Bid_Pricing_Schedule.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
SEKI - Rehab Cedar Grove Water System Federal contract opportunity
Solicitation number
P17PS00749
Issued by
Department of the Interior National Park Service

About this file

Contract Bid Schedule Sec J 001

View the file

Other files for this federal contract opportunity

Other files attached to SEKI - Rehab Cedar Grove Water System, newest first.
File Type Posted
P17PS00749_General_References.docx DOCX document
A06_-_CG_WS_-_DRAWINGS.pdf PDF
P17PS00749_Key_Personnel_Qualifications.docx DOCX document
SF_24_Bid_Bond.pdf PDF
Past_Performance_Quesionnaire.docx DOCX document
P17PS00749_Subcontractor_Reference.docx DOCX document
SEKI_203630_-_Directions_to_Site_Visit.pdf PDF
B03_-_DOL_Wage.pdf PDF
Sol_P17PS00749.pdf PDF
A06_-_Specifications.pdf PDF
B01_-_PRESOLICITATION_NOTICE.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Price Schedule

SECTION 00 41 00 - CONTRACT BID SCHEDULE
SOLICITATION NUMBER: P17PS00749
PARK - PMIS: 203630
DEVELOPED AREA: Cedar Grove
PROJECT TITLE: Rehabilitate Cedar Grove Water System for Reliable Potable and Fire Source
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBERCONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Mobilization and Demobilization1L.S.$ - 0
2Install New Slow Sand Filter Steel Shelter1L.S.$ - 0
3Install Two New Slow Sand Filters1L.S.$ - 0
4Connect Existing Raw Water Pipe to Slow Sand Filters1L.S.$ - 0
5New Filtered Water Piping to Water Treatment Building1L.S.$ - 0
6New Drain Piping from Slow Sand Filters1L.S.$ - 0
7Replace Existing Filtered Water Flow Meter1L.S.$ - 0
8Modify Treatment Building Piping1L.S.$ - 0
9Install New SCADA System UPS1Ea.$ - 0
10Upgrade SCADA Programming1L.S.$ - 0
11System Startup & Commissioning1L.S.$ - 0
12Demolish Aboveground Plastic Piping375L.F.$ - 0
TOTAL BASE PRICE (Contract Line Item Number 1 through 12) ------------------------------------$ - 0
13OPTION A, Demolish Ex. Slow Sand Filters and Control Tanks1L.S.$ - 0
14OPTION B, Miscellaneous Pipe Disposal1L.S.$ - 0
15OPTION C, Furnish New Intake Screens and Replace Area Access Gate1L.S.$ - 0
16OPTION D, Reprogram SCADA to Run Well 2 Only in Generator Mode1L.S.$ - 0
17OPTION E, Deduct for Park Housing Availability1L.S.$ - 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 13 through 17) ------------------------------------$ - 0
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 17) -----------$ - 0
All measurement and payment information is included in the project specifications, Section 01 27 00.

SEKI - PMIS 203630

CPS - &P