SHEET INDEX
SHEET No. SHEET TITLE
1 COVER SHEET
2 GENERAL NOTES, SUMMARY OF QUANTITIES, AND SHEET INDEX
3 PROJECT LAYOUT AND SAFETY PLAN
4 PHASING PLAN
5 PHASING DETAILS
6 WEST CARGO APRON JOINT LAYOUT
7 WEST CARGO APRON MARKING PLAN
8 WEST CARGO APRON MARKING DETAILS
9 RUNWAY 6-24 MARKING PLAN 1
10 RUNWAY 6-24 MARKING PLAN 2
11 RUNWAY 6-24 MARKING PLAN 3
12 TAXIWAY MARKING PLAN 1
13 TAXIWAY MARKING PLAN 2
14 TAXIWAY MARKING PLAN 3
15 TAXIWAY MARKING PLAN 4
16 TAXIWAY MARKING PLAN 5
17 TAXIWAY MARKING PLAN 6
18 TAXIWAY MARKING PLAN 7
19 TAXIWAY MARKING PLAN 8
20 TAXIWAY MARKING PLAN 9
21 TAXIWAY MARKING PLAN 10
22 RUNWAY MARKING DETAILS
23 TAXIWAY MARKING DETAILS 1
24 TAXIWAY MARKING DETAILS 2
25 TAXIWAY MARKING DETAILS 3
Item No.
Spec.
No. Description Units
Estimated Quantity
Record Quantity
1.01 C-105 Mobilization LS 1
1.02 P-605-5.1 Rout, Clean, and Seal Existing Concrete Joints LF 35,300
1.03 P-620-5.1 Surface Preparation SF 160,300
1.04 P-620-5.2a White Marking (Reflective) SF 103,300
1.05 P-620-5.2b Yellow Marking (Reflective) SF 11,900
1.06 P-620-5.2c Red Marking (Reflective) SF 5,100
1.07 P-620-5.2d Black Marking (Non-Reflective) SF 40,200
1.08 105-3.1 Barricades and Markings for Pavement Closures LS 1
XXX
XXXXXX
X
X
X
X X
X X
X
X X
X
X
X
X
X
X
X
X
X
XX
X
X
X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X
X
X
X X X
X
X
X X
X
X
X
X
X
X X
X
XXXX
X
X X X X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
32-1
32-
24-6
24-6
6-24
32-
14-32
32-
32-
24-6
6-24
PR
O
JE
C
T
LA
YO
U
T
AN
D
SA
FE
TY
P
LA
N
KS
A
JO
B N
O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -P
R O
J-
.D
W G
PR
O
JE
C T
LA
YO
U T
| 7 /1
8/
8:
A M
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
GENERAL NOTES
1. CONTRACTOR SHALL COMPLY WITH APPROVED PROJECT SAFETY PLAN.
2. AC 150/5370-2G, OPERATIONAL SAFETY ON AIRPORTS DURING
CONSTRUCTION, ANY REFERENCES THEREIN SHALL APPLY TO THIS
PROJECT.
3. AIRPORT OPERATIONS WILL COORDINATE RADIO CONTACT WITH
SHREVEPORT GROUND CONTROL, HOWEVER, THE CONTRACTOR SHALL
MAINTAIN RADIO CONTACT WITH SHREVEPORT GROUND CONTROL (FREQ.
121.175) AT ALL TIMES WHEN WORKING IN THE MOVEMENT AREA
SHREVEPORT AIRPORT AUTHORITY TO PROVIDE LOCATION MAP OF ALL
MOVEMENT AND NON-MOVEMENT AREAS DURING TRAINING.
4. CONTRACTOR WILL BE ADVISED WHICH AREAS WILL BE CLOSED OR
ACCESSIBLE WHEN NOTICE TO PROCEED IS ISSUED. BARRICADE PLAN TO
BE COORDINATED WITH AIRPORT OPERATIONS AT THE TIME OF
CONSTRUCTION FOR EACH PHASE.
5. ACTIVE TAXIWAYS AND RUNWAYS AFFECTED DURING CONSTRUCTION SHALL
BE SWEPT AND DEBRIS REMOVED FROM THE SURFACE AS IT OCCURS. NO
DIRECT PAY.
6. CONTRACTOR HAUL ROUTE AND LOCKABLE ACCESS GATE (NO DIRECT PAY)
AS SHOWN. THE CONTRACTOR'S HAUL ROUTE AND PARKING AREA TO BE
USED DURING CONSTRUCTION OF THIS PROJECT ARE TO BE MAINTAINED
AND LEFT IN A CONDITION EQUAL TO OR BETTER THAN ITS CURRENT
CONDITION.
7. THE CONTRACTOR SHALL, WHEN REQUESTED, SUSPEND OPERATIONS IN A
SPECIFIC AREA. WORK WILL ONLY RESUME IN SAID AREA WHEN
AUTHORIZED BY AIRPORT AUTHORITY PERSONNEL.
8. DURING ANY CONSTRUCTION WITHIN 90 FEET OF THE CENTERLINE OF
TAXIWAYS, 250 FEET OF CENTERLINE OF RUNWAY, OR WITHIN THE ILS
CRITICAL AREA (ACTIVE AREAS) THE CONTRACTOR SHALL MAINTAIN RADIO
CONTACT WITH SHREVEPORT GROUND CONTROL UPON INSTRUCTION BY
AIRPORT OPERATIONS. THE CONTRACTOR SHALL IMMEDIATELY VACATE THE
SAFETY AREA OF AN ACTIVE RUNWAY OR TAXIWAY AND NOT RESUME WORK
IN THE SAFETY AREA UNTIL THE RUNWAY OR TAXIWAY IS CLEAR OF
AIRCRAFT OPERATIONS. FAILURE TO COMPLY SHALL BE CAUSE FOR
SUSPENSION OF THE CONTRACTOR'S OPERATIONS WITHIN THESE AREAS.
9. CONTRACTOR SHALL ESTABLISH A STAGING AREA PER THE DIRECTION OF
THE SHREVEPORT AIRPORT AUTHORITY. OTHER AREAS MAY BE MADE
AVAILABLE BY THE DIRECTOR OF AIRPORTS AS NECESSARY. NO EQUIPMENT
OR BULK MATERIAL SHALL BE PERMITTED IN THE RUNWAY SAFETY AREAS,
RUNWAY OBJECT FREE AREAS, OR ILS CRITICAL AREAS AT THE END OF A
WORKING DAY. EQUIPMENT SHALL BE PULLED BACK AND PARKED IN THE
STAGING AREA.
ACCESS ROUTE NOTES
1. DAMAGE TO EXISTING PAVEMENT, FENCES, OR OTHER PROPERTY WHICH IS
CAUSED BY THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED TO
ORIGINAL OR BETTER CONDITION AT NO EXPENSE TO THE OWNER.
2. ACCESS ROUTES FOR EACH CONSTRUCTION PHASE SHALL BE
COORDINATED WITH THE OWNER. ROUTES SHOWN ARE PRELIMINARY ONLY,
AND SUBJECT TO APPROVAL AND ADJUSTMENT BY THE OWNER.
3. AIRCRAFT ALWAYS HAVE THE RIGHT OF WAY.
4. SWEEP RUNWAY, TAXIWAYS, AND APRONS FREQUENTLY TO KEEP
PAVEMENT FREE OF DEBRIS.
5. REPAIR ANY DAMAGE TO ANY EXISTING PAVEMENTS UPON COMPLETION OF
CONSTRUCTION AT NO DIRECT PAY.
COMMUNICATIONS
1. RPR SHALL CONTACT SHV OPS PRIOR TO ENTERING AND UPON EXITING THE
AIRPORT FACILITY. ALL OPERATIONS WITHIN AN ACTIVE AOA REQUIRE THE
CONTRACTOR AND RPR TO BE ESCORTED BY SHV OPS PERSONNEL.
COORDINATION
1. CONTRACTOR PROGRESS MEETINGS - THE OWNER, ENGINEER AND/OR THE
ON-SITE REPRESENTATIVE AND THE CONTRACTOR WILL HOLD PROGRESS
MEETINGS ON A COORDINATED SCHEDULE DURING CONSTRUCTION.
AIRPORT TENANTS AND USERS SHALL BE INVITED TO ATTEND THESE
MEETINGS. THE CSPP WILL BE A STANDING AGENDA ITEM IN SUCH
MEETINGS. AIRPORT TENANTS AND USERS SHALL BE INVITED TO ATTEND
THESE MEETINGS.
2. SCOPE OR SCHEDULE CHANGES - CHANGES IN THE SCOPE OR DURATION OF
THE PROJECT MAY NECESSITATE REVISIONS TO THE CSPP AND REQUIRE
REVIEW AND APPROVAL BY THE OWNER AND FAA.
3. FAA ATO COORDINATION - COORDINATION WITH THE FAA WILL BE DIRECTED
THROUGH THE OWNER. COORDINATION WILL BE MADE WHEN SCHEDULING
AIRWAY FACILITY SHUTDOWN AND RESTARTS. CONTRACTOR WILL
COORDINATE WITH OWNER REGARDING SPECIFIC REQUIREMENTS RELATED
TO SHUTDOWNS AND RESTARTS.
PHASING
1. REFER TO PLANS (SHEET 4) FOR INDIVIDUAL PHASE ELEMENTS REGARDING
PAVEMENT CLOSURE, DURATION, TAXI ROUTES, AND NAVAID IMPACTS..
NAVIGATION AID (NAVAID PROTECTION)
1. NOTICE TO AIRMEN (NOTAM) - CONTRACTOR SHALL NOTIFY THE OWNER AT
LEAST 96 HOURS BEFORE NOTAMS ARE REQUIRED. OWNER WILL THEN
ENSURE NOTAMS ARE PUBLISHED APPROPRIATELY. ALL OPENINGS AND
CLOSURES OF THE AOA OR RESTRICTION ON AIRPORT OPERATIONS SHALL
BE INITIATED OR CANCELED BY THE OWNER. THE CONTRACTOR WILL NOT
COMMENCE CONSTRUCTION UNTIL APPROPRIATE NOTAMS HAVE BEEN
ISSUED.
CONTRACTOR ACCESS
1. THE AIR OPERATIONS AREA (AOA) IS DEFINED AS ALL PAVED AND UNPAVED
AREAS OF THE AIRPORT INSIDE THE PERIMETER FENCE AND INCLUDES BUT
IS NOT LIMITED TO APRONS, TAXIWAYS, RUNWAYS AND RUNWAY SAFETY
AREAS.
a. IT IS THE INTENT OF THESE PLANS TO MINIMIZE INTERFERENCE TO
AIRCRAFT MOVEMENT. IN ACTIVE PORTIONS OF THE AOA, AIRCRAFT
SHALL HAVE THE RIGHT-OF-WAY. THE ENGINEER MAY REQUIRE THE
CONTRACTOR TO SUSPEND ALL CONSTRUCTION ACTIVITY IF
REQUIRED FOR AIRCRAFT OPERATIONS. THIS WILL REQUIRE THE
CONTRACTOR TO MOVE PERSONNEL, EQUIPMENT AND MATERIALS
TO A SAFE LOCATION AND STAND BY UNTIL AIRCRAFT USE IS
COMPLETED.
b. DURING PERFORMANCE OF THIS CONTRACT, RUNWAYS, TAXIWAYS
AND AIRCRAFT PARKING APRONS WILL REMAIN OPEN TO THE
MAXIMUM EXTENT POSSIBLE.
2. CONSTRUCTION ACCESS AND HAUL ROUTES
a. ACCESS TO THE JOB SITE SHALL BE THROUGH DESIGNATED ROUTES.
b. ACCESS ROUTES FOR EACH CONSTRUCTION PHASE WILL BE
COORDINATED WITH THE OWNER. ACCESS ROUTES DEPICTED ON
THE PLANS ARE PRELIMINARY ONLY AND ARE SUBJECT TO
APPROVAL AND ADJUSTMENT BY THE OWNER.
c. THE PAVEMENTS ON THE ACCESS ROUTES MAY NOT SUPPORT
LOADS IMPOSED BY CONSTRUCTION EQUIPMENT OR VEHICLES. THE
CONTRACTOR SHALL LIMIT LOADS AS NECESSARY TO PREVENT
DAMAGE OR SHALL INCLUDE IN HIS BID ADEQUATE BUDGET TO
REPAIR DAMAGE TO THE PAVEMENT.
d. AIRCRAFT ALWAYS HAVE RIGHT OF WAY.
e. SWEEP PAVEMENTS ADJACENT TO WORK AND ACCESS AREAS
FREQUENTLY TO KEEP PAVEMENT FREE OF LOOSE DEBRIS AT ALL
TIMES.
f. PRIVATELY OWNED VEHICLES (POV) PARKING SHALL BE DESIGNATED
BY ENGINEER OR AS SHOWN.
g. CONSTRUCTION EQUIPMENT AND VEHICLES SHALL TRAVEL A
MINIMUM AMOUNT ON NEWLY CONSTRUCTED PAVEMENTS SO THAT
THESE ARE NOT DAMAGED. THE CONTRACTOR WILL BE
RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO PAVEMENTS AT THE
CONTRACTOR'S EXPENSE.
h. DAMAGE TO EXISTING FACILITIES CAUSED BY THE CONTRACTOR'S
OPERATIONS SHALL BE REPAIRED TO ORIGINAL OR BETTER
CONDITION AT NO EXPENSE TO THE OWNER.
3. VEHICLE AND PEDESTRIAN OPERATIONS
a. NO VEHICLE OR EQUIPMENT SHALL MOVE INSIDE THE AOA UNLESS IT
IS
LIGHTED OR MARKED / FLAGGED (FLAG OR LIGHT FOR DAY TIME
ACTIVITY AND LIGHT FOR NIGHT TIME ACTIVITY).
b. NO CONTRACTOR EMPLOYEES OR EMPLOYEES OF
SUBCONTRACTORS OR SUPPLIERS, OR ANY OTHER PERSON UNDER
THE CONTROL OF THE CONTRACTOR SHALL ENTER ANY PART OF
THE AIR OPERATIONS AREA (AOA) FROM THE CONSTRUCTION SITE
UNLESS AUTHORIZED.
c. CONSTRUCTION EQUIPMENT AND VEHICLES SHALL NOT EXCEED A
SPEED OF 15 MPH WITHIN AIRPORT PROPERTY.
4. STOCKPILED MATERIAL
a. CONTRACTOR WILL BE REQUIRED TO COORDINATE WITH THE OWNER
PRIOR TO STOCKPILING MATERIALS.
b. MATERIAL STOCKPILES WILL BE MANAGED BY CONTRACTOR SO THAT
THEY DO NOT - ATTRACT WILDLIFE, GENERATE FOREIGN OBJECT
DEBRIS (FOD) OR PENETRATE ANY AIRPORT OPERATION SURFACE
LIKE THE APPROACH/DEPARTURE SURFACE ETC.
SAFETY
1. THE CONTRACTOR WILL ENSURE THAT AREAS OF AIRCRAFT OPERATION ARE
CLEARLY AND VISIBLY SEPARATED FROM CONSTRUCTION AREAS.
2. THE CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL SAFETY
DEVICES AS INDICATED ON THE PLANS OR AS DIRECTED BY THE RPR.
3. THE CONTRACTOR SHALL STRICTLY ADHERE TO ALL SECURITY POLICIES OF
THE AIRPORT INCLUDING ESCORTING PERSONNEL, BADGING AND ACCESS
WITHIN THE SECURED AREAS OF THE AIRPORT. ACCESS OUTSIDE THE
DEFINED CONSTRUCTION AREA IS STRICTLY PROHIBITED.
4. THE CONTRACTOR MUST TAKE CARE TO MAINTAIN SECURITY DURING
CONSTRUCTION. THE CONTRACTOR SHALL KEEP THE GATES LOCKED OR
GUARDED AT ALL TIMES TO PREVENT ACCESS BY UNAUTHORIZED
PERSONNEL AND ANIMALS. THE CONTRACTOR MUST IMPLEMENT
PROCEDURES TO ENSURE THAT ONLY AUTHORIZED PERSONS AND
VEHICLES HAVE ACCESS TO THE AOA AND TO PROHIBIT ”PIGGYBACKING”
BEHIND AUTHORIZED VEHICLES.
5. FOD PREVENTION - THE CONTRACTOR SHALL PROVIDE A MOTORIZED
MECHANICAL SWEEPER ALONG WITH A “FOD PLAN” PRIOR TO COMMENCING
CONSTRUCTION ACTIVITIES. THE FOD PLAN IS SUBJECT TO APPROVAL BY
THE CONSTRUCTION MANAGER. THE FOD PLAN AND DAILY ACTIVITIES SHALL
BE COORDINATED WITH THE CONSTRUCTION MANAGER.
6. THE CONTRACTOR SHALL HANDLE ALL HAZARDOUS MATERIAL (HAZMAT)
WITH THE RELEVANT AUTHORITIES AND PURSUANT TO LOCAL, STATE, AND
FEDERAL RULES AND REGULATIONS.
7. ALL ACTIVITIES WILL BE PERFORMED IN CONFORMANCE WITH FEDERAL
AVIATION ADMINISTRATION'S (FAA) ADVISORY CIRCULAR (AC) 150/5370-2G
TITLED “OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION”,
LATEST VERSION. NOTHING ON THE PLANS WILL RELIEVE THE CONTRACTOR
FROM HIS/HER RESPONSIBILITY TO COMPLY WITH THE REQUIREMENTS SET
FORTH THEREIN.
0 500' 1000'500'
GRAPHIC SCALE IN FEET
TWY A
TWY A1
TWY C
TWY A2
TWY A4
TWY A
TW
Y A
TW
Y A
TWY C
TWY B
W
EST CARGO APRON
RW
Y 14-32
RWY 6-24
TW
Y
D
TW
Y B2
TWY B
TW
Y L
TWY L1
TWY A5
TWY A1
TWY A6
TW
Y
D
EXISTING BUILDING
EXISTING PAVEMENT
EXISTING TAXIWAY SAFETY AREA
EXISTING RUNWAY SAFETY AREA
PROPERTY LINE
PROPOSED WORK AREA
LEGEND
RUNWAY CLOSURE
STAGING AREA
BARRICADE LOCATION
SEE PHASING PLAN FOR DETAILS OF SPECIFIC
LIMITATIONS FOR WORK AREAS. BARRICADES
DEPICTED ARE MINIMAL AMOUNT REQUIRED TO
NECESSITATE RUNWAY 6-24 CLOSURE.
STAGING AREA
W
70TH ST
HOLLYWOOD AVE
TAXILANE E
X
XXXX
XXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X
X
X
X X
X
X
X
X
X
X
X X X
X
X
XXXX
X
X
X X X X X X X
X
X X
X X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X X
X X
X X
X X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
32-
24-6
24-6
6-24
32-
14-32
32-
32-
14 14
24-6
6-24
PH
AS
IN
G
P
LA
N
GRAPHIC SCALE IN FEET
400' 400' 800'
EXISTING BUILDING
EXISTING PAVEMENT
EXISTING TAXIWAY SAFETY AREA
EXISTING RUNWAY SAFETY AREA
PROPERTY LINE
PROPOSED WORK AREA
LEGEND
RUNWAY CLOSURE
STAGING AREA
PHASING NOTES:
1. RUNWAY 6-24 TO BE CLOSED FOR DURATION OF MARKING
WORK FOR RUNWAY 6-24, TAXIWAY C (RUNWAY 6 END),
TAXIWAY A (INTERSECTION WITH RUNWAY 6-24), TAXIWAY
B2, TAXIWAY B, AND TAXILANE E. RUNWAY 6-24 CLOSURE
SHALL BE COMPLETED WITHIN FIVE (5) CALENDAR DAYS.
2. MARKING WORK WITHIN AND ADJACENT TO THE RUNWAY
14-32 SAFETY AREA SHALL BE COORDINATED WITH SHV
OPERATIONS STAFF AND COMPLETED ON A PULL BACK
BASIS. WORK AREAS INCLUDE RUNWAY 6-24/14-32
INTERSECTION, TAXIWAY L1, TAXIWAY A (RUNWAY 14 END),
TAXIWAY C, TAXIWAY A2, TAXIWAY A4, AND TAXIWAY A
(RUNWAY 32 END).
3. TAXIWAY A CENTERLINE MARKING WORK SHALL BE
COORDINATED WITH SHV OPERATIONS STAFF AND
COMPLETED ON A PULL BACK BASIS. TWO OF THE THREE
ENTRANCES TO THE COMMERCIAL SERVICE APRON MUST
BE OPEN AT ALL TIMES DURING THE MARKING OF TAXIWAY
A CENTERLINE.
4. JOINT SEALANT REMOVAL AND REPLACEMENT/MARKING
WORK ON THE WEST CARGO APRON MAY BE COMPLETED
SIMULTANEOUSLY WITH THE PREVIOUSLY NOTED MARKING
WORK. CONTRACTOR SHALL COORDINATE WITH SHV
OPERATIONS FOR CLOSING SECTIONS OF THE WEST
CARGO RAMP FOR WORK AND PLACEMENT OF LOW
PROFILE BARRICADES. ACCESS TO AND FROM THE WEST
CARGO APRON BY AIR CARGO OPERATORS SHALL BE
MAINTAINED AT ALL TIMES. AIR CARGO AIRCRAFT WILL NOT
BE PRESENT ON THE WEST CARGO APRON ON
SATURDAYS/SUNDAYS.
5. PRIOR TO BEGINNING WORK, THE AIRPORT WILL ISSUE THE
APPROPRIATE NOTAM INDICATING THE CLOSURE OF
RUNWAY 6-24 AND/OR OTHER WORK AREAS NOTED ABOVE.
6. INSTALL/MAINTAIN BARRICADES AND RUNWAY CLOSURE
X'S AT LOCATIONS SHOWN.
7. AT THE COMPLETION OF THE ITEMS ABOVE, COORDINATE
WITH THE CONSTRUCTION MANAGER TO OPEN WORK AREA
AND ACCESS ROUTES. FOLLOW STEPS BELOW:
· CLEAN ALL PAVED SURFACES TO REMOVE FOD.
· REMOVE LOW PROFILE BARRICADES AND RUNWAY
CLOSURE X'S.
· REMOVE ALL EQUIPMENT, MATERIALS, AND PERSONNEL
FROM WORK AREA.
8. COORDINATE WITH THE AIRPORT TO CANCEL ALL NOTAMS
THE AIRPORT ISSUED.
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -P
H
AS
E-
.D
W G
PR
O
JE
C T
LA
YO
U T
| 7 /1
8/
8:
A M
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
TWY A
TWY A1
TWY C
TWY A2
TWY A4
TWY A
TW
Y A
TW
Y A
TWY C
TWY B
W
EST CARGO APRON
RW
Y 14-32
RWY 6-24
TW
Y
D
TW
Y B2
TWY B
TW
Y L
TWY L1
TWY A5
TWY A1
TWY A6
TW
Y
D
CONSTRUCTION ACCESS ROUTE
GATE 32
GATE 29
GATE 7
GATE 20
STAGING AREA
W
70TH ST
HOLLYWOOD AVE
TAXILANE E
COMMERCIAL SERVICE APRON
PH
AS
IN
G
D
ET
AI
LS
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -D
T-
PR
O J-
.D W
G
PH
AS
IN
G
7/
/2
- 8 :3
AM
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
NOTES:
1. LIGHTED BARRICADES SHALL BE PROVIDED, INSTALLED, AND MAINTAINED BY CONTRACTOR.
2. BARRICADE LIGHTING SHALL BE SPACED NOT TO EXCEED 20' ON CENTER AND SPACING
BETWEEN BARRICADES NOT EXCEEDING 10'.
3. BARRICADES SHALL BE REQUIRED AROUND ALL EXCAVATIONS WHICH EXCEED 3" IN DEPTH
BELOW ADJACENT PAVEMENT AND IN LOCATIONS SHOWN.
4. CONTRACTOR SHALL CHECK LAYOUT AND LIGHTS EACH DAY TO ENSURE BARRICADES ARE
FUNCTIONING CORRECTLY.
5. OTHER METHODS FOR PROVIDING PAVEMENT BARRICADES MAY BE ACCEPTABLE, IF
APPROVED BY ENGINEER. ALTERNATE METHODS SHALL BE SUBMITTED TO THE ENGINEER
FOR APPROVAL PRIOR TO USE.
±8'
FLASHING RED LIGHT
(DUSK TO DAWN
OPERATION)
6" ORANGE & WHITE
REFLECTIVE STRIPES
TEMPORARY WATER FILLED
LOW-PROFILE BARRICADE
N.T.S.
PORTABLE LIGHTED RUNWAY CLOSURE MARKER NOTES:
1. THE PORTABLE LIGHTED RUNWAY CLOSURE MARKER (RCM) SHALL MEET THE REQUIREMENTS AND SPECIFICATIONS SET FORTH IN AC 150/5345-55 (CURRENT VERSION), SPECIFICATION FOR L-893, LIGHTED VISUAL AID TO INDICATE TEMPORARY RUNWAY CLOSURE. THE REQUIREMENTS OF THIS AC SHALL GOVERN IN THE EVENT OF CONFLICT WITH THE REQUIREMENTS OUTLINED IN THIS DETAIL.
2. THE (RCM) SHALL BE DESIGNED TO FORM A LIGHTED "X" WHICH CONTAINS TWENTY-ONE (21) 90 WATT PAR 38, 10 DEGREE WEATHER PROOF OUTDOOR STANDARD BASE CLEAR LED SPOT BULBS WITH ONE (1) BULB LOCATED IN THE CENTER AND FIVE (5) BULBS LOCATED IN EACH OF THE FOUR (4) LEGS. ALL "X" PANEL BULBS, LIGHTED SOCKETS, WIRING, AND CONNECTIONS MUST BE ENCLOSED IN A WEATHER RESISTANT HOUSING.
3. THE LIGHTED "X" FORMED WHEN OPENED AND OPERATING WILL BE 20'-6" EACH CONTINUOUS LEG AND 14'-6" ON THE PERIPHERAL.
4. THE ANGLE MECHANISM MUST BE CAPABLE OF TILTING 3 DEGREES FROM VERTICAL AND HAVE TRAILER ADJUSTMENTS TO ACCOMMODATE THIS
ANGLE NO MATTER WHAT THE DEGREE OF THE RUNWAY.
5. ILLUMINATION OF THE RCM SHALL BE WORKABLE IN A CONTINUOUS OR FLASHING MODE. THIS MUST BE CONTROLLED BY A SOLID STATE
FLASHER. MECHANICAL FLASHERS ARE NOT ACCEPTABLE.
6. A PHOTO CELL MUST BE USED TO REDUCE THE VOLTAGE TO 75 VOLTS FOR NIGHTTIME OPERATIONS.
7. A RADIO FREQUENCY FILTER SHALL BE INSTALLED WITH AN OPERATION FREQUENCY OF 50 HZ.
8. THE RCM MUST BE ABLE TO WITHSTAND WINDS OF 40 MPH WHILE IN OPERATIONAL MODE.
PORTABLE LIGHTED RUNWAY CLOSURE MARKER
N.T.S.
MAXIMUM WEIGHT
NO FUEL
MAXIMUM LENGTH
TOWING AND STORAGE POSITION
MAXIMUM WIDTH IN
TOWING AND STORAGE POSITION
MAXIMUM HEIGHT IN
TOWING AND STORAGE POSITION
MAXIMUM WIDTH IN RAISED
OPERATING POSITION
MAXIMUM LENGTH IN
RAISED POSITION
MAXIMUM HEIGHT IN
RAISED OPERATING POSITION
MAXIMUM TONGUE - WEIGHT
EMPTY FUEL TANK
MAXIMUM TONGUE WEIGHT
- FULL FUEL TANK
MAXIMUM TONGUE WEIGHT
-FULL FUEL TANK AND SECOND
UNIT ON REAR HITCH
1854 LBS
127.9 INCHES
101.0 INCHES
76.5 INCHES
188.5 INCHES
187.4 INCHES
206.7 INCHES
234 LBS
318 LBS
245 LBS
X
XX
XXXXXXXXXX
X
X
X X
X X
X
W
ES
T C
AR
G
O A
PR
O
N
JO
IN
T
LA
YO
U T
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -J
O
IN
T-
.D
W G
PR
O
JE
C T
LA
YO
U T
| 7 /1
8/
8:
A M
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
LEGEND
PAVEMENT JOINT SEALANT
REPLACEMENT
EXISTING PAVEMENT JOINT
EXISTING BUILDING
TW
Y L1
TW
Y L
0 50' 100'50'
GRAPHIC SCALE IN FEET
EXISTING JOINT ROUTING AND
CLEANING DETAILS
N.T.S.
NOTES:
1. ALL JOINTS TO BE REMOVED AND REPLACED SHALL BE ROUTED AND PREPARED
FOR JOINT REPLACEMENT BY THE USE OF HIGH PRESSURE WATER BLAST, WITH
THE JOINT BEING ADEQUATELY CLEANED AND ACCEPTED BY THE ENGINEER.
2. JOINT REPLACEMENTS SHALL BE MADE IN ACCORDANCE WITH THE JOINT
SEALANT DETAILS SHOWN ON THIS SHEET AND IN ACCORDANCE WITH FAA
SPECIFICATION P-605, JOINT SEALANTS FOR PAVEMENTS.
JOINT TO BE ROUTED AND
CLEANED OF ALL JOINT SEALER,
DEBRIS AND VEGETATION.
X
XX
XXXXXXXXXX
X X
X X
X X
X
X
X X
X X
X
W
ES
T C
AR
G
O A
PR
O
N M
AR
KI
N G
P
LA
N
KS
A
JO
B N
O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -M
AR
K-
.D W
G
PR
O
JE
C
T
LA
YO
U
T | 7
/1 8/
8:
A
M
LA
ST
S
AV
ED
B
Y:
C
M O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
TW
Y L1
TW
Y L
0 50' 100'50'
GRAPHIC SCALE IN FEET
PROPOSED ZIPPER STYLE
ROADWAY EDGE STRIPE MARKING
PROPOSED AIRCRAFT
LEAD-IN LINE MARKING
PROPOSED MARKING
PROPOSED INTERMEDIATE
HOLDING POSITION MARKING
W
ES
T C
AR
G
O A
PR
O
N M
AR
KI
N G
D
ET
AI
LS
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -D
T-
PR
O J-
.D W
G
AP
R
O N
7/
/2
- 8 :3
AM
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
12" WIDE YELLOW
REFLECTIVE LEAD-IN
CENTERLINE MARKING
SURFACE PAINTED
IDENTIFICATION SIGN (BLACK
BACKGROUND WITH
YELLOW REFLECTIVE PAINTED
NUMBER). MATCH DIMENSIONS
OF EXISTING MARKINGS.
6" WIDE BLACK NON-
REFLECTIVE OUTLINE
MARKING (TYP.)
TYPICAL 12" YELLOW
AIRCRAFT HOLD BAR
MARKINGS
57 - 3W
TYPICAL AIRCRAFT HOLD
DESIGNATION MARKING
(BLACK BACKGROUND W/
YELLOW CHARACTERS).
MATCH EXISTING MARKING
DIMENSIONS AND
CHARACTERS.
AIRCRAFT LEAD-IN LINE
MARKING DETAIL
N.T.S.
NOTES:
1. REFER TO PLANS FOR LOCATIONS OF MARKINGS REGARDING SPECIFIC
AIRCRAFT STOP BARS.
4'
4'
1' (TYP.)
NON-M
OVEMENT
AREA
AIR
CRAFT
MOVEMENT
AREA
ROADWAY
BOUNDARY
BLACK MARKING
BACKGROUND
6"
6"
3'
ZIPPER STYLE ROADWAY EDGE
STRIPE MARKING DETAIL
N.T.S.
6"
GAP
BLACK MARKING
BACKGROUND
EDGE OF
PAVEMENT
3' (T
YP
3' (T
YP
6"
GAP
1' (TYP.)
EDGE OF
PAVEMENT
2' (1 - 1' STRIPE
AND 2 - 6" SPACES)
INTERMEDIATE HOLDING
POSITION MARKING DETAIL
N.T.S.
12" WIDE WHITE
REFLECTIVE
XXX
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
32-1
24-6
24-6
6-24
32-
14-32
32-1
32-1
14 14
24-6
6-24
200'
10' 10'
150' 40' 63' 37' 120' 80' 120' 80' 120' 80'
120' 80' 120'
150'1020'
21.59'
PROPOSED RUNWAY
THRESHOLD MARKINGS
PROPOSED RUNWAY
LANDING DESIGNATION MARKING PROPOSED RUNWAY
CENTERLINE MARKING
PROPOSED RUNWAY
EDGE MARKING (3')
PROPOSED RUNWAY
TOUCHDOWN ZONE MARKINGSPROPOSED RUNWAY
THRESHOLD BAR MARKING
PROPOSED BLASTPAD
MARKINGS
PROPOSED TAXIWAY
CENTERLINE MARKING
PROPOSED HOLD
POSITION MARKING
80'58.41' 69.95'120' 120' 80' 120' 80' 120' 80' 60.03' 58.36' 80' 120'
PROPOSED RUNWAY
CENTERLINE MARKING
PROPOSED RUNWAY
EDGE MARKING (3')
R U
N W
AY
-2
M
AR
KI
N
G P
LA
N
0 50' 100'50'
GRAPHIC SCALE IN FEET
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -M
AR
K-
.D W
G
R W
Y (1
/1 8/
8:
A
M
LA
ST
S
AV
ED
B
Y:
C
M O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
M
AT
C H
L
IN
E M
AT
C
H L
IN
E
M
AT
C H
L
IN
E
RUNWAY 6-24
TW
Y
C
R U
N W
AY 14-32
RUNWAY 6-24
24-6
80'
23.76'24.61'
120' 80' 120' 80' 120' 120' 80' 120' 80' 120' 80' 120' 80'
PROPOSED RUNWAY
CENTERLINE MARKING
PROPOSED RUNWAY
EDGE MARKING (3')
PROPOSED HOLD
POSITION MARKING
PROPOSED TAXIWAY
CENTERLINE MARKING
24-6
6-24
24-6
6-24
80' 55.39'
10.05'
120' 80' 120' 120' 40' 80' 40' 80' 62.91' 80' 40' 80' 40' 120' 80' 120'
PROPOSED RUNWAY
CENTERLINE MARKING
PROPOSED RUNWAY
EDGE MARKING (3')
PROPOSED TAXIWAY
CENTERLINE MARKING
PROPOSED HOLD
POSITION MARKING PROPOSED HOLD
POSITION MARKING
PROPOSED TAXIWAY
CENTERLINE MARKING
PROPOSED TAXIWAY
CENTERLINE MARKING PROPOSED TAXIWAY
CENTERLINE MARKING
PROPOSED HOLD
POSITION MARKING PROPOSED HOLD
POSITION MARKING
XXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
32-1
24-6
24-6
6-24
32-
14-32
32-1
32-1
14 14
24-6
6-24
R U
N W
AY
-2
M
AR
KI
N
G P
LA
N
KS
A
JO
B N
O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -M
AR
K-
.D W
G
R W
Y (2
/1 8/
8:
A
M
LA
ST
S
AV
ED
B
Y:
C
M O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
0 50' 100'50'
GRAPHIC SCALE IN FEET
M
AT
C H
L
IN
E
M
AT
C H
L
IN
E
M
AT
C H
L
IN
E
M
AT
C H
L
IN
E RUNWAY 6-24
RUNWAY 6-24
TW
Y A
TW
Y A
TW
Y
D
TW
Y
D
TW
Y
B2
80'52.06' 120' 120' 40' 60' 40' 150'
10' 10'
100'
150'
682.06'
PROPOSED RUNWAY
EDGE MARKING (3')
PROPOSED HOLD
POSITION MARKING
PROPOSED TAXIWAY
CENTERLINE MARKING
PROPOSED TAXIWAY
CENTERLINE MARKING
PROPOSED HOLD
POSITION MARKING
PROPOSED BLASTPAD
MARKINGS
PROPOSED RUNWAY
THRESHOLD BAR MARKING
PROPOSED RUNWAY
LANDING DESIGNATION MARKING
PROPOSED RUNWAY
THRESHOLD MARKINGS
80'
27.94'
96.24' 80' 120'
150'
120' 120'80'
337.64'
PROPOSED RUNWAY
CENTERLINE MARKING
PROPOSED RUNWAY
EDGE MARKING (3')
PROPOSED RUNWAY
TOUCHDOWN ZONE MARKINGS
XXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
32-1
24-6
24-6
6-24
32-
14-32
32-1
32-1
14 14
24-6
6-24
R U
N W
AY
-2
M
AR
KI
N
G P
LA
N
KS
A
JO
B N
O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -M
AR
K-
.D W
G
R W
Y (3
/1 8/
8:
A
M
LA
ST
S
AV
ED
B
Y:
C
M O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
M
AT
C H
L
IN
E
M
AT
C H
L
IN
E
M
AT
C H
L
IN
E
0 50' 100'50'
GRAPHIC SCALE IN FEET
RUNWAY 6-24
RUNWAY 6-24
TWY B
TW
E
250'
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKINGS
PROPOSED HOLD
POSITION MARKING
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING
PROPOSED TAXIWAY
CENTERLINE MARKING
XXX
X
X
X
X
X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
32-1
24-6
24-6
6-24
32-
14-32
32-1
32-1
14 14
24-6
6-24
TA
XI
W
AY
M
AR
KI
N
G P
LA
N
0 30' 60'30'
GRAPHIC SCALE IN FEET
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -M
AR
K-
.D W
G
TW
Y
(1
/1
8/
8:
A M
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
RUNWAY 6-24
TW
C
6-24
32-
24-6
6-24
250'
200'
200'
200' 200'
379.78'
200'
200'
250'
R100'
R100' R100'
R100'
R100' R100'
R100' R100'
250'
250'
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKING
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKING
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKING
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKING
PROPOSED HOLD
POSITION MARKING
PROPOSED HOLD
POSITION MARKING PROPOSED HOLD
POSITION MARKING
PROPOSED HOLD
POSITION MARKING
PROPOSED TAXIWAY
CENTERLINE MARKING
PROPOSED TAXIWAY
CENTERLINE MARKING
PROPOSED TAXIWAY
CENTERLINE MARKING
PROPOSED TAXIWAY
CENTERLINE MARKING
XXX
X
X
X
X
X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
32-1
24-6
24-6
6-24
32-
14-32
32-1
32-1
14 14
24-6
6-24
TA
XI
W
AY
M
AR
KI
N
G P
LA
N
0 50' 100'50'
GRAPHIC SCALE IN FEET
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -M
AR
K-
.D W
G
TW
Y
(2
/1
8/
8:
A M
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
TW
Y A TW
Y D
RUNWAY 6-24
R U
N W
AY 14-32
TW
Y A
TW
Y
D
TWY C
200' 200'
R100' R100'
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKING
PROPOSED HOLD
POSITION MARKING
PROPOSED TAXIWAY
CENTERLINE MARKING
XXX
X
X
X
X
X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
32-1
24-6
24-6
6-24
32-
14-32
32-1
32-1
14 14
24-6
6-24
TA
XI
W
AY
M
AR
KI
N
G P
LA
N
0 30' 60'30'
GRAPHIC SCALE IN FEET
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -M
AR
K-
.D W
G
TW
Y
(3
/1
8/
8:
A M
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
RUNWAY 6-24
TW
Y
B2
TWY B
250'
250'
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKINGS
PROPOSED HOLD
POSITION MARKING
PROPOSED TAXIWAY
CENTERLINE MARKING
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKING
PROPOSED HOLD
POSITION MARKING
PROPOSED TAXIWAY
CENTERLINE MARKING
XXX
X
X
X
X
X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
32-1
24-6
24-6
6-24
32-
14-32
32-1
32-1
14 14
24-6
6-24
TA
XI
W
AY
M
AR
KI
N
G P
LA
N
0 40' 80'40'
GRAPHIC SCALE IN FEET
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -M
AR
K-
.D W
G
TW
Y
(4
/1
8/
8:
A M
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
RUNWAY 6-24
TWY B
TW
E
32-
14-32
24-6
250'
250'
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKING
PROPOSED HOLD
POSITION MARKING
PROPOSED HOLD
POSITION MARKING
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKING
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING
XXX
X
X
X
X
X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
32-1
24-6
24-6
6-24
32-
14-32
32-1
32-1
14 14
24-6
6-24
TA
XI
W
AY
M
AR
KI
N
G P
LA
N
0 40' 80'40'
GRAPHIC SCALE IN FEET
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -M
AR
K-
.D W
G
TW
Y
(5
/1
8/
8:
A M
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
TWY C
TWY C
TW
Y A
R U
N W
AY 14-32
RUNWAY 6-24
32-14
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKING
PROPOSED HOLD
POSITION MARKING
XXX
X
X
X
X
X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
32-1
24-6
24-6
6-24
32-
14-32
32-1
32-1
14 14
24-6
6-24
TA
XI
W
AY
M
AR
KI
N
G P
LA
N
0 30' 60'30'
GRAPHIC SCALE IN FEET
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -M
AR
K-
.D W
G
TW
Y
(6
/1
8/
8:
A M
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
RUNWAY 14-32
TW
Y
A2
TWY A
32-14
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKING
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING
PROPOSED HOLD
POSITION MARKING
XXX
X
X
X
X
X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
32-1
24-6
24-6
6-24
32-
14-32
32-1
32-1
14 14
24-6
6-24
TA
XI
W
AY
M
AR
KI
N
G P
LA
N
0 30' 60'30'
GRAPHIC SCALE IN FEET
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -M
AR
K-
.D W
G
TW
Y
(7
/1
8/
8:
A M
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
RUNWAY 14-32
TW
Y A4
PROPOSED HOLD
POSITION MARKING
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKINGS
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING
XXX
X
X
X
X
X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
32-1
24-6
24-6
6-24
32-
14-32
32-1
32-1
14 14
24-6
6-24
TA
XI
W
AY
M
AR
KI
N
G P
LA
N
0 30' 60'30'
GRAPHIC SCALE IN FEET
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -M
AR
K-
.D W
G
TW
Y
(8
/1
8/
8:
A M
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
RUNWAY 14-32
TW
Y
A
250' 250'
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING (12")
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKINGS
PROPOSED HOLD
POSITION MARKING
PROPOSED HOLD
POSITION MARKING
PROPOSED SURFACE PAINTED
HOLDING POSITION MARKINGS
PROPOSED TAXIWAY ENHANCED
CENTERLINE MARKING (12")
BEGIN PROPOSED TAXIWAY
CENTERLINE MARKING (12")
R135'
32-14
PROPOSED TAXIWAY
CENTERLINE MARKING (12")
XXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
32-1
24-6
24-6
6-24
32-
14-32
32-1
32-1
14 14
24-6
6-24
TA
XI
W
AY
M
AR
KI
N
G P
LA
N
0 40' 80'40'
GRAPHIC SCALE IN FEET
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -M
AR
K-
.D W
G
TW
Y
(9
/1
8/
8:
A M
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
M
AT
C H
L
IN
E
M
AT
C H
L
IN
E
MATCH LINE
0 40' 80'40'
GRAPHIC SCALE IN FEET
R U
N W
AY
4-
TWY L1
TWY A
TWY A
TW
Y
A1
TW
Y
A1
TW
Y
A5
TW
A6
END PROPOSED TAXIWAY
CENTERLINE MARKING (12")
XXX
X
X
X
X
X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
32-1
24-6
24-6
6-24
32-
14-32
32-1
32-1
14 14
24-6
6-24
TA
XI
W
AY
M
AR
KI
N
G P
LA
N
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -L
O -M
AR
K-
.D W
G
TW
Y
(1 0)
7/
/2
- 8 :3
AM
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
M
AT
C H
L
IN
E
0 40' 80'40'
GRAPHIC SCALE IN FEET
TW
Y
A6
TWY A
RUNWAY 14-32
TW
Y
C
TW
Y C
TWY B
R U
N W
AY
M
AR
KI
N G
D
ET
AI
LS
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -D
T-
PR
O J-
.D W
G
R W
Y
| 7 /1
8/
8:
A M
LA
ST
S
AV
ED
B Y:
C M
O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa en g.
co m a Pa pe -D aw so n co m pa ny
0'
10' 150'
40' TO
RUNWAY
NUMBER
5.
(T
YP
.5
5.
(T
YP
THRESHOLD MARKING
RUNWAY ℄
EDGE OF PAVEMENT
RUNWAY THRESHOLD
MARKING DETAIL (150')
N.T.S.
10'
THRESHOLD BAR
3' STRIPE
(TYP.)
RUNWAY EDGE
OF PAVEMENT RUNWAY ℄
6" BLACK
MARKING
BORDER
(TYP.)
NOTES:
1. RUNWAY EDGE MARKINGS SHALL EXTEND THE FULL LENGTH
OF THE RUNWAY BETWEEN THRESHOLD MARKINGS.
RUNWAY EDGE
OF PAVEMENT
3.0' WIDE RUNWAY
EDGE MARKING DETAIL
N.T.S.
7RUNWAY CENTERLINE
MARKING DETAIL (PRECISION)
N.T.S.
(T
YP
3'
RUNWAY ℄
6"
(TYP.)
BLACK NON-REFLECTIVE
BORDER BACKGROUND
WHITE RETRO-REFLECTIVE
RUNWAY CL MARKING
' T
O E
D G
E O
F R
U N
W
AY
D
ES
IG
N
AT
IO
N
0'
(T
YP
RUNWAY EDGE MARKING
(IF APPLICABLE)
1,020' 150'
0'
AIMING POINT MARKING
RUNWAY ℄
EDGE OF
PAVEMENT OR
THRESHOLD
RUNWAY AIMING POINT
MARKING DETAIL (150')
N.T.S.
5'
5' 5'
20'
RUNWAY ℄
10'
RUNWAY 6 LANDING
DESIGNATION DETAIL
N.T.S.
' T
O T
H R
ES
H
O
LD
M
AR
KI
N
G S
' T
O R
U N
W
AY
C
EN
TE
R
LI
N
E
6'
3'
20'
7'
' 5'
5'
15'
RUNWAY ℄
10'
5'15'
25'
5'
30'
RUNWAY 24 LANDING
DESIGNATION DETAIL
N.T.S.
' T
O T
H R
ES
H
O
LD
M
AR
KI
N
G S
' T
O R
U N
W
AY
C
EN
TE
R
LI
N
E
RUNWAY ℄
3' (M
IN
5' (M
AX
50' 50'
20' 200'
(RWY 6 END)
EDGE OF PAVEMENT
START OF RUNWAY THRESHOLD IS AT
OUTBOARD EDGE OF THRESHOLD BAR
STANDARD RUNWAY
MARKING
0'
(R W
Y
EN
D
5' (MAX.)
OPTIONAL MARKING
CHEVRON MARKING
RUNWAY BLASTPAD/STOPWAY (< 250') MARKING DETAIL
N.T.S.
NOTES:
1. RUNWAY CHEVRON MARKINGS SHALL BE PAINTED YELLOW.
2. WIDTH OF BLASTPAD SHALL EQUAL THE RUNWAY WIDTH PLUS THE
RUNWAY SHOULDERS. WIDTH OF STOPWAY SHALL EQUAL THE RUNWAY
WIDTH ONLY.
3. CHEVRON SPACING MAY BE DOUBLED IF LENGTH OF AREA EXCEEDS 1000'.
4. FOR STOPWAYS LESS THAN 250' IN LENGTH, ONLY FULL CHEVRONS ARE
REQUIRED WITH THE OPTION TO PAINT PARTIAL CHEVRONS.
10' WIDE
THRESHOLD
BAR (WHITE)
0'
(R W
Y
E N
D
100'
(RWY 24 END)
TA
XI
W
AY
M
AR
KI
N
G D
ET
AI
LS
KS
A
JO
B
N O
LA
TE
ST
R
EV
IS
IO
N
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
JN
F
SH
R
EV
EP
O R
T
AI
R
PO
R T
AU
TH
O R
IT
Y
W
ES
T C
AR
G
O A
PR
O
N
PA
VE
M
EN
T
R
EH
AB
IL
IT
AT
IO
N
PH
AS
E
II
SH
EE
T N
AM
E:
PR
O
JE
C
T N
AM
E:
SEAL:
LOUISIANA STATE REG. NO. EF-476
SHEET NO.
P
RO
JE
CT
T
IT
LE
: W
ES
T
CA
RG
O
AP
RO
N
PA
VE
ME
NT
R
EH
AB
ILI
TA
TI
ON
P
HA
SE
II
- S
HR
EV
EP
OR
T, LO
UI
SI
AN
A
M
AR
K R
EV
IS
IO
N
D
AT
E
\\K
SA
.N
ET
\G
AT
EW
AY
\P R
O
JE
C
TS
\1
9\
C
AD
\3
SH
EE
TS
\0
C
IV
IL
\ 1
9-
C -D
T-
PR
O J-
.D W
G
TW
Y
| 7
/1 8/
8:
A
M
LA
ST
S
AV
ED
B
Y:
C
M O
ER
I
C
JM
7/
/2
H aw n Av e.
Sh re ve po rt, L A
T.
.2
.7 w w w
.k sa…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .