Permits.pdf

PDF 489 KB Posted

Attached to
Laurie Drive Sewer Rehabilitation
Solicitation number
86585
Issued by
Prince George's County, Maryland

About this file

This file consists of Right-of-Way Construction Permits issued by the Montgomery County Department of Permitting Services for the Washington Suburban Sanitary Commission (WSSC) and a Roadside Tree Care Maintenance Authorization related to sewer rehabilitation work in the Paint Branch Basin of Silver Spring, Maryland. The permits authorize WSSC to perform sewer infrastructure work including main line pipe replacement, manhole rehabilitation, lateral renewal, pipe lining, and related utility installation across multiple project sites along Brantford Avenue, Laurie Drive, Eastbourne Drive, Montclair Drive, Kilgore Road, and surrounding streets. Four Right-of-Way Construction Permits were issued with initial permit periods ranging from November 2022 to September 2025, with expiration dates between May 2026 and March 2027. All work must comply with County Specifications for Utility Construction Permits, Public Right-of-Way Accessibility Guidelines (PROWAG), Maryland Department of Transportation approved Traffic Control Plans, and Work Zone Temporary Traffic Control standards. Contractors are required to conduct preconstruction meetings with the designated DPS ROW Inspector, Matthew Melton, at least 48 hours before initial work commencement and upon completion for final inspection and bond release.

The Roadside Tree Care Maintenance Authorization (2024-0269) permits WSSC to perform necessary tree pruning, root pruning, and selective tree removal at twelve locations to facilitate sewer main installation and rehabilitation work. The authorization specifies tree removal and replacement requirements at eight locations and pruning activities at four additional sites, with provisions for 7 to 13 total tree removals and 6 to 12 replacement plantings. All tree work must be performed by licensed tree care experts in compliance with Maryland Department of Natural Resources Roadside Tree Law and ANSI A300 standards. The authorization, executed on April 3, 2024, expires one year from issuance and requires notification of adjacent property owners at least 48 hours prior to tree removal. Contractors must consider alternative repair and construction methods that avoid open trenching and tree removal as a condition of the authorization. All work is subject to inspection by the Environmental Group, which must be contacted at 301-206-8077 if tree removal becomes necessary beyond the expressed authorization.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF PERMITTING SERVICES

RIGHT-OF-WAY CONSTRUCTION PERMIT

Marc Elrich County Executive

Rabbiah Sabbakhan Director

389716Permit No:Issue Date: 11/03/2022 05/03/2026Expires:

1262957ID:

_ WSSC

14501 SWEITZER LANE

LAUREL, MD 20707

THIS IS TO CERTIFY THAT:

HAS PERMISSION TO: INSTALL PUBLIC UTILITY

SPECIAL NOTES: Relay sewer main and line manhole. Renew laterals in accordance with WSSC permit, plans and specifications. Work shall comply with the current County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). A full width mill and overlay shall be required should the patch not meet the specifications as set forth by the County Specifications and as directed by the DPS ROW inspector. Any and all adjustments of existing utilities within the work area are the responsibility of the permittee prior to mill and overlay and acceptance of work. Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way including haul route caused by construction. All lane closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the DPS ROW Inspector. Permittee must have preconstruction meeting with DPS ROW inspector prior to beginning of construction work. Permittee must check and coordinate with other permitted construction on site.

EXTENDED TO 5/3/2026/ Note: Approved for renewal on 6/2/2025.

The proposed work must comply with the conditions of this permit and with the provisions of the Montgomery County Road Construction Code and the "Standards and Specifications"adopted by the County Council for Montgomery County.

Notify: MATTHEW MELTON Field Inspector at (240)876-5825 or Matthew.Melton@montgomerycountymd.gov 48 hours before initial start of work, restart of work after 48 hours or more of work stoppage and upon completion of the work for final inspection and bond release.

Upon Permit expiration, payment of an extension fee and approval by the DPS inspector are required for permit extension.

PREMISE ADDRESS: 2 SITES ALONG THIS ROAD: 1006 BRANTFORD AVENUE AND 1206

BRANTFORD AVENUE, SILVER SPRING, MD, 20904

LOT - BLOCK: - ZONE: ELECTION DISTRICT:

PS NUMBER:BOND TYPE:BOND NO.:

SUBDIVISION:PERMIT FEE:

The permit fee is calculated based on the approved Executive Regulations multiplied by the Enterprise Fund Stabilization Factor for the current fiscal year.

Director, Department of Permitting Services

2425 Reedie Drive, 7th Floor ∙ Wheaton, MD ∙ 20902 ∙ (240)777-0311 ∙ (240)777-6256 TTY www.montgomerycountymd.gov/dps

Marc Elrich County Executive

Rabbiah Sabbakhan Director

418557Permit No:Issue Date: 09/05/2025 03/05/2027Expires:

1262957ID:

_ WSSC

14501 SWEITZER LANE

LAUREL, MD 20707

THIS IS TO CERTIFY THAT:

HAS PERMISSION TO: INSTALL PUBLIC UTILITY

SPECIAL NOTES: Sewer rehabilitation work consisting of main line pipe replacement, manhole rehabilitation, replacement of 2 lampholes with manholes, and renew laterals in accordance with WSSC Water plans and specifications. Work shall comply with the current County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). A full width mill and overlay shall be required should the patch not meet the specifications as set forth by the County Specifications and as directed by the DPS ROW inspector. Any and all adjustments of existing utilities within the work area are the responsibility of the permittee prior to mill and overlay and acceptance of work. Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way, including haul route, caused by construction. All lane closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the DPS ROW Inspector. Permittee must have preconstruction meeting with DPS ROW inspector prior to beginning of construction work. Permittee must check and coordinate with other permitted construction on site. ROW Trees: If right-of-way-trees are removed or impacted as determined by the DPS ROW Inspector/certified tree arborist due to construction under this Permit, a Maryland DNR Roadside Permit must be obtained.

The proposed work must comply with the conditions of this permit and with the provisions of the Montgomery County Road Construction Code and the "Standards and Specifications"adopted by the County Council for Montgomery County.

Notify: MATTHEW MELTON Field Inspector at (240)876-5825 or Matthew.Melton@montgomerycountymd.gov 48 hours before initial start of work, restart of work after 48 hours or more of work stoppage and upon completion of the work for final inspection and bond release.

Upon Permit expiration, payment of an extension fee and approval by the DPS inspector are required for permit extension.

PREMISE ADDRESS: Montclair Dr, Kilgore Rd

LOT - BLOCK: - ZONE: ELECTION DISTRICT:

PS NUMBER:BOND TYPE:BOND NO.:

SUBDIVISION:PERMIT FEE:

The permit fee is calculated based on the approved Executive Regulations multiplied by the Enterprise Fund Stabilization Factor for the current fiscal year.

Director, Department of Permitting Services

Marc Elrich County Executive

Rabbiah Sabbakhan Director

389729Permit No:Issue Date: 11/04/2022 05/04/2026Expires:

1262957ID:

_ WSSC

14501 SWEITZER LANE

LAUREL, MD 20707

THIS IS TO CERTIFY THAT:

HAS PERMISSION TO: INSTALL PUBLIC UTILITY

SPECIAL NOTES: Sewer rehabilitation work consisting of pipe lining, pipe replacement, and manhole rehabilitation in accordance with WSSC permit, plans and specifications. Work shall comply with the current County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). A full width mill and overlay shall be required should the patch not meet the specifications as set forth by the County Specifications and as directed by the DPS ROW inspector. Any and all adjustments of existing utilities within the work area are the responsibility of the permittee prior to mill and overlay and acceptance of work. Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way including haul route caused by construction. All lane closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the DPS ROW Inspector. Permittee must have preconstruction meeting with DPS ROW inspector prior to beginning of construction work. Permittee must check and coordinate with other permitted construction on site.

The proposed work must comply with the conditions of this permit and with the provisions of the Montgomery County Road Construction Code and the "Standards and Specifications"adopted by the County Council for Montgomery County.

Notify: MATTHEW MELTON Field Inspector at (240)876-5825 or Matthew.Melton@montgomerycountymd.gov 48 hours before initial start of work, restart of work after 48 hours or more of work stoppage and upon completion of the work for final inspection and bond release.

Upon Permit expiration, payment of an extension fee and approval by the DPS inspector are required for permit extension.

PREMISE ADDRESS: 6 SITES ALONG THIS ROAD: 12502, 12604, 12620, 12701, 12703, AND

12713 LAURIE DRIVE, SILVER SPRING, MD, 20904

LOT - BLOCK: - ZONE: ELECTION DISTRICT:

PS NUMBER:BOND TYPE:BOND NO.:

SUBDIVISION:PERMIT FEE:

The permit fee is calculated based on the approved Executive Regulations multiplied by the Enterprise Fund Stabilization Factor for the current fiscal year.

Director, Department of Permitting Services

Marc Elrich County Executive

Rabbiah Sabbakhan Director

389726Permit No:Issue Date: 11/03/2022 05/03/2026Expires:

1262957ID:

_ WSSC

14501 SWEITZER LANE

LAUREL, MD 20707

THIS IS TO CERTIFY THAT:

HAS PERMISSION TO: INSTALL PUBLIC UTILITY

SPECIAL NOTES: Replace sewer main and manhole. Renew laterals in accordance with WSSC permit, plans and specifications. Work shall comply with the current County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). A full width mill and overlay shall be required should the patch not meet the specifications as set forth by the County Specifications and as directed by the DPS ROW inspector. Any and all adjustments of existing utilities within the work area are the responsibility of the permittee prior to mill and overlay and acceptance of work. Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way including haul route caused by construction. All lane closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the DPS ROW Inspector. Permittee must have preconstruction meeting with DPS ROW inspector prior to beginning of construction work. Permittee must check and coordinate with other permitted construction on site. PERMIT EXTENDED TO 5/3/2026

The proposed work must comply with the conditions of this permit and with the provisions of the Montgomery County Road Construction Code and the "Standards and Specifications"adopted by the County Council for Montgomery County.

Notify: MATTHEW MELTON Field Inspector at (240)876-5825 or Matthew.Melton@montgomerycountymd.gov 48 hours before initial start of work, restart of work after 48 hours or more of work stoppage and upon completion of the work for final inspection and bond release.

Upon Permit expiration, payment of an extension fee and approval by the DPS inspector are required for permit extension.

PREMISE ADDRESS: 2 SITES ALONG THIS ROAD: 12504 EASTBOURNE DRIVE AND 12525

EASTBOURNE DRIVE, SILVER SPRING, MD, 20904

LOT - BLOCK: - ZONE: ELECTION DISTRICT:

PS NUMBER:BOND TYPE:BOND NO.:

SUBDIVISION:PERMIT FEE:

The permit fee is calculated based on the approved Executive Regulations multiplied by the Enterprise Fund Stabilization Factor for the current fiscal year.

Director, Department of Permitting Services

PUBLIC AGENCY (WSSC) ROADSIDE TREE CARE MAINTENANCE AUTHORIZATION

RTPA No.: 2024-0269 Page: 1 of 2

County: Montgomery

Authorization No.: 2024-0269-016

WSSC Contract No.: CI7338A22 - CTO 8-5

Location: Silver Spring Paint Branch Basin

WSSC is hereby granted authorization to:

Prune roots and limbs as necessary to provide for machine access and installation of sewer mains, manholes, lining, and other sewer related rehabilitation at the following locations: Billington Road; Brantford Avenue; Chilton Drive;

Downs Drive; Eastbourne Drive; Eastbourne Place; Laurie Drive; Leister Drive; Montclair Drive; Mullins Street;

Randolph Road; Rigdale Terrace.

1. 1006 Brantford Avenue –

A.) Remove 5”-5”-6”-6”-7” diameter multi-stemmed Sweet Gum; Remove stump and fill hole with topsoil;

level to match existing grade and add grass seed and straw mulch. No suitable location for replacement.

B.) Remove 12”-14”-14”-15” diameter multi-stemmed Silver Maple; Grind stump and flare roots within

12” from base of tree to minimum 12” depth; remove grindings and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree removed with one 1.75” to 2” caliper

Blackgum. Plant replacement tree in same location after stump is ground.

C.) Remove 14” diameter Red Maple; Grind stump and flare roots within 12” from base of tree to minimum 12” depth; remove grindings and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree removed with one 1.75” to 2” caliper Willow Oak. Plant replacement tree in same location after stump is ground.

2. 1205 Brantford Avenue - Remove 8" diameter ornamental cherry if trenching within 3' of base tree.

If tree removed, replace in kind at same or similar location.

3. 12614 Montclair Drive – Prune limbs of one ^'-8" multi-stemmed Japanese Maple as needed. Remove tree only if trenching within 3' of base tree. If tree removed, replace in kind at location minimum 10' from SHC.

4. 12600 Eastbourne Drive - ONLY IF a minimum of 5.5’ clearance cannot be provided between trench and tree, Remove 21” diameter ornamental Cherry; Grind stump and flare roots within 12” from base of tree to minimum 12” depth; remove grindings and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree removed with one 1.25” to 1.75” caliper Okame Cherry. Plant replacement tree 12’ left of driveway and center in treelawn between sidewalk and back of curb.

5. 12505 Laurie Drive - ONLY IF a minimum of 6’ clearance cannot be provided between trench and tree, Remove 24” diameter Pin Oak; Grind stump and flare roots within 12” from base of tree to minimum 12” depth; remove grindings and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree removed with one 1.25” to 1.75” caliper Red Bud in same location.

6. 12617 Laurie Drive - Remove 1” and 2” diameter trees if excavation is within 3’ of trees; Remove stump and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree(s) if removed each with one 1.25” to 1.75” caliper Okame Cherry to be located minimum 10' from SHC.

7. 12704 Lauri Drive - Remove 7" diameter Pear Tree and remove stump; Replace tree removed with one

1.75" to 2" caliper Black Gum; Plant replacement tree 15' left of SHC and 5' behind back of curb.

8. 1203 Brantford Avenue – Remove 4” tree. Remove stump and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree removed with one 1.25” to 1.75” caliper

Redbud. Plant replacement tree 6’ left of SHC and 4’ behind edge of pavement.

gwallac Highlight gwallac Highlight gwallac Highlight

Page: 2 of 2

9. 1408 Leister Drive - Remove 24” diameter ornamental Cherry; Grind stump and flare roots within 12” from base of tree to minimum 12” depth; remove grindings and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree removed with one 1.25” to 1.75” caliper

Red Bud. Plant replacement tree 10’ right of the SHC and 6’ behind curb.

10. 12702 Laurie Drive - ONLY IF a minimum of 6’ clearance cannot be provided between trench and tree, Remove 24” diameter Pear tree; Grind stump and flare roots within 12” from base of tree to minimum 12” depth; remove grindings and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. If removed, replace tree removed with one 1.25” to 1.75” to 2” caliper Blackgum. Plant replacement tree 15’ right of the SHC and 6’ behind curb.

11. 1301 Mullins Street - ONLY IF a minimum of 6.5’ clearance cannot be provided between trench and tree, Remove 28” diameter Ornamental cherry; Grind stump and flare roots within 12” from base of tree to minimum 12” depth; remove grindings and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree removed with one 1.25” to 1.75” caliper Okame Cherry. Plant replacement tree 14’ right of driveway and 6’ behind curb.

12. 1214 Downs Drive - Prune/Remove two 3.5' height Japanese Barberry next to mailbox as needed. Protect

9" diameter Japanese Maple if open cutting in vicinity.

* Notify adjacent property owner(s) at least 48 hours prior to tree removal.

** Denotes private tree. Private trees and trees outside of public road ROW are not subject to MD Roadside

Tree Law

The following ISA standards for ‘open cut’ trenching shall be used to avoid impact to roadside trees. (Please note: Condition #7) If

‘open cut’ trenching is within standard distances noted, responsible person must contact Environmental Group for field inspection and possible amended tree authorization for removal.

Tree Size: Distance from center of tree:

Up to 6” DBH (diameter) Dripline

6 – 9” DBH 5 ft 10 – 14” DBH 10 ft

15 – 19” DBH 12 ft Over 19” DBH 15 ft

Reason for tree care: Sewer main/ manhole rehabilitation Contract No. CI7338A22 Gary Wallace

Number of trees removed: 7 to 13

Number of trees planted: 6 to 12

Number of trees pruned: 100

Signature of Roadside Tree Care Expert: John ‘Doug’ Sievers Date: 4/3/2024

John Sievers

CONDITIONS:

1. All work accomplished under this authorization shall comply with the Maryland Department of

Natural Resources Roadside Tree Care Law. (COMAR 08.07.02 or Natural Resources Article 5-401 et seq.).

2. All work including trimming, root pruning, and removals shall be performed by a Licensed Tree

Care Expert under the supervision of a Roadside Tree Care Expert.

3. Tree branch trimming shall be in such a manner so as not to cause damage to other parts of the tree or to other plants or property. Pruning of limbs must be in conformance with the ANSI A300 standards.

4. Roots one inch in diameter or greater shall be cut flush on the tree side of the trench. Excavation to expose roots for pruning must be performed by hand digging.

5. All stockpile fill or excavated material must be either placed on impermeable material or placed outside the dripline of the tree.

6. Tree removal is necessary to eliminate a hazard to public health, public safety, and /or property. If the expressed authorization is for tree care work other than removal and tree removal becomes necessary, then the WSSC or its representative is required to contact the Environmental Group at

301-206-8077 to obtain a revised authorization.

7. WSSC or its representative is required to consider alternative repair/construction methods that avoid open trenching and tree removal as a condition of this authorization.

8. This authorization expires one year from date of issuance.