About this file

This is a Planholder Agreement document issued by the State of Colorado Department of Corrections for Project Number 2021-004P26, the Electronic Security System Replacement at Colorado State Penitentiary. The document establishes the terms and conditions under which authorized planholders may access and distribute bid documents for the construction project. Due to the sensitive nature of the project, planholders are prohibited from reproducing the hard-copy or electronic bid document sets in any form. Planholders may request additional document sets through the Point of Contact listed in the Advertisement for Bids, provided that documents are maintained in their original bound or electronic format and a formal distribution log is maintained documenting all parties receiving such materials. A mandatory Pre-Bid Meeting attendance was required for parties formally requesting documents pursuant to the Invitation for Bids.

The agreement requires that all hard-copy bid document sets be returned and all electronic media format documents be deleted or destroyed no later than seven calendar days after bid opening. By executing the agreement, planholders certify they will not make unauthorized copies of any documents and will ensure that third-party organizations receiving documents from them likewise refrain from unauthorized reproduction. The document was issued in October 2014 and requires the signature of a representative with name, title, and date before execution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Colorado Department of Corrections Colorado State Penitentiary

Project Number: 2021-004P26 Project Title: Electronic Security System Replacement, Colorado

State Penitentiary

Planholder Agreement Prohibiting Reproduction of Documents

The Architect/Engineer of Record for the above referenced project has prepared drawings and a project manual describing the scope of work to be performed for purposes of soliciting construction bids for the above referenced project. These documents have been issued to those parties formally requesting documents pursuant to the Invitation for Bids, or by attendance at the mandatory Pre-Bid Meeting (herein referred to as “planholders”).

Due to the sensitive nature of the project, the Colorado Department of Corrections has required that all planholders be prohibited from reproducing the hard-copy bid document sets issued them in any form, including hard copies and electronic files.

ONLY Planholders may request additional hard-copy bid document sets, or electronic media bid document sets, through the Point of Contact in the Advertisement for Bids, provided:

1) document sets are maintained in their original bound or electronic media format, and

2) a formal distribution log shall be maintained to include the names and addresses of all other parties receiving such documents from the Planholder, to include direction that “All hard-copy bid document sets shall be returned to the Planholder and all electronic media format document data be deleted or destroyed (no later than seven (7) calendar days after the bid opening).”

By executing this Agreement, the Planholder agrees it will not make any unauthorized copies of any part of the documents, and assures that no third party organization to whom the Planholder may issue documents will likewise make unauthorized copies.

Representative for

Name/Title Date

END OF PLANHOLDER AGREEMENT PROHIBITING REPRODUCTION OF DOCUMENTS