This document is a past performance questionnaire for a construction contractor being considered for a repair project at Travis Air Force Base in California. The project involves repairing the Combat Arms Training and Marksmanship facility to comply with Air Force engineering standards, including removing exterior walls, constructing a new control booth and low wall at the ready line perimeter, and replacing an electrical panel and lighting. The questionnaire asks the respondent to rate the contractor's past performance on a scale of 1 to 5 in areas such as management, quality control, scheduling, and work with government personnel. It also asks if the contractor was ever issued a cure notice and if the respondent would award another contract to the contractor, with an option to explain any ratings of 4 or 5, or answers of no. The completed survey must be returned to the 60th Contracting Squadron by February 19, 2020.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

When Filled In This Document Is Source Selection Sensitive IAW FAR 2.101 and FAR 3.104

SUBJECT: Request for Past Performance Evaluation

You have been identified as a point of contact for a past and/or present performance evaluation of the firm listed on the attached questionnaire. This firm is currently being considered for a construction contract at Travis AFB, CA.

Your prompt attention to this questionnaire will be greatly appreciated. If you have any questions concerning this request, please contact MSgt Marcus Thomas at (707) 424-7736 or marcus.thomas.3@us.af.mil

BRYAN ARMSTRONG

Contracting Officer

1 Atch Past and Present Performance Questionnaire mailto:marcus.thomas.3@us.af.mil

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

A. GENERAL INFORMATION: Please correct any information below known to be inaccurate:

Contractor’s Name:

Address:

Phone Number:

Project Title and Brief Description of Work:

Contract Number Provided by Offeror:

Dollar Amount:

Contract Period or Dates of Performance Provided by Offeror:

Contractor performed as the Prime Contractor Sub-Contractor Key Personnel.

B. RESPONDENT INFORMATION:

Name of Respondent: Title:

Address: Telephone Number:

Fax Number:

Email Address:

Respondent wet or digital signature: _________________________

C. EMAIL COMPLETED SURVEY FORM TO:

60th Contracting Squadron Attn: MSgt Marcus Thomas marcus.thomas.3@us.af.mil mailto:marcus.thomas.3@us.af.mil

D. PERFORMANCE INFORMATION: Choose the appropriate number on the scale (1, 2, 3, 4, and 5) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF 4 or 5.

1 2 3 4 5

Substantial Confidence

Satisfactory Confidence

Limited Confidence

No Confidence Unknown Confidence

Based on the offeror’s performance record, the government has a high expectation that the offeror will successfully perform the required effort.

Based on the offeror’s performance record, the government has an expectation that the offeror will successfully perform the required effort.

Based on the offeror’s performance record, the government has a low expectation that the offeror will successfully perform the required effort

Based on the offeror’s performance record, the government has no expectation that the offeror will successfully perform the required effort

No performance record is identifiable or the offeror’s performance record is so sparse that no confidence assessment rating can be reasonably assigned.

Place an “X” in the appropriate column using the definitions matrix above.

The contractor: 1 2 3 4 5

1. Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.

2. Demonstrated the ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.

3. Delegated authority to project managers and supervisors commensurate with contract requirements.

4. Provided effective quality control and/or inspection procedures to meet contract requirements.

5. Identified problems as they occurred.

6. Suggested alternative approaches to problems.

7. How would you rate the contractor's overall performance?

8. Developed realistic progress schedules.

9. Met established project schedules.

10. Provided timely resolution of warranty defects.

11. Provided adequate project supervision.

12. Paid subcontractors/suppliers in a timely manner.

13. Provided accurate and complete line item cost proposals including all aspects of work required for each task.

14. Cooperated with Government personnel after award.

15. Completed projects involving mechanical, electrical and plumbing renovations.

16. Is familiar with Unified Facilities Criteria’s (UFCs) for HVAC, Plumbing and Interior Electrical Systems.

17. Modified fire alarm systems and wet pipe fire sprinkler systems.

The contractor: 1 2 3 4 5

18. Was the contractor ever issued a cure or show cause notice under the referenced contract?

If yes, explain.

EXPLANATION:

□ Yes

□ No

19. Would you award another contract to this contractor? If not, explain.

EXPLANATION:

□ Yes

□ No

B. RESPONDENT INFORMATION:
Place an “X” in the appropriate column using the definitions matrix above.
2020-02-19T15:21:07-0800
ARMSTRONG.BRYAN.D.1175356637

File details come from the government source that posted it. Updated .