Permits.pdf
PDF 489 KB Posted
- Attached to
- Laurie Drive Sewer Rehabilitation
- Solicitation number
- 86585
- Issued by
- Prince George's County, Maryland
About this file
This file contains right-of-way construction permits issued by the Montgomery County, Maryland Department of Permitting Services for the Washington Suburban Sanitary Commission (WSSC) and a roadside tree care maintenance authorization related to sewer rehabilitation work in the Paint Branch Basin. The permits authorize WSSC to install public utility infrastructure consisting of sewer main relay, replacement and rehabilitation work; manhole rehabilitation and replacement; replacement of lampholes with manholes; and renewal of sewer laterals across multiple project sites in Silver Spring, Maryland. Four permits are documented with issue dates ranging from November 2022 to September 2025, with expiration dates between May 2026 and March 2027. The work spans six locations along Laurie Drive, two sites on Eastbourne Drive, two sites on Brantford Avenue, and multiple streets including Billington Road, Chilton Drive, Downs Drive, Leister Drive, Montclair Drive, Mullins Street, Randolph Road, and Rigdale Terrace. All work must comply with current County Specifications for Utility Construction Permit, Public Right-of-Way Accessibility Guidelines (PROWAG), Montgomery County Road Construction Code, Work Zone Temporary Traffic Control standards, and MCDOT-approved Traffic Control Plans. Permittees must notify Field Inspector Matthew Melton at (240)876-5825 or Matthew.Melton@montgomerycountymd.gov at least 48 hours before initial work start, restart after work stoppage exceeding 48 hours, and upon work completion for final inspection and bond release.
The roadside tree care maintenance authorization (2024-0269) permits WSSC to prune roots and limbs and authorizes removal and replacement of up to 13 trees while protecting approximately 100 trees through pruning. The authorization specifies tree removal and replacement requirements at 12 specific residential locations, with replacement trees ranging from 1.25 to 2 inches in caliper diameter according to species and site conditions. All tree work must comply with Maryland Department of Natural Resources Roadside Tree Care Law and be performed by licensed tree care experts under supervision of a certified roadside tree care expert. Work authorization expires one year from the April 3, 2024 issuance date. The related contract opportunity solicits sealed responses from contractors for the Laurie Drive Sewer Rehabilitation project, which encompasses 1,171 linear feet of defective sewer mains, 1,006 linear feet of defective sewer laterals, and three manholes in the Paint Branch Basin, with responses due by 2:00 pm on December 23, 2025, via WSSC's eProcurement Portal.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF PERMITTING SERVICES
RIGHT-OF-WAY CONSTRUCTION PERMIT
Marc Elrich County Executive
Rabbiah Sabbakhan Director
389716Permit No:Issue Date: 11/03/2022 05/03/2026Expires:
1262957ID:
_ WSSC
14501 SWEITZER LANE
LAUREL, MD 20707
THIS IS TO CERTIFY THAT:
HAS PERMISSION TO: INSTALL PUBLIC UTILITY
SPECIAL NOTES: Relay sewer main and line manhole. Renew laterals in accordance with WSSC permit, plans and specifications. Work shall comply with the current County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). A full width mill and overlay shall be required should the patch not meet the specifications as set forth by the County Specifications and as directed by the DPS ROW inspector. Any and all adjustments of existing utilities within the work area are the responsibility of the permittee prior to mill and overlay and acceptance of work. Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way including haul route caused by construction. All lane closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the DPS ROW Inspector. Permittee must have preconstruction meeting with DPS ROW inspector prior to beginning of construction work. Permittee must check and coordinate with other permitted construction on site.
EXTENDED TO 5/3/2026/ Note: Approved for renewal on 6/2/2025.
The proposed work must comply with the conditions of this permit and with the provisions of the Montgomery County Road Construction Code and the "Standards and Specifications"adopted by the County Council for Montgomery County.
Notify: MATTHEW MELTON Field Inspector at (240)876-5825 or Matthew.Melton@montgomerycountymd.gov 48 hours before initial start of work, restart of work after 48 hours or more of work stoppage and upon completion of the work for final inspection and bond release.
Upon Permit expiration, payment of an extension fee and approval by the DPS inspector are required for permit extension.
PREMISE ADDRESS: 2 SITES ALONG THIS ROAD: 1006 BRANTFORD AVENUE AND 1206
BRANTFORD AVENUE, SILVER SPRING, MD, 20904
LOT - BLOCK: - ZONE: ELECTION DISTRICT:
PS NUMBER:BOND TYPE:BOND NO.:
SUBDIVISION:PERMIT FEE:
The permit fee is calculated based on the approved Executive Regulations multiplied by the Enterprise Fund Stabilization Factor for the current fiscal year.
Director, Department of Permitting Services
2425 Reedie Drive, 7th Floor ∙ Wheaton, MD ∙ 20902 ∙ (240)777-0311 ∙ (240)777-6256 TTY www.montgomerycountymd.gov/dps
Marc Elrich County Executive
Rabbiah Sabbakhan Director
418557Permit No:Issue Date: 09/05/2025 03/05/2027Expires:
1262957ID:
_ WSSC
14501 SWEITZER LANE
LAUREL, MD 20707
THIS IS TO CERTIFY THAT:
HAS PERMISSION TO: INSTALL PUBLIC UTILITY
SPECIAL NOTES: Sewer rehabilitation work consisting of main line pipe replacement, manhole rehabilitation, replacement of 2 lampholes with manholes, and renew laterals in accordance with WSSC Water plans and specifications. Work shall comply with the current County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). A full width mill and overlay shall be required should the patch not meet the specifications as set forth by the County Specifications and as directed by the DPS ROW inspector. Any and all adjustments of existing utilities within the work area are the responsibility of the permittee prior to mill and overlay and acceptance of work. Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way, including haul route, caused by construction. All lane closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the DPS ROW Inspector. Permittee must have preconstruction meeting with DPS ROW inspector prior to beginning of construction work. Permittee must check and coordinate with other permitted construction on site. ROW Trees: If right-of-way-trees are removed or impacted as determined by the DPS ROW Inspector/certified tree arborist due to construction under this Permit, a Maryland DNR Roadside Permit must be obtained.
The proposed work must comply with the conditions of this permit and with the provisions of the Montgomery County Road Construction Code and the "Standards and Specifications"adopted by the County Council for Montgomery County.
Notify: MATTHEW MELTON Field Inspector at (240)876-5825 or Matthew.Melton@montgomerycountymd.gov 48 hours before initial start of work, restart of work after 48 hours or more of work stoppage and upon completion of the work for final inspection and bond release.
Upon Permit expiration, payment of an extension fee and approval by the DPS inspector are required for permit extension.
PREMISE ADDRESS: Montclair Dr, Kilgore Rd
LOT - BLOCK: - ZONE: ELECTION DISTRICT:
PS NUMBER:BOND TYPE:BOND NO.:
SUBDIVISION:PERMIT FEE:
The permit fee is calculated based on the approved Executive Regulations multiplied by the Enterprise Fund Stabilization Factor for the current fiscal year.
Director, Department of Permitting Services
Marc Elrich County Executive
Rabbiah Sabbakhan Director
389729Permit No:Issue Date: 11/04/2022 05/04/2026Expires:
1262957ID:
_ WSSC
14501 SWEITZER LANE
LAUREL, MD 20707
THIS IS TO CERTIFY THAT:
HAS PERMISSION TO: INSTALL PUBLIC UTILITY
SPECIAL NOTES: Sewer rehabilitation work consisting of pipe lining, pipe replacement, and manhole rehabilitation in accordance with WSSC permit, plans and specifications. Work shall comply with the current County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). A full width mill and overlay shall be required should the patch not meet the specifications as set forth by the County Specifications and as directed by the DPS ROW inspector. Any and all adjustments of existing utilities within the work area are the responsibility of the permittee prior to mill and overlay and acceptance of work. Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way including haul route caused by construction. All lane closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the DPS ROW Inspector. Permittee must have preconstruction meeting with DPS ROW inspector prior to beginning of construction work. Permittee must check and coordinate with other permitted construction on site.
The proposed work must comply with the conditions of this permit and with the provisions of the Montgomery County Road Construction Code and the "Standards and Specifications"adopted by the County Council for Montgomery County.
Notify: MATTHEW MELTON Field Inspector at (240)876-5825 or Matthew.Melton@montgomerycountymd.gov 48 hours before initial start of work, restart of work after 48 hours or more of work stoppage and upon completion of the work for final inspection and bond release.
Upon Permit expiration, payment of an extension fee and approval by the DPS inspector are required for permit extension.
PREMISE ADDRESS: 6 SITES ALONG THIS ROAD: 12502, 12604, 12620, 12701, 12703, AND
12713 LAURIE DRIVE, SILVER SPRING, MD, 20904
LOT - BLOCK: - ZONE: ELECTION DISTRICT:
PS NUMBER:BOND TYPE:BOND NO.:
SUBDIVISION:PERMIT FEE:
The permit fee is calculated based on the approved Executive Regulations multiplied by the Enterprise Fund Stabilization Factor for the current fiscal year.
Director, Department of Permitting Services
Marc Elrich County Executive
Rabbiah Sabbakhan Director
389726Permit No:Issue Date: 11/03/2022 05/03/2026Expires:
1262957ID:
_ WSSC
14501 SWEITZER LANE
LAUREL, MD 20707
THIS IS TO CERTIFY THAT:
HAS PERMISSION TO: INSTALL PUBLIC UTILITY
SPECIAL NOTES: Replace sewer main and manhole. Renew laterals in accordance with WSSC permit, plans and specifications. Work shall comply with the current County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). A full width mill and overlay shall be required should the patch not meet the specifications as set forth by the County Specifications and as directed by the DPS ROW inspector. Any and all adjustments of existing utilities within the work area are the responsibility of the permittee prior to mill and overlay and acceptance of work. Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way including haul route caused by construction. All lane closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the DPS ROW Inspector. Permittee must have preconstruction meeting with DPS ROW inspector prior to beginning of construction work. Permittee must check and coordinate with other permitted construction on site. PERMIT EXTENDED TO 5/3/2026
The proposed work must comply with the conditions of this permit and with the provisions of the Montgomery County Road Construction Code and the "Standards and Specifications"adopted by the County Council for Montgomery County.
Notify: MATTHEW MELTON Field Inspector at (240)876-5825 or Matthew.Melton@montgomerycountymd.gov 48 hours before initial start of work, restart of work after 48 hours or more of work stoppage and upon completion of the work for final inspection and bond release.
Upon Permit expiration, payment of an extension fee and approval by the DPS inspector are required for permit extension.
PREMISE ADDRESS: 2 SITES ALONG THIS ROAD: 12504 EASTBOURNE DRIVE AND 12525
EASTBOURNE DRIVE, SILVER SPRING, MD, 20904
LOT - BLOCK: - ZONE: ELECTION DISTRICT:
PS NUMBER:BOND TYPE:BOND NO.:
SUBDIVISION:PERMIT FEE:
The permit fee is calculated based on the approved Executive Regulations multiplied by the Enterprise Fund Stabilization Factor for the current fiscal year.
Director, Department of Permitting Services
PUBLIC AGENCY (WSSC) ROADSIDE TREE CARE MAINTENANCE AUTHORIZATION
RTPA No.: 2024-0269 Page: 1 of 2
County: Montgomery
Authorization No.: 2024-0269-016
WSSC Contract No.: CI7338A22 - CTO 8-5
Location: Silver Spring Paint Branch Basin
WSSC is hereby granted authorization to:
Prune roots and limbs as necessary to provide for machine access and installation of sewer mains, manholes, lining, and other sewer related rehabilitation at the following locations: Billington Road; Brantford Avenue; Chilton Drive;
Downs Drive; Eastbourne Drive; Eastbourne Place; Laurie Drive; Leister Drive; Montclair Drive; Mullins Street;
Randolph Road; Rigdale Terrace.
1. 1006 Brantford Avenue –
A.) Remove 5”-5”-6”-6”-7” diameter multi-stemmed Sweet Gum; Remove stump and fill hole with topsoil;
level to match existing grade and add grass seed and straw mulch. No suitable location for replacement.
B.) Remove 12”-14”-14”-15” diameter multi-stemmed Silver Maple; Grind stump and flare roots within
12” from base of tree to minimum 12” depth; remove grindings and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree removed with one 1.75” to 2” caliper
Blackgum. Plant replacement tree in same location after stump is ground.
C.) Remove 14” diameter Red Maple; Grind stump and flare roots within 12” from base of tree to minimum 12” depth; remove grindings and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree removed with one 1.75” to 2” caliper Willow Oak. Plant replacement tree in same location after stump is ground.
2. 1205 Brantford Avenue - Remove 8" diameter ornamental cherry if trenching within 3' of base tree.
If tree removed, replace in kind at same or similar location.
3. 12614 Montclair Drive – Prune limbs of one ^'-8" multi-stemmed Japanese Maple as needed. Remove tree only if trenching within 3' of base tree. If tree removed, replace in kind at location minimum 10' from SHC.
4. 12600 Eastbourne Drive - ONLY IF a minimum of 5.5’ clearance cannot be provided between trench and tree, Remove 21” diameter ornamental Cherry; Grind stump and flare roots within 12” from base of tree to minimum 12” depth; remove grindings and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree removed with one 1.25” to 1.75” caliper Okame Cherry. Plant replacement tree 12’ left of driveway and center in treelawn between sidewalk and back of curb.
5. 12505 Laurie Drive - ONLY IF a minimum of 6’ clearance cannot be provided between trench and tree, Remove 24” diameter Pin Oak; Grind stump and flare roots within 12” from base of tree to minimum 12” depth; remove grindings and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree removed with one 1.25” to 1.75” caliper Red Bud in same location.
6. 12617 Laurie Drive - Remove 1” and 2” diameter trees if excavation is within 3’ of trees; Remove stump and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree(s) if removed each with one 1.25” to 1.75” caliper Okame Cherry to be located minimum 10' from SHC.
7. 12704 Lauri Drive - Remove 7" diameter Pear Tree and remove stump; Replace tree removed with one
1.75" to 2" caliper Black Gum; Plant replacement tree 15' left of SHC and 5' behind back of curb.
8. 1203 Brantford Avenue – Remove 4” tree. Remove stump and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree removed with one 1.25” to 1.75” caliper
Redbud. Plant replacement tree 6’ left of SHC and 4’ behind edge of pavement.
gwallac Highlight gwallac Highlight gwallac Highlight
Page: 2 of 2
9. 1408 Leister Drive - Remove 24” diameter ornamental Cherry; Grind stump and flare roots within 12” from base of tree to minimum 12” depth; remove grindings and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree removed with one 1.25” to 1.75” caliper
Red Bud. Plant replacement tree 10’ right of the SHC and 6’ behind curb.
10. 12702 Laurie Drive - ONLY IF a minimum of 6’ clearance cannot be provided between trench and tree, Remove 24” diameter Pear tree; Grind stump and flare roots within 12” from base of tree to minimum 12” depth; remove grindings and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. If removed, replace tree removed with one 1.25” to 1.75” to 2” caliper Blackgum. Plant replacement tree 15’ right of the SHC and 6’ behind curb.
11. 1301 Mullins Street - ONLY IF a minimum of 6.5’ clearance cannot be provided between trench and tree, Remove 28” diameter Ornamental cherry; Grind stump and flare roots within 12” from base of tree to minimum 12” depth; remove grindings and fill hole with topsoil; level to match existing grade and add grass seed and straw mulch. Replace tree removed with one 1.25” to 1.75” caliper Okame Cherry. Plant replacement tree 14’ right of driveway and 6’ behind curb.
12. 1214 Downs Drive - Prune/Remove two 3.5' height Japanese Barberry next to mailbox as needed. Protect
9" diameter Japanese Maple if open cutting in vicinity.
* Notify adjacent property owner(s) at least 48 hours prior to tree removal.
** Denotes private tree. Private trees and trees outside of public road ROW are not subject to MD Roadside
Tree Law
The following ISA standards for ‘open cut’ trenching shall be used to avoid impact to roadside trees. (Please note: Condition #7) If
‘open cut’ trenching is within standard distances noted, responsible person must contact Environmental Group for field inspection and possible amended tree authorization for removal.
Tree Size: Distance from center of tree:
Up to 6” DBH (diameter) Dripline
6 – 9” DBH 5 ft 10 – 14” DBH 10 ft
15 – 19” DBH 12 ft Over 19” DBH 15 ft
Reason for tree care: Sewer main/ manhole rehabilitation Contract No. CI7338A22 Gary Wallace
Number of trees removed: 7 to 13
Number of trees planted: 6 to 12
Number of trees pruned: 100
Signature of Roadside Tree Care Expert: John ‘Doug’ Sievers Date: 4/3/2024
John Sievers
CONDITIONS:
1. All work accomplished under this authorization shall comply with the Maryland Department of
Natural Resources Roadside Tree Care Law. (COMAR 08.07.02 or Natural Resources Article 5-401 et seq.).
2. All work including trimming, root pruning, and removals shall be performed by a Licensed Tree
Care Expert under the supervision of a Roadside Tree Care Expert.
3. Tree branch trimming shall be in such a manner so as not to cause damage to other parts of the tree or to other plants or property. Pruning of limbs must be in conformance with the ANSI A300 standards.
4. Roots one inch in diameter or greater shall be cut flush on the tree side of the trench. Excavation to expose roots for pruning must be performed by hand digging.
5. All stockpile fill or excavated material must be either placed on impermeable material or placed outside the dripline of the tree.
6. Tree removal is necessary to eliminate a hazard to public health, public safety, and /or property. If the expressed authorization is for tree care work other than removal and tree removal becomes necessary, then the WSSC or its representative is required to contact the Environmental Group at
301-206-8077 to obtain a revised authorization.
7. WSSC or its representative is required to consider alternative repair/construction methods that avoid open trenching and tree removal as a condition of this authorization.
8. This authorization expires one year from date of issuance.