Contract Summary
This is a Sole Source Justification Form (Bulletin Reference 26-448DOIT-TELEC-B-51674) submitted by the Illinois Department of Innovation and Technology (DoIT) for a procurement from i3 Broadband. The form documents DoIT's justification for awarding a sole source contract for dark fiber infrastructure services without competitive bidding. The procurement was approved by the State Purchasing Officer (David Papp) on April 8, 2026, and authorized by the Chief Procurement Officer (Ellen H. Daley) on April 22, 2026.
The contract provides network backbone services supporting Point of Presence (POP) and Internet Local Area (ILA) sites across the Champaign, Kankakee, and Chicago areas. The services consist of four fiber rings (I-57 North Ring #1, I-74 West Ring #1, I-72 West Ring #2, I-74 East Ring #6) totaling approximately 68 miles of dark fiber with 16 fiber strands, plus Layer Two Transport to three locations. The initial term runs from April 30, 2026, through July 14, 2034 (8 years) with no renewal options. The contract is structured as a reciprocal, no-cost Indefeasible Right of Use (IRU) agreement, where i3 Broadband's annual maintenance costs of $23,410 are offset by DoIT's reciprocal obligation valued at $55,580.70, resulting in i3 Broadband paying the State a cost difference of $32,170.70. The stated contract value to DoIT is $461,319.81 for the initial term, and the agency determined this arrangement saves the State $181,646.94 compared to a standard commercial arrangement. Funding is provided through state appropriated funds. The sole source justification is based on the uniqueness of the fiber route (the only available fiber on the specified path from I-57 & Olympian to 350 E Cermak in Chicago) and compatibility with existing infrastructure; DoIT determined that building alternative fiber infrastructure would cost approximately $6,114,000 at $120,000 per mile in an urban environment.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sole Source Justification Form
Version 7.01 Page 1 of 6
Bulletin Reference Number 26-448DOIT-TELEC-B-51674
Requesting Agency/University DoIT
Sole Source Justification Form - Part I Section I - General Information
Department/Bureau/Section: ICN-WAN Backbone Services - Network Services - DOIT
Need Identified Date: Mar 1, 2026 Supply/Service Need By Date: Apr 30, 2026
Project Title: i3 Broadband Scott Hall IRU Dark Fiber - No Cost
Vendor: i3 Broadband
Provide a description of the supplies or services required:
Network Backbone services supporting the Champaign/Kankakee/Chicago area POP Sites and ILA sites. This allows for backbone connectivity related to POP to POP and POP to ILA communications. This supports ALL network services to and through the Champaign and Chicago Illinois area.
Value: Actual Value of Initial Term, this Change Order or Amendment: 461,319.81
Will this Sole Source amend a Professional or Artistic Services contract? Yes No
*Sole Source may not be used for amendments for Professional or Artistic Services if the amendment would increase the value by more than 5% of the initial award or extend the term by more than 60 days.
Type: New Sole Economically Feasible Source
Section II - Proposed Term
One-Time Purchase Term Contract
Estimated Contract Begin Date: 4/30/2026
Estimated Contract End Date: 7/14/2034
Number of Potential Renewals: 0
Length of Each Renewal in Months: 0
Total Value of All Renewals: 0
If a Term Contract, does the term, including renewals, exceed 12 months? Yes No
If yes, provide a detailed justification including any economic benefit received for agreeing to a multi-year term:
The Agency is entering into a reciprocal No Cost agreement with i3 Broadband.
Section III - Funding Source Select the type of funding to be used (Check all that apply): State Appropriate Funds Federal Funds Other (Explain):
Section IV - Sole Source Justification
This purchase is economically only available from a single source primarily because it is: (If "Other" explain in one sentence)
Compatibility of Equipment, Accessories, Replacement Parts or Service
Are there secondary justification(s) for this sole source? Yes No
Another justification that this purchase is only available from a sole source is because it is:
This fiber is the only fiber available on the path as described above, this path is also currently operational, representing a significant inves
Version 7.01 Page 2 of 6
Bulletin Reference Number 26-448DOIT-TELEC-B-51674
Requesting Agency/University DoIT
Another justification that this purchase is only available from a sole source is because it is:
Section V - Purchase History
Has the Agency or University Purchased these supplies or services in the past? Yes No
Term Term From Term To Value Description Contract Number Type
1 Jul 15, 2014 Jul 14, 2024 515,520 UC2B/IGA /IRU Sole Source
If more than 10, or if other comments, explain:
Section VI - Business Rationale
1. Provide a detailed explanation of the need for the supplies or services:
This allows for backbone connectivity related to POP to POP and POP to ILA communications. This supports ALL network services to and through the Chicago and Champaign Illinois area.
Version 7.01 Page 3 of 6
Bulletin Reference Number 26-448DOIT-TELEC-B-51674
Requesting Agency/University DoIT
2. Provide a list and describe in detail the specifications required to satisfy the need:
The Illinois Department of Innovation and Technology (DoIT), Networks Division, has a critical need for the fiber route services provided by i3 Broadband to ensure continued, reliable network connectivity for State operations and affiliated institutions. These fiber routes are essential for maintaining high-speed, redundant, and secure data transport across key locations, including Champaign/Kankakee/ Chicago area POP Sites and ILA sites. The services are required to support government communications infrastructure, facilitate data exchange between State offices.
Pricing Table. Includes reference number from reciprocal contract to determine "cost difference".
Reciprocal Contract Value (DoIT) Description Mile Maintenance #Fiber Strand Mile Fiber Maintenance Annual Maintenance Term Cost I-57 & Olympian 136.50 NA 2 273.00 NA NA NA to Cermak I-57 & Bradley 139.65 139.65 2 279.30 $398.00 $55,580.70 $461,319.81 to Cermak Total $55,580.70 $461,319.81
Contract Value (i3 Broadband - @Scott Hall) Description Mile Maintenance #Fiber Strand Mile Maintenance Annual Maintenance Term Cost I-57 North Ring #1 17.38 17.38 4 69.52 $459.47 $7,985.59 $66,280.39 I-57 & Olympian I-74 West Ring #1 17.38 NA 4 69.52 NA NA NA I-57 & Olympian I-72 West Ring #2 17.59 17.59 4 70.36 $459.47 $8,082.08 $67,081.24 I-57 & Bradley I-57 South Ring #2 17.59 NA 4 70.36 NA NA NA I-57 & Bradley I-74 East Ring #6 15.98 15.98 4 63.92 $459.47 $7,342.33 $60,941.34 Rt 150 & High Cross Total $23,410.00 $194,302.97
Ancillary Services Other Services Detail Quantity Monthly Cost Annual Cost Term Cost Layer Two Transport to Three Locations 3 $240.00 $8,640.00 $69.120.00 (313 Mattis-HCFS), SOS on Bradley, IDOT on Market Street)
Reciprocal Agreement Cost: $55,580.70 i3 Broadband Agreement Cost: $23,410.00 Cost Difference - i3 Broadband Pays $32,170.70
3. Provide detail explaining the justification selected in Section IV to explain why the requested supplies or services are the only ones available that can satisfy the agency or university requirements?
This fiber is the only fiber available on the path as described above. Staff came to this determination based on building review, area review and consulted with fiber operator. As well as in current contract with vendor for other IRU locations, would like all contracts with said vendor to end together.
Version 7.01 Page 4 of 6
Bulletin Reference Number 26-448DOIT-TELEC-B-51674
Requesting Agency/University DoIT
4. What are the unique features of the supplies or services that are not available in any other product or by any other vendor? Provide specific quantifiable factors/qualifications:
Fiber infrastructure is existing infrastructure that the state can use to satisfy its data / connectivity needs to Agencies, K12 and Higher Education. The connection points required include the I-57 & Olympia to 350 E Cermak in Chicago. Creating a new path would require
50.95 miles of fiber at a value of $6,114,000.00 of infrastructure/fiber optic investments based on average cost $120K per mile for building in a densely populated urban environment.
5. Has the Agency or University considered alternative supplies or services to satisfy their need? Yes No
5a. If yes, name the alternative vendors whose supplies or services were evaluated:
In review of fiber routes in Illinois, the Agency has determined that are no vendors available with the same footprint.
5b. If yes, what were the alternatives for each vendor and why were they unacceptable? Be specific with regard to features, characteristics, requirements, capabilities and compatibility:
In review of fiber routes in Illinois, the Agency has determined that are no vendors available with the same footprint.
5c. Explain how the market evaluation was conducted?
*This evaluation is to determine available options within a market. If the evaluation is to determine quality or best suited option, this is not the appropriate source selection. Under no circumstances shall the evaluation consist of testing alternative options. These activities must be conducted in a competitive transparent environment (i.e. IFB or RFP).
Based on current and past contracts with the State and quotes for similar services (IRU), the Agency determined there are no vendors with the same footprint. The Staff came to this determination based on building review, area review and consulted with fiber operator as well as in current contract with vendor for other IRU locations.
6. Are there resellers or distributors?
Yes No N/A
7. What efforts were made to get the best possible price (i.e. did the agency/university negotiate) and how did you determine the price for this purchase is considered fair and reasonable?
Agency used vendors public pricing model including historic pricing in previous and current IRU's, which also matches the State's model for IRU services. The Agency has negotiated a No Cost IRU arrangement with i3 Broadband which resulted in the State saving $181,646.94.
8. Will this purchase obligate the State to this vendor for future purchases such as maintenance, licensing or continuing need?
Yes No
9. What will be the financial or other impact to the State if this sole source is not approved and a competitive bid is required?
The most significant impact would be a loss of service in the Champaign/Kankakee/Chicago area POP Sites and ILA sites which would affect the Network services across the State. If the Agency was required to competitively bid this procurement it would cost the State $869,006.94 as opposed to the No Cost arrangement contained herein.
10. Is there any additional information you would like to add to justify this sole source?
Currently in a 20-year term contract with vendor, and would like to continue this contract with said vendor in order for all contracts to end at the same time as well as maintain the No Cost arrangement within this agreement.
Version 7.01 Page 5 of 6
Bulletin Reference Number 26-448DOIT-TELEC-B-51674
Requesting Agency/University DoIT
Section VII
Requesting Department Representative
Requesting Department Signature Required
I know and understand the contents of this Sole Source Justification and attest that all statements are true and correct and the fairness and reasonableness of the price was adequately confirmed.
Date Apr 7, 2026
Printed Name Patrick Kelleher E-mail Address patrick.kelleher@illinois.gov
Phone Number 217-557-7303
State Agency Bureau/Division Head or University Purchasing Director Approval and Signature Required
I know and understand the contents of this Sole Source Justification and attest that all statements are true and correct and the fairness and reasonableness of the price was adequately confirmed. (All prior form fields will lock once this e-signature is completed)
E-mail Address christopher.brinkmeyer@illinois.gov
Phone Number 217-524-7057 Date Apr 7, 2026
Printed Name Chris Brinkmeyer
Agency Bureau/Division Head or University Purchasing Director and Not a Designee
SPO Approval and Signature Required
I have reviewed and understand the contents of this Sole Source Justification and agree with the State Agency or University determination.
I have reviewed and understand the contents of this Sole Source Justification and do not agree with the State Agency or University determination. As a result, the State Agency or University must explore other sourcing methods to satisfy their need.
State Purchasing Officer Signature Phone Number 217-720-6643 Date Apr 8, 2026
Printed Name David Papp E-mail Address David.Papp@Illinois.gov
Version 7.01 Page 6 of 6
Bulletin Reference Number 26-448DOIT-TELEC-B-51674
Requesting Agency/University DoIT
Sole Source Justification Form - Part II Section I - General Information
Project Title i3 Broadband Scott Hall IRU Dark Fiber - No Cost
Vendor i3 Broadband
Initial Date of Procurement Bulletin Posting Apr 8, 2026
Was a Sole Source hearing held per 30 ILCS 500/20-25?
Yes - Complete Section II and III below (Section II will only be visible when this option is selected)
No - Section II not required, go to Section III below Section III - CPO Approval and Signature Required
Based on my review, I authorize the Agency/University to proceed in accordance with the published Notice referenced above.
Based upon my review, I authorize the Agency/University to proceed with the following Changes.
Based on my review, the Agency/University is not authorized to proceed with this sole source as presented and my recommendation is that it be cancelled.
Other
CPO Signature CPO Phone 217-622-1857
Printed Name Ellen H. Daley Date Apr 22, 2026
CPO E-mail Ellen.H.Daley@illinois.gov
Version 7.01 Page of Sole Source Justification Form - Part I Section I - General Information Will this Sole Source amend a Professional or Artistic Services contract?
If yes, what was the original contract value?
*Sole Source may not be used for amendments for Professional or Artistic Services if the amendment would increase the value by more than 5% of the initial award or extend the term by more than 60 days.
Section II - Proposed Term If a Term Contract, does the term, including renewals, exceed 12 months?
If yes, provide a detailed justification including any economic benefit received for agreeing to a multi-year term:
Section III - Funding Source Select the type of funding to be used (Check all that apply):
Section IV - Sole Source Justification Are there secondary justification(s) for this sole source?
Section V - Purchase History Has the Agency or University Purchased these supplies or services in the past?
Term Term From Term To Value Description Contract Number Type Section VI - Business Rationale
1. Provide a detailed explanation of the need for the supplies or services:
2. Provide a list and describe in detail the specifications required to satisfy the need:
3. Provide detail explaining the justification selected in Section IV to explain why the requested supplies or services are the only ones available that can satisfy the agency or university requirements?
4. What are the unique features of the supplies or services that are not available in any other product or by any other vendor? Provide specific quantifiable factors/qualifications:
5. Has the Agency or University considered alternative supplies or services to satisfy their need?
5a. If yes, name the alternative vendors whose supplies or services were evaluated:
5b. If yes, what were the alternatives for each vendor and why were they unacceptable? Be specific with regard to features, characteristics, requirements, capabilities and compatibility:
5c. Explain how the market evaluation was conducted?
*This evaluation is to determine available options within a market. If the evaluation is to determine quality or best suited option, this is not the appropriate source selection. Under no circumstances shall the evaluation consist of testing alternative options. These activities must be conducted in a competitive transparent environment (i.e. IFB or RFP).
5a. If no, why weren't alternatives evaluated?
6. Are there resellers or distributors?
7. What efforts were made to get the best possible price (i.e. did the agency/university negotiate) and how did you determine the price for this purchase is considered fair and reasonable?
8. Will this purchase obligate the State to this vendor for future purchases such as maintenance, licensing or continuing need?
8a. If yes, please provide details regarding future obligations and/or needs:
9. What will be the financial or other impact to the State if this sole source is not approved and a competitive bid is required?
10. Is there any additional information you would like to add to justify this sole source?
Section VII Requesting Department Signature Required I know and understand the contents of this Sole Source Justification and attest that all statements are true and correct and the fairness and reasonableness of the price was adequately confirmed.
State Agency Bureau/Division Head or University Purchasing Director Approval and Signature Required I know and understand the contents of this Sole Source Justification and attest that all statements are true and correct and the fairness and reasonableness of the price was adequately confirmed. (All prior form fields will lock once this e-signature is completed) SPO Approval and Signature Required Sole Source Justification Form - Part II Section I - General Information Was a Sole Source hearing held per 30 ILCS 500/20-25?
Section II - Sole Source Hearing Details The State posted to the Illinois Procurement Bulletin a description of the State's need, the justification for the sole source decision, and information regarding the opportunity to submit comments and testify at a public hearing. Notice of the hearing was also posted outside of the hearing room 48 hours prior to the hearing.
The public hearing was conducted for the purpose of receiving testimony regarding the sole source determination. The Hearing Officer recommends the following:
The following relevant documents are attached:
Section III - CPO Approval and Signature Required 9.0.0.2.20101008.1.734229 Ellen.H.Daley@illinois.gov
| BulletinNum: 26-448DOIT-TELEC-B-51674 |
| Requesting: DoIT |
| CurrentPage: |
| PageCount: |
| Department: ICN-WAN Backbone Services - Network Services - DOIT |
| NeedIdentifiedDate: 2026-03-01 |
| NeedbyDate: 2026-04-30 |
| ProjectTitle: i3 Broadband Scott Hall IRU Dark Fiber - No Cost |
| ProjectTitle: i3 Broadband Scott Hall IRU Dark Fiber - No Cost |
| Vendor: i3 Broadband |
| Vendor: i3 Broadband |
| Description: Network Backbone services supporting the Champaign/Kankakee/Chicago area POP Sites and ILA sites. This allows for backbone connectivity related to POP to POP and POP to ILA communications. This supports ALL network services to and through the Champaign and Chicago Illinois area. |
| ValueIs: Actual |
| ValueofInitialTerm: 461319.81000000 |
| P-Ayes: |
| P-Ano: |
| P-AValue: |
| ThisIsA: New Sole Economically Feasible Source |
| One-Time: |
| Term: |
| BeginDate: 4/30/2026 |
| EndDate: 7/14/2034 |
| NumberofRenewals: 0.00000000 |
| RenewalLength: 0.00000000 |
| RenewalValue: 0.00000000 |
| ExceedingYes: |
| ExceedingNo: |
| TextField3: The Agency is entering into a reciprocal No Cost agreement with i3 Broadband. |
| StateFunds: 1 |
| FederalFunds: 0 |
| FundingOther: 0 |
| TextField4: UC2B/IGA /IRU |
| DropDownList1: Compatibility of Equipment, Accessories, Replacement Parts or Service |
| DropDownList1: This fiber is the only fiber available on the path as described above, this path is also currently operational, representing a significant investment and partnership through the ARRA BTOP Federal Grant. |
| DropDownList1: Sole Source |
| Justify: |
| PastYes: |
| PastNo: |
| DateTimeField20: 2014-07-15 |
| DateTimeField19: 2024-07-14 |
| NumericField8: 515520.00000000 |
| TextField5: |
| DateTimeField18: |
| DateTimeField17: |
| NumericField9: |
| TextField10: |
| TextField11: |
| DateTimeField16: |
| DateTimeField15: |
| NumericField10: |
| TextField16: |
| TextField17: |
| DateTimeField14: |
| DateTimeField13: |
| NumericField11: |
| TextField22: |
| TextField23: |
| DateTimeField12: |
| DateTimeField11: |
| NumericField12: |
| TextField28: |
| TextField29: |
| DateTimeField10: |
| DateTimeField9: |
| NumericField13: |
| TextField34: |
| TextField35: |
| DateTimeField8: |
| DateTimeField7: |
| NumericField14: |
| TextField40: |
| TextField41: |
| DateTimeField6: |
| DateTimeField5: |
| NumericField15: |
| TextField46: |
| TextField47: |
| DateTimeField4: 2026-04-07 |
| DateTimeField4: 2026-04-07 |
| DateTimeField3: |
| NumericField16: |
| TextField52: |
| TextField53: |
| DateTimeField2: |
| DateTimeField1: |
| NumericField17: |
| TextField58: |
| TextField59: |
| IfMoreThan10: |
| Q1Answer: This allows for backbone connectivity related to POP to POP and POP to ILA communications. This supports ALL network services to and through the Chicago and Champaign Illinois area. |
| Q2Answer: The Illinois Department of Innovation and Technology (DoIT), Networks Division, has a critical need for the fiber route services provided by i3 Broadband to ensure continued, reliable network connectivity for State operations and affiliated institutions. These fiber routes are essential for maintaining high-speed, redundant, and secure data transport across key locations, including Champaign/Kankakee/Chicago area POP Sites and ILA sites. The services are required to support government communications infrastructure, facilitate data exchange between State offices. |
Pricing Table. Includes reference number from reciprocal contract to determine "cost difference".
Reciprocal Contract Value (DoIT) Description Mile Maintenance #Fiber Strand Mile Fiber Maintenance Annual Maintenance Term Cost I-57 & Olympian 136.50 NA 2 273.00 NA NA NA to Cermak I-57 & Bradley 139.65 139.65 2 279.30 $398.00 $55,580.70 $461,319.81 to Cermak Total $55,580.70 $461,319.81
Contract Value (i3 Broadband - @Scott Hall) Description Mile Maintenance #Fiber Strand Mile Maintenance Annual Maintenance Term Cost I-57 North Ring #1 17.38 17.38 4 69.52 $459.47 $7,985.59 $66,280.39 I-57 & Olympian I-74 West Ring #1 17.38 NA 4 69.52 NA NA NA I-57 & Olympian I-72 West Ring #2 17.59 17.59 4 70.36 $459.47 $8,082.08 $67,081.24 I-57 & Bradley I-57 South Ring #2 17.59 NA 4 70.36 NA NA NA I-57 & Bradley I-74 East Ring #6 15.98 15.98 4 63.92 $459.47 $7,342.33 $60,941.34 Rt 150 & High Cross Total $23,410.00 $194,302.97
Ancillary Services Other Services Detail Quantity Monthly Cost Annual Cost Term Cost Layer Two Transport to Three Locations 3 $240.00 $8,640.00 $69.120.00 (313 Mattis-HCFS), SOS on Bradley, IDOT on Market Street)
Reciprocal Agreement Cost: $55,580.70 i3 Broadband Agreement Cost: $23,410.00 Cost Difference - i3 Broadband Pays $32,170.70
| Q3Answer: This fiber is the only fiber available on the path as described above. Staff came to this determination based on building review, area review and consulted with fiber operator. As well as in current contract with vendor for other IRU locations, would like all contracts with said vendor to end together. |
| Q4Answer: Fiber infrastructure is existing infrastructure that the state can use to satisfy its data / connectivity needs to Agencies, K12 and Higher Education. The connection points required include the I-57 & Olympia to 350 E Cermak in Chicago. Creating a new path would require 50.95 miles of fiber at a value of $6,114,000.00 of infrastructure/fiber optic investments based on average cost $120K per mile for building in a densely populated urban environment. |
| altYes: |
| altNo: |
| Q5aAnswer: In review of fiber routes in Illinois, the Agency has determined that are no vendors available with the same footprint. |
| Q5bAnswer: In review of fiber routes in Illinois, the Agency has determined that are no vendors available with the same footprint. |
| Q5cAnswer: Based on current and past contracts with the State and quotes for similar services (IRU), the Agency determined there are no vendors with the same footprint. The Staff came to this determination based on building review, area review and consulted with fiber operator as well as in current contract with vendor for other IRU locations. |
| Q6Yes: |
| Q6No: |
| Q6NA: |
| Q7Answer: Agency used vendors public pricing model including historic pricing in previous and current IRU's, which also matches the State's model for IRU services. The Agency has negotiated a No Cost IRU arrangement with i3 Broadband which resulted in the State saving $181,646.94. |
| Q8y: |
| Q8n: |
| Q8aAnswer: Maintenance for fiber is baked in to this contract. |
| Q9Answer: The most significant impact would be a loss of service in the Champaign/Kankakee/Chicago area POP Sites and ILA sites which would affect the Network services across the State. If the Agency was required to competitively bid this procurement it would cost the State $869,006.94 as opposed to the No Cost arrangement contained herein. |
| Q10Answer: Currently in a 20-year term contract with vendor, and would like to continue this contract with said vendor in order for all contracts to end at the same time as well as maintain the No Cost arrangement within this agreement. |
| SignatureField1: |
| TextField63: Patrick Kelleher |
| TextField63: patrick.kelleher@illinois.gov |
| TextField63: christopher.brinkmeyer@illinois.gov |
| TextField63: Chris Brinkmeyer |
| TextField64: 217-557-7303 |
| TextField65: 217-524-7057 |
| Approve: |
| denied: |
| Comments: |
| Phone: 217-720-6643 |
| Date: 2026-04-08 |
| Date: 2026-04-22 |
| PN: David Papp |
| Email: David.Papp@Illinois.gov |
| InitialPostingDate: 2026-04-08 |
| HearingYes: |
| HearingNo: |
| HearingDate: |
| HearingTime: |
| HearingLocation: |
| No: 0 |
| Members: 0 |
| recommends: |
| WrittenComments: 0 |
| DecisionMemo: 0 |
| HearingMinutes: 0 |
| Other: 0 |
| OtherComments: |
| HearingOfficerSignature: |
| Authorize: |
| AuthorizeWChanges: |
| Cancel: |
| CPOComments: |
| CPOSignature: |
| CPOTelephone: 217-622-1857 |
| CPOPrintedName: Ellen H. Daley |
| CPOEmail: |
File details come from the government source that posted it. Updated .